Semua | Belum e-Kontrak | Belum Penilaian Kinerja | Selesai | |||||
---|---|---|---|---|---|---|---|---|
Jenis | Paket | Pagu | Paket | Pagu | Paket | Pagu | Paket | Pagu |
Tender | 199 | 738.526.885.745 | 198 | 737.199.967.745 | 199 | 738.526.885.745 | 0 | 0 |
Seleksi | 116 | 59.386.137.674 | 115 | 59.146.137.674 | 116 | 59.386.137.674 | 0 | 0 |
Tender Cepat | 34 | 33.638.615.000 | 34 | 33.638.615.000 | 34 | 33.638.615.000 | 0 | 0 |
Total | 349 | 831.551.638.419 | 347 | 829.984.720.419 | 349 | 831.551.638.419 | 0 | 0 |
Persentase | 99.43 % | 100 % | 0 % |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 2018 | BADAN PENGELOLAAN KEUANGAN DAN ASET DAERAH | Belanja Jasa Pembongkaran Gedung Kantor | Tender | Pekerjaan Konstruksi | 3329181 | 14054140 | APBD | 2,100,000,000 | 2,056,037,500 | 1,678,137,807 | 1,678,137,807 | 1,678,137,807 | 0 | 0 | 0 | 2017-12-06 12:30:00 | 2017-12-21 | 01.815.248.8-732.000 | CV. ADIL MAKMUR | 421,862,193 | 20.09 % | ||||
2 | 2018 | SEKRETARIAT DPRD | Pengadaan Jasa Keamanan Kantor (Satpam) | Tender | Jasa Lainnya | 3335181 | 14290691 | APBD | 1,513,950,000 | 1,387,989,001 | 1,369,000,000 | 1,369,000,000 | 1,369,000,000 | 0 | 0 | 0 | 2018-01-23 16:00:00 | 2018-01-31 | 73.446.568.5-731.000 | PT. Multi Guna Tiga Prima | 144,950,000 | 9.57 % | ||||
3 | 2018 | RUMAH SAKIT UMUM DAERAH ULIN BANJARMASIN | Manajemen Konstruksi Gedung CSSD/Laundry Rumah Sakit | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3340181 | 14898376 | APBD | 265,098,106 | 263,007,800 | 210,060,400 | 210,060,400 | 210,060,400 | 0 | 0 | 0 | 2018-01-22 15:00:00 | 2018-02-27 | 01.860.230.0-731.000 | CV PRAKTIRA KONSULTAN | 55,037,706 | 20.76 % | ||||
4 | 2018 | BIRO PERLENGKAPAN DAN LAYANAN PENGADAAN BARANG JASA SETDA PROVINSI KALSEL | Belanja Modal Pengadaan Alat-alat Angkutan Darat Bermotor Jeep | Tender | Pengadaan Barang | 3341181 | 14886752 | APBD | 4,600,000,000 | 4,557,499,980 | 4,449,540,000 | 4,449,540,000 | 4,449,540,000 | 0 | 0 | 0 | 2018-01-25 10:00:00 | 2018-02-07 | 01.302.584.6-092.000 | PT ASTRA INTERNATIONAL Tbk | 150,460,000 | 3.27 % | ||||
5 | 2018 | DINAS PARIWISATA | Kain Sasirangan | Tender | Pengadaan Barang | 3342181 | 15039139;15065223;15275534 | APBD | 465,000,000 | 464,999,535 | 429,660,000 | 429,660,000 | 429,660,000 | 0 | 0 | 0 | 2018-01-23 12:00:00 | 2018-02-06 | 03.094.314.6-732.000 | CV. WIRA MUDA MANDIRI | 35,340,000 | 7.6 % | ||||
6 | 2018 | SEKRETARIAT DPRD | Pengadaan Jasa Kebersihan Kantor (Cleaning Service) | Tender | Jasa Lainnya | 3348181 | 14291177 | APBD | 1,167,868,000 | 972,874,000 | 800,000,000 | 800,000,000 | 800,000,000 | 0 | 0 | 0 | 2018-01-26 08:00:00 | 2018-02-08 | 03.221.475.1-735.000 | PT YASMINE BUIH PERSADA | 367,868,000 | 31.5 % | ||||
7 | 2018 | RUMAH SAKIT JIWA SAMBANG LIHUM | Belanja Makanan dan Minuman Pasien | Tender | Pengadaan Barang | 3352181 | 15472085 | APBD | 4,807,650,000 | 4,807,636,400 | 4,343,544,960 | 4,343,544,960 | 4,343,544,960 | 0 | 0 | 0 | 2018-02-11 10:00:00 | 2018-02-23 | 72.029.256.4-731.000 | Cv. Hasanul Bashri | 464,105,040 | 9.65 % | ||||
8 | 2018 | BIRO UMUM | Belanja Pemeliharaan Bangunan Gedung Kantor | Tender | Jasa Lainnya | 3355181 | 14841154 | APBD | 2,149,200,000 | 1,800,478,932 | 1,621,611,005 | 1,621,611,005 | 1,621,611,005 | 0 | 0 | 0 | 2018-02-05 14:00:00 | 2018-02-20 | 74.601.733.4-432.000 | PT. ARINA TAMA PERSADA | 527,588,995 | 24.55 % | ||||
9 | 2018 | RUMAH SAKIT JIWA SAMBANG LIHUM | Belanja Obat Non E-Katalog | Tender | Pengadaan Barang | 3356181 | 15430837 | APBD | 1,212,527,718 | 1,160,643,541 | 105,063,420 | 105,063,420 | 105,063,420 | 0 | 0 | 0 | 2018-02-05 14:00:00 | 2018-02-24 | 01.061.248.9-051.000 | Rajawali Nusindo | 1,107,464,298 | 91.34 % | ||||
10 | 2018 | DINAS SOSIAL | Pengadaan Bantuan Sosial Barang Kegiatan Pemenuhan Kebutuhan Pangan Fakir Miskin Perkotaan | Tender | Pengadaan Barang | 3405181 | 15755832 | APBD | 1,136,000,000 | 1,136,000,000 | 1,079,591,920 | 1,079,591,920 | 1,079,591,920 | 0 | 0 | 0 | 2018-02-14 10:00:00 | 2018-03-08 | 02.489.908.0-731.000 | CV. GIZA EMERALD | 56,408,080 | 4.97 % | ||||
11 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Batulicin - Mekarsari - Mentewe | Tender | Pekerjaan Konstruksi | 3408181 | 14823154 | APBD | 34,396,755,000 | 34,396,755,000 | 33,812,113,294 | 33,812,113,294 | 33,812,113,294 | 0 | 0 | 0 | 2018-02-27 11:00:00 | 2018-04-02 | 03.169.298.1-734.000 | PT.BATULICIN BETON ASPHALT | 584,641,706 | 1.7 % | ||||
12 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Lingkar Binuang | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3409181 | 14822718 | APBD | 350,000,000 | 346,390,000 | 294,096,000 | 294,096,000 | 294,096,000 | 0 | 0 | 0 | 2018-02-27 10:50:00 | 2018-04-16 | 01.489.654.2-711.000 | PT.TEMA KARYA MANDIRI | 55,904,000 | 15.97 % | ||||
13 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Anjir Pasar - Marabahan | Tender | Pekerjaan Konstruksi | 3410181 | 14821819 | APBD | 24,546,755,000 | 24,546,755,000 | 23,689,070,581 | 23,689,070,581 | 23,689,070,581 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-16 | 03.265.981.5-731.000 | PT. Pandji Pratama Indonesia | 857,684,419 | 3.49 % | ||||
14 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Angsana | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3411181 | 14822267 | APBD | 350,000,000 | 346,390,000 | 337,260,000 | 337,260,000 | 337,260,000 | 0 | 0 | 0 | 2018-02-27 10:50:00 | 2018-04-16 | 95.412.417.8-731.000 | PT. Prisma Jasa Konsulindo | 12,740,000 | 3.64 % | ||||
15 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Rantau - Muara Muning Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3412181 | 14822863 | APBD | 450,000,000 | 443,850,000 | 419,815,000 | 419,815,000 | 419,815,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-17 | 02.531.704.1-731.000 | CV. FIAZTA MATRIX CONSULTANT | 30,185,000 | 6.71 % | ||||
16 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Rantau - Muara Muning | Tender | Pekerjaan Konstruksi | 3413181 | 14820451 | APBD | 4,467,471,000 | 4,467,465,000 | 3,911,156,404 | 3,911,156,404 | 3,911,156,404 | 0 | 0 | 0 | 2018-02-27 10:50:00 | 2018-04-17 | 80.203.029.6-731.000 | PT. WAJI PUTERA KARYA MANDIRI | 556,314,596 | 12.45 % | ||||
17 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Angsana | Tender | Pekerjaan Konstruksi | 3415181 | 14819063 | APBD | 4,567,471,000 | 4,567,471,000 | 4,325,315,880 | 4,325,315,880 | 4,325,315,880 | 0 | 0 | 0 | 2018-02-27 11:00:00 | 2018-04-19 | 02.216.301.8-734.000 | PT. Arta Cipta Permata | 242,155,120 | 5.3 % | ||||
18 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Pandahan - Margasari dan Penyelesaian Pile Slab | Tender | Pekerjaan Konstruksi | 3416181 | 14820217 | APBD | 4,906,505,000 | 4,906,495,000 | 4,270,910,613 | 4,270,910,613 | 4,270,910,613 | 0 | 0 | 0 | 2018-02-27 10:50:00 | 2018-04-13 | 02.237.343.5-733.000 | PT.Bina Bangun Banua Bersama | 635,594,387 | 12.95 % | ||||
19 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Lingkar Binuang | Tender | Pekerjaan Konstruksi | 3417181 | 14820107 | APBD | 4,567,471,000 | 4,567,471,000 | 4,322,129,000 | 4,322,129,000 | 4,322,129,000 | 0 | 0 | 0 | 2018-02-27 10:50:00 | 2018-04-13 | 01.137.511.0-731.000 | PT. SAMA SENTRAL SWA SEMBADA | 245,342,000 | 5.37 % | ||||
20 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Kasturi - Jalan Akses Bandara - Jalan Lingkar Utara Banjarbaru(Paket II) | Tender | Pekerjaan Konstruksi | 3418181 | 14818611 | APBD | 11,465,000,000 | 11,465,000,000 | 9,683,749,950 | 9,683,749,950 | 9,683,749,950 | 0 | 0 | 0 | 2018-02-27 11:00:00 | 2018-04-13 | 02.172.893.6-731.000 | PT IRINA PERKASA | 1,781,250,050 | 15.54 % | ||||
21 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Dahai - Tanjung | Tender | Pekerjaan Konstruksi | 3420181 | 14819498 | APBD | 4,906,505,000 | 4,906,505,000 | 4,651,671,930 | 4,651,671,930 | 4,651,671,930 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-02 | 02.746.857.8-735.000 | PT. Sinar Mahaputera Mandaga Bakti | 254,833,070 | 5.19 % | ||||
22 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Amuntai - Lampihong - Paringin | Tender | Pekerjaan Konstruksi | 3421181 | 14818966 | APBD | 4,906,505,000 | 4,906,505,000 | 4,639,595,545 | 4,639,595,545 | 4,639,595,545 | 0 | 0 | 0 | 2018-02-27 10:50:00 | 2018-04-17 | 01.124.238.5-735.000 | PT. ULIN SUBUR | 266,909,455 | 5.44 % | ||||
23 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan dan Jembatan Batulicin-Mentewe (DAK) | Tender | Pekerjaan Konstruksi | 3422181 | 15148955 | APBD | 11,130,000,000 | 11,130,000,000 | 10,848,356,660 | 10,848,356,660 | 10,848,356,660 | 0 | 0 | 0 | 2018-02-27 11:00:00 | 2018-04-13 | 03.169.298.1-734.000 | PT.BATULICIN BETON ASPHALT | 281,643,340 | 2.53 % | ||||
24 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Poros, Lingkungan Perkantoran Prov. Kalsel | Tender | Pekerjaan Konstruksi | 3423181 | 14820351 | APBD | 6,972,525,000 | 6,972,525,000 | 6,610,065,823 | 6,610,065,823 | 6,610,065,823 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-02 | 31.635.224.4-731.000 | PT. MULTI USAHA PEMBANGUNAN | 362,459,177 | 5.2 % | ||||
25 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Trikora | Tender | Pekerjaan Konstruksi | 3424181 | 14820658 | APBD | 4,974,750,000 | 4,974,750,000 | 4,725,257,000 | 4,725,257,000 | 4,725,257,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-16 | 01.222.209.7-731.000 | PT. PERDANA PANSELLA | 249,493,000 | 5.02 % | ||||
26 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Banjang - Pulau Nyiur - Batumandi | Tender | Pekerjaan Konstruksi | 3425181 | 14819294 | APBD | 4,467,471,000 | 4,467,471,000 | 3,870,342,459 | 3,870,342,459 | 3,870,342,459 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-05-18 | 73.271.215.3-733.000 | PT. KARYA ANNISA GEMILANG | 597,128,541 | 13.37 % | ||||
27 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Banjang - Pulau Nyiur - Batumandi Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3426181 | 14822408 | APBD | 450,000,000 | 396,330,000 | 380,000,500 | 380,000,500 | 380,000,500 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-17 | 02.531.483.2-731.000 | MANDIRI cipta PRATAMA | 69,999,500 | 15.56 % | ||||
28 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan dan Jembatan Lumpangi - Loksado | Tender | Pekerjaan Konstruksi | 3427181 | 14820801 | APBD | 6,554,280,000 | 6,554,280,000 | 6,059,052,350 | 6,059,052,350 | 6,059,052,350 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-18 | 02.014.742.7-714.000 | PT. RAHMAT AGUNG UTAMA | 495,227,650 | 7.56 % | ||||
29 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Birayang - Tariwin - Lok Batu - Batumandi | Tender | Pekerjaan Konstruksi | 3428181 | 14819454 | APBD | 5,554,280,000 | 5,554,280,000 | 4,858,205,000 | 4,858,205,000 | 4,858,205,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-13 | 01.124.058.7-733.000 | AIRA DUTA MURAKATA. PT | 696,075,000 | 12.53 % | ||||
30 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Guntung - Panaitan - Lampihong | Tender | Pekerjaan Konstruksi | 3429181 | 14819806 | APBD | 4,906,505,000 | 4,906,505,000 | 4,659,645,137 | 4,659,645,137 | 4,659,645,137 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-16 | 01.124.098.3-735.000 | PT. CAHAYA MENTARI | 246,859,863 | 5.03 % | ||||
31 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Tanjung - Muara Uya | Tender | Pekerjaan Konstruksi | 3430181 | 14820593 | APBD | 6,454,280,000 | 6,454,280,000 | 5,808,114,242 | 5,808,114,242 | 5,808,114,242 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-02 | 02.590.754.4-735.000 | PT. TABALONG JAYA MARGA BERSAMA | 646,165,758 | 10.01 % | ||||
32 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Banjarbaru - Simpang 3 Tahura - Aranio | Tender | Pekerjaan Konstruksi | 3432181 | 14819355 | APBD | 5,522,525,000 | 5,522,525,000 | 5,097,062,906 | 5,097,062,906 | 5,097,062,906 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-02 | 31.704.295.0-732.000 | PT. KELANA MULTI KONSTRUKSI | 425,462,094 | 7.7 % | ||||
33 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Dalam Kota Banjarmasin | Tender | Pekerjaan Konstruksi | 3433181 | 14819539 | APBD | 4,974,750,000 | 4,974,750,000 | 4,774,925,149 | 4,774,925,149 | 4,774,925,149 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-16 | 01.424.331.5-732.000 | PT. JATI BARU | 199,824,851 | 4.02 % | ||||
34 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Kiram - Simpang 3 Tahura - Mandiangin | Tender | Pekerjaan Konstruksi | 3434181 | 14820050 | APBD | 4,974,750,000 | 4,974,750,000 | 4,872,898,891 | 4,872,898,891 | 4,872,898,891 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-16 | 03.018.148.1-732.000 | PT. ADJI PERKASA | 101,851,109 | 2.05 % | ||||
35 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Gambut - Pulau Sari | Tender | Pekerjaan Konstruksi | 3435181 | 14819632 | APBD | 4,524,750,000 | 4,524,750,000 | 4,365,176,985 | 4,365,176,985 | 4,365,176,985 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-16 | 01.137.533.4-731.000 | PT. PUTRA KANCA | 159,573,015 | 3.53 % | ||||
36 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Tanjung Serdang - Lontar | Tender | Pekerjaan Konstruksi | 3436181 | 14820534 | APBD | 4,903,925,000 | 4,903,925,000 | 4,847,744,000 | 4,847,744,000 | 4,847,744,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-13 | 02.216.301.8-734.000 | PT. Arta Cipta Permata | 56,181,000 | 1.15 % | ||||
37 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Paringin - Halong | Tender | Pekerjaan Konstruksi | 3437181 | 14820304 | APBD | 6,454,280,000 | 6,454,280,000 | 6,187,609,759 | 6,187,609,759 | 6,187,609,759 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-24 | 01.124.098.3-735.000 | PT. CAHAYA MENTARI | 266,670,241 | 4.13 % | ||||
38 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Kandangan - Negara | Tender | Pekerjaan Konstruksi | 3438181 | 14819866 | APBD | 5,404,280,000 | 5,404,000,000 | 4,917,636,279 | 4,917,636,279 | 4,917,636,279 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-13 | 01.124.396.1-733.000 | PT. KARYA MAWAR LESTARI | 486,643,721 | 9 % | ||||
39 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Simpang 3 Lingkar Utara - Simpang 3 Jalan Golf - Jalan Kasturi (Paket I) | Tender | Pekerjaan Konstruksi | 3439181 | 14818665 | APBD | 11,015,000,000 | 11,015,000,000 | 10,090,308,687 | 10,090,308,687 | 10,090,308,687 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-19 | 01.124.946.3-731.000 | PT. ADIMANUNGGAL CIPTA PADUNUSA | 924,691,313 | 8.39 % | ||||
40 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan dan Jembatan Pelaihari-Batakan (DAK) | Tender | Pekerjaan Konstruksi | 3441181 | 15149206 | APBD | 9,700,000,000 | 9,700,000,000 | 8,696,700,000 | 8,696,700,000 | 8,696,700,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-13 | 01.141.578.3-732.000 | PT. SARANA DOA BERSAMA | 1,003,300,000 | 10.34 % | ||||
41 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Pelaihari - Batakan | Tender | Pekerjaan Konstruksi | 3442181 | 14822007 | APBD | 9,454,280,000 | 9,454,280,000 | 9,020,605,059 | 9,020,605,059 | 9,020,605,059 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-13 | 01.322.015.7-009.000 | PT. JOGLO MULTI AYU | 433,674,941 | 4.59 % | ||||
42 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Golf Banjarbaru | Tender | Pekerjaan Konstruksi | 3443181 | 14819742 | APBD | 6,522,525,000 | 6,522,525,000 | 5,782,218,261 | 5,782,218,261 | 5,782,218,261 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-16 | 01.434.922.9-731.000 | PT. MERCU JAYA BUANA | 740,306,739 | 11.35 % | ||||
43 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Simpang 4 Gatot Subroto - Lingkar Dalam Selatan | Tender | Pekerjaan Konstruksi | 3444181 | 14818839 | APBD | 5,522,525,000 | 5,522,525,000 | 4,752,361,474 | 4,752,361,474 | 4,752,361,474 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-17 | 72.196.664.6-731.000 | BIMO LAKSANA GROUP | 770,163,526 | 13.95 % | ||||
44 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Birayang - Tariwin - Lok Batu - Batumandi | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3445181 | 14822528 | APBD | 350,000,000 | 348,040,000 | 336,105,000 | 336,105,000 | 336,105,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-17 | 02.090.318.3-731.000 | CV. Inditec Consultant | 13,895,000 | 3.97 % | ||||
45 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Negara - Muara Tapus | Tender | Pekerjaan Konstruksi | 3446181 | 14820134 | APBD | 5,904,280,000 | 5,904,280,000 | 5,606,756,728 | 5,606,756,728 | 5,606,756,728 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-16 | 01.134.056.9-733.000 | PT. ASIA TIMUR KONSTRUKSI | 297,523,272 | 5.04 % | ||||
46 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Gunung Kupang - Kiram - Tambang Ulang | Tender | Pekerjaan Konstruksi | 3447181 | 14818515 | APBD | 14,515,000,000 | 14,515,000,000 | 14,199,402,386 | 14,199,402,386 | 14,199,402,386 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-13 | 70.694.710.8-732.000 | PT.TANJUNG RAYA BERSAMA | 315,597,614 | 2.17 % | ||||
47 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Banjarmasin - Martapura | Tender | Pekerjaan Konstruksi | 3448181 | 14819422 | APBD | 5,972,525,000 | 5,972,525,000 | 5,702,383,679 | 5,702,383,679 | 5,702,383,679 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-16 | 01.133.868.8-731.000 | PT. HM Taher | 270,141,321 | 4.52 % | ||||
48 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Anjir Pasar - Marabahan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3449181 | 14822318 | APBD | 350,000,000 | 348,040,000 | 337,865,000 | 337,865,000 | 337,865,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-17 | 01.854.518.6-711.000 | CV. KARYA PERDANA KONSULTAN | 12,135,000 | 3.47 % | ||||
49 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan dan Jembatan Lumpangi - Loksado | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3450181 | 14823056 | APBD | 350,000,000 | 349,855,000 | 339,350,000 | 339,350,000 | 339,350,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-17 | 76.010.632.8-711.000 | PT Prakarsa Desain Konsultan | 10,650,000 | 3.04 % | ||||
50 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Simpang 3 Lingkar Utara - Simpang 3 Jalan Golf - Jalan Kasturi (Paket I) Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3451181 | 14822117 | APBD | 450,000,000 | 435,380,000 | 432,320,000 | 432,320,000 | 432,320,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-17 | 01.879.315.8-731.000 | CV. ADIHANMAN TATA RANCANG | 17,680,000 | 3.93 % | ||||
51 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Kandangan - Negara Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3452181 | 14822655 | APBD | 500,000,000 | 498,080,000 | 476,790,000 | 476,790,000 | 476,790,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-17 | 02.708.931.7-731.000 | CV. DIAN MITRA TEKNIKA | 23,210,000 | 4.64 % | ||||
52 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Gunung Kupang - Kiram - Tambang Ulang Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3453181 | 14822039 | APBD | 450,000,000 | 430,100,000 | 415,360,000 | 415,360,000 | 415,360,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-17 | 02.050.569.9-731.000 | CV. Dharma Cipta Pratama | 34,640,000 | 7.7 % | ||||
53 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Simpang 4 Gatot Subroto - Lingkar Dalam Selatan Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3454181 | 14822177 | APBD | 450,000,000 | 377,520,000 | 350,070,000 | 350,070,000 | 350,070,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-17 | 02.050.569.9-731.000 | CV. Dharma Cipta Pratama | 99,930,000 | 22.21 % | ||||
54 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Batulicin - Mekarsari - Mentewe Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3455181 | 14822432 | APBD | 500,000,000 | 496,925,000 | 472,065,000 | 472,065,000 | 472,065,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-17 | 01.517.846.0-731.000 | PT. WINAYA KONTEKS KHARISMA | 27,935,000 | 5.59 % | ||||
55 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Tanjung - Muara Uya Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3456181 | 14822907 | APBD | 450,000,000 | 396,330,000 | 372,680,000 | 372,680,000 | 372,680,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-17 | 02.531.704.1-731.000 | CV. FIAZTA MATRIX CONSULTANT | 77,320,000 | 17.18 % | ||||
56 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Pelaihari - Batakan Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3457181 | 14822817 | APBD | 450,000,000 | 422,840,000 | 401,555,000 | 401,555,000 | 401,555,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-13 | 01.517.846.0-731.000 | PT. WINAYA KONTEKS KHARISMA | 48,445,000 | 10.77 % | ||||
57 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Banjarbaru - Simpang 3 Tahura - Aranio Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3458181 | 14822475 | APBD | 450,000,000 | 435,380,000 | 412,060,000 | 412,060,000 | 412,060,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-17 | 02.050.569.9-731.000 | CV. Dharma Cipta Pratama | 37,940,000 | 8.43 % | ||||
58 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Gambut - Pulau Sari Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3460181 | 14822554 | APBD | 450,000,000 | 377,520,000 | 353,485,000 | 353,485,000 | 353,485,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-13 | 80.562.640.5-731.000 | CV. RAMIER JAYA ARKANANTA | 96,515,000 | 21.45 % | ||||
59 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Jalan Bebas Hambatan Tol Banjarbaru - Batulicin | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3461181 | 14818573 | APBD | 4,898,725,000 | 4,892,578,000 | 4,525,469,300 | 4,525,469,300 | 4,525,469,300 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-17 | 01.124.766.5-731.000 | PT.WIRA WIDYATAMA | 373,255,700 | 7.62 % | ||||
60 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Paringin - Halong Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3462181 | 14822758 | APBD | 400,000,000 | 385,715,000 | 384,780,000 | 384,780,000 | 384,780,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-13 | 02.708.931.7-731.000 | CV. DIAN MITRA TEKNIKA | 15,220,000 | 3.81 % | ||||
61 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Golf Banjarbaru Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3463181 | 14822613 | APBD | 450,000,000 | 430,100,000 | 411,070,000 | 411,070,000 | 411,070,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-13 | 76.010.632.8-711.000 | PT Prakarsa Desain Konsultan | 38,930,000 | 8.65 % | ||||
62 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penyusunan Identifikasi dan Kajian Teknis Rumah Susun Kalimantan Selatan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3464181 | 14718658 | APBD | 482,000,000 | 481,946,190 | 400,125,000 | 400,125,000 | 400,125,000 | 0 | 0 | 0 | 2018-03-01 12:00:00 | 2018-03-29 | 01.548.564.2-424.000 | PT. Belaputera Interplan | 81,875,000 | 16.99 % | ||||
63 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penyusunan DED Kawasan Permukiman Kumuh Kewenangan Provinsi Kalimantan Selatan (Paket 5 : Kabupaten Hulu Sungai Tengah dan Kabupaten Hulu Sungai Utara) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3465181 | 17264619 | APBD | 200,000,000 | 199,498,640 | 198,385,000 | 198,385,000 | 198,385,000 | 0 | 0 | 0 | 2018-03-05 08:00:00 | 2018-03-27 | 03.242.995.3-731.000 | CV. DIGDAYA MAHARDIKA | 1,615,000 | 0.81 % | ||||
64 | 2018 | DINAS PERHUBUNGAN | Penyusunan Review Jaringan Trayek Angkutan Antar Kota Dalam Provinsi (AKDP) Tahap I ( Banua Anam ) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3466181 | 15284275 | APBD | 213,180,000 | 213,056,800 | 172,535,000 | 172,535,000 | 172,535,000 | 0 | 0 | 0 | 2018-03-12 08:00:00 | 2018-04-22 | 02.108.378.7-429.000 | PT. Munasa Kreasi Nusantara | 40,645,000 | 19.07 % | ||||
65 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penyusunan DED Kawasan Permukiman Kumuh Kewenangan Provinsi Kalimantan Selatan (Paket 2 : Kab. Tanah Bumbu dan Kabupaten Kotabaru) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3467181 | 17263826 | APBD | 200,000,000 | 199,498,640 | 197,670,000 | 197,670,000 | 197,670,000 | 0 | 0 | 0 | 2018-03-07 08:00:00 | 2018-03-24 | 02.215.319.1-732.000 | CV. POLA ARSITEK KONSULTAN | 2,330,000 | 1.17 % | ||||
66 | 2018 | RUMAH SAKIT UMUM DAERAH ULIN BANJARMASIN | Pengadaan/Pembangunan (Konstruksi) Gedung CSSD/Laundry | Tender | Pekerjaan Konstruksi | 3468181 | 14900889 | APBD | 13,807,193,000 | 13,801,915,463 | 12,360,000,366 | 12,360,000,366 | 12,360,000,366 | 0 | 0 | 0 | 2018-03-09 20:00:00 | 2018-04-17 | 02.467.598.5-722.000 | PT. NAURA LIBRA JAYA | 1,447,192,634 | 10.48 % | ||||
67 | 2018 | DINAS PERHUBUNGAN | Penyusunan Kebutuhan Kuota Angkutan Orang Provinsi Kalimantan Selatan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3471181 | 15284368 | APBD | 300,000,000 | 299,999,920 | 267,118,500 | 267,118,500 | 267,118,500 | 0 | 0 | 0 | 2018-03-07 08:00:00 | 2018-04-11 | 02.108.378.7-429.000 | PT. Munasa Kreasi Nusantara | 32,881,500 | 10.96 % | ||||
68 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penyusunan DED Kawasan Permukiman Kumuh Kewenangan Provinsi Kalimantan Selatan (Paket 1 : Kab. Barito Kuala, Kota Banjarmasin, Kota Banjarbaru) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3472181 | 17255427 | APBD | 200,000,000 | 199,498,772 | 195,442,500 | 195,442,500 | 195,442,500 | 0 | 0 | 0 | 2018-03-09 14:00:00 | 2018-03-26 | 01.984.994.2-429.000 | PT. GENTA PERTIWI KONSULTAN | 4,557,500 | 2.28 % | ||||
69 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Supervisi Pembangunan Daerah Irigasi Kinarum 1.004 Ha Kabupaten Tabalong | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3473181 | 14756085 | APBD | 700,000,000 | 699,996,000 | 682,467,000 | 682,467,000 | 682,467,000 | 0 | 0 | 0 | 2018-03-15 12:00:00 | 2018-05-11 | 02.172.574.2-731.000 | CV. ANDALUSIA | 17,533,000 | 2.5 % | ||||
70 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Survey Identifikasi dan Evaluasi Jaringan Tersier DI. Haruyan Dayak Kabupaten Hulu Sungai Tengah | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3475181 | 14759300 | APBD | 1,500,000,000 | 1,499,987,500 | 1,477,465,000 | 1,477,465,000 | 1,477,465,000 | 0 | 0 | 0 | 2018-03-15 10:00:00 | 2018-05-18 | 01.844.485.1-015.000 | PT INAKKO Internasional Konsulindo | 22,535,000 | 1.5 % | ||||
71 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Supervisi Pembangunan Embung Landasan Ulin Kota Banjarbaru | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3476181 | 14756347 | APBD | 200,000,000 | 199,000,000 | 191,100,000 | 191,100,000 | 191,100,000 | 0 | 0 | 0 | 2018-03-15 16:00:00 | 2018-04-16 | 02.531.704.1-731.000 | CV. FIAZTA MATRIX CONSULTANT | 8,900,000 | 4.45 % | ||||
72 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Rehabilitasi Jaringan Daerah Irigasi Rawa Tanggul Martapura Kabupaten Banjar | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3477181 | 14759484 | APBD | 1,000,000,000 | 999,949,500 | 990,000,000 | 990,000,000 | 990,000,000 | 0 | 0 | 0 | 2018-03-15 10:00:00 | 2018-05-18 | 01.469.763.5-428.000 | PT. VITRAHA CONSINDOTAMA | 10,000,000 | 1 % | ||||
73 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Outline Plan Penyediaan Air Baku Kab. Tanah Laut, Kab. Tanah Bumbu dan Kab. Kota Baru | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3478181 | 14759648 | APBD | 1,500,000,000 | 1,499,999,600 | 1,474,000,000 | 1,474,000,000 | 1,474,000,000 | 0 | 0 | 0 | 2018-03-16 20:00:00 | 2018-05-15 | 01.554.042.0-121.000 | PT. ALLES KLAR PRIMA | 26,000,000 | 1.73 % | ||||
74 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Pengawas Pembangunan Kantor Samsat Tanjung | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3479181 | 14772503 | APBD | 260,000,000 | 259,677,000 | 235,455,000 | 235,455,000 | 235,455,000 | 0 | 0 | 0 | 2018-03-15 10:00:00 | 2018-05-18 | 02.050.569.9-731.000 | CV. Dharma Cipta Pratama | 24,545,000 | 9.44 % | ||||
75 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Pengawas Rehab Gedung Mess Biliton dan TMII | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3480181 | 14780220 | APBD | 150,000,000 | 149,770,000 | 134,659,800 | 134,659,800 | 134,659,800 | 0 | 0 | 0 | 2018-03-15 12:30:00 | 2018-04-17 | 01.860.230.0-731.000 | CV PRAKTIRA KONSULTAN | 15,340,200 | 10.23 % | ||||
76 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Pengawas Pembangunan Gedung Rapat BAKEUDA | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3481181 | 14772568 | APBD | 150,000,000 | 149,770,000 | 147,730,000 | 147,730,000 | 147,730,000 | 0 | 0 | 0 | 2018-03-15 12:00:00 | 2018-04-17 | 03.025.627.5-731.000 | SADWA RAMA CONSULTANT | 2,270,000 | 1.51 % | ||||
77 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Pengawas Pembangunan Gedung BPSDM Prov. Kalsel di Banjarbaru | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3482181 | 14772364 | APBD | 664,000,000 | 663,610,000 | 560,005,600 | 560,005,600 | 560,005,600 | 0 | 0 | 0 | 2018-03-15 10:00:00 | 2018-05-21 | 01.860.230.0-731.000 | CV PRAKTIRA KONSULTAN | 103,994,400 | 15.66 % | ||||
78 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Revisi rancangan Pola Pengelolaan WS. Cengal Batulicin | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3483181 | 14759161 | APBD | 2,050,000,000 | 2,049,987,500 | 1,966,100,000 | 1,966,100,000 | 1,966,100,000 | 0 | 0 | 0 | 2018-03-15 12:00:00 | 2018-05-23 | 01.646.915.7-009.000 | PT. SUPRAHARMONIA CONSULTINDO | 83,900,000 | 4.09 % | ||||
79 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Perencana Review Penyusunan Masterplan Sport Center | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3484181 | 14772089 | APBD | 1,464,250,000 | 1,464,241,000 | 1,342,423,500 | 1,342,423,500 | 1,342,423,500 | 0 | 0 | 0 | 2018-03-15 12:00:00 | 2018-05-15 | 01.309.520.3-062.000 | PT. PERENTJANA DJAJA | 121,826,500 | 8.32 % | ||||
80 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Perencana Review Masterplan Masjid Raya Sabilal Muhtadin di Banjarmasin | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3485181 | 14780772 | APBD | 240,750,000 | 240,747,000 | 224,537,000 | 224,537,000 | 224,537,000 | 0 | 0 | 0 | 2018-03-15 12:00:00 | 2018-05-21 | 02.108.378.7-429.000 | PT. Munasa Kreasi Nusantara | 16,213,000 | 6.73 % | ||||
81 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Perencana DED Monomen Pal Nol | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3486181 | 16033291 | APBD | 980,500,000 | 980,430,000 | 931,279,800 | 931,279,800 | 931,279,800 | 0 | 0 | 0 | 2018-03-15 12:00:00 | 2018-05-23 | 01.455.616.1-441.000 | PT. DAYA CIPTA DIANRANCANA | 49,220,200 | 5.02 % | ||||
82 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penyusunan Rencana Pembangunan dan Pengembangan Perumahan dan Kawasan Permukiman Daerah Provinsi Kalimantan Selatan (Tahap II) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3487181 | 14718949 | APBD | 987,000,000 | 986,973,658 | 915,365,000 | 915,365,000 | 915,365,000 | 0 | 0 | 0 | 2018-03-07 12:10:00 | 2018-04-28 | 02.430.817.3-731.000 | PT. KINARYA ALAM RAYA | 71,635,000 | 7.26 % | ||||
83 | 2018 | DINAS SOSIAL | Pengadaan Bantuan Sosial Barang Kegiatan Pemenuhan Kebutuhan Pangan Fakir Miskin Pesisir dan Pulau-Pulau kecil | Tender | Pengadaan Barang | 3489181 | 16445960 | APBD | 225,000,000 | 225,000,000 | 221,625,000 | 221,625,000 | 221,625,000 | 0 | 0 | 0 | 2018-03-07 12:00:00 | 2018-03-22 | 02.531.293.5-731.000 | CV.SORAYA UTAMA | 3,375,000 | 1.5 % | ||||
84 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penyusunan DED Kawasan Permukiman Kumuh Kewenangan Provinsi Kalimantan Selatan (Paket 6 : Kabupaten Balangan dan Kabupaten Tabalong) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3492181 | 17264742 | APBD | 200,000,000 | 199,498,640 | 195,442,500 | 195,442,500 | 195,442,500 | 0 | 0 | 0 | 2018-03-16 16:00:00 | 2018-03-29 | 01.984.994.2-429.000 | PT. GENTA PERTIWI KONSULTAN | 4,557,500 | 2.28 % | ||||
85 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Pengawas Kantor Samsat Kandangan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3493181 | 16243279 | APBD | 285,000,000 | 284,251,000 | 248,600,000 | 248,600,000 | 248,600,000 | 0 | 0 | 0 | 2018-03-16 15:00:00 | 2018-04-16 | 01.585.258.5-731.000 | CV. ASRINDO GRAHA CONSULTANT | 36,400,000 | 12.77 % | ||||
86 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Rehabilitasi Jaringan Daerah Irigasi Rawa Polder Tambak Hanyar Kabupaten Banjar | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3496181 | 14759536 | APBD | 1,000,000,000 | 999,982,000 | 976,250,000 | 976,250,000 | 976,250,000 | 0 | 0 | 0 | 2018-03-16 07:30:00 | 2018-05-07 | 01.426.908.8-441.000 | PT. SARANA BHUANA JAYA | 23,750,000 | 2.38 % | ||||
87 | 2018 | DINAS PERKEBUNAN DAN PETERNAKAN | Pengadaan Benih karet | Tender | Pengadaan Barang | 3499181 | 17343381 | APBN | 880,000,000 | 880,000,000 | 874,386,975 | 874,386,975 | 874,386,975 | 0 | 0 | 0 | 2018-03-20 08:00:00 | 2018-04-06 | 02.237.261.9-732.000 | CV. GUNUNG PUTRI | 5,613,025 | 0.64 % | ||||
88 | 2018 | DINAS KESEHATAN PROVINSI KALIMANTAN SELATAN-03 | Pengadaan Distribusi PMT Ibu Hamil KEK (3.753 Bumil KEK x 9 Kg) | Tender Cepat | Jasa Lainnya | 3500181 | 17422249 | APBN | 506,700,000 | 506,700,000 | 0 | 0 | 0 | 0 | 0 | 0 | 2018-03-23 08:00:00 | 2018-03-29 | 506,700,000 | 100 % | ||||||
89 | 2018 | DINAS KESEHATAN PROVINSI KALIMANTAN SELATAN-03 | Pengadaan Distribusi PMT Balita (3.887 Balita x 10,8 Kg) | Tender Cepat | Jasa Lainnya | 3501181 | 17423825 | APBN | 629,850,000 | 629,850,000 | 0 | 0 | 0 | 0 | 0 | 0 | 2018-03-23 08:00:00 | 2018-03-29 | 629,850,000 | 100 % | ||||||
90 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Rehabilitasi Jaringan Daerah Irigasi Rawa Alalak Padang Kabupaten Banjar | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3503181 | 14759430 | APBD | 1,000,000,000 | 999,955,000 | 975,232,000 | 975,232,000 | 975,232,000 | 0 | 0 | 0 | 2018-03-15 12:00:00 | 2018-05-08 | 02.429.467.0-015.000 | PT. Mitratama Asia Pasific | 24,768,000 | 2.48 % | ||||
91 | 2018 | DINAS PERKEBUNAN DAN PETERNAKAN | Pengadaan Benih karet | Tender | Pengadaan Barang | 3505181 | 17341483;17342001 | APBN | 704,000,000 | 704,000,000 | 684,200,000 | 684,200,000 | 684,200,000 | 0 | 0 | 0 | 2018-03-15 21:34:00 | 2018-03-28 | 03.185.504.2-733.000 | CV. NAHDI NAJUA | 19,800,000 | 2.81 % | ||||
92 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Pengendali Banjir Kabupaten Hulu Sungai Tengah - Kabupaten Hulu Sungai Selatan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3506181 | 14759816 | APBD | 496,000,000 | 495,990,000 | 470,600,000 | 470,600,000 | 470,600,000 | 0 | 0 | 0 | 2018-03-15 12:00:00 | 2018-05-11 | 01.646.915.7-009.000 | PT. SUPRAHARMONIA CONSULTINDO | 25,400,000 | 5.12 % | ||||
93 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Perencana Review Masterplan dan Penyusunan Masterplan Drainase dan Penghijauan di Kawasan Perkantoran di Banjarbaru | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3508181 | 14772161 | APBD | 1,484,250,000 | 1,483,744,000 | 1,359,473,000 | 1,359,473,000 | 1,359,473,000 | 0 | 0 | 0 | 2018-03-15 13:00:00 | 2018-05-15 | 01.309.520.3-062.000 | PT. PERENTJANA DJAJA | 124,777,000 | 8.41 % | ||||
94 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Supervisi Pembangunan Sarana dan Prasarana RTH Kantor Gubernur di Banjarmasin | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3510181 | 14780380 | APBD | 250,000,000 | 249,029,000 | 230,873,000 | 230,873,000 | 230,873,000 | 0 | 0 | 0 | 2018-03-15 23:45:00 | 2018-05-03 | 01.534.559.8-731.000 | PT TECTAMA KARYA | 19,127,000 | 7.65 % | ||||
95 | 2018 | DINAS PERKEBUNAN DAN PETERNAKAN | Pengadaan Benih Karet Tabalong | Tender | Pengadaan Barang | 3515181 | 17341095 | APBN | 809,600,000 | 809,600,000 | 794,420,000 | 794,420,000 | 794,420,000 | 0 | 0 | 0 | 2018-03-17 12:00:00 | 2018-03-28 | 02.919.025.3-735.000 | CV. AGRO PERMATA PRIMA | 15,180,000 | 1.88 % | ||||
96 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Embung Kampung Banjar | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3517181 | 17778484 | APBD | 400,000,000 | 399,987,500 | 390,500,000 | 390,500,000 | 390,500,000 | 0 | 0 | 0 | 2018-03-16 12:00:00 | 2018-05-11 | 01.469.763.5-428.000 | PT. VITRAHA CONSINDOTAMA | 9,500,000 | 2.38 % | ||||
97 | 2018 | BIRO PERLENGKAPAN DAN LAYANAN PENGADAAN BARANG JASA SETDA PROVINSI KALSEL | Pengadaan Mobil Jeep/SUV Operasional | Tender | Pengadaan Barang | 3519181 | 17410374 | APBD | 696,850,000 | 529,999,800 | 529,000,000 | 529,000,000 | 529,000,000 | 0 | 0 | 0 | 2018-03-19 14:00:00 | 2018-04-04 | 01.647.543.6-732.000 | PT ISTANA MOBIL TRIO MOTOR | 167,850,000 | 24.09 % | ||||
98 | 2018 | DINAS SOSIAL | Pengadaan Bantuan Sosial Barang Kegiatan Pemenuhan Kebutuhan Pangan Fakir Miskin Pedesaan | Tender | Pengadaan Barang | 3520181 | 15723752 | APBD | 825,000,000 | 825,000,000 | 760,031,250 | 760,031,250 | 760,031,250 | 0 | 0 | 0 | 2018-03-17 18:00:00 | 2018-03-28 | 02.709.388.9-731.000 | CV. LEMBU SWANA | 64,968,750 | 7.88 % | ||||
99 | 2018 | DINAS PERTANIAN DAN KETAHANAN PANGAN | Pengadaan Sarana Produksi Pengembangan Jeruk Siam Banjar | Tender | Pengadaan Barang | 3523181 | 14899967 | APBD | 447,500,000 | 426,500,000 | 420,500,000 | 420,500,000 | 420,500,000 | 0 | 0 | 0 | 2018-03-26 09:00:00 | 2018-04-12 | 02.215.569.1-732.000 | CV. Dimasindo Arthamulya | 27,000,000 | 6.03 % | ||||
100 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Embung Landasan Ulin Kota Banjarbaru | Tender | Pekerjaan Konstruksi | 3524181 | 14756274 | APBD | 1,880,000,000 | 1,879,960,000 | 1,719,700,000 | 1,719,700,000 | 1,719,700,000 | 0 | 0 | 0 | 2018-03-26 23:59:00 | 2018-04-27 | 02.019.281.1-731.000 | CV. OKTAVIANCA | 160,300,000 | 8.53 % | ||||
101 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Supervisi Rehabilitasi DIR. Tanggul Lungau Kabupaten Hulu Sungai Selatan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3528181 | 17673900 | APBD | 300,000,000 | 299,915,000 | 284,765,000 | 284,765,000 | 284,765,000 | 0 | 0 | 0 | 2018-03-22 12:00:00 | 2018-05-11 | 02.531.704.1-731.000 | CV. FIAZTA MATRIX CONSULTANT | 15,235,000 | 5.08 % | ||||
102 | 2018 | DINAS PERKEBUNAN DAN PETERNAKAN | Pengadaan Pupuk NPK dan Fungisida untuk Intensifikasi Tanaman Karet Kabupaten Tabalong dan Balangan | Tender | Pengadaan Barang | 3529181 | 17851390 | APBN | 420,000,000 | 390,949,350 | 389,400,000 | 389,400,000 | 389,400,000 | 0 | 0 | 0 | 2018-03-22 10:00:00 | 2018-04-13 | 81.189.188.6-731.000 | cv. inti bumi | 30,600,000 | 7.29 % | ||||
103 | 2018 | DINAS PERKEBUNAN DAN PETERNAKAN | Pengadaan Pupuk NPK dan Fungisida Untuk Intensifikasi Tanaman Karet Kabupaten Tapin dan Hulu Sungai Tengah | Tender | Pengadaan Barang | 3530181 | 17850711 | APBN | 576,000,000 | 443,075,930 | 441,320,000 | 441,320,000 | 441,320,000 | 0 | 0 | 0 | 2018-03-22 10:00:00 | 2018-04-13 | 81.189.188.6-731.000 | cv. inti bumi | 134,680,000 | 23.38 % | ||||
104 | 2018 | DINAS PERKEBUNAN DAN PETERNAKAN | Pengadaan Pupuk NPK dan Fungisida Intensifikasi Tanaman Karet Kabupaten Banjar | Tender | Pengadaan Barang | 3531181 | 17851156 | APBN | 280,000,000 | 260,632,900 | 259,600,000 | 259,600,000 | 259,600,000 | 0 | 0 | 0 | 2018-03-22 10:00:00 | 2018-04-13 | 81.163.850.1-731.000 | CV. Dapat Tarus | 20,400,000 | 7.29 % | ||||
105 | 2018 | DINAS KEHUTANAN | Pengadaan Bahan dan Media Tanam | Tender | Pengadaan Barang | 3532181 | 17296385 | APBD | 373,990,000 | 339,113,863 | 295,054,000 | 295,054,000 | 295,054,000 | 0 | 0 | 0 | 2018-03-28 20:00:00 | 2018-04-12 | 01.424.490.9-731.000 | TIGA DARA | 78,936,000 | 21.11 % | ||||
106 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Outline Plan Sistem Drainase Kota Kabupaten Tanah Laut | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3533181 | 17224277 | APBD | 850,000,000 | 849,997,500 | 838,695,000 | 838,695,000 | 838,695,000 | 0 | 0 | 0 | 2018-03-22 16:00:00 | 2018-05-04 | 01.131.029.9-441.000 | PT. RAYAKONSULT | 11,305,000 | 1.33 % | ||||
107 | 2018 | DINAS PERKEBUNAN DAN PETERNAKAN | Pengadaan Pupuk NPK, Fungisida dan Herbisida Intensifikasi Tanaman Karet Kabupaten Tanah Bumbu | Tender | Pengadaan Barang | 3534181 | 17850991 | APBN | 624,000,000 | 561,476,520 | 561,000,000 | 561,000,000 | 561,000,000 | 0 | 0 | 0 | 2018-03-22 10:00:00 | 2018-04-13 | 81.163.850.1-731.000 | CV. Dapat Tarus | 63,000,000 | 10.1 % | ||||
108 | 2018 | DINAS PERKEBUNAN DAN PETERNAKAN | Pengadaan Chainsaw Untuk Kegiatan Peremajaan Tanaman Karet | Tender | Pengadaan Barang | 3535181 | 14458770;14458834;14459236;14465072 | APBN | 318,000,000 | 275,129,989 | 259,578,000 | 259,578,000 | 259,578,000 | 0 | 0 | 0 | 2018-03-22 10:00:00 | 2018-04-13 | 66.220.474.2-731.000 | CV. SAFFANAH | 58,422,000 | 18.37 % | ||||
109 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penyusunan Identifikasi dan Kajian Teknis Rumah Khusus | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3537181 | 14717888 | APBD | 482,000,000 | 481,946,190 | 457,435,000 | 457,435,000 | 457,435,000 | 0 | 0 | 0 | 2018-03-23 16:00:00 | 2018-05-08 | 02.241.591.3-424.000 | PT. WINAGUNA SARANA TEKNIK | 24,565,000 | 5.1 % | ||||
110 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Normalisasi Sungai Jepana (DAS Satui) Kabupaten Tanah Bumbu | Tender | Pekerjaan Konstruksi | 3538181 | 17673812 | APBD | 10,700,000,000 | 10,699,500,000 | 8,007,338,763 | 8,007,338,763 | 8,007,338,763 | 0 | 0 | 0 | 2018-03-22 11:00:00 | 2018-04-23 | 01.137.507.8-731.000 | PT. Apu Stiants | 2,692,661,237 | 25.17 % | ||||
111 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Daerah Irigasi Kinarum 1.004 Ha Kabupaten Tabalong | Tender | Pekerjaan Konstruksi | 3539181 | 17673748 | APBD | 10,170,000,000 | 10,169,995,000 | 9,395,185,330 | 9,395,185,330 | 9,395,185,330 | 0 | 0 | 0 | 2018-03-22 11:00:00 | 2018-04-23 | 01.407.735.8-711.000 | PT.ARGO SANJOYO ADHITAMA | 774,814,670 | 7.62 % | ||||
112 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Supervisi Normalisasi Sungai Jepana (DAS Satui) Kabupaten Tanah Bumbu | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3540181 | 14756679 | APBD | 700,000,000 | 699,990,000 | 663,245,000 | 663,245,000 | 663,245,000 | 0 | 0 | 0 | 2018-03-22 16:00:00 | 2018-05-08 | 01.455.616.1-441.000 | PT. DAYA CIPTA DIANRANCANA | 36,755,000 | 5.25 % | ||||
113 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penyusunan Identifikasi dan Verifikasi Rumah Swadaya Tidak Layak Huni (RTLH) Kabupaten Tapin, HSS dan HST | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3541181 | 14717735 | APBD | 432,000,000 | 430,712,073 | 400,537,500 | 400,537,500 | 400,537,500 | 0 | 0 | 0 | 2018-04-02 09:00:00 | 2018-05-08 | 02.089.773.2-733.000 | PT. TECHNIKATAMA JASA KONSULTAN | 31,462,500 | 7.28 % | ||||
114 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penyusunan Identifikasi dan Verifikasi Rumah Swadaya Tidak Layak Huni (RTLH) Kabupaten Tanah Laut, Tanah Bumbu dan Kotabaru | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3542181 | 14718149 | APBD | 482,000,000 | 481,946,190 | 467,775,000 | 467,775,000 | 467,775,000 | 0 | 0 | 0 | 2018-04-02 08:00:00 | 2018-05-14 | 02.089.773.2-733.000 | PT. TECHNIKATAMA JASA KONSULTAN | 14,225,000 | 2.95 % | ||||
115 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Supervisi Daerah Irigasi Rawa Danda Besar Kabupaten Barito Kuala | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3543181 | 17045839 | APBD | 199,702,000 | 199,650,000 | 186,716,000 | 186,716,000 | 186,716,000 | 0 | 0 | 0 | 2018-03-23 11:10:00 | 2018-04-16 | 02.090.106.2-732.000 | CV. FAJAR KARYA PRATAMA | 12,986,000 | 6.5 % | ||||
116 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Pembuatan Sistem Informasi Perumahan dan Kawasan Permukiman Provinsi Kalimantan Selatan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3546181 | 14718442 | APBD | 731,000,000 | 730,922,918 | 717,200,000 | 717,200,000 | 714,147,500 | 0 | 0 | 0 | 2018-03-26 22:00:00 | 2018-05-01 | 02.430.817.3-731.000 | PT. KINARYA ALAM RAYA | 13,800,000 | 1.89 % | ||||
117 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penyusunan Identifikasi Penanganan Rumah Umum & Rumah Korban Bencana Alam Provinsi Kalimantan Selatan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3548181 | 14718258 | APBD | 482,000,000 | 481,643,778 | 453,750,000 | 453,750,000 | 453,750,000 | 0 | 0 | 0 | 2018-04-02 08:00:00 | 2018-04-24 | 02.430.817.3-731.000 | PT. KINARYA ALAM RAYA | 28,250,000 | 5.86 % | ||||
118 | 2018 | TAMAN HUTAN RAYA SULTAN ADAM | Belanja Jasa Konsultan Perencana Sarpras Wisata lembah Kahung Belangian | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3550181 | 17567135 | APBD | 101,500,000 | 100,551,000 | 99,110,000 | 99,110,000 | 99,110,000 | 0 | 0 | 0 | 2018-04-02 08:00:00 | 2018-04-11 | 02.215.319.1-732.000 | CV. POLA ARSITEK KONSULTAN | 2,390,000 | 2.35 % | ||||
119 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penyusunan DED Kawasan Permukiman Kumuh Kewenangan Provinsi Kalimantan Selatan (Paket 3 : Kab. Banjar dan Kab. Tanah Laut) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3551181 | 17264320 | APBD | 200,000,000 | 199,498,640 | 194,865,000 | 194,865,000 | 194,865,000 | 0 | 0 | 0 | 2018-03-27 14:00:00 | 2018-04-06 | 01.534.546.5-731.000 | CV. PRESMATEK CONSULTANT | 5,135,000 | 2.57 % | ||||
120 | 2018 | TAMAN HUTAN RAYA SULTAN ADAM | Pembangunan Fasilitas parkir | Tender Cepat | Pekerjaan Konstruksi | 3552181 | 14240346 | APBD | 1,092,500,000 | 1,090,646,617 | 988,575,478 | 988,575,478 | 988,575,478 | 0 | 0 | 0 | 2018-03-28 10:00:00 | 2018-04-02 | 03.297.153.3-728.000 | CV. PUTRA SAMBOJA | 103,924,522 | 9.51 % | ||||
121 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Supervisi Rehabilitasi DI. Intangan Kabupaten Hulu Sungai Tengah | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3554181 | 17673918 | APBD | 200,000,000 | 199,980,000 | 182,655,000 | 182,655,000 | 182,655,000 | 0 | 0 | 0 | 2018-03-29 13:00:00 | 2018-04-18 | 02.043.129.2-731.000 | CV. GANESHA TEKNIK | 17,345,000 | 8.67 % | ||||
122 | 2018 | DINAS PERTANIAN DAN KETAHANAN PANGAN | Pengadaan sarana pasca panen berupa power thresher | Tender Cepat | Pengadaan Barang | 3559181 | 14927577 | APBD | 479,250,000 | 479,160,000 | 478,714,500 | 478,714,500 | 478,714,500 | 0 | 0 | 0 | 2018-04-02 10:00:00 | 2018-04-04 | 02.753.642.4-732.000 | CV.RESAGRI JAYA | 535,500 | 0.11 % | ||||
123 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penyusunan Identifikasi Data dan Kajian Teknis Perumahan untuk mendukung PSU di Permukiman Kota Banjarmasin dan Kabupaten Barito Kuala | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3562181 | 17972166 | APBD | 473,562,500 | 473,475,816 | 399,905,000 | 399,905,000 | 399,905,000 | 0 | 0 | 0 | 2018-04-20 09:00:00 | 2018-07-05 | 02.089.773.2-733.000 | PT. TECHNIKATAMA JASA KONSULTAN | 73,657,500 | 15.55 % | ||||
124 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penyusunan Identifikasi Data dan Kajian Teknis Perumahan untuk mendukung PSU di Permukiman Kabupaten Tapin dan Kabupaten Hulu Sungai Selatan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3563181 | 17972118 | APBD | 473,562,500 | 473,475,816 | 275,858,000 | 275,858,000 | 275,858,000 | 0 | 0 | 0 | 2018-04-20 09:00:00 | 2018-07-05 | 01.860.272.2-731.000 | CV. DAYAKARSA MADYA Consultant | 197,704,500 | 41.75 % | ||||
125 | 2018 | DINAS KESEHATAN PROVINSI KALIMANTAN SELATAN-03 | Pengadaan Distribusi PMT Balita (3.887 Balita x 10,8 Kg) | Tender Cepat | Jasa Lainnya | 3566181 | 17423825 | APBN | 629,850,000 | 629,850,000 | 346,417,500 | 346,417,500 | 346,417,500 | 0 | 0 | 0 | 2018-04-02 08:00:00 | 2018-04-05 | 81.519.949.2-407.000 | PT ARTHA INOVA ABADI | 283,432,500 | 45 % | ||||
126 | 2018 | DINAS KESEHATAN PROVINSI KALIMANTAN SELATAN-03 | Pengadaan Distribusi PMT Ibu Hamil KEK (3.753 Bumil KEK x 9 Kg) | Tender Cepat | Jasa Lainnya | 3567181 | 17422249 | APBN | 506,700,000 | 506,700,000 | 278,685,000 | 278,685,000 | 278,685,000 | 0 | 0 | 0 | 2018-04-02 08:00:00 | 2018-04-05 | 81.519.949.2-407.000 | PT ARTHA INOVA ABADI | 228,015,000 | 45 % | ||||
127 | 2018 | DINAS ENERGI DAN SUMBER DAYA MINERAL | Pemetaan zona konservasi air tanah wilayah CAT Pagatan Tahap II (Kab. Kotabaru) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3568181 | 15411505 | APBD | 600,000,000 | 599,981,800 | 584,779,800 | 584,779,800 | 584,955,800 | 0 | 0 | 0 | 2018-04-02 08:00:00 | 2018-05-04 | 02.265.266.3-541.000 | CV. Madani Callysta Saibuyun | 15,220,200 | 2.54 % | ||||
128 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Pengawas Toilet dan Rehabilitasi Halaman Masjid Raya Sabilal Muhtadin di Banjarmasin | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3569181 | 17678897 | APBD | 75,000,000 | 74,981,000 | 57,560,000 | 57,560,000 | 57,560,000 | 0 | 0 | 0 | 2018-04-03 18:00:00 | 2018-04-25 | 80.263.300.8-732.000 | CV. INDISIGN CONSULINDO | 17,440,000 | 23.25 % | ||||
129 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Perencana Pembuatan Trotoar dan Pagar Keliling di Lingkungan Setda Prov. Kalsel di Banjarbaru | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3571181 | 17679278 | APBD | 125,000,000 | 124,949,000 | 124,162,000 | 124,162,000 | 124,162,000 | 0 | 0 | 0 | 2018-04-03 18:00:00 | 2018-04-25 | 02.090.106.2-732.000 | CV. FAJAR KARYA PRATAMA | 838,000 | 0.67 % | ||||
130 | 2018 | DINAS PERHUBUNGAN | Study Kebutuhan dan Perencanaan Teknis Perlengkapan Keselamtan Jalan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3572181 | 15283571 | APBD | 125,000,000 | 124,997,950 | 117,551,500 | 117,551,500 | 117,551,500 | 0 | 0 | 0 | 2018-05-16 15:00:00 | 2018-06-23 | 03.025.809.9-731.000 | CV. SETIA JASA UTAMA | 7,448,500 | 5.96 % | ||||
131 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Kiram-Gunung Mawar Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3573181 | 17730711 | APBDP | 450,000,000 | 435,380,000 | 409,200,000 | 409,200,000 | 409,200,000 | 0 | 0 | 0 | 2018-04-03 16:00:00 | 2018-05-21 | 80.562.640.5-731.000 | CV. RAMIER JAYA ARKANANTA | 40,800,000 | 9.07 % | ||||
132 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Paramasan Bawah-Paramasan Atas | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3574181 | 17734511 | APBDP | 300,000,000 | 191,950,000 | 186,065,000 | 186,065,000 | 186,065,000 | 0 | 0 | 0 | 2018-04-03 16:00:00 | 2018-04-25 | 03.025.627.5-731.000 | SADWA RAMA CONSULTANT | 113,935,000 | 37.98 % | ||||
133 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Pengawas Pembuatan Kantor dan Laboratorium Unit Pelayanan Jasa Sumber Daya Mineral dan Energi | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3575181 | 17678785 | APBD | 100,000,000 | 100,000,000 | 98,972,000 | 98,972,000 | 98,972,000 | 0 | 0 | 0 | 2018-04-03 18:00:00 | 2018-04-25 | 01.860.308.4-731.000 | CV. KARYASA CONSULINDO | 1,028,000 | 1.03 % | ||||
134 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehab Gedung Mess Biliton dan TMII | Tender | Pekerjaan Konstruksi | 3576181 | 17679009 | APBD | 4,690,100,000 | 4,659,189,000 | 4,307,367,000 | 4,307,367,000 | 4,307,367,000 | 0 | 0 | 0 | 2018-04-05 12:00:00 | 2018-06-07 | 02.708.995.2-731.000 | PT. LIAN KAMALA | 382,733,000 | 8.16 % | ||||
135 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Kiram-Gunung Mawar (DID) | Tender | Pekerjaan Konstruksi | 3577181 | 17708219 | APBDP | 10,000,000,000 | 9,517,025,000 | 8,914,917,640 | 8,914,917,640 | 8,914,917,640 | 0 | 0 | 0 | 2018-04-17 12:00:00 | 2018-05-23 | 70.694.710.8-732.000 | PT.TANJUNG RAYA BERSAMA | 1,085,082,360 | 10.85 % | ||||
136 | 2018 | DINAS ENERGI DAN SUMBER DAYA MINERAL | Pemetaan zona konservasi air tanah wilayah CAT Pagatan Tahap II (Kab. Tanah Laut) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3579181 | 15411451 | APBD | 600,000,000 | 599,981,800 | 582,532,500 | 582,532,500 | 582,532,500 | 0 | 0 | 0 | 2018-04-07 14:00:00 | 2018-05-08 | 02.265.266.3-541.000 | CV. Madani Callysta Saibuyun | 17,467,500 | 2.91 % | ||||
137 | 2018 | DINAS PERHUBUNGAN | Penyusunan Rencana Induk Lalu Lintas Angkutan Jalan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3581181 | 15279192 | APBD | 380,000,000 | 379,980,700 | 330,660,000 | 330,660,000 | 330,660,000 | 0 | 0 | 0 | 2018-04-24 14:00:00 | 2018-06-18 | 02.108.378.7-429.000 | PT. Munasa Kreasi Nusantara | 49,340,000 | 12.98 % | ||||
138 | 2018 | DINAS PERTANIAN DAN KETAHANAN PANGAN | Pengadaan Power Thresher | Tender Cepat | Pengadaan Barang | 3583181 | 17924306 | APBN | 896,000,000 | 459,976,000 | 459,800,000 | 459,800,000 | 459,800,000 | 0 | 0 | 0 | 2018-04-09 10:00:00 | 2018-04-12 | 02.753.642.4-732.000 | CV.RESAGRI JAYA | 436,200,000 | 48.68 % | ||||
139 | 2018 | DINAS ENERGI DAN SUMBER DAYA MINERAL | Konsultansi penyusunan dokumen RUED Prov. Kalsel | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3584181 | 15436748 | APBD | 377,000,000 | 373,972,500 | 315,450,000 | 315,450,000 | 315,450,000 | 0 | 0 | 0 | 2018-04-26 09:00:00 | 2018-05-30 | 01.118.674.9-441.000 | PT. HEGAR DAYA | 61,550,000 | 16.33 % | ||||
140 | 2018 | KEBUN RAYA BANUA | Belanja Modal Pengadaan Instalasi Listrik | Tender | Pekerjaan Konstruksi | 3585181 | 17536021 | APBD | 3,301,000,000 | 3,257,449,925 | 3,191,237,757 | 3,191,237,757 | 3,191,237,757 | 0 | 0 | 0 | 2018-04-27 08:00:00 | 2018-05-21 | 80.257.244.6-609.000 | PT ARGE HABRO SOLUTIO | 109,762,243 | 3.33 % | ||||
141 | 2018 | KEBUN RAYA BANUA | Belanja Modal Pengadaan Instalasi Listrik | Tender Cepat | Jasa Konsultansi Badan Usaha Non Konstruksi | 3587181 | 17536305 | APBD | 100,000,000 | 99,874,225 | 98,450,000 | 98,450,000 | 98,450,000 | 0 | 0 | 0 | 2018-04-11 09:00:00 | 2018-04-17 | 03.025.627.5-731.000 | SADWA RAMA CONSULTANT | 1,550,000 | 1.55 % | ||||
142 | 2018 | DINAS PERTANIAN DAN KETAHANAN PANGAN | Pengadaan Sarana Produksi Pengembangan Kacang Tanah | Tender | Pengadaan Barang | 3588181 | 14882475 | APBD | 983,660,000 | 983,454,500 | 971,590,300 | 971,590,300 | 971,590,300 | 0 | 0 | 0 | 2018-04-12 10:00:00 | 2018-04-26 | 03.255.474.3-732.000 | CV. ANUGRAH LESTARI | 12,069,700 | 1.23 % | ||||
143 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Gedung BPSDM Prov. Kalsel di Banjarbaru | Tender | Pekerjaan Konstruksi | 3589181 | 14761859 | APBD | 24,281,000,000 | 24,239,008,000 | 22,394,916,000 | 22,394,916,000 | 22,394,916,000 | 0 | 0 | 0 | 2018-04-16 10:20:00 | 2018-05-16 | 02.708.996.0-731.000 | PT.CHARIA BENEFIT UTAMA | 1,886,084,000 | 7.77 % | ||||
144 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Toliet dan Rehabilitasi Halaman Masjid Raya Sabilal Muhtadin di Banjarmasin | Tender | Pekerjaan Konstruksi | 3591181 | 18092214 | APBD | 1,876,050,000 | 1,849,855,000 | 1,495,601,096 | 1,495,601,096 | 1,495,601,096 | 0 | 0 | 0 | 2018-04-13 15:00:00 | 2018-05-04 | 01.879.396.8-731.000 | CV. EDNA BERSAUDARA | 380,448,904 | 20.28 % | ||||
145 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Gunung Kupang-Kiram (DID) | Tender | Pekerjaan Konstruksi | 3593181 | 17710812 | APBDP | 2,500,000,000 | 2,471,750,000 | 2,001,138,536 | 2,001,138,536 | 2,001,138,536 | 0 | 0 | 0 | 2018-04-17 14:00:00 | 2018-05-18 | 74.117.390.0-732.000 | MIRZA UTAMA MARGA | 498,861,464 | 19.95 % | ||||
146 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Paramasan Bawah-Paramasan Atas (DID) | Tender | Pekerjaan Konstruksi | 3594181 | 17708118 | APBDP | 2,000,000,000 | 1,647,253,000 | 1,596,507,072 | 1,596,507,072 | 1,596,507,072 | 0 | 0 | 0 | 2018-04-17 16:00:00 | 2018-05-18 | 01.124.716.0-731.000 | CV. DUA MAS | 403,492,928 | 20.17 % | ||||
147 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penyusunan Identifikasi Data dan Kajian Teknis Perumahan untuk mendukung PSU di Permukiman Kabupaten Tanah Laut dan Kabupaten Tanah Bumbu | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3599181 | 17972275 | APBD | 473,562,500 | 473,475,816 | 448,360,000 | 448,360,000 | 448,360,000 | 0 | 0 | 0 | 2018-04-24 14:00:00 | 2018-06-13 | 02.430.817.3-731.000 | PT. KINARYA ALAM RAYA | 25,202,500 | 5.32 % | ||||
148 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penyusunan Identifikasi Data dan Kajian Teknis Perumahan untuk mendukung PSU di Permukiman Kabupaten Tabalong dan Kabupaten Hulu Sungai Utara | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3600181 | 17972250 | APBD | 473,562,500 | 473,475,816 | 431,915,000 | 431,915,000 | 431,915,000 | 0 | 0 | 0 | 2018-04-24 14:00:00 | 2018-06-13 | 03.242.995.3-731.000 | CV. DIGDAYA MAHARDIKA | 41,647,500 | 8.79 % | ||||
149 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penyusunan DED Kawasan Permukiman Kumuh Kewenangan Provinsi Kalimantan Selatan (Paket 4 : Kabupaten Tapin dan Kabupaten Hulu Sungai Selatan) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3601181 | 17264188 | APBD | 200,000,000 | 199,498,640 | 192,170,000 | 192,170,000 | 192,170,000 | 0 | 0 | 0 | 2018-04-20 23:00:00 | 2018-07-02 | 01.815.062.3-731.000 | CV. ITNASINDO | 7,830,000 | 3.92 % | ||||
150 | 2018 | DINAS PERTANIAN DAN KETAHANAN PANGAN | Pengadaan Sarana Produksi Pengembangan Bawang Merah seluas 20 HA | Tender Cepat | Pengadaan Barang | 3603181 | 14926995 | APBD | 900,000,000 | 857,799,970 | 763,000,000 | 763,000,000 | 763,000,000 | 0 | 0 | 0 | 2018-04-25 09:00:00 | 2018-04-27 | 70.057.665.5-732.000 | CV. Rizki Banua Borneo | 137,000,000 | 15.22 % | ||||
151 | 2018 | DINAS PERTANIAN DAN KETAHANAN PANGAN | Pengadaan Sarana Produksi Pengembangan Tanaman Cabe Besar Seluas 80 HA | Tender Cepat | Pengadaan Barang | 3604181 | 14903871 | APBD | 806,000,000 | 784,899,976 | 744,856,000 | 744,856,000 | 744,856,000 | 0 | 0 | 0 | 2018-04-25 09:00:00 | 2018-04-27 | 03.282.504.4-732.000 | CV. Hervi Transseed | 61,144,000 | 7.59 % | ||||
152 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Perencanaan dan Kajian Teknis Pengembangan Kampung Berbasis Karakter Tradisional | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3605181 | 14719549 | APBD | 940,590,000 | 940,157,350 | 800,360,000 | 800,360,000 | 800,360,000 | 0 | 0 | 0 | 2018-04-26 10:00:00 | 2018-06-07 | 01.455.616.1-441.000 | PT. DAYA CIPTA DIANRANCANA | 140,230,000 | 14.91 % | ||||
153 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penyusunan Identifikasi Kawasan Permukiman Kumuh Kewenangan Provinsi Kalimantan Selatan (Paket 3) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3607181 | 18155726 | APBD | 900,000,000 | 899,079,478 | 810,480,000 | 810,480,000 | 810,480,000 | 0 | 0 | 0 | 2018-05-01 13:30:00 | 2018-06-25 | 02.430.817.3-731.000 | PT. KINARYA ALAM RAYA | 89,520,000 | 9.95 % | ||||
154 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penyusunan Identifikasi Kawasan Permukiman Kumuh Kewenangan Provinsi Kalimantan Selatan (Paket 2) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3608181 | 18155712 | APBD | 900,000,000 | 899,079,478 | 800,635,000 | 800,635,000 | 800,635,000 | 0 | 0 | 0 | 2018-04-24 14:00:00 | 2018-06-12 | 01.455.616.1-441.000 | PT. DAYA CIPTA DIANRANCANA | 99,365,000 | 11.04 % | ||||
155 | 2018 | RUMAH SAKIT JIWA SAMBANG LIHUM | Perencanaan Rehabilitasi, Renovasi, Restorasi Bangunan, Ruangan, Bangsal, Bangunan Penunjang | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3609181 | 15432795 | APBD | 150,000,000 | 149,859,600 | 148,362,500 | 148,362,500 | 148,362,500 | 0 | 0 | 0 | 2018-04-25 17:00:00 | 2018-05-14 | 03.025.627.5-731.000 | SADWA RAMA CONSULTANT | 1,637,500 | 1.09 % | ||||
156 | 2018 | DINAS PERKEBUNAN DAN PETERNAKAN | Pengadaan Peralatan dan Mesin Pembuatan RSS | Tender | Pengadaan Barang | 3611181 | 18048700 | APBN | 500,000,000 | 451,000,000 | 440,000,000 | 440,000,000 | 431,750,000 | 0 | 0 | 0 | 2018-04-24 10:00:00 | 2018-05-05 | 03.202.301.2-731.000 | CV. MAKMUR BANUA | 60,000,000 | 12 % | ||||
157 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi DI. Intangan Kabupaten Hulu Sungai Tengah | Tender | Pekerjaan Konstruksi | 3612181 | 14757215 | APBD | 1,300,000,000 | 1,299,992,873 | 1,013,292,066 | 1,013,292,066 | 1,013,292,066 | 0 | 0 | 0 | 2018-04-27 08:00:00 | 2018-05-26 | 72.232.474.6-733.000 | CV. MIRANTI | 286,707,934 | 22.05 % | ||||
158 | 2018 | DINAS PERKEBUNAN DAN PETERNAKAN | Belanja barang fisik lainnya untuk diserahkan kepada masyarakat/Pemda Pengadaan Container Lapang 3 Liter dan Container Depo N2 Cair 50 Liter | Tender | Pengadaan Barang | 3613181 | 18147038 | APBN | 547,350,000 | 547,184,000 | 521,950,000 | 521,950,000 | 521,950,000 | 0 | 0 | 0 | 2018-04-25 00:00:00 | 2018-05-15 | 70.405.861.9-615.000 | CV. MITRA BERKAH SEJAHTERA | 25,400,000 | 4.64 % | ||||
159 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penyusunan Identifikasi Kawasan Permukiman Kumuh Kewenangan Provinsi Kalimantan Selatan (Paket 1) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3614181 | 18155704 | APBD | 900,000,000 | 899,079,000 | 791,120,000 | 791,120,000 | 791,120,000 | 0 | 0 | 0 | 2018-04-25 10:00:00 | 2018-06-27 | 01.534.559.8-731.000 | PT TECTAMA KARYA | 108,880,000 | 12.1 % | ||||
160 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penyusunan Materi Teknis dan Naskah Akademis Rancangan Peraturan Daerah tentang Penyelenggaraan Perumahan dan Kawasan Permukiman di Provinsi Kalimantan Selatan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3615181 | 15461712 | APBD | 300,000,000 | 188,952,654 | 180,592,500 | 180,592,500 | 180,592,500 | 0 | 0 | 0 | 2018-04-27 08:00:00 | 2018-05-21 | 02.089.773.2-733.000 | PT. TECHNIKATAMA JASA KONSULTAN | 119,407,500 | 39.8 % | ||||
161 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Perencanaan dan Kajian Teknis Penataan Lingkungan Permukiman Komunitas Adat Tertinggal | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3617181 | 14719733 | APBD | 934,350,000 | 933,557,350 | 831,270,000 | 831,270,000 | 831,270,000 | 0 | 0 | 0 | 2018-04-26 14:00:00 | 2018-06-22 | 01.118.581.6-428.000 | PT. BIRO ARSITEK DAN INSINJUR SANGKURIANG | 103,080,000 | 11.03 % | ||||
162 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Pengawas Pembangunan Pintu Gerbang Kantor Kawasan Perkantoran di Banjarbaru | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3620181 | 17678695 | APBD | 133,142,500 | 133,133,000 | 120,945,000 | 120,945,000 | 120,945,000 | 0 | 0 | 0 | 2018-05-19 00:59:00 | 2018-06-05 | 01.585.258.5-731.000 | CV. ASRINDO GRAHA CONSULTANT | 12,197,500 | 9.16 % | ||||
163 | 2018 | SEKRETARIAT DPRD | Pengadaan Pakaian Dinas Beserta Kelengkapannnya | Tender | Pengadaan Barang | 3621181 | 14973958 | APBD | 1,349,750,000 | 1,325,499,975 | 1,179,750,000 | 1,179,750,000 | 1,179,750,000 | 0 | 0 | 0 | 2018-05-14 12:00:00 | 2018-06-02 | 80.073.039.2-731.000 | CV. TATA BUSANA RUDY DAN FAMILY | 170,000,000 | 12.59 % | ||||
164 | 2018 | DINAS PERKEBUNAN DAN PETERNAKAN | Pengadaan Benih/Bibit Kakao Unggul | Tender Cepat | Pengadaan Barang | 3622181 | 14457917 | APBN | 800,000,000 | 725,000,000 | 696,900,000 | 696,900,000 | 696,900,000 | 0 | 0 | 0 | 2018-05-02 09:00:00 | 2018-05-07 | 02.237.261.9-732.000 | CV. GUNUNG PUTRI | 103,100,000 | 12.89 % | ||||
165 | 2018 | DINAS PERTANIAN DAN KETAHANAN PANGAN | Pengadaan Sarana Produksi untuk Pemberdayaan Penangkar Benih Kacang Tanah | Tender Cepat | Pengadaan Barang | 3623181 | 14883764 | APBD | 260,700,000 | 251,893,950 | 250,965,000 | 250,965,000 | 250,965,000 | 0 | 0 | 0 | 2018-05-08 09:00:00 | 2018-05-11 | 03.255.474.3-732.000 | CV. ANUGRAH LESTARI | 9,735,000 | 3.73 % | ||||
166 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Pengawas Pembangunan Taman Edukasi Lalu Lintas | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3624181 | 17678744 | APBD | 150,000,000 | 149,765,000 | 98,505,000 | 98,505,000 | 98,505,000 | 0 | 0 | 0 | 2018-05-20 14:00:00 | 2018-06-21 | 01.860.272.2-731.000 | CV. DAYAKARSA MADYA Consultant | 51,495,000 | 34.33 % | ||||
167 | 2018 | DINAS PERPUSTAKAAN DAN KEARSIPAN | Belanja Modal Pengadaan Konstruksi/ Pembelian Gedung Kantor (Pembangunan Depo Arsip Daerah Prov. Kalsel (Biaya Konsultan Pengawas)) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3625181 | 15345814 | APBD | 216,594,263 | 199,963,500 | 175,408,750 | 175,408,750 | 175,408,750 | 0 | 0 | 0 | 2018-05-22 10:00:00 | 2018-06-05 | 02.708.989.5-731.000 | CV. MANDIRI TATA SARANA CONSULTANT | 41,185,513 | 19.02 % | ||||
168 | 2018 | RUMAH SAKIT UMUM DR. H. MOCH ANSARI SALEH | Pengadaan Pneumatic Tube System | Tender | Pengadaan Barang | 3626181 | 14786588 | APBD | 3,420,000,000 | 2,767,780,000 | 2,214,298,900 | 2,214,298,900 | 2,214,298,900 | 0 | 0 | 0 | 2018-05-18 11:00:00 | 2018-07-05 | 02.625.153.8-504.000 | SURYA GAS INDUSTRI | 1,205,701,100 | 35.25 % | ||||
169 | 2018 | RUMAH SAKIT JIWA SAMBANG LIHUM | Pengadaan Mobile File | Tender Cepat | Pengadaan Barang | 3627181 | 15432653 | APBD | 260,200,000 | 260,188,200 | 259,600,000 | 259,600,000 | 259,600,000 | 0 | 0 | 0 | 2018-05-22 11:00:00 | 2018-05-24 | 01.124.774.9-731.000 | CV. SYARIAAT | 600,000 | 0.23 % | ||||
170 | 2018 | DINAS PERKEBUNAN DAN PETERNAKAN | Pengadaan benih kopi unggul | Tender Cepat | Pengadaan Barang | 3628181 | 14492011 | APBN | 495,000,000 | 495,000,000 | 494,395,000 | 494,395,000 | 494,395,000 | 0 | 0 | 0 | 2018-05-15 09:00:00 | 2018-05-21 | 02.753.911.3-732.000 | CV.Putra Mandiri | 605,000 | 0.12 % | ||||
171 | 2018 | DINAS PERKEBUNAN DAN PETERNAKAN | Pengadaan benih kopi unggul | Tender Cepat | Pengadaan Barang | 3629181 | 14499171 | APBN | 495,000,000 | 495,000,000 | 494,950,500 | 494,950,500 | 494,950,500 | 0 | 0 | 0 | 2018-05-15 09:00:00 | 2018-05-21 | 02.753.911.3-732.000 | CV.Putra Mandiri | 49,500 | 0.01 % | ||||
172 | 2018 | DINAS PERKEBUNAN DAN PETERNAKAN | Pengadaan Pupuk NPK, Fungisida, dan Herbisida untuk peremajaan tanaman karet kab. Balangan | Tender Cepat | Pengadaan Barang | 3630181 | 18086419 | APBN | 272,000,000 | 242,265,760 | 239,597,600 | 239,597,600 | 239,597,600 | 0 | 0 | 0 | 2018-05-21 09:00:00 | 2018-05-24 | 03.282.504.4-732.000 | CV. Hervi Transseed | 32,402,400 | 11.91 % | ||||
173 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Kantor Samsat Kandangan | Tender | Pekerjaan Konstruksi | 3631181 | 16032314 | APBD | 8,658,175,000 | 8,585,865,000 | 8,052,015,000 | 8,052,015,000 | 8,052,015,000 | 0 | 0 | 0 | 2018-05-18 10:00:00 | 2018-05-30 | 80.680.022.3-731.000 | PT.HAMIRI BANGUN MANDIRI | 606,160,000 | 7 % | ||||
174 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Kantor Samsat Tanjung | Tender | Pekerjaan Konstruksi | 3634181 | 14765233 | APBD | 7,683,175,000 | 7,553,895,000 | 6,795,743,000 | 6,795,743,000 | 6,795,743,000 | 0 | 0 | 0 | 2018-05-18 10:00:00 | 2018-06-22 | 01.124.865.5-731.000 | PT. PARTNER KEMENANGAN | 887,432,000 | 11.55 % | ||||
175 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Sarana dan Prasarana Penunjang Gedung Kantor Gubernur Kalsel di Banjarmasin | Tender | Pekerjaan Konstruksi | 3636181 | 18212962 | APBD | 7,732,302,500 | 7,640,321,000 | 7,077,706,000 | 7,077,706,000 | 7,077,706,000 | 0 | 0 | 0 | 2018-05-18 10:00:00 | 2018-05-30 | 72.871.311.6-731.000 | PT. HAMIRI ARTHA MULIA | 654,596,500 | 8.47 % | ||||
176 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Gedung Rapat BAKEUDA | Tender | Pekerjaan Konstruksi | 3637181 | 17678349 | APBD | 4,811,750,000 | 4,704,252,000 | 4,057,593,000 | 4,057,593,000 | 4,057,593,000 | 0 | 0 | 0 | 2018-05-18 10:00:00 | 2018-05-31 | 01.322.015.7-009.000 | PT. JOGLO MULTI AYU | 754,157,000 | 15.67 % | ||||
177 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan dan Jembatan Sei Mandala - Sei Buluh | Tender | Pekerjaan Konstruksi | 3638181 | 14821172 | APBD | 4,906,505,000 | 4,906,505,000 | 4,750,030,967 | 4,750,030,967 | 4,750,030,967 | 0 | 0 | 0 | 2018-05-18 15:00:00 | 2018-05-31 | 01.137.533.4-731.000 | PT. PUTRA KANCA | 156,474,033 | 3.19 % | ||||
178 | 2018 | DINAS ENERGI DAN SUMBER DAYA MINERAL | Konsultansi pengawas pekerjaan pembangunan PLTS Terpusat di Desa Pulau Panjang KEc. Simpang Empat Kab. Tanah Bumbu | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3639181 | 15349779 | APBD | 136,700,000 | 136,494,600 | 135,905,000 | 135,905,000 | 135,905,000 | 0 | 0 | 0 | 2018-05-21 10:00:00 | 2018-06-23 | 03.025.627.5-731.000 | SADWA RAMA CONSULTANT | 795,000 | 0.58 % | ||||
179 | 2018 | DINAS ENERGI DAN SUMBER DAYA MINERAL | Pengadaan PLTS Terpusat off Grid di Kabupaten Tabalong | Tender | Pekerjaan Konstruksi | 3640181 | 15350095 | APBD | 4,557,563,400 | 4,532,630,300 | 4,371,826,800 | 4,371,826,800 | 4,371,826,800 | 0 | 0 | 0 | 2018-05-21 10:00:00 | 2018-07-02 | 03.185.590.1-733.000 | PT. DANIAL ARRAHMAN | 185,736,600 | 4.08 % | ||||
180 | 2018 | DINAS ENERGI DAN SUMBER DAYA MINERAL | Pembangunan Pembangkit PLTS Terpusat Off Grid di Kabupaten Tanah Bumbu | Tender | Pekerjaan Konstruksi | 3641181 | 18028593 | APBDP | 4,534,350,000 | 3,533,691,700 | 3,401,359,500 | 3,401,359,500 | 3,401,359,500 | 0 | 0 | 0 | 2018-05-21 10:00:00 | 2018-06-27 | 03.122.205.2-732.000 | PT. SENTRAL UTAMA TEKNIKAL MANDIRI | 1,132,990,500 | 24.99 % | ||||
181 | 2018 | DINAS ENERGI DAN SUMBER DAYA MINERAL | Pengawasan Pekerjaan Pembangunan PLTS Terpusat Desa Sungai Kumap Kec. Muara Uya Kab. Tabalong | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3642181 | 18028667 | APBDP | 143,000,000 | 136,494,600 | 135,905,000 | 135,905,000 | 135,905,000 | 0 | 0 | 0 | 2018-05-21 10:00:00 | 2018-06-23 | 03.025.627.5-731.000 | SADWA RAMA CONSULTANT | 7,095,000 | 4.96 % | ||||
182 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Renovasi/ Rehab Rumah Jabatan / Dinas Ess I di banjarbaru | Tender | Pekerjaan Konstruksi | 3643181 | 14763125 | APBD | 4,784,025,000 | 4,784,025,000 | 4,704,911,000 | 4,704,911,000 | 4,704,911,000 | 0 | 0 | 0 | 2018-05-20 14:00:00 | 2018-05-31 | 02.048.394.7-217.000 | PT. SUMBER ALAM SEJAHTERA | 79,114,000 | 1.65 % | ||||
183 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembuatan Kantor dan Laboratorium Unit Pelayanan Jasa Sumber Daya Mineral dan Energi | Tender | Pekerjaan Konstruksi | 3644181 | 14765193 | APBD | 2,871,750,000 | 2,763,493,000 | 2,482,319,000 | 2,482,319,000 | 2,482,319,000 | 0 | 0 | 0 | 2018-05-21 08:00:00 | 2018-06-27 | 02.531.377.6-731.000 | PT. SESTRA JENDRA | 389,431,000 | 13.56 % | ||||
184 | 2018 | RUMAH SAKIT JIWA SAMBANG LIHUM | Konstruksi Pembangunan Taman Air | Tender | Pekerjaan Konstruksi | 3646181 | 15433050 | APBD | 4,314,720,000 | 4,206,277,214 | 3,907,919,711 | 3,907,919,711 | 3,907,919,711 | 0 | 0 | 0 | 2018-06-01 11:00:00 | 2018-07-07 | 73.442.192.8-731.000 | KARYA ABU FADHIL | 406,800,289 | 9.43 % | ||||
185 | 2018 | DINAS KEPEMUDAAN DAN OLAHRAGA | Konsumsi Atlet Pada PPLP Prov. Kalsel | Tender | Pengadaan Barang | 3647181 | 16517459 | APBN | 1,101,600,000 | 716,040,000 | 668,304,000 | 668,304,000 | 668,304,000 | 0 | 0 | 0 | 2018-05-31 12:00:00 | 2018-06-24 | 02.531.536.7-731.000 | CV. AGRA NISRINA | 433,296,000 | 39.33 % | ||||
186 | 2018 | DINAS PERPUSTAKAAN DAN KEARSIPAN | Belanja Modal Pengadaan Konstruksi/ Pembelian Gedung Kantor (Pembangunan Depo Arsip Daerah Prov. Kalsel (Biaya Konstruksi Fisik)) | Tender | Pekerjaan Konstruksi | 3648181 | 15345953 | APBD | 9,292,886,653 | 9,275,728,382 | 8,647,903,589 | 8,647,903,589 | 8,647,903,589 | 0 | 0 | 0 | 2018-06-05 22:00:00 | 2018-07-10 | 75.003.859.8-701.000 | PT. NAIRUZ SYIFA MUMTAZA | 644,983,064 | 6.94 % | ||||
187 | 2018 | DINAS PARIWISATA | Belanja Konstruksi Revitalisasi Rumah Adat | Tender | Pekerjaan Konstruksi | 3649181 | 15031000 | APBD | 774,170,000 | 774,169,235 | 767,213,697 | 767,213,697 | 767,213,697 | 0 | 0 | 0 | 2018-06-18 08:00:00 | 2018-07-19 | 02.613.883.4-731.000 | CV. MEGA BERSAUDARA | 6,956,303 | 0.9 % | ||||
188 | 2018 | UPT LABORATORIUM LINGKUNGAN | Pengadaan Alat-Alat Laboratorium Untuk Pengujian Air Dan Udara | Tender Cepat | Pengadaan Barang | 3650181 | 16528433 | APBD | 950,000,000 | 927,999,999 | 918,500,000 | 918,500,000 | 918,500,000 | 0 | 0 | 0 | 2018-05-28 10:00:00 | 2018-05-31 | 72.173.656.9-407.000 | PT. Manunggaling Karsa Persada | 31,500,000 | 3.32 % | ||||
189 | 2018 | DINAS SOSIAL | Pembangunan Rumah Sederhana Desa Hinas Kanan Kec. Hantakan Kab. Hulu Sungai Tengah Luas 30 m2 sebanyak 39 unit | Tender | Pekerjaan Konstruksi | 3652181 | 18157963 | APBN | 1,638,000,000 | 1,637,930,056 | 1,151,885,117 | 1,151,885,117 | 1,151,885,117 | 0 | 0 | 0 | 2018-06-02 20:00:00 | 2018-07-03 | 02.300.399.9-735.000 | CV. RIZKI NOOR FAJAR | 486,114,883 | 29.68 % | ||||
190 | 2018 | DINAS PENDIDIKAN DAN KEBUDAYAAN | Penataan Kawasan Taman Budaya dan Gedung Sultan Suriansyah | Tender | Pekerjaan Konstruksi | 3653181 | 18253157 | APBD | 622,600,000 | 622,599,919 | 547,726,580 | 547,726,580 | 547,726,580 | 0 | 0 | 0 | 2018-06-25 08:00:00 | 2018-08-06 | 02.708.747.7-731.000 | CV.SURYA PUTERA | 74,873,420 | 12.03 % | ||||
191 | 2018 | BADAN PENGEMBANGAN SUMBER DAYA MANUSIA | Pengadaan Makan Minum Peserta dan Panitia PIM II Tahun 2018 (1 Angk) | Tender | Jasa Lainnya | 3654181 | 15424029 | APBD | 275,400,000 | 270,810,000 | 235,926,000 | 235,926,000 | 235,926,000 | 0 | 0 | 0 | 2018-05-28 12:00:00 | 2018-06-08 | 03.202.364.0-731.000 | PT FOKUS PRIMA TALENTA | 39,474,000 | 14.33 % | ||||
192 | 2018 | DINAS PENDIDIKAN DAN KEBUDAYAAN | Penataan Kawasan Makam Syech M. Arsyad Al-Banjari | Tender | Pekerjaan Konstruksi | 3656181 | 18234433 | APBD | 8,828,600,000 | 8,824,017,000 | 8,383,800,000 | 8,383,800,000 | 8,383,800,000 | 0 | 0 | 0 | 2018-06-18 08:00:00 | 2018-07-04 | 01.124.865.5-731.000 | PT. PARTNER KEMENANGAN | 444,800,000 | 5.04 % | ||||
193 | 2018 | DINAS PERTANIAN DAN KETAHANAN PANGAN | Pengadaan Sarana Produksi Pengembangan Kawasan Cabe Rawit (Paket 1) | Tender Cepat | Pengadaan Barang | 3657181 | 15432185 | APBN | 3,089,375,000 | 1,531,798,125 | 1,514,963,698 | 1,514,963,698 | 1,514,963,698 | 0 | 0 | 0 | 2018-05-30 09:00:00 | 2018-06-04 | 03.282.504.4-732.000 | CV. Hervi Transseed | 1,574,411,303 | 50.96 % | ||||
194 | 2018 | DINAS PERTANIAN DAN KETAHANAN PANGAN | Pengadaan Sarana Produksi Pengembangan Kawasan Cabe Besar | Tender Cepat | Pengadaan Barang | 3658181 | 15431904 | APBN | 3,418,750,000 | 846,890,000 | 828,967,040 | 828,967,040 | 828,967,040 | 0 | 0 | 0 | 2018-05-30 09:00:00 | 2018-06-06 | 03.282.504.4-732.000 | CV. Hervi Transseed | 2,589,782,960 | 75.75 % | ||||
195 | 2018 | DINAS PENDIDIKAN DAN KEBUDAYAAN | Pengawasan Penataan Kawasan Syech M. Arsyad Al-Banjari | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3659181 | 18253161 | APBD | 500,000,000 | 414,611,984 | 353,411,344 | 353,411,344 | 353,411,344 | 0 | 0 | 0 | 2018-06-18 08:00:00 | 2018-07-13 | 03.025.627.5-731.000 | SADWA RAMA CONSULTANT | 146,588,656 | 29.32 % | ||||
196 | 2018 | DINAS PENDIDIKAN DAN KEBUDAYAAN | Pembangunan Ruang Kelas Baru (RKB) SLBN Pelambuan Kota Banjarmasin | Tender | Pekerjaan Konstruksi | 3660181 | 16620662 | APBD | 775,250,000 | 775,246,747 | 611,995,424 | 611,995,424 | 611,995,424 | 0 | 0 | 0 | 2018-07-01 20:00:00 | 2018-08-14 | 72.010.859.6-731.000 | CV. 2 NANANG | 163,254,576 | 21.06 % | ||||
197 | 2018 | DINAS PERKEBUNAN DAN PETERNAKAN | Pengadaan Pupuk | Tender Cepat | Pengadaan Barang | 3661181 | 18086428 | APBN | 680,000,000 | 605,664,400 | 593,890,000 | 593,890,000 | 593,890,000 | 0 | 0 | 0 | 2018-06-02 09:00:00 | 2018-06-05 | 81.189.188.6-731.000 | cv. inti bumi | 86,110,000 | 12.66 % | ||||
198 | 2018 | DINAS PERKEBUNAN DAN PETERNAKAN | Pengadaan Pupuk | Tender Cepat | Pengadaan Barang | 3662181 | 18086423 | APBN | 272,000,000 | 242,265,760 | 234,520,000 | 234,520,000 | 234,520,000 | 0 | 0 | 0 | 2018-06-02 09:00:00 | 2018-06-05 | 81.189.188.6-731.000 | cv. inti bumi | 37,480,000 | 13.78 % | ||||
199 | 2018 | DINAS PERKEBUNAN DAN PETERNAKAN | Pengadaan Alat Pengolahan Tanaman Karet | Tender | Pengadaan Barang | 3663181 | 18049933 | APBN | 377,250,000 | 362,037,500 | 351,114,500 | 351,114,500 | 350,014,500 | 0 | 0 | 0 | 2018-06-18 08:00:00 | 2018-07-03 | 03.202.301.2-731.000 | CV. MAKMUR BANUA | 26,135,500 | 6.93 % | ||||
200 | 2018 | TAMAN HUTAN RAYA SULTAN ADAM | Belanja Modal Pengadaan Instalasi Listrik dan Telpon | Tender Cepat | Pekerjaan Konstruksi | 3666181 | 16929763 | APBD | 361,050,000 | 338,447,486 | 337,271,470 | 337,271,470 | 337,271,470 | 0 | 0 | 0 | 2018-06-20 09:00:00 | 2018-06-25 | 03.204.115.4-722.000 | cv.Iqbal Iqram Bersaudara | 23,778,530 | 6.59 % | ||||
201 | 2018 | DINAS LINGKUNGAN HIDUP | Belanja Jasa Konsultan Perencanaan Penyusunan Dokumen Andalalin TPA Regional Banjarbakula (Lelang Ulang) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3670181 | 18273795 | APBD | 275,000,000 | 274,302,050 | 266,475,000 | 266,475,000 | 266,475,000 | 0 | 0 | 0 | 2018-06-18 08:00:00 | 2018-07-10 | 01.216.271.5-441.000 | PT. INTIMULYA MULTIKENCANA | 8,525,000 | 3.1 % | ||||
202 | 2018 | DINAS KELAUTAN DAN PERIKANAN | Pembangunan Kantor Pengelola Konservasi Perairan daerah (PKPD). | Tender | Pekerjaan Konstruksi | 3671181 | 18292916 | APBD | 821,949,000 | 757,047,073 | 722,683,304 | 722,683,304 | 722,683,304 | 0 | 0 | 0 | 2018-06-15 00:00:00 | 2018-07-04 | 83.644.357.2-731.000 | CV ARAFAT UTAMA | 99,265,696 | 12.08 % | ||||
203 | 2018 | DINAS PERHUBUNGAN | Sewa Ponton dan Alat Penggerak | Tender | Jasa Lainnya | 3672181 | 18143934 | APBD | 966,000,000 | 956,340,000 | 935,431,200 | 935,431,200 | 935,431,200 | 0 | 0 | 0 | 2018-06-23 13:00:00 | 2018-07-12 | 02.708.975.4-731.000 | CV.PUTERA BANYIUR | 30,568,800 | 3.16 % | ||||
204 | 2018 | DINAS PERHUBUNGAN | Sewa Exavator Berserta Operator | Tender | Jasa Lainnya | 3674181 | 18132119 | APBD | 736,000,000 | 667,920,000 | 647,680,000 | 647,680,000 | 647,680,000 | 0 | 0 | 0 | 2018-06-23 13:00:00 | 2018-07-12 | 02.614.034.3-731.000 | CV. GEMILANG RIZKI | 88,320,000 | 12 % | ||||
205 | 2018 | DINAS PERKEBUNAN DAN PETERNAKAN | Pengadaan Pupuk | Tender Cepat | Pengadaan Barang | 3676181 | 18083792 | APBN | 625,600,000 | 557,211,248 | 536,049,316 | 536,049,316 | 536,049,316 | 0 | 0 | 0 | 2018-06-22 09:00:00 | 2018-06-26 | 03.282.504.4-732.000 | CV. Hervi Transseed | 89,550,684 | 14.31 % | ||||
206 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan DIR. Polder Bakar Kabupaten Hulu Sungai Utara | Tender | Pekerjaan Konstruksi | 3681181 | 17673833 | APBD | 5,000,000,000 | 4,999,994,000 | 4,772,075,000 | 4,772,075,000 | 4,772,075,000 | 0 | 0 | 0 | 2018-06-22 19:00:00 | 2018-07-04 | 73.215.057.8-731.000 | PT. ADERUS WIRA PERSADA | 227,925,000 | 4.56 % | ||||
207 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi DIR. Tanggul Lungau Kabupaten Hulu Sungai Selatan | Tender | Pekerjaan Konstruksi | 3682181 | 17673880 | APBD | 3,000,000,000 | 2,999,380,000 | 2,542,499,000 | 2,542,499,000 | 2,542,499,000 | 0 | 0 | 0 | 2018-06-22 19:00:00 | 2018-07-11 | 76.644.426.9-733.000 | PT. DATU MULIA BORNEO | 457,501,000 | 15.25 % | ||||
208 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Daerah Irigasi Rawa Danda Besar Kabupaten Barito Kuala | Tender | Pekerjaan Konstruksi | 3683181 | 17674358 | APBD | 5,235,000,000 | 5,234,997,000 | 4,379,080,000 | 4,379,080,000 | 4,379,080,000 | 0 | 0 | 0 | 2018-06-22 19:00:00 | 2018-07-19 | 02.531.377.6-731.000 | PT. SESTRA JENDRA | 855,920,000 | 16.35 % | ||||
209 | 2018 | TAMAN HUTAN RAYA SULTAN ADAM | Konstruksi bangunan Workshop dan alat berat | Tender Cepat | Pekerjaan Konstruksi | 3684181 | 16841079 | APBD | 803,250,000 | 802,722,042 | 724,309,179 | 724,309,179 | 724,309,179 | 0 | 0 | 0 | 2018-07-05 08:00:00 | 2018-07-09 | 03.181.364.5-728.000 | CV. MEGAH KARYA MANDIRI | 78,940,821 | 9.83 % | ||||
210 | 2018 | DINAS PENDIDIKAN DAN KEBUDAYAAN | Pengadaan Peralatan Pendidikan | Tender | Pengadaan Barang | 3685181 | 18165631 | APBD | 4,651,710,000 | 4,632,916,350 | 4,150,228,280 | 4,150,228,280 | 4,150,228,280 | 0 | 0 | 0 | 2018-07-02 21:15:00 | 2018-07-13 | 31.560.597.2-606.000 | PT DELTA SARANA MEDIKA | 501,481,720 | 10.78 % | ||||
211 | 2018 | DINAS PENDIDIKAN DAN KEBUDAYAAN | Rehabilitasi Ruang Kelas SMAN 6 Banjarmasin | Tender | Pekerjaan Konstruksi | 3686181 | 18318877 | APBD | 1,400,000,000 | 1,399,999,669 | 1,119,858,179 | 1,119,858,179 | 1,119,858,179 | 0 | 0 | 0 | 2018-06-30 20:00:00 | 2018-07-21 | 02.708.992.9-731.000 | CV. MITRA SEJAHTERA MANDIRI | 280,141,821 | 20.01 % | ||||
212 | 2018 | DINAS KELAUTAN DAN PERIKANAN | Belanja Modal Jasa Konsultan (Pekerjaan Jasa Konsultan Upaya Kelolaan Lingkungan (UKL) dan Upaya Pemantauan Lingkungan (UPL) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3689181 | 15386330 | APBD | 325,000,000 | 127,765,000 | 126,170,000 | 126,170,000 | 126,170,000 | 0 | 0 | 0 | 2018-06-29 08:00:00 | 2018-07-24 | 01.815.062.3-731.000 | CV. ITNASINDO | 198,830,000 | 61.18 % | ||||
213 | 2018 | DINAS KELAUTAN DAN PERIKANAN | Pengadaan Alat Tangkap Ikan Gillnet untuk Pendukung Kapal > 10 GT | Tender | Pengadaan Barang | 3690181 | 15385840 | APBD | 2,227,500,000 | 2,224,073,775 | 2,109,329,475 | 2,109,329,475 | 2,109,329,475 | 0 | 0 | 0 | 2018-06-28 08:00:00 | 2018-07-20 | 82.742.775.8-731.000 | CV. BANGKIT BANGUN PERSADA | 118,170,525 | 5.31 % | ||||
214 | 2018 | DINAS SOSIAL | Pembangunan Rumah Sederhana Desa Hinas Kiri Kec. Batang Alai Timur Kab. Hulu Sungai Tengah luas 30 m2 sebanyak 39 unit | Tender | Pekerjaan Konstruksi | 3691181 | 18157971 | APBN | 1,638,000,000 | 1,637,752,456 | 1,303,250,708 | 1,303,250,708 | 1,303,250,708 | 0 | 0 | 0 | 2018-07-02 10:00:00 | 2018-07-30 | 03.185.597.6-733.000 | cv.dua putra batara | 334,749,292 | 20.44 % | ||||
215 | 2018 | DINAS KELAUTAN DAN PERIKANAN | Pembangunan KAPAL Fiber > 10 GT dan Mesin | Tender | Pekerjaan Konstruksi | 3692181 | 15385660 | APBD | 10,500,000,000 | 10,473,573,000 | 10,159,380,000 | 10,159,380,000 | 10,109,715,000 | 0 | 0 | 0 | 2018-06-26 12:00:00 | 2018-07-13 | 01.474.138.3-731.000 | PT. PERMATA BARITO SHIPYARD & ENGINEERING | 340,620,000 | 3.24 % | ||||
216 | 2018 | SEKRETARIAT DPRD | Pengadaan Alat-alat Studio untuk Sekretariat DPRD Provinsi Kalimantan Selatan | Tender | Pengadaan Barang | 3694181 | 18306394 | APBD | 1,551,541,600 | 1,523,801,000 | 1,445,378,880 | 1,445,378,880 | 1,445,378,880 | 0 | 0 | 0 | 2018-06-30 10:00:00 | 2018-07-18 | 03.318.046.4-731.000 | CV. KENCANA KARYA | 106,162,720 | 6.84 % | ||||
217 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Supervisi Peningkatan DIR. Polder Bakar Kabupaten Hulu Sungai Utara | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3695181 | 14756929 | APBD | 300,000,000 | 299,970,000 | 284,935,200 | 284,935,200 | 284,935,200 | 0 | 0 | 0 | 2018-06-28 22:00:00 | 2018-08-03 | 01.141.524.7-731.000 | CV. BINA BANUA | 15,064,800 | 5.02 % | ||||
218 | 2018 | DINAS KEHUTANAN | Pengadaan Konstruksi Gedung Kantor KPH Pulau Laut Sebuku | Tender Cepat | Pekerjaan Konstruksi | 3700181 | 15471619 | APBD | 930,000,000 | 929,917,925 | 665,649,533 | 665,649,533 | 665,649,533 | 0 | 0 | 0 | 2018-07-07 09:00:00 | 2018-07-11 | 73.184.099.7-734.000 | CV. BANUA JAYA SAIJAAN | 264,350,467 | 28.42 % | ||||
219 | 2018 | DINAS KEHUTANAN | Pengadaan Konstruksi Gedung Kantor KPH Balangan | Tender Cepat | Pekerjaan Konstruksi | 3701181 | 15470850 | APBD | 750,000,000 | 749,877,647 | 667,113,700 | 667,113,700 | 667,113,700 | 0 | 0 | 0 | 2018-07-07 12:00:00 | 2018-07-10 | 75.146.078.3-728.000 | CV. INSAN CITA MANDIRI | 82,886,300 | 11.05 % | ||||
220 | 2018 | DINAS KEHUTANAN | Pembuatan Sarana Prasarana Persemaian Permanen | Tender Cepat | Pekerjaan Konstruksi | 3702181 | 15259907 | APBD | 819,260,000 | 818,961,316 | 716,937,880 | 716,937,880 | 716,937,880 | 0 | 0 | 0 | 2018-07-13 08:00:00 | 2018-07-16 | 02.531.645.6-731.000 | BIRU LANGIT.CV | 102,322,120 | 12.49 % | ||||
221 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Pintu Gerbang Kantor Kws. Perkantoran di Banjarbaru | Tender | Pekerjaan Konstruksi | 3703181 | 16032641 | APBD | 4,852,000,000 | 4,410,781,966 | 4,271,465,394 | 4,271,465,394 | 4,271,465,394 | 0 | 0 | 0 | 2018-07-13 08:00:00 | 2018-07-31 | 02.902.233.2-009.000 | PT. BAHANA KRIDA NUSANTARA | 580,534,606 | 11.96 % | ||||
222 | 2018 | TAMAN HUTAN RAYA SULTAN ADAM | Instalasi Air | Tender Cepat | Pekerjaan Konstruksi | 3706181 | 16929933 | APBD | 500,000,000 | 470,412,984 | 0 | 0 | 0 | 0 | 0 | 0 | 2018-07-11 08:30:00 | 2018-07-14 | 500,000,000 | 100 % | ||||||
223 | 2018 | TAMAN HUTAN RAYA SULTAN ADAM | Perencanaan Masterplan Lembah Kahung Belangin (Lanscape, Site plan, DED) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3709181 | 17565836 | APBD | 500,000,000 | 499,191,000 | 474,732,500 | 474,732,500 | 474,732,500 | 0 | 0 | 0 | 2018-07-12 08:00:00 | 2018-07-31 | 01.119.163.2-424.000 | PT. SECON DWITUNGGAL PUTRA | 25,267,500 | 5.05 % | ||||
224 | 2018 | RUMAH SAKIT JIWA SAMBANG LIHUM | Konstruksi Rehab Bangunan IGD | Tender | Pekerjaan Konstruksi | 3710181 | 18154515 | APBD | 2,215,059,119 | 2,215,000,001 | 2,023,520,300 | 2,023,520,300 | 2,023,520,300 | 0 | 0 | 0 | 2018-07-29 01:00:00 | 2018-09-25 | 72.019.782.1-735.000 | CV.ORTANG UTAMA | 191,538,819 | 8.65 % | ||||
225 | 2018 | DINAS KELAUTAN DAN PERIKANAN | Jasa Konsultan Pengawasan Pembangunan Kapal Fiber >10 GT dan Mesin | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3711181 | 15385505 | APBD | 180,000,000 | 179,685,000 | 177,375,000 | 177,375,000 | 177,375,000 | 0 | 0 | 0 | 2018-07-12 08:00:00 | 2018-07-24 | 75.718.181.3-001.000 | PT. SENTA SEA MANAJEMEN | 2,625,000 | 1.46 % | ||||
226 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehab Gedung Kantor Setda Provinsi Kalsel di Banjarbaru | Tender | Pekerjaan Konstruksi | 3719181 | 14780477 | APBD | 1,167,202,000 | 1,118,661,070 | 1,057,394,715 | 1,057,394,715 | 1,055,350,000 | 0 | 0 | 0 | 2018-07-13 08:00:00 | 2018-07-25 | 66.139.132.6-733.000 | CV. AL MADINAH | 109,807,285 | 9.41 % | ||||
227 | 2018 | RUMAH SAKIT JIWA SAMBANG LIHUM | Pekerjaan Fisik Rehabilitasi, Renovasi, Restorasi Bangunan, Ruangan, Bangsal, Bangunan Penunjang | Tender | Pekerjaan Konstruksi | 3720181 | 15432728 | APBD | 4,458,153,000 | 4,458,024,005 | 4,133,486,837 | 4,133,486,837 | 4,133,486,837 | 0 | 0 | 0 | 2018-07-16 08:00:00 | 2018-07-27 | 76.608.413.1-731.000 | PT.SUGIWAN BERSAUDARA | 324,666,163 | 7.28 % | ||||
228 | 2018 | DINAS PARIWISATA | Belanja Jasa Konstruksi | Tender | Pekerjaan Konstruksi | 3721181 | 15034812 | APBD | 285,080,000 | 285,079,365 | 231,261,107 | 231,261,107 | 231,261,107 | 0 | 0 | 0 | 2018-08-01 10:00:00 | 2018-08-24 | 73.857.383.1-735.000 | CV. HARAPAN MASA | 53,818,893 | 18.88 % | ||||
229 | 2018 | BADAN RISET DAN INOVASI DAERAH | Belanja Modal Pembuatan Embung dan Siring | Tender | Pekerjaan Konstruksi | 3722181 | 17746951 | APBD | 829,500,000 | 826,686,259 | 0 | 0 | 0 | 0 | 0 | 0 | 2018-08-06 10:00:00 | 2018-09-21 | 01.214.209.7-732.000 | CV. YUDI | 829,500,000 | 100 % | ||||
230 | 2018 | RUMAH SAKIT UMUM DAERAH ULIN BANJARMASIN | Manajemen Konstruksi Pembangunan Gd. SMF Rawat Inap Kelas I | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3723181 | 18016619 | APBD | 1,717,419,000 | 1,714,597,500 | 1,641,035,000 | 1,641,035,000 | 1,641,035,000 | 0 | 0 | 0 | 2018-07-13 19:00:00 | 2018-08-17 | 01.000.012.3-093.000 | PT Indah Karya (Persero) | 76,384,000 | 4.45 % | ||||
231 | 2018 | SEKRETARIAT DPRD | Belanja Modal Pengadaan Penghias Ruangan Rumah tangga | Tender | Pekerjaan Konstruksi | 3724181 | 18299892 | APBD | 681,490,375 | 404,177,552 | 324,439,887 | 324,439,887 | 324,439,887 | 0 | 0 | 0 | 2018-07-14 08:00:00 | 2018-07-27 | 83.377.589.3-732.000 | PT. SIS Karya Utama | 357,050,488 | 52.39 % | ||||
232 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Perbaikan Sarana dan Prasarana WC/KM Masyarakat Pekauman, Kec. Martapura Timur, di Kabupaten Banjar | Tender | Pekerjaan Konstruksi | 3734181 | 16032045 | APBD | 954,225,000 | 927,146,507 | 833,388,248 | 833,388,248 | 833,388,248 | 0 | 0 | 0 | 2018-07-18 13:00:00 | 2018-07-30 | 81.162.895.7-731.000 | cv. usaha umat | 120,836,752 | 12.66 % | ||||
233 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Perbaikan Sarana dan Prasarana WC/KM Masyarakat Sungai Bilu, Kec. Banjarmasin di Kab/Kota Banjarmasin | Tender | Pekerjaan Konstruksi | 3735181 | 16031962 | APBD | 954,225,000 | 789,080,877 | 721,967,273 | 721,967,273 | 721,967,273 | 0 | 0 | 0 | 2018-07-18 13:00:00 | 2018-07-30 | 81.162.895.7-731.000 | cv. usaha umat | 232,257,727 | 24.34 % | ||||
234 | 2018 | DINAS PENDIDIKAN DAN KEBUDAYAAN | Pembangunan Unit Sekolah Baru SMA Sungai Rangas (Kab. Banjar) | Tender | Pekerjaan Konstruksi | 3736181 | 18321661 | APBD | 1,500,000,000 | 1,378,742,503 | 1,214,534,499 | 1,214,534,499 | 1,214,534,499 | 0 | 0 | 0 | 2018-07-16 08:00:00 | 2018-08-01 | 02.362.068.5-731.000 | CV. BANGUN SELARAS | 285,465,501 | 19.03 % | ||||
235 | 2018 | DINAS PARIWISATA | Belanja Konstruksi Pembuatan Halaman, Bangunan, Tugu dan Siring | Tender | Pekerjaan Konstruksi | 3737181 | 15028148 | APBD | 1,840,650,000 | 1,364,809,970 | 1,228,473,175 | 1,228,473,175 | 1,228,473,175 | 0 | 0 | 0 | 2018-08-01 10:00:00 | 2018-08-21 | 02.216.306.7-732.000 | CV. RAHIMAH | 612,176,825 | 33.26 % | ||||
236 | 2018 | DINAS PEMBERDAYAAN MASYARAKAT DAN DESA | DED/FS Pembangunan Jalan Ruas Banjar-Batulicin Provinsi Kalimantan Selatan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3739181 | 18292716 | APBD | 550,000,000 | 548,825,475 | 536,195,000 | 536,195,000 | 536,195,000 | 0 | 0 | 0 | 2018-07-18 10:00:00 | 2018-08-28 | 01.719.362.4-732.000 | CV. SENTRATECS | 13,805,000 | 2.51 % | ||||
237 | 2018 | DINAS KEHUTANAN | Penanaman Sepanjang Jalur Kawasan Perkantoran Pemprov Kalsel | Tender | Jasa Lainnya | 3742181 | 15472304 | APBD | 1,408,600,000 | 1,408,113,000 | 1,274,333,000 | 1,274,333,000 | 1,274,333,000 | 0 | 0 | 0 | 2018-07-25 08:00:00 | 2018-08-07 | 01.424.490.9-731.000 | TIGA DARA | 134,267,000 | 9.53 % | ||||
238 | 2018 | DINAS PERHUBUNGAN | Penyusunan Kebutuhan Feeder dan Kelayakan Angkutan Massal BRT Banjarbakula | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3744181 | 15091232 | APBD | 258,500,000 | 258,439,500 | 244,024,000 | 244,024,000 | 244,024,000 | 0 | 0 | 0 | 2018-08-03 12:00:00 | 2018-09-07 | 02.090.318.3-731.000 | CV. Inditec Consultant | 14,476,000 | 5.6 % | ||||
239 | 2018 | DINAS PEMBERDAYAAN MASYARAKAT DAN DESA | Penyusunan Dokumen AMDAL Pembangunan Jalan Ruas Banjar-Batulicin Provinsi Kalimantan Selatan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3745181 | 18292710 | APBD | 900,000,000 | 893,640,000 | 883,190,000 | 883,190,000 | 884,400,000 | 0 | 0 | 0 | 2018-07-31 15:30:00 | 2018-09-03 | 01.719.362.4-732.000 | CV. SENTRATECS | 16,810,000 | 1.87 % | ||||
240 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Halaman Rumah Dinas Kediaman Gubernur di Banjarmasin | Tender | Pekerjaan Konstruksi | 3751181 | 17678537 | APBD | 435,750,000 | 432,864,280 | 399,329,528 | 399,329,528 | 399,326,928 | 0 | 0 | 0 | 2018-07-30 08:00:00 | 2018-08-15 | 73.471.507.1-731.000 | CV.MAWADDAH | 36,420,472 | 8.36 % | ||||
241 | 2018 | TAMAN HUTAN RAYA SULTAN ADAM | Pembangunan Kantor RPH (Dana DAK) | Tender | Pekerjaan Konstruksi | 3752181 | 18232574 | APBDP | 900,000,000 | 899,986,056 | 821,727,986 | 821,727,986 | 810,636,000 | 0 | 0 | 0 | 2018-07-25 08:00:00 | 2018-08-07 | 02.910.439.5-732.000 | CV. MAJAPAHIT | 78,272,014 | 8.7 % | ||||
242 | 2018 | DINAS ENERGI DAN SUMBER DAYA MINERAL | Pembangunan Sumur Pantau di Kabupaten Tanah Laut | Tender | Pekerjaan Konstruksi | 3753181 | 15414322 | APBD | 501,830,000 | 497,299,470 | 476,644,353 | 476,644,353 | 467,918,000 | 0 | 0 | 0 | 2018-07-28 14:00:00 | 2018-08-17 | 31.355.455.2-429.000 | CV. Persada Cipta Pesona | 25,185,647 | 5.02 % | ||||
243 | 2018 | LABORATORIUM ENERGI DAN SUMBER DAYA MINERAL | Pengadaan Atomic Absorption Spectrophotometer (AAS) | Tender | Pengadaan Barang | 3756181 | 14458599 | APBD | 1,326,918,000 | 1,323,314,300 | 1,281,500,000 | 1,281,500,000 | 1,281,500,000 | 1,281,500,000 | 0 | 0 | 2018-08-07 22:00:00 | 2018-09-07 | 2018-09-24 | 02.090.307.6-731.000 | CV. IFSAN PRATAMA | 02.090.307.6-731.000 | CV. IFSAN PRATAMA | 45,418,000 | 3.42 % | |
244 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Desa Bahandang-Desa Keliling Benteng | Tender | Pekerjaan Konstruksi | 3757181 | 18376222 | APBDP | 5,881,500,000 | 5,881,500,000 | 5,500,276,756 | 5,500,276,756 | 5,500,276,756 | 0 | 0 | 0 | 2018-07-27 15:00:00 | 2018-08-27 | 70.694.710.8-732.000 | PT.TANJUNG RAYA BERSAMA | 381,223,244 | 6.48 % | ||||
245 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Ray 7-Desa Bahandang | Tender | Pekerjaan Konstruksi | 3758181 | 18376199 | APBDP | 4,781,500,000 | 4,781,500,000 | 4,411,466,366 | 4,411,466,366 | 4,411,466,366 | 0 | 0 | 0 | 2018-07-27 15:00:00 | 2018-08-23 | 03.265.981.5-731.000 | PT. Pandji Pratama Indonesia | 370,033,634 | 7.74 % | ||||
246 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Jejangkit Muara-Ray 7 | Tender | Pekerjaan Konstruksi | 3759181 | 18376171 | APBDP | 4,181,500,000 | 4,181,500,000 | 3,906,023,082 | 3,906,023,082 | 3,906,023,082 | 0 | 0 | 0 | 2018-07-27 15:00:00 | 2018-08-13 | 01.124.946.3-731.000 | PT. ADIMANUNGGAL CIPTA PADUNUSA | 275,476,918 | 6.59 % | ||||
247 | 2018 | DINAS PARIWISATA | Penataan Kawasan Wisata Budaya Candi Agung | Tender | Pekerjaan Konstruksi | 3760181 | 15014035;15014312;15014747;15015185;15015351;15028782 | APBD | 417,070,000 | 417,069,689 | 347,841,563 | 347,841,563 | 295,732,544 | 0 | 0 | 0 | 2018-07-31 14:30:00 | 2018-08-20 | 72.140.732.8-735.000 | CV. KARYA AMANAH | 69,228,438 | 16.6 % | ||||
248 | 2018 | TAMAN HUTAN RAYA SULTAN ADAM | Pengadaan Bibit Tanaman dan Pengadaan Tanaman Sulaman | Tender | Pengadaan Barang | 3762181 | 18387886 | APBDP | 317,625,000 | 317,625,000 | 293,803,125 | 293,803,125 | 293,803,125 | 0 | 0 | 0 | 2018-08-01 22:00:00 | 2018-08-13 | 01.424.490.9-731.000 | TIGA DARA | 23,821,875 | 7.5 % | ||||
249 | 2018 | BLUD BALAI PENGELOLAAN AIR MINUM BANJARBAKULA | Pembangunan Gudang Bahan Kimia dan Dinding Penahan Backwash dan Dinding Ruang Garam | Tender | Pekerjaan Konstruksi | 3763181 | 15233398;15233539 | APBD | 500,000,000 | 499,970,420 | 450,065,237 | 450,065,237 | 450,065,237 | 0 | 0 | 0 | 2018-08-03 14:00:00 | 2018-08-30 | 02.243.078.9-732.000 | PT. Indah Perkasa Konstruksi | 49,934,763 | 9.99 % | ||||
250 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Penyusunan Pergub tentang Peraturan Zonasi Lintas Kabupaten Kota (Kawasan Strategis Provinsi Rawa Batang Banyu) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3764181 | 18392489 | APBD | 399,960,000 | 399,960,000 | 365,530,000 | 365,530,000 | 365,530,000 | 0 | 0 | 0 | 2018-08-06 09:00:00 | 2018-09-03 | 02.108.378.7-429.000 | PT. Munasa Kreasi Nusantara | 34,430,000 | 8.61 % | ||||
251 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Orthorektifikasi Peta (Dasar) Rencana Tata Ruang Kawasan Strategis Provinsi Rawa Batang Banyu | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3765181 | 18392492 | APBD | 199,980,000 | 199,980,000 | 188,540,000 | 188,540,000 | 188,540,000 | 0 | 0 | 0 | 2018-08-06 09:00:00 | 2018-09-03 | 02.980.044.8-404.000 | PT. Komperji Nusaraya | 11,440,000 | 5.72 % | ||||
252 | 2018 | LABORATORIUM KESEHATAN | Pengadaan Alat-alat Laboratorium Kimia | Tender | Pengadaan Barang | 3769181 | 15333285 | APBD | 1,072,000,000 | 1,071,269,073 | 1,019,016,900 | 1,019,016,900 | 1,019,016,900 | 0 | 0 | 0 | 2018-08-07 20:00:00 | 2018-08-15 | 66.511.969.9-731.000 | PT VISADA PRATAMA INDONESIA | 52,983,100 | 4.94 % | ||||
253 | 2018 | DINAS ENERGI DAN SUMBER DAYA MINERAL | Konsultansi penyusunan dokumen mineral dan batubara | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3770181 | 15440147 | APBD | 434,500,000 | 433,482,500 | 426,008,500 | 426,008,500 | 428,197,000 | 0 | 0 | 0 | 2018-08-07 10:00:00 | 2018-08-24 | 75.545.223.2-517.000 | PT. JAVA DESAIN CONSULTAN | 8,491,500 | 1.95 % | ||||
254 | 2018 | TAMAN HUTAN RAYA SULTAN ADAM | Pembangunan Dermaga di Pulau Bekantan | Tender | Pekerjaan Konstruksi | 3771181 | 18342224 | APBDP | 1,300,000,000 | 1,299,969,990 | 1,262,722,670 | 1,262,722,670 | 1,262,722,670 | 0 | 0 | 0 | 2018-08-07 22:00:00 | 2018-08-27 | 75.429.932.9-731.000 | CV. DUTA KARYA ADHITAMA | 37,277,330 | 2.87 % | ||||
255 | 2018 | DINAS PERINDUSTRIAN | Pemeliharaan atap, plafon, dan pengecetan gedung dekranasda | Tender | Pekerjaan Konstruksi | 3772181 | 18282740 | APBD | 445,992,000 | 445,991,995 | 366,700,783 | 366,700,783 | 366,700,783 | 0 | 0 | 0 | 2018-08-07 14:00:00 | 2018-08-23 | 02.362.068.5-731.000 | CV. BANGUN SELARAS | 79,291,217 | 17.78 % | ||||
256 | 2018 | TAMAN HUTAN RAYA SULTAN ADAM | Pembangunan Dermaga Wisata Bukit Batu di Tahura Sultan Adam | Tender | Pekerjaan Konstruksi | 3773181 | 18342188 | APBDP | 1,000,000,000 | 997,289,444 | 927,567,032 | 927,567,032 | 927,567,032 | 0 | 0 | 0 | 2018-08-09 08:00:00 | 2018-08-25 | 01.879.380.2-731.000 | ARUNG SAMUDRA | 72,432,968 | 7.24 % | ||||
257 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengadaan Alat Hidrologi (Telemetri) AWLR Intake DI. Haruyan Dayak Kab. Hulu Sungai Tengah dan Sungai WS. Cengal Batulicin | Tender | Pekerjaan Konstruksi | 3774181 | 17674508 | APBD | 600,000,000 | 599,854,479 | 539,101,200 | 539,101,200 | 539,101,200 | 0 | 0 | 0 | 2018-08-07 15:00:00 | 2018-08-28 | 02.342.725.5-733.000 | CV. SAKA PERSADA | 60,898,800 | 10.15 % | ||||
258 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penataan Kualitas Permukiman Kumuh Kab. HSS | Tender | Pekerjaan Konstruksi | 3779181 | 14712662 | APBD | 1,242,500,000 | 1,239,232,350 | 1,090,505,364 | 1,090,505,364 | 1,090,505,364 | 0 | 0 | 0 | 2018-08-08 14:00:00 | 2018-09-08 | 82.936.017.1-731.000 | Cv. Borneo Surya Mandiri | 151,994,636 | 12.23 % | ||||
259 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penanganan Jalan Permukiman Sekumpul di Kabupaten Banjar | Tender | Pekerjaan Konstruksi | 3780181 | 18314308 | APBD | 1,800,000,000 | 1,789,281,352 | 1,432,434,756 | 1,432,434,756 | 1,432,434,756 | 0 | 0 | 0 | 2018-08-10 16:00:00 | 2018-09-03 | 01.110.797.6-732.000 | CV. BERINGIN JAYA | 367,565,244 | 20.42 % | ||||
260 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penanganan Jalan Komplek Amanah di Kabupaten Banjar | Tender | Pekerjaan Konstruksi | 3781181 | 18314293 | APBD | 1,500,000,000 | 1,418,932,191 | 1,012,771,031 | 1,012,771,031 | 1,012,771,031 | 0 | 0 | 0 | 2018-08-17 15:00:00 | 2018-09-12 | 02.043.060.9-731.000 | CV. SHELMA MITRA | 487,228,969 | 32.48 % | ||||
261 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penataan Kualitas Permukiman Kumuh Kab. HST | Tender | Pekerjaan Konstruksi | 3783181 | 14713127 | APBD | 765,700,000 | 763,422,529 | 611,940,790 | 611,940,790 | 611,940,790 | 0 | 0 | 0 | 2018-08-19 12:00:00 | 2018-09-06 | 02.590.775.9-733.000 | CV. PRIMA ROSA | 153,759,210 | 20.08 % | ||||
262 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Peningkatan Kualitas Permukiman Kumuh Kab Banjar | Tender | Pekerjaan Konstruksi | 3784181 | 14710286 | APBD | 912,550,000 | 905,782,707 | 725,385,386 | 725,385,386 | 725,385,386 | 0 | 0 | 0 | 2018-08-19 12:00:00 | 2018-09-05 | 83.644.357.2-731.000 | CV ARAFAT UTAMA | 187,164,614 | 20.51 % | ||||
263 | 2018 | DINAS KELAUTAN DAN PERIKANAN | Pengadaan Pengembangan Budidaya Laut (Bibit Rumput Laut Eucheuma Cottoni Culture Jaringan) Luar Daerah | Tender | Pengadaan Barang | 3793181 | 15389773 | APBD | 276,000,000 | 266,859,700 | 234,135,000 | 234,135,000 | 234,135,000 | 0 | 0 | 0 | 2018-08-20 16:00:00 | 2018-09-24 | 85.111.672.3-732.000 | cv.asmi yuna | 41,865,000 | 15.17 % | ||||
264 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Konsultan Pengawas Penanganan PSU di Permukiman Prov. Kalsel | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3795181 | 18314321 | APBD | 142,050,000 | 140,866,000 | 129,998,825 | 129,998,825 | 129,998,825 | 0 | 0 | 0 | 2018-08-13 09:00:00 | 2018-09-17 | 01.463.263.2-731.000 | PT. MATRA ESTETIKA REKAYASA | 12,051,175 | 8.48 % | ||||
265 | 2018 | DINAS LINGKUNGAN HIDUP | Belanja Jasa Konsultan Perencanaan Dokumen Kajian Masterplan Persampahan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3798181 | 18273770 | APBD | 209,935,000 | 205,768,200 | 184,070,000 | 184,070,000 | 191,565,000 | 0 | 0 | 0 | 2018-08-18 09:00:00 | 2018-09-19 | 01.119.163.2-424.000 | PT. SECON DWITUNGGAL PUTRA | 25,865,000 | 12.32 % | ||||
266 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penanganan Jalan Pesona Bakti Persada di Kota Banjarmasin | Tender | Pekerjaan Konstruksi | 3799181 | 18314110 | APBD | 300,000,000 | 234,553,000 | 204,889,000 | 204,889,000 | 204,889,000 | 0 | 0 | 0 | 2018-08-14 18:00:00 | 2018-08-30 | 02.614.136.6-731.000 | CV. KARYA PANGESTU | 95,111,000 | 31.7 % | ||||
267 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Peningkatan Kualitas Permukiman Kumuh Kota Banjarmasin | Tender | Pekerjaan Konstruksi | 3800181 | 14709310 | APBD | 1,949,300,000 | 1,745,100,000 | 1,498,165,000 | 1,498,165,000 | 1,498,165,000 | 0 | 0 | 0 | 2018-08-14 16:31:00 | 2018-08-31 | 31.662.570.6-731.000 | CV HASDON JAYA | 451,135,000 | 23.14 % | ||||
268 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penataan Kualitas Permukiman Kumuh Kab. Tabalong | Tender | Pekerjaan Konstruksi | 3801181 | 15462592 | APBD | 1,303,100,000 | 1,296,312,562 | 1,098,362,663 | 1,098,362,663 | 1,096,802,919 | 0 | 0 | 0 | 2018-08-20 17:00:00 | 2018-09-05 | 73.623.688.6-735.000 | CV. BUDI KARYA MANDIRI | 204,737,337 | 15.71 % | ||||
269 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penataan Kualitas Permukiman Kumuh Kab Barito Kuala | Tender | Pekerjaan Konstruksi | 3802181 | 14711244 | APBD | 1,120,300,000 | 1,116,013,704 | 912,908,968 | 912,908,968 | 912,908,968 | 0 | 0 | 0 | 2018-08-20 15:00:00 | 2018-09-18 | 02.019.140.9-731.000 | CV. MULIA JAYA | 207,391,032 | 18.51 % | ||||
270 | 2018 | TAMAN HUTAN RAYA SULTAN ADAM | Konstruksi Musholla,Pembangunan Shelter Pada kegiatan Pembangunan dan pemeliharaan sarana dan Prasarana,Pembangunan Rumah Jaga Pada kegiatan Pembangunan dan pemeliharaan sarana dan Prasarana | Tender | Pekerjaan Konstruksi | 3804181 | 17563935;17564089;17564181 | APBD | 369,500,000 | 369,499,542 | 333,101,694 | 333,101,694 | 333,101,694 | 0 | 0 | 0 | 2018-08-17 23:00:00 | 2018-08-23 | 75.146.078.3-728.000 | CV. INSAN CITA MANDIRI | 36,398,306 | 9.85 % | ||||
271 | 2018 | DINAS PERHUBUNGAN | Pengadaan dan Pemasangan Warning Light | Tender | Pekerjaan Konstruksi | 3805181 | 15283279 | APBD | 336,000,000 | 328,593,560 | 312,204,604 | 312,204,604 | 312,204,604 | 0 | 0 | 0 | 2018-08-23 09:30:00 | 2018-09-13 | 01.860.453.8-731.000 | CV. ARUM SEJAHTERA | 23,795,396 | 7.08 % | ||||
272 | 2018 | DINAS KEHUTANAN | Pengadaan Pupuk,Pengadaan Bibit Tanaman Kehutanan,Belanja Bahan/Bibit - Belanja Bibit Kegiatan RHL | Tender | Pengadaan Barang | 3808181 | 15473833;15474511;15475245 | APBD | 1,521,700,000 | 1,105,277,250 | 911,132,000 | 911,132,000 | 911,132,000 | 0 | 0 | 0 | 2018-08-21 20:00:00 | 2018-08-31 | 02.237.173.6-732.000 | CV. Nusantara Asri | 610,568,000 | 40.12 % | ||||
273 | 2018 | DINAS KEPEMUDAAN DAN OLAHRAGA | Rehabilitasi Asrama PPLP dan Lingkungan Sekitar | Tender | Pekerjaan Konstruksi | 3809181 | 14773977 | APBD | 871,940,000 | 853,444,793 | 753,647,917 | 753,647,917 | 753,647,917 | 0 | 0 | 0 | 2018-08-24 09:00:00 | 2018-09-07 | 02.043.385.0-731.000 | CV. Amanat Anugrah Karya | 118,292,083 | 13.57 % | ||||
274 | 2018 | DINAS PERHUBUNGAN | Pengadaan dan pemasangan marka jalan | Tender | Pekerjaan Konstruksi | 3815181 | 15096784 | APBD | 663,100,000 | 659,207,038 | 621,680,199 | 621,680,199 | 621,680,199 | 0 | 0 | 0 | 2018-08-28 09:00:00 | 2018-09-18 | 01.860.453.8-731.000 | CV. ARUM SEJAHTERA | 41,419,801 | 6.25 % | ||||
275 | 2018 | TAMAN HUTAN RAYA SULTAN ADAM | Pembuatan Pagar | Tender | Pekerjaan Konstruksi | 3816181 | 16847121 | APBD | 809,400,000 | 743,642,090 | 561,146,316 | 561,146,316 | 561,146,316 | 0 | 0 | 0 | 2018-08-24 10:00:00 | 2018-09-24 | 02.708.976.2-731.000 | CV. AUDI VINA | 248,253,684 | 30.67 % | ||||
276 | 2018 | DINAS KOMUNIKASI DAN INFORMATIKA | Pengembangan dan Penata Kelolaan E-Government | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3817181 | 18422861 | APBD | 150,000,000 | 148,830,000 | 140,965,000 | 140,965,000 | 140,965,000 | 0 | 0 | 0 | 2018-08-24 00:00:00 | 2018-09-17 | 02.369.197.5-541.000 | PT. GAMATECHNO INDONESIA | 9,035,000 | 6.02 % | ||||
277 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan HELIPAD di Jejangkit | Tender | Pekerjaan Konstruksi | 3820181 | 18420609 | APBDP | 1,550,000,000 | 1,531,724,500 | 1,463,455,082 | 1,463,455,082 | 1,463,455,082 | 0 | 0 | 0 | 2018-08-25 18:00:00 | 2018-09-16 | 31.245.996.9-731.000 | CV.RIDHEVAL HANDIL BHAKTI | 86,544,918 | 5.58 % | ||||
278 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Angkipih-Paramasan Bawah-Paramasan Atas | Tender | Pekerjaan Konstruksi | 3821181 | 18410837 | APBDP | 4,861,335,000 | 4,861,329,665 | 4,519,228,279 | 4,519,228,279 | 4,519,228,279 | 0 | 0 | 0 | 2018-08-25 20:00:00 | 2018-09-14 | 01.141.113.9-651.000 | PT. KARYA TUNGGAL MULYA ABADI | 342,106,721 | 7.04 % | ||||
279 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Perbaikan/Renovasi BRIMOB | Tender | Pekerjaan Konstruksi | 3823181 | 18420593 | APBDP | 935,000,000 | 925,344,400 | 740,035,192 | 740,035,192 | 731,330,297 | 0 | 0 | 0 | 2018-08-25 16:00:00 | 2018-09-10 | 71.462.122.4-732.000 | CV. Salma Aulia | 194,964,808 | 20.85 % | ||||
280 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Jembatan Batulicin-Mentewe | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3826181 | 18410823 | APBDP | 662,818,000 | 657,052,000 | 649,345,500 | 649,345,500 | 650,545,500 | 0 | 0 | 0 | 2018-08-28 17:00:00 | 2018-10-16 | 02.613.877.6-731.000 | CV SEMBILAN SATU ENGINEERING | 13,472,500 | 2.03 % | ||||
281 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Taman Budaya Baru di Kawasan Perkantoran Pemprov. Kalsel | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3827181 | 18420334 | APBDP | 390,000,000 | 389,953,300 | 346,280,000 | 346,280,000 | 370,370,000 | 0 | 0 | 0 | 2018-08-27 12:00:00 | 2018-09-27 | 01.455.616.1-441.000 | PT. DAYA CIPTA DIANRANCANA | 43,720,000 | 11.21 % | ||||
282 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Istana Mahligai Rakyat | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3828181 | 18420291 | APBDP | 191,500,000 | 191,405,500 | 154,628,925 | 154,628,925 | 154,628,925 | 0 | 0 | 0 | 2018-08-27 16:00:00 | 2018-10-20 | 01.463.263.2-731.000 | PT. MATRA ESTETIKA REKAYASA | 36,871,075 | 19.25 % | ||||
283 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Tanjung Serdang-Lontar II | Tender | Pekerjaan Konstruksi | 3829181 | 18410685 | APBDP | 4,469,818,000 | 4,469,817,737 | 4,440,624,241 | 4,440,624,000 | 4,440,624,000 | 0 | 0 | 0 | 2018-08-31 08:15:00 | 2018-09-17 | 02.216.301.8-734.000 | PT. Arta Cipta Permata | 29,193,759 | 0.65 % | ||||
284 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Batulicin-Mekarsari-Mentewe | Tender | Pekerjaan Konstruksi | 3832181 | 18410700 | APBDP | 14,851,585,000 | 14,851,584,856 | 14,073,727,541 | 14,073,727,541 | 14,050,688,106 | 0 | 0 | 0 | 2018-08-27 13:00:00 | 2018-09-15 | 02.421.791.1-734.000 | pt hm family | 777,857,459 | 5.24 % | ||||
285 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penanganan PSU Perumahan di Permukiman Kab. Tapin | Tender | Pekerjaan Konstruksi | 3833181 | 14716981 | APBD | 736,000,000 | 735,999,155 | 589,122,205 | 589,122,205 | 589,122,205 | 0 | 0 | 0 | 2018-09-03 11:00:00 | 2018-09-19 | 73.857.383.1-735.000 | CV. HARAPAN MASA | 146,877,795 | 19.96 % | ||||
286 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Jalan Alternatif ke Makam Syech M. Arsyad Al-Banjari dan DED Jembatan Jalan Pendidikan Sekumpul | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3835181 | 18420292 | APBDP | 396,250,000 | 395,164,000 | 358,325,000 | 358,325,000 | 369,270,000 | 0 | 0 | 0 | 2018-08-28 16:00:00 | 2018-10-26 | 01.489.654.2-711.000 | PT.TEMA KARYA MANDIRI | 37,925,000 | 9.57 % | ||||
287 | 2018 | DINAS PERTANIAN DAN KETAHANAN PANGAN | Pengadaan Power Thresher | Tender | Pengadaan Barang | 3836181 | 17924306 | APBN | 896,000,000 | 525,183,615 | 514,800,000 | 514,800,000 | 514,800,000 | 0 | 0 | 0 | 2018-09-07 15:00:00 | 2018-09-28 | 01.124.774.9-731.000 | CV. SYARIAAT | 381,200,000 | 42.54 % | ||||
288 | 2018 | DINAS KOMUNIKASI DAN INFORMATIKA | Belanja Modal Pengadaan Peralatan Kantor,Belanja Modal Pengadaan Komputer | Tender | Pengadaan Barang | 3837181 | 14724836;14725231 | APBD | 1,678,900,000 | 1,678,388,800 | 1,491,003,633 | 1,491,003,633 | 1,491,003,633 | 0 | 0 | 0 | 2018-09-03 09:00:00 | 2018-09-24 | 72.329.230.6-086.000 | Gunung Emas Ekaputra | 187,896,367 | 11.19 % | ||||
289 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Lanjutan Makam Syeh Arsyad Al Banjari | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3839181 | 18420341 | APBDP | 390,000,000 | 389,953,300 | 300,008,500 | 300,008,500 | 300,008,500 | 0 | 0 | 0 | 2018-08-27 23:55:00 | 2018-10-30 | 02.050.569.9-731.000 | CV. Dharma Cipta Pratama | 89,991,500 | 23.07 % | ||||
290 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Jaringan Listrik Kawasan Perkantoran Pemprov. Kalsel | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3840181 | 18420374 | APBDP | 540,000,000 | 539,990,000 | 341,000,000 | 341,000,000 | 523,600,000 | 0 | 0 | 0 | 2018-08-29 09:00:00 | 2018-10-17 | 02.883.220.2-731.000 | CV. RIA KONSULTAN | 199,000,000 | 36.85 % | ||||
291 | 2018 | DINAS PARIWISATA | Belanja Konstruksi,Belanja Pengadaan Plang Nama | Tender | Pekerjaan Konstruksi | 3842181 | 15028395;15028782 | APBD | 412,850,000 | 404,050,999 | 0 | 0 | 0 | 0 | 0 | 0 | 2018-08-29 13:00:00 | 2018-09-05 | 412,850,000 | 100 % | ||||||
292 | 2018 | TAMAN HUTAN RAYA SULTAN ADAM | Konstruksi Pembangunan Sarana dan Prasarana Wisata Lembah Kahung - Belangian | Tender | Pekerjaan Konstruksi | 3850181 | 14239650;14239917;14240045;16929816;16929890 | APBD | 1,930,000,000 | 1,929,774,662 | 1,815,876,679 | 1,815,876,678 | 1,815,876,678 | 0 | 0 | 0 | 2018-08-31 13:00:00 | 2018-09-14 | 72.296.686.8-732.000 | CV. BARAKAT MANDIRI TEKNIK | 114,123,321 | 5.91 % | ||||
293 | 2018 | DINAS PERPUSTAKAAN DAN KEARSIPAN | Belanja Modal Pengadaan Buku Ilmu Pengetahuan Umum (Belanja Bahan Pustaka Umum) | Tender | Pengadaan Barang | 3851181 | 15345037 | APBD | 1,007,500,000 | 991,326,300 | 971,197,200 | 971,197,200 | 971,197,200 | 0 | 0 | 0 | 2018-10-02 10:00:00 | 2018-10-22 | 73.391.015.2-616.000 | CV.SARANA SUKSES SEJAHTERA | 36,302,800 | 3.6 % | ||||
294 | 2018 | DINAS PERPUSTAKAAN DAN KEARSIPAN | Belanja Modal Pengadaan Buku Ilmu Pengetahuan Umum (Bahan Pustaka untuk Layanan Umum) | Tender | Pengadaan Barang | 3852181 | 15338997 | APBD | 1,000,000,000 | 982,779,300 | 928,178,600 | 928,178,600 | 928,178,600 | 0 | 0 | 0 | 2018-10-02 10:00:00 | 2018-10-22 | 66.576.596.2-625.000 | CV.DUTA SARANA SEJAHTERA | 71,821,400 | 7.18 % | ||||
295 | 2018 | DINAS KESEHATAN | Pengadaan Tablet Tambah Darah Remaja Puteri | Tender | Pengadaan Barang | 3854181 | 14935124 | APBD | 455,392,600 | 455,392,600 | 447,302,684 | 447,302,684 | 447,301,800 | 0 | 0 | 0 | 2018-09-06 14:00:00 | 2018-09-17 | 01.061.248.9-051.000 | Rajawali Nusindo | 8,089,916 | 1.78 % | ||||
296 | 2018 | DINAS PERPUSTAKAAN DAN KEARSIPAN | Pengadaan Videotron. | Tender | Pengadaan Barang | 3856181 | 15182652 | APBD | 1,000,000,000 | 989,999,930 | 731,429,954 | 731,429,954 | 731,429,954 | 0 | 0 | 0 | 2018-09-05 08:00:00 | 2018-09-23 | 03.094.249.4-732.000 | CV. Fingers Buana Angkasa | 268,570,046 | 26.86 % | ||||
297 | 2018 | DINAS PERHUBUNGAN | Pengadaan dan Pemasangan Lampu Penerangan Jalan SolarCell | Tender | Pekerjaan Konstruksi | 3857181 | 15280558 | APBD | 1,755,000,000 | 1,698,603,093 | 1,684,780,559 | 1,684,780,559 | 1,684,780,559 | 0 | 0 | 0 | 2018-09-09 08:00:00 | 2018-09-25 | 02.215.967.7-731.000 | CV. BANJARBARU UTAMA | 70,219,441 | 4 % | ||||
298 | 2018 | DINAS KEHUTANAN | Pemeliharaan/Pembersihan PMUMHM | Tender | Jasa Lainnya | 3859181 | 18421878 | APBD | 306,000,000 | 303,120,048 | 278,520,000 | 278,520,000 | 278,520,000 | 0 | 0 | 0 | 2018-09-07 11:00:00 | 2018-09-25 | 81.748.223.5-733.000 | CV.TELAGA SARI | 27,480,000 | 8.98 % | ||||
299 | 2018 | DINAS PERPUSTAKAAN DAN KEARSIPAN | Belanja Barang Penunjang Kegiatan Dekonsentrasi untuk diserahkan Kepada Pemerintah Daerah (Bantuan Buku Siap Layan untuk diHibahkan ke Perpustakaan Desa) | Tender | Pengadaan Barang | 3861181 | 18324307 | APBN | 536,000,000 | 466,747,200 | 459,190,800 | 459,190,800 | 459,190,800 | 0 | 0 | 0 | 2018-09-05 23:00:00 | 2018-09-21 | 03.018.204.2-732.000 | CV. ANEKA JASA | 76,809,200 | 14.33 % | ||||
300 | 2018 | PANTI PERLINDUNGAN DAN REHABILITASI SOSIAL ANAK DAN REMAJA MULIA SATRIA | Pengadaan Perlengkapan Kantor dan Pengadaan Mebeulair | Tender | Pengadaan Barang | 3864181 | 18325809 | APBD | 465,500,000 | 435,033,500 | 355,520,000 | 355,520,000 | 355,520,000 | 0 | 0 | 0 | 2018-09-06 14:00:00 | 2018-09-25 | 02.531.293.5-731.000 | CV.SORAYA UTAMA | 109,980,000 | 23.63 % | ||||
301 | 2018 | LABORATORIUM KESEHATAN DAN KESELAMATAN KERJA | Belanja modal pengadaan alat-alat laboratorium | Tender | Pengadaan Barang | 3865181 | 18429748 | APBD | 3,046,275,000 | 2,990,000,001 | 2,960,100,000 | 2,960,100,000 | 2,960,100,000 | 0 | 0 | 0 | 2018-09-06 17:00:00 | 2018-09-23 | 03.153.699.8-604.000 | PT. DESINA DEWA RIZKY | 86,175,000 | 2.83 % | ||||
302 | 2018 | DINAS PERPUSTAKAAN DAN KEARSIPAN | Belanja Modal Pengadaan Buku Ilmu Pengetahuan Umum (Pembelian Bahan untuk Referensi) | Tender | Pengadaan Barang | 3866181 | 15344511 | APBD | 1,000,000,000 | 984,001,900 | 929,673,200 | 929,673,200 | 929,673,200 | 0 | 0 | 0 | 2018-10-05 11:00:00 | 2018-10-23 | 66.576.596.2-625.000 | CV.DUTA SARANA SEJAHTERA | 70,326,800 | 7.03 % | ||||
303 | 2018 | DINAS PERINDUSTRIAN | Pekerjaan Pengadaan Jasa Tim Appraisal (Jasa Penilai) Bidang Tanah Sertifikat HPL No. 00001 Tahun 2012 | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3868181 | 14248620 | APBD | 600,000,000 | 597,162,500 | 417,280,000 | 417,280,000 | 417,280,000 | 0 | 0 | 0 | 2018-09-10 16:00:00 | 2018-10-26 | 21.061.218.0-526.000 | KJPP Sih Wiryadi & Rekan | 182,720,000 | 30.45 % | ||||
304 | 2018 | DINAS PERPUSTAKAAN DAN KEARSIPAN | Belanja Modal Rehab Sedang/ Berat Gedung Pertemuan (Rehab Desain Interior Dinas Perpustakaan dan Kearsipan (Konstruksi)) | Tender | Pekerjaan Konstruksi | 3869181 | 15335876 | APBD | 876,250,000 | 869,941,349 | 768,391,998 | 768,391,998 | 768,391,998 | 0 | 0 | 0 | 2018-09-18 10:00:00 | 2018-10-05 | 02.614.219.0-731.000 | CV. Anggun Membangun | 107,858,002 | 12.31 % | ||||
305 | 2018 | DINAS PERPUSTAKAAN DAN KEARSIPAN | Belanja Modal Pengadaan Mesin Fotocopy | Tender | Pengadaan Barang | 3872181 | 15490760 | APBD | 450,000,000 | 435,000,001 | 400,785,000 | 400,785,000 | 400,785,000 | 0 | 0 | 0 | 2018-09-12 08:00:00 | 2018-10-03 | 31.821.374.1-731.000 | CV. KIARATAMA PERSADA | 49,215,000 | 10.94 % | ||||
306 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Study Pendahuluan Sport City | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3873181 | 18446564 | APBDP | 240,000,000 | 239,965,000 | 221,705,000 | 221,705,000 | 221,705,000 | 176,158,400 | 0 | 0 | 2018-09-13 12:00:00 | 2018-11-02 | 2018-11-15 | 01.548.564.2-424.000 | PT. Belaputera Interplan | 01.548.564.2-424.000 | PT. Belaputera Interplan | 18,295,000 | 7.62 % | |
307 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Simpang 3 Tahura-Mandiangin | Tender | Pekerjaan Konstruksi | 3875181 | 18425381 | APBDP | 9,877,725,000 | 9,877,720,641 | 8,218,382,336 | 8,218,382,336 | 8,218,382,336 | 0 | 0 | 0 | 2018-09-13 12:00:00 | 2018-10-01 | 70.694.710.8-732.000 | PT.TANJUNG RAYA BERSAMA | 1,659,342,664 | 16.8 % | ||||
308 | 2018 | DINAS PERHUBUNGAN | Pengadaan dan pemasangan Pagar Pengaman Jalan | Tender | Pekerjaan Konstruksi | 3876181 | 15103208 | APBD | 760,320,000 | 741,262,399 | 724,400,798 | 724,400,798 | 724,400,798 | 0 | 0 | 0 | 2018-09-16 08:00:00 | 2018-10-10 | 81.189.188.6-731.000 | cv. inti bumi | 35,919,202 | 4.72 % | ||||
309 | 2018 | BADAN PENGELOLAAN KEUANGAN DAN ASET DAERAH | Surat Ketetapan Pajak Daerah (SKPD) | Tender | Jasa Lainnya | 3877181 | 14385288 | APBD | 1,350,000,000 | 1,262,250,000 | 1,195,425,000 | 1,195,425,000 | 1,195,425,000 | 0 | 0 | 0 | 2018-09-17 10:00:00 | 2018-10-12 | 01.531.261.4-054.000 | PT JASUINDO TIGA PERKASA TBK | 154,575,000 | 11.45 % | ||||
310 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penanganan PSU Perumahan di Permukiman Kab. Tabalong | Tender | Pekerjaan Konstruksi | 3878181 | 14716499 | APBD | 484,000,000 | 483,000,751 | 384,647,865 | 384,647,865 | 384,647,865 | 0 | 0 | 0 | 2018-09-17 08:00:00 | 2018-10-01 | 75.896.565.8-733.000 | CV.SHAFIRA MULIA | 99,352,135 | 20.53 % | ||||
311 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penanganan Jalan Griya Alam Pemurus di Kabupaten Banjar. | Tender | Pekerjaan Konstruksi | 3879181 | 18314297 | APBD | 800,000,000 | 747,524,241 | 645,119,890 | 645,119,000 | 645,119,000 | 0 | 0 | 0 | 2018-09-20 14:00:00 | 2018-10-09 | 02.675.124.8-734.000 | PUTRA DEWATA | 154,880,110 | 19.36 % | ||||
312 | 2018 | SEKRETARIAT DPRD | Belanja Modal Pengadaan Perlengkapan kantor | Tender | Pengadaan Barang | 3881181 | 18306357 | APBD | 5,083,340,625 | 4,904,415,180 | 4,504,654,000 | 4,504,654,000 | 4,504,654,000 | 0 | 0 | 0 | 2018-09-27 10:00:00 | 2018-10-15 | 74.883.402.5-732.000 | PT. AMEIDHO PUTERA PERDANA | 578,686,625 | 11.38 % | ||||
313 | 2018 | DINAS KOMUNIKASI DAN INFORMATIKA | Pembuatan Masterplan TV Banua | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3882181 | 18440704 | APBD | 357,700,000 | 356,180,000 | 328,735,000 | 328,735,000 | 328,735,000 | 0 | 0 | 0 | 2018-09-21 16:00:00 | 2018-11-06 | 31.552.819.0-423.000 | PT. Sisarti Baksya Asasta | 28,965,000 | 8.1 % | ||||
314 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penanganan Jalan Warga Indah V di Kota Banjarmasin | Tender | Pekerjaan Konstruksi | 3884181 | 18419010 | APBD | 440,000,000 | 439,958,280 | 352,127,310 | 352,127,000 | 352,127,000 | 0 | 0 | 0 | 2018-09-20 14:00:00 | 2018-10-09 | 74.832.861.4-734.000 | AGRA NUSANTARA | 87,872,690 | 19.97 % | ||||
315 | 2018 | DINAS PERPUSTAKAAN DAN KEARSIPAN | Belanja Modal Rehab Sedang/ Berat Gedung Pertemuan (Belanja Rehab Sedang/ Berat Gedung Kantor Perpustakaan Kantor Km.6 (Perbaikan Atap, Palpon, Lantai dan Dinding) (Biaya Konstruksi)) | Tender | Pekerjaan Konstruksi | 3885181 | 15270339 | APBD | 2,270,500,000 | 2,223,163,353 | 2,008,299,362 | 2,008,299,362 | 2,008,299,362 | 0 | 0 | 0 | 2018-09-21 20:00:00 | 2018-10-04 | 02.362.068.5-731.000 | CV. BANGUN SELARAS | 262,200,638 | 11.55 % | ||||
316 | 2018 | DINAS PERPUSTAKAAN DAN KEARSIPAN | Belanja Modal Pengadaan Konstruksi/ Pembelian Gedung Kantor (Pembangunan Depo Arsip Daerah Prov. Kalsel (Biaya Konsultan Perencanaan)) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3887181 | 15345678 | APBD | 312,488,805 | 310,737,075 | 230,925,000 | 230,925,000 | 232,925,000 | 0 | 0 | 0 | 2018-09-21 23:00:00 | 2018-10-31 | 02.050.569.9-731.000 | CV. Dharma Cipta Pratama | 81,563,805 | 26.1 % | ||||
317 | 2018 | DINAS SOSIAL | Pemenuhan pangan Lanjut Usia dalam rangka Hari Kesetiakawanan Sosial (HKSN) | Tender | Pengadaan Barang | 3889181 | 18450773 | APBDP | 442,000,000 | 441,557,116 | 419,347,500 | 419,347,500 | 419,347,500 | 0 | 0 | 0 | 2018-09-27 07:00:00 | 2018-10-10 | 80.422.291.7-731.000 | CV. BAROKAH MANDIRI SEJAHTERA | 22,652,500 | 5.13 % | ||||
318 | 2018 | DINAS PARIWISATA | Belanja Pengadaan Jukung | Tender | Pengadaan Barang | 3890181 | 15038762 | APBD | 695,500,000 | 695,500,000 | 660,725,000 | 660,725,000 | 660,725,000 | 0 | 0 | 0 | 2018-09-27 10:00:00 | 2018-10-11 | 02.708.747.7-731.000 | CV.SURYA PUTERA | 34,775,000 | 5 % | ||||
319 | 2018 | DINAS SOSIAL | Pemberdayaan Fakir Miskin Pedesaan | Tender | Pengadaan Barang | 3891181 | 18450859 | APBDP | 505,000,000 | 504,493,990 | 483,840,500 | 483,840,500 | 483,840,500 | 0 | 0 | 0 | 2018-09-27 09:00:00 | 2018-10-10 | 80.406.318.8-731.000 | CV. Fauzan Faris | 21,159,500 | 4.19 % | ||||
320 | 2018 | DINAS SOSIAL | Belanja Bantuan Sosial Barang | Tender | Pengadaan Barang | 3892181 | 18450822 | APBDP | 820,000,000 | 819,999,180 | 737,610,500 | 737,610,500 | 737,610,500 | 0 | 0 | 0 | 2018-09-27 09:00:00 | 2018-10-10 | 02.489.908.0-731.000 | CV. GIZA EMERALD | 82,389,500 | 10.05 % | ||||
321 | 2018 | DINAS PARIWISATA | Belanja Konstruksi Toilet,Belanja Pengadaan Plang Nama,Belanja Konstruksi Pintu Gerbang | Tender | Pekerjaan Konstruksi | 3893181 | 15038395;15038523;15038968 | APBD | 257,100,000 | 257,064,490 | 220,902,839 | 220,902,839 | 220,902,839 | 0 | 0 | 0 | 2018-10-01 17:00:00 | 2018-10-15 | 02.531.654.8-731.000 | CV. MACRO PERKASA | 36,197,161 | 14.08 % | ||||
322 | 2018 | DINAS PARIWISATA | Penataan Kawasan Wisata Budaya Sei. Jingah Banjarmasin (Kota Pusaka) | Tender | Pekerjaan Konstruksi | 3896181 | 18469556 | APBD | 444,750,000 | 444,504,160 | 405,874,608 | 405,874,608 | 405,874,608 | 0 | 0 | 0 | 2018-10-08 12:00:00 | 2018-10-20 | 03.202.468.9-731.000 | CV. AR RAZAK | 38,875,392 | 8.74 % | ||||
323 | 2018 | DINAS TENAGA KERJA DAN TRANSMIGRASI | Pengembangan Usaha Transmigrasi / Pengadaan Rumah RMU di KTM Cahaya Baru | Tender | Pekerjaan Konstruksi | 3897181 | 18485249 | APBN | 387,400,000 | 387,382,951 | 306,978,177 | 306,978,177 | 306,978,177 | 0 | 0 | 0 | 2018-10-04 20:00:00 | 2018-10-23 | 02.531.536.7-731.000 | CV. AGRA NISRINA | 80,421,823 | 20.76 % | ||||
324 | 2018 | DINAS TENAGA KERJA DAN TRANSMIGRASI | Pengurusan Sertifikat Tanah Transmigrasi/IPL Kab. Barito Kuala | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3898181 | 18446695 | APBN | 147,840,000 | 147,840,000 | 143,880,000 | 143,880,000 | 143,880,000 | 0 | 0 | 0 | 2018-10-09 14:00:00 | 2018-11-08 | 01.563.866.1-701.000 | PT. Tiara Pilar Kreasi | 3,960,000 | 2.68 % | ||||
325 | 2018 | DINAS TENAGA KERJA DAN TRANSMIGRASI | Pengurusan Sertifikat Tanah Transmigrasi/IPL Kab. Tanah Bumbu | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3899181 | 18446678 | APBN | 193,040,000 | 193,030,200 | 188,980,000 | 188,980,000 | 188,980,000 | 0 | 0 | 0 | 2018-10-09 14:00:00 | 2018-11-08 | 01.563.866.1-701.000 | PT. Tiara Pilar Kreasi | 4,060,000 | 2.1 % | ||||
326 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Peningkatan Jalan Perumahan Mustika Abadi Griyatma Kota Banjarbaru | Tender | Pekerjaan Konstruksi | 3900181 | 18314253 | APBD | 1,100,000,000 | 1,098,281,562 | 822,843,877 | 822,843,877 | 822,843,877 | 0 | 0 | 0 | 2018-10-09 20:00:00 | 2018-10-31 | 74.916.754.0-733.000 | AL HIDAYAH, CV | 277,156,123 | 25.2 % | ||||
327 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penanganan Jalan Kruwing Indah 4 Kabupaten Barito Kuala | Tender | Pekerjaan Konstruksi | 3901181 | 18314144 | APBD | 370,000,000 | 369,944,873 | 307,935,611 | 307,935,611 | 307,935,611 | 0 | 0 | 0 | 2018-10-09 20:00:00 | 2018-10-26 | 02.675.124.8-734.000 | PUTRA DEWATA | 62,064,389 | 16.77 % | ||||
328 | 2018 | DINAS KESEHATAN | Pengadaan obat penunjang | Tender | Pengadaan Barang | 3902181 | 14929776 | APBD | 907,500,000 | 907,354,325 | 874,350,950 | 874,350,950 | 874,350,950 | 0 | 0 | 0 | 2018-10-11 12:00:00 | 2018-10-22 | 01.106.301.3-441.000 | PT. Sapta Sari Tama | 33,149,050 | 3.65 % | ||||
329 | 2018 | DINAS KOMUNIKASI DAN INFORMATIKA | Masterplan Smart Province Kalimantan Selatan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3903181 | 18493266 | APBDP | 360,575,000 | 354,105,290 | 326,205,000 | 326,205,000 | 326,205,000 | 0 | 0 | 0 | 2018-10-15 10:00:00 | 2018-11-16 | 02.542.161.1-541.000 | PT. Inixindo Widya Iswara Nusantara | 34,370,000 | 9.53 % | ||||
330 | 2018 | DINAS PERKEBUNAN DAN PETERNAKAN | Pengadaan Tanaman Intercroping pada Intensifikasi Tanaman Karet | Tender | Pengadaan Barang | 3904181 | 18441016 | APBN | 451,700,000 | 398,926,000 | 394,570,000 | 394,570,000 | 394,570,000 | 0 | 0 | 0 | 2018-10-16 14:00:00 | 2018-10-30 | 81.163.850.1-731.000 | CV. Dapat Tarus | 57,130,000 | 12.65 % | ||||
331 | 2018 | TAMAN HUTAN RAYA SULTAN ADAM | Pengadaan Bahan / Bibit Tanaman | Tender | Pengadaan Barang | 3905181 | 18536306 | APBDP | 376,725,000 | 251,565,000 | 238,986,000 | 238,986,000 | 238,986,000 | 0 | 0 | 0 | 2018-10-23 08:00:00 | 2018-10-31 | 01.424.490.9-731.000 | TIGA DARA | 137,739,000 | 36.56 % | ||||
332 | 2018 | BIRO PERLENGKAPAN DAN LAYANAN PENGADAAN BARANG JASA SETDA PROVINSI KALSEL | Pengadaan Televisi (Videotron Mahligai) | Tender | Pengadaan Barang | 3906181 | 18544938 | APBDP | 1,000,000,000 | 999,900,000 | 985,050,000 | 985,050,000 | 985,050,000 | 0 | 0 | 0 | 2018-10-22 23:00:00 | 2018-12-03 | 66.726.236.4-604.000 | PT. BIAN INDAH SANTOSA | 14,950,000 | 1.5 % | ||||
333 | 2018 | BIRO PERLENGKAPAN DAN LAYANAN PENGADAAN BARANG JASA SETDA PROVINSI KALSEL | Pengadaan Mesin Generator/Genset | Tender | Pengadaan Barang | 3907181 | 18545074 | APBDP | 999,999,980 | 990,000,000 | 925,100,000 | 925,100,000 | 925,100,000 | 0 | 0 | 0 | 2018-10-22 23:05:00 | 2018-11-08 | 80.406.318.8-731.000 | CV. Fauzan Faris | 74,899,980 | 7.49 % | ||||
334 | 2018 | SEKRETARIAT DPRD | Belanja Modal Pengadaan Penghias Ruangan Rumah tangga | Tender | Pekerjaan Konstruksi | 3908181 | 18299892 | APBD | 681,490,375 | 404,177,552 | 396,016,877 | 396,016,877 | 396,016,877 | 0 | 0 | 0 | 2018-10-23 21:00:00 | 2018-11-01 | 01.534.417.9-732.000 | CV. VASUNDAN ELC | 285,473,498 | 41.89 % | ||||
335 | 2018 | DINAS TENAGA KERJA DAN TRANSMIGRASI | Pengembangan usaha transmigrasi/Pengadaan alat penangkapan ikan di Kimtrans Angsana | Tender | Pengadaan Barang | 3909181 | 18485356 | APBN | 253,125,000 | 253,044,000 | 251,831,250 | 251,831,250 | 251,831,250 | 0 | 0 | 0 | 2018-10-29 15:30:00 | 2018-11-13 | 02.237.586.9-732.000 | CV. IHSAN MUFAKAT | 1,293,750 | 0.51 % | ||||
336 | 2018 | TAMAN HUTAN RAYA SULTAN ADAM | Pembangunan Dermaga Belangian | Tender | Pekerjaan Konstruksi | 3912181 | 18517249 | APBDP | 1,200,000,000 | 1,168,644,581 | 1,166,523,979 | 1,166,523,979 | 1,166,000,000 | 0 | 0 | 0 | 2018-10-24 10:00:00 | 2018-11-16 | 02.039.406.0-722.000 | NAUFAL LIBRA JAYA, CV | 33,476,021 | 2.79 % | ||||
337 | 2018 | DINAS PARIWISATA | Belanja Konstruksi,Belanja Pengadaan Plang Nama | Tender | Pekerjaan Konstruksi | 3914181 | 15028395;15028782 | APBD | 412,850,000 | 411,530,999 | 390,632,644 | 390,632,644 | 390,632,644 | 0 | 0 | 0 | 2018-10-25 10:00:00 | 2018-11-05 | 03.185.597.6-733.000 | cv.dua putra batara | 22,217,356 | 5.38 % | ||||
338 | 2018 | DINAS PERKEBUNAN DAN PETERNAKAN | Pengadaan Obat Pelapuk Kayu (Peremajaan Tanaman Karet) di Kab. Tanbu, HST, Tabalong dan Balangan | Tender | Pengadaan Barang | 3915181 | 18555957 | APBN | 340,000,000 | 339,995,920 | 297,704,000 | 297,704,000 | 297,704,000 | 0 | 0 | 0 | 2018-10-25 22:00:00 | 2018-11-07 | 03.282.504.4-732.000 | CV. Hervi Transseed | 42,296,000 | 12.44 % | ||||
339 | 2018 | DINAS KOMUNIKASI DAN INFORMATIKA | Belanja Modal Pengadaan Komputer,Belanja Modal Pengadaan Sound System,Belanja Modal Pengadaan Alat-alat Studio | Tender | Pengadaan Barang | 3918181 | 15699613;15699621;15699904;15699908 | APBD | 680,165,000 | 497,255,000 | 493,350,000 | 493,350,000 | 493,350,000 | 0 | 0 | 0 | 2018-11-07 13:00:00 | 2018-11-22 | 02.796.695.1-013.000 | CV. MAHADEWI PERTIWI | 186,815,000 | 27.47 % | ||||
340 | 2018 | DINAS PARIWISATA | Belanja Konstruksi Pembuatan Toilet / Kamar Ganti,Belanja Konstruksi Pembuatan Panggung,Pengadaan Dermaga Apung,Pengadaan Plang Nama,Pengadaan Gazebo | Tender | Pekerjaan Konstruksi | 3919181 | 15018380;15018787;15018969;15019389;15019708 | APBD | 495,280,000 | 492,811,389 | 457,920,785 | 457,920,785 | 457,920,785 | 0 | 0 | 0 | 2018-11-01 16:20:00 | 2018-11-09 | 31.725.819.2-731.000 | CV. ADHI KARYA MANDIRI | 37,359,215 | 7.54 % | ||||
341 | 2018 | RUMAH SAKIT UMUM DAERAH ULIN BANJARMASIN | Pembangunan Gedung SMF Rawat Inap | Tender | Pekerjaan Konstruksi | 3922181 | 18605676 | APBDP | 107,736,613,800 | 107,378,459,727 | 100,210,636,833 | 100,210,636,833 | 100,210,636,833 | 0 | 0 | 0 | 2018-11-02 17:00:00 | 2018-11-20 | 01.362.643.7-054.000 | PT. Jaya Konstruksi Manggala Pratama, Tbk | 7,525,976,967 | 6.99 % | ||||
342 | 2018 | DINAS PERKEBUNAN DAN PETERNAKAN | Pengadaan Pupuk Organik, NPK, Fungisida, Herbisida dan Insektisida (Perluasan Tanaman Kakao di Kab. Banjar) | Tender | Pengadaan Barang | 3924181 | 18656695 | APBN | 260,500,000 | 226,450,950 | 0 | 0 | 0 | 0 | 0 | 0 | 2018-11-15 14:30:00 | 2018-11-30 | 260,500,000 | 100 % | ||||||
343 | 2018 | DINAS KELAUTAN DAN PERIKANAN | Pengadaan Mesin Kapal Nelayan dan Alat Tangkap Ikan Tramel Net | Tender | Pengadaan Barang | 3927181 | 15386054 | APBD | 859,000,000 | 854,326,000 | 821,216,000 | 821,216,000 | 821,216,000 | 0 | 0 | 0 | 2018-11-21 22:00:00 | 2018-12-06 | 85.206.556.4-731.000 | CV. MAKMUR ABADI SEJAHTERA | 37,784,000 | 4.4 % | ||||
344 | 2018 | BIRO PERLENGKAPAN DAN LAYANAN PENGADAAN BARANG JASA SETDA PROVINSI KALSEL | Pengadaan Karpet Untuk Gedung Ideham Khalid | Tender Cepat | Pengadaan Barang | 3933181 | 18706606 | APBDP | 525,000,000 | 524,656,000 | 485,903,000 | 485,903,000 | 485,903,000 | 0 | 0 | 0 | 2018-11-29 12:00:00 | 2018-12-04 | 02.489.908.0-731.000 | CV. GIZA EMERALD | 39,097,000 | 7.45 % | ||||
345 | 2018 | TAMAN HUTAN RAYA SULTAN ADAM | Pagar Keliling Pulau Bekantan | Tender Cepat | Pekerjaan Konstruksi | 3935181 | 18639462 | APBDP | 315,000,000 | 314,990,115 | 0 | 0 | 0 | 0 | 0 | 0 | 2018-11-26 08:00:00 | 2018-11-28 | 315,000,000 | 100 % | ||||||
346 | 2018 | DINAS KELAUTAN DAN PERIKANAN | Pengadaan Keramba Jaring Apung Aquatec | Tender Cepat | Pengadaan Barang | 3937181 | 18507694 | APBD | 500,000,000 | 249,955,433 | 245,000,000 | 245,000,000 | 245,000,000 | 0 | 0 | 0 | 2018-11-28 15:30:00 | 2018-12-03 | 81.364.488.7-808.000 | cv Tunisanga | 255,000,000 | 51 % | ||||
347 | 2018 | BIRO PERLENGKAPAN DAN LAYANAN PENGADAAN BARANG JASA SETDA PROVINSI KALSEL | Pengadaan Lift Setda | Tender Cepat | Pengadaan Barang | 3938181 | 18545037 | APBDP | 1,800,000,000 | 1,799,600,000 | 1,713,800,000 | 1,713,800,000 | 1,713,800,000 | 0 | 0 | 0 | 2018-11-27 09:00:00 | 2018-11-30 | 02.184.852.8-061.000 | PT AKINDO PURNA PRATAMA | 86,200,000 | 4.79 % | ||||
348 | 2018 | SEKRETARIAT PROVINSI KALIMANTAN SELATAN | Belanja Sewa Kendaraan Operasional Roda 4 Bawaslu Kab/Kota | Tender Cepat | Jasa Lainnya | 3942181 | 18696130 | APBN | 7,569,580,000 | 7,569,232,000 | 0 | 0 | 0 | 0 | 0 | 0 | 2018-12-05 08:00:00 | 2018-12-07 | 7,569,580,000 | 100 % | ||||||
349 | 2018 | DINAS PENDIDIKAN DAN KEBUDAYAAN | Pengadaan Mesin Genset | Tender Cepat | Pengadaan Barang | 3944181 | 18855887 | APBDP | 600,000,000 | 587,400,000 | 571,450,000 | 571,450,000 | 571,450,000 | 0 | 0 | 0 | 2018-12-12 08:00:00 | 2018-12-14 | 81.364.488.7-808.000 | cv Tunisanga | 28,550,000 | 4.76 % | ||||
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 2018 | BADAN PENGELOLAAN KEUANGAN DAN ASET DAERAH | Belanja Jasa Pembongkaran Gedung Kantor | Tender | Pekerjaan Konstruksi | 3329181 | 14054140 | APBD | 2,100,000,000 | 2,056,037,500 | 1,678,137,807 | 1,678,137,807 | 1,678,137,807 | 0 | 0 | 0 | 2017-12-06 12:30:00 | 2017-12-21 | 01.815.248.8-732.000 | CV. ADIL MAKMUR | 421,862,193 | 20.09 % | ||||
2 | 2018 | SEKRETARIAT DPRD | Pengadaan Jasa Keamanan Kantor (Satpam) | Tender | Jasa Lainnya | 3335181 | 14290691 | APBD | 1,513,950,000 | 1,387,989,001 | 1,369,000,000 | 1,369,000,000 | 1,369,000,000 | 0 | 0 | 0 | 2018-01-23 16:00:00 | 2018-01-31 | 73.446.568.5-731.000 | PT. Multi Guna Tiga Prima | 144,950,000 | 9.57 % | ||||
3 | 2018 | BIRO PERLENGKAPAN DAN LAYANAN PENGADAAN BARANG JASA SETDA PROVINSI KALSEL | Belanja Modal Pengadaan Alat-alat Angkutan Darat Bermotor Jeep | Tender | Pengadaan Barang | 3341181 | 14886752 | APBD | 4,600,000,000 | 4,557,499,980 | 4,449,540,000 | 4,449,540,000 | 4,449,540,000 | 0 | 0 | 0 | 2018-01-25 10:00:00 | 2018-02-07 | 01.302.584.6-092.000 | PT ASTRA INTERNATIONAL Tbk | 150,460,000 | 3.27 % | ||||
4 | 2018 | DINAS PARIWISATA | Kain Sasirangan | Tender | Pengadaan Barang | 3342181 | 15039139;15065223;15275534 | APBD | 465,000,000 | 464,999,535 | 429,660,000 | 429,660,000 | 429,660,000 | 0 | 0 | 0 | 2018-01-23 12:00:00 | 2018-02-06 | 03.094.314.6-732.000 | CV. WIRA MUDA MANDIRI | 35,340,000 | 7.6 % | ||||
5 | 2018 | SEKRETARIAT DPRD | Pengadaan Jasa Kebersihan Kantor (Cleaning Service) | Tender | Jasa Lainnya | 3348181 | 14291177 | APBD | 1,167,868,000 | 972,874,000 | 800,000,000 | 800,000,000 | 800,000,000 | 0 | 0 | 0 | 2018-01-26 08:00:00 | 2018-02-08 | 03.221.475.1-735.000 | PT YASMINE BUIH PERSADA | 367,868,000 | 31.5 % | ||||
6 | 2018 | RUMAH SAKIT JIWA SAMBANG LIHUM | Belanja Makanan dan Minuman Pasien | Tender | Pengadaan Barang | 3352181 | 15472085 | APBD | 4,807,650,000 | 4,807,636,400 | 4,343,544,960 | 4,343,544,960 | 4,343,544,960 | 0 | 0 | 0 | 2018-02-11 10:00:00 | 2018-02-23 | 72.029.256.4-731.000 | Cv. Hasanul Bashri | 464,105,040 | 9.65 % | ||||
7 | 2018 | BIRO UMUM | Belanja Pemeliharaan Bangunan Gedung Kantor | Tender | Jasa Lainnya | 3355181 | 14841154 | APBD | 2,149,200,000 | 1,800,478,932 | 1,621,611,005 | 1,621,611,005 | 1,621,611,005 | 0 | 0 | 0 | 2018-02-05 14:00:00 | 2018-02-20 | 74.601.733.4-432.000 | PT. ARINA TAMA PERSADA | 527,588,995 | 24.55 % | ||||
8 | 2018 | RUMAH SAKIT JIWA SAMBANG LIHUM | Belanja Obat Non E-Katalog | Tender | Pengadaan Barang | 3356181 | 15430837 | APBD | 1,212,527,718 | 1,160,643,541 | 105,063,420 | 105,063,420 | 105,063,420 | 0 | 0 | 0 | 2018-02-05 14:00:00 | 2018-02-24 | 01.061.248.9-051.000 | Rajawali Nusindo | 1,107,464,298 | 91.34 % | ||||
9 | 2018 | DINAS SOSIAL | Pengadaan Bantuan Sosial Barang Kegiatan Pemenuhan Kebutuhan Pangan Fakir Miskin Perkotaan | Tender | Pengadaan Barang | 3405181 | 15755832 | APBD | 1,136,000,000 | 1,136,000,000 | 1,079,591,920 | 1,079,591,920 | 1,079,591,920 | 0 | 0 | 0 | 2018-02-14 10:00:00 | 2018-03-08 | 02.489.908.0-731.000 | CV. GIZA EMERALD | 56,408,080 | 4.97 % | ||||
10 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Batulicin - Mekarsari - Mentewe | Tender | Pekerjaan Konstruksi | 3408181 | 14823154 | APBD | 34,396,755,000 | 34,396,755,000 | 33,812,113,294 | 33,812,113,294 | 33,812,113,294 | 0 | 0 | 0 | 2018-02-27 11:00:00 | 2018-04-02 | 03.169.298.1-734.000 | PT.BATULICIN BETON ASPHALT | 584,641,706 | 1.7 % | ||||
11 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Anjir Pasar - Marabahan | Tender | Pekerjaan Konstruksi | 3410181 | 14821819 | APBD | 24,546,755,000 | 24,546,755,000 | 23,689,070,581 | 23,689,070,581 | 23,689,070,581 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-16 | 03.265.981.5-731.000 | PT. Pandji Pratama Indonesia | 857,684,419 | 3.49 % | ||||
12 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Rantau - Muara Muning | Tender | Pekerjaan Konstruksi | 3413181 | 14820451 | APBD | 4,467,471,000 | 4,467,465,000 | 3,911,156,404 | 3,911,156,404 | 3,911,156,404 | 0 | 0 | 0 | 2018-02-27 10:50:00 | 2018-04-17 | 80.203.029.6-731.000 | PT. WAJI PUTERA KARYA MANDIRI | 556,314,596 | 12.45 % | ||||
13 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Angsana | Tender | Pekerjaan Konstruksi | 3415181 | 14819063 | APBD | 4,567,471,000 | 4,567,471,000 | 4,325,315,880 | 4,325,315,880 | 4,325,315,880 | 0 | 0 | 0 | 2018-02-27 11:00:00 | 2018-04-19 | 02.216.301.8-734.000 | PT. Arta Cipta Permata | 242,155,120 | 5.3 % | ||||
14 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Pandahan - Margasari dan Penyelesaian Pile Slab | Tender | Pekerjaan Konstruksi | 3416181 | 14820217 | APBD | 4,906,505,000 | 4,906,495,000 | 4,270,910,613 | 4,270,910,613 | 4,270,910,613 | 0 | 0 | 0 | 2018-02-27 10:50:00 | 2018-04-13 | 02.237.343.5-733.000 | PT.Bina Bangun Banua Bersama | 635,594,387 | 12.95 % | ||||
15 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Lingkar Binuang | Tender | Pekerjaan Konstruksi | 3417181 | 14820107 | APBD | 4,567,471,000 | 4,567,471,000 | 4,322,129,000 | 4,322,129,000 | 4,322,129,000 | 0 | 0 | 0 | 2018-02-27 10:50:00 | 2018-04-13 | 01.137.511.0-731.000 | PT. SAMA SENTRAL SWA SEMBADA | 245,342,000 | 5.37 % | ||||
16 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Kasturi - Jalan Akses Bandara - Jalan Lingkar Utara Banjarbaru(Paket II) | Tender | Pekerjaan Konstruksi | 3418181 | 14818611 | APBD | 11,465,000,000 | 11,465,000,000 | 9,683,749,950 | 9,683,749,950 | 9,683,749,950 | 0 | 0 | 0 | 2018-02-27 11:00:00 | 2018-04-13 | 02.172.893.6-731.000 | PT IRINA PERKASA | 1,781,250,050 | 15.54 % | ||||
17 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Dahai - Tanjung | Tender | Pekerjaan Konstruksi | 3420181 | 14819498 | APBD | 4,906,505,000 | 4,906,505,000 | 4,651,671,930 | 4,651,671,930 | 4,651,671,930 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-02 | 02.746.857.8-735.000 | PT. Sinar Mahaputera Mandaga Bakti | 254,833,070 | 5.19 % | ||||
18 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Amuntai - Lampihong - Paringin | Tender | Pekerjaan Konstruksi | 3421181 | 14818966 | APBD | 4,906,505,000 | 4,906,505,000 | 4,639,595,545 | 4,639,595,545 | 4,639,595,545 | 0 | 0 | 0 | 2018-02-27 10:50:00 | 2018-04-17 | 01.124.238.5-735.000 | PT. ULIN SUBUR | 266,909,455 | 5.44 % | ||||
19 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan dan Jembatan Batulicin-Mentewe (DAK) | Tender | Pekerjaan Konstruksi | 3422181 | 15148955 | APBD | 11,130,000,000 | 11,130,000,000 | 10,848,356,660 | 10,848,356,660 | 10,848,356,660 | 0 | 0 | 0 | 2018-02-27 11:00:00 | 2018-04-13 | 03.169.298.1-734.000 | PT.BATULICIN BETON ASPHALT | 281,643,340 | 2.53 % | ||||
20 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Poros, Lingkungan Perkantoran Prov. Kalsel | Tender | Pekerjaan Konstruksi | 3423181 | 14820351 | APBD | 6,972,525,000 | 6,972,525,000 | 6,610,065,823 | 6,610,065,823 | 6,610,065,823 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-02 | 31.635.224.4-731.000 | PT. MULTI USAHA PEMBANGUNAN | 362,459,177 | 5.2 % | ||||
21 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Trikora | Tender | Pekerjaan Konstruksi | 3424181 | 14820658 | APBD | 4,974,750,000 | 4,974,750,000 | 4,725,257,000 | 4,725,257,000 | 4,725,257,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-16 | 01.222.209.7-731.000 | PT. PERDANA PANSELLA | 249,493,000 | 5.02 % | ||||
22 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Banjang - Pulau Nyiur - Batumandi | Tender | Pekerjaan Konstruksi | 3425181 | 14819294 | APBD | 4,467,471,000 | 4,467,471,000 | 3,870,342,459 | 3,870,342,459 | 3,870,342,459 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-05-18 | 73.271.215.3-733.000 | PT. KARYA ANNISA GEMILANG | 597,128,541 | 13.37 % | ||||
23 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan dan Jembatan Lumpangi - Loksado | Tender | Pekerjaan Konstruksi | 3427181 | 14820801 | APBD | 6,554,280,000 | 6,554,280,000 | 6,059,052,350 | 6,059,052,350 | 6,059,052,350 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-18 | 02.014.742.7-714.000 | PT. RAHMAT AGUNG UTAMA | 495,227,650 | 7.56 % | ||||
24 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Birayang - Tariwin - Lok Batu - Batumandi | Tender | Pekerjaan Konstruksi | 3428181 | 14819454 | APBD | 5,554,280,000 | 5,554,280,000 | 4,858,205,000 | 4,858,205,000 | 4,858,205,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-13 | 01.124.058.7-733.000 | AIRA DUTA MURAKATA. PT | 696,075,000 | 12.53 % | ||||
25 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Guntung - Panaitan - Lampihong | Tender | Pekerjaan Konstruksi | 3429181 | 14819806 | APBD | 4,906,505,000 | 4,906,505,000 | 4,659,645,137 | 4,659,645,137 | 4,659,645,137 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-16 | 01.124.098.3-735.000 | PT. CAHAYA MENTARI | 246,859,863 | 5.03 % | ||||
26 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Tanjung - Muara Uya | Tender | Pekerjaan Konstruksi | 3430181 | 14820593 | APBD | 6,454,280,000 | 6,454,280,000 | 5,808,114,242 | 5,808,114,242 | 5,808,114,242 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-02 | 02.590.754.4-735.000 | PT. TABALONG JAYA MARGA BERSAMA | 646,165,758 | 10.01 % | ||||
27 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Banjarbaru - Simpang 3 Tahura - Aranio | Tender | Pekerjaan Konstruksi | 3432181 | 14819355 | APBD | 5,522,525,000 | 5,522,525,000 | 5,097,062,906 | 5,097,062,906 | 5,097,062,906 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-02 | 31.704.295.0-732.000 | PT. KELANA MULTI KONSTRUKSI | 425,462,094 | 7.7 % | ||||
28 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Dalam Kota Banjarmasin | Tender | Pekerjaan Konstruksi | 3433181 | 14819539 | APBD | 4,974,750,000 | 4,974,750,000 | 4,774,925,149 | 4,774,925,149 | 4,774,925,149 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-16 | 01.424.331.5-732.000 | PT. JATI BARU | 199,824,851 | 4.02 % | ||||
29 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Kiram - Simpang 3 Tahura - Mandiangin | Tender | Pekerjaan Konstruksi | 3434181 | 14820050 | APBD | 4,974,750,000 | 4,974,750,000 | 4,872,898,891 | 4,872,898,891 | 4,872,898,891 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-16 | 03.018.148.1-732.000 | PT. ADJI PERKASA | 101,851,109 | 2.05 % | ||||
30 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Gambut - Pulau Sari | Tender | Pekerjaan Konstruksi | 3435181 | 14819632 | APBD | 4,524,750,000 | 4,524,750,000 | 4,365,176,985 | 4,365,176,985 | 4,365,176,985 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-16 | 01.137.533.4-731.000 | PT. PUTRA KANCA | 159,573,015 | 3.53 % | ||||
31 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Tanjung Serdang - Lontar | Tender | Pekerjaan Konstruksi | 3436181 | 14820534 | APBD | 4,903,925,000 | 4,903,925,000 | 4,847,744,000 | 4,847,744,000 | 4,847,744,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-13 | 02.216.301.8-734.000 | PT. Arta Cipta Permata | 56,181,000 | 1.15 % | ||||
32 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Paringin - Halong | Tender | Pekerjaan Konstruksi | 3437181 | 14820304 | APBD | 6,454,280,000 | 6,454,280,000 | 6,187,609,759 | 6,187,609,759 | 6,187,609,759 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-24 | 01.124.098.3-735.000 | PT. CAHAYA MENTARI | 266,670,241 | 4.13 % | ||||
33 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Kandangan - Negara | Tender | Pekerjaan Konstruksi | 3438181 | 14819866 | APBD | 5,404,280,000 | 5,404,000,000 | 4,917,636,279 | 4,917,636,279 | 4,917,636,279 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-13 | 01.124.396.1-733.000 | PT. KARYA MAWAR LESTARI | 486,643,721 | 9 % | ||||
34 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Simpang 3 Lingkar Utara - Simpang 3 Jalan Golf - Jalan Kasturi (Paket I) | Tender | Pekerjaan Konstruksi | 3439181 | 14818665 | APBD | 11,015,000,000 | 11,015,000,000 | 10,090,308,687 | 10,090,308,687 | 10,090,308,687 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-19 | 01.124.946.3-731.000 | PT. ADIMANUNGGAL CIPTA PADUNUSA | 924,691,313 | 8.39 % | ||||
35 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan dan Jembatan Pelaihari-Batakan (DAK) | Tender | Pekerjaan Konstruksi | 3441181 | 15149206 | APBD | 9,700,000,000 | 9,700,000,000 | 8,696,700,000 | 8,696,700,000 | 8,696,700,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-13 | 01.141.578.3-732.000 | PT. SARANA DOA BERSAMA | 1,003,300,000 | 10.34 % | ||||
36 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Pelaihari - Batakan | Tender | Pekerjaan Konstruksi | 3442181 | 14822007 | APBD | 9,454,280,000 | 9,454,280,000 | 9,020,605,059 | 9,020,605,059 | 9,020,605,059 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-13 | 01.322.015.7-009.000 | PT. JOGLO MULTI AYU | 433,674,941 | 4.59 % | ||||
37 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Golf Banjarbaru | Tender | Pekerjaan Konstruksi | 3443181 | 14819742 | APBD | 6,522,525,000 | 6,522,525,000 | 5,782,218,261 | 5,782,218,261 | 5,782,218,261 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-16 | 01.434.922.9-731.000 | PT. MERCU JAYA BUANA | 740,306,739 | 11.35 % | ||||
38 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Simpang 4 Gatot Subroto - Lingkar Dalam Selatan | Tender | Pekerjaan Konstruksi | 3444181 | 14818839 | APBD | 5,522,525,000 | 5,522,525,000 | 4,752,361,474 | 4,752,361,474 | 4,752,361,474 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-17 | 72.196.664.6-731.000 | BIMO LAKSANA GROUP | 770,163,526 | 13.95 % | ||||
39 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Negara - Muara Tapus | Tender | Pekerjaan Konstruksi | 3446181 | 14820134 | APBD | 5,904,280,000 | 5,904,280,000 | 5,606,756,728 | 5,606,756,728 | 5,606,756,728 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-16 | 01.134.056.9-733.000 | PT. ASIA TIMUR KONSTRUKSI | 297,523,272 | 5.04 % | ||||
40 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Gunung Kupang - Kiram - Tambang Ulang | Tender | Pekerjaan Konstruksi | 3447181 | 14818515 | APBD | 14,515,000,000 | 14,515,000,000 | 14,199,402,386 | 14,199,402,386 | 14,199,402,386 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-13 | 70.694.710.8-732.000 | PT.TANJUNG RAYA BERSAMA | 315,597,614 | 2.17 % | ||||
41 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Banjarmasin - Martapura | Tender | Pekerjaan Konstruksi | 3448181 | 14819422 | APBD | 5,972,525,000 | 5,972,525,000 | 5,702,383,679 | 5,702,383,679 | 5,702,383,679 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-16 | 01.133.868.8-731.000 | PT. HM Taher | 270,141,321 | 4.52 % | ||||
42 | 2018 | RUMAH SAKIT UMUM DAERAH ULIN BANJARMASIN | Pengadaan/Pembangunan (Konstruksi) Gedung CSSD/Laundry | Tender | Pekerjaan Konstruksi | 3468181 | 14900889 | APBD | 13,807,193,000 | 13,801,915,463 | 12,360,000,366 | 12,360,000,366 | 12,360,000,366 | 0 | 0 | 0 | 2018-03-09 20:00:00 | 2018-04-17 | 02.467.598.5-722.000 | PT. NAURA LIBRA JAYA | 1,447,192,634 | 10.48 % | ||||
43 | 2018 | DINAS SOSIAL | Pengadaan Bantuan Sosial Barang Kegiatan Pemenuhan Kebutuhan Pangan Fakir Miskin Pesisir dan Pulau-Pulau kecil | Tender | Pengadaan Barang | 3489181 | 16445960 | APBD | 225,000,000 | 225,000,000 | 221,625,000 | 221,625,000 | 221,625,000 | 0 | 0 | 0 | 2018-03-07 12:00:00 | 2018-03-22 | 02.531.293.5-731.000 | CV.SORAYA UTAMA | 3,375,000 | 1.5 % | ||||
44 | 2018 | DINAS PERKEBUNAN DAN PETERNAKAN | Pengadaan Benih karet | Tender | Pengadaan Barang | 3499181 | 17343381 | APBN | 880,000,000 | 880,000,000 | 874,386,975 | 874,386,975 | 874,386,975 | 0 | 0 | 0 | 2018-03-20 08:00:00 | 2018-04-06 | 02.237.261.9-732.000 | CV. GUNUNG PUTRI | 5,613,025 | 0.64 % | ||||
45 | 2018 | DINAS PERKEBUNAN DAN PETERNAKAN | Pengadaan Benih karet | Tender | Pengadaan Barang | 3505181 | 17341483;17342001 | APBN | 704,000,000 | 704,000,000 | 684,200,000 | 684,200,000 | 684,200,000 | 0 | 0 | 0 | 2018-03-15 21:34:00 | 2018-03-28 | 03.185.504.2-733.000 | CV. NAHDI NAJUA | 19,800,000 | 2.81 % | ||||
46 | 2018 | DINAS PERKEBUNAN DAN PETERNAKAN | Pengadaan Benih Karet Tabalong | Tender | Pengadaan Barang | 3515181 | 17341095 | APBN | 809,600,000 | 809,600,000 | 794,420,000 | 794,420,000 | 794,420,000 | 0 | 0 | 0 | 2018-03-17 12:00:00 | 2018-03-28 | 02.919.025.3-735.000 | CV. AGRO PERMATA PRIMA | 15,180,000 | 1.88 % | ||||
47 | 2018 | BIRO PERLENGKAPAN DAN LAYANAN PENGADAAN BARANG JASA SETDA PROVINSI KALSEL | Pengadaan Mobil Jeep/SUV Operasional | Tender | Pengadaan Barang | 3519181 | 17410374 | APBD | 696,850,000 | 529,999,800 | 529,000,000 | 529,000,000 | 529,000,000 | 0 | 0 | 0 | 2018-03-19 14:00:00 | 2018-04-04 | 01.647.543.6-732.000 | PT ISTANA MOBIL TRIO MOTOR | 167,850,000 | 24.09 % | ||||
48 | 2018 | DINAS SOSIAL | Pengadaan Bantuan Sosial Barang Kegiatan Pemenuhan Kebutuhan Pangan Fakir Miskin Pedesaan | Tender | Pengadaan Barang | 3520181 | 15723752 | APBD | 825,000,000 | 825,000,000 | 760,031,250 | 760,031,250 | 760,031,250 | 0 | 0 | 0 | 2018-03-17 18:00:00 | 2018-03-28 | 02.709.388.9-731.000 | CV. LEMBU SWANA | 64,968,750 | 7.88 % | ||||
49 | 2018 | DINAS PERTANIAN DAN KETAHANAN PANGAN | Pengadaan Sarana Produksi Pengembangan Jeruk Siam Banjar | Tender | Pengadaan Barang | 3523181 | 14899967 | APBD | 447,500,000 | 426,500,000 | 420,500,000 | 420,500,000 | 420,500,000 | 0 | 0 | 0 | 2018-03-26 09:00:00 | 2018-04-12 | 02.215.569.1-732.000 | CV. Dimasindo Arthamulya | 27,000,000 | 6.03 % | ||||
50 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Embung Landasan Ulin Kota Banjarbaru | Tender | Pekerjaan Konstruksi | 3524181 | 14756274 | APBD | 1,880,000,000 | 1,879,960,000 | 1,719,700,000 | 1,719,700,000 | 1,719,700,000 | 0 | 0 | 0 | 2018-03-26 23:59:00 | 2018-04-27 | 02.019.281.1-731.000 | CV. OKTAVIANCA | 160,300,000 | 8.53 % | ||||
51 | 2018 | DINAS PERKEBUNAN DAN PETERNAKAN | Pengadaan Pupuk NPK dan Fungisida untuk Intensifikasi Tanaman Karet Kabupaten Tabalong dan Balangan | Tender | Pengadaan Barang | 3529181 | 17851390 | APBN | 420,000,000 | 390,949,350 | 389,400,000 | 389,400,000 | 389,400,000 | 0 | 0 | 0 | 2018-03-22 10:00:00 | 2018-04-13 | 81.189.188.6-731.000 | cv. inti bumi | 30,600,000 | 7.29 % | ||||
52 | 2018 | DINAS PERKEBUNAN DAN PETERNAKAN | Pengadaan Pupuk NPK dan Fungisida Untuk Intensifikasi Tanaman Karet Kabupaten Tapin dan Hulu Sungai Tengah | Tender | Pengadaan Barang | 3530181 | 17850711 | APBN | 576,000,000 | 443,075,930 | 441,320,000 | 441,320,000 | 441,320,000 | 0 | 0 | 0 | 2018-03-22 10:00:00 | 2018-04-13 | 81.189.188.6-731.000 | cv. inti bumi | 134,680,000 | 23.38 % | ||||
53 | 2018 | DINAS PERKEBUNAN DAN PETERNAKAN | Pengadaan Pupuk NPK dan Fungisida Intensifikasi Tanaman Karet Kabupaten Banjar | Tender | Pengadaan Barang | 3531181 | 17851156 | APBN | 280,000,000 | 260,632,900 | 259,600,000 | 259,600,000 | 259,600,000 | 0 | 0 | 0 | 2018-03-22 10:00:00 | 2018-04-13 | 81.163.850.1-731.000 | CV. Dapat Tarus | 20,400,000 | 7.29 % | ||||
54 | 2018 | DINAS KEHUTANAN | Pengadaan Bahan dan Media Tanam | Tender | Pengadaan Barang | 3532181 | 17296385 | APBD | 373,990,000 | 339,113,863 | 295,054,000 | 295,054,000 | 295,054,000 | 0 | 0 | 0 | 2018-03-28 20:00:00 | 2018-04-12 | 01.424.490.9-731.000 | TIGA DARA | 78,936,000 | 21.11 % | ||||
55 | 2018 | DINAS PERKEBUNAN DAN PETERNAKAN | Pengadaan Pupuk NPK, Fungisida dan Herbisida Intensifikasi Tanaman Karet Kabupaten Tanah Bumbu | Tender | Pengadaan Barang | 3534181 | 17850991 | APBN | 624,000,000 | 561,476,520 | 561,000,000 | 561,000,000 | 561,000,000 | 0 | 0 | 0 | 2018-03-22 10:00:00 | 2018-04-13 | 81.163.850.1-731.000 | CV. Dapat Tarus | 63,000,000 | 10.1 % | ||||
56 | 2018 | DINAS PERKEBUNAN DAN PETERNAKAN | Pengadaan Chainsaw Untuk Kegiatan Peremajaan Tanaman Karet | Tender | Pengadaan Barang | 3535181 | 14458770;14458834;14459236;14465072 | APBN | 318,000,000 | 275,129,989 | 259,578,000 | 259,578,000 | 259,578,000 | 0 | 0 | 0 | 2018-03-22 10:00:00 | 2018-04-13 | 66.220.474.2-731.000 | CV. SAFFANAH | 58,422,000 | 18.37 % | ||||
57 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Normalisasi Sungai Jepana (DAS Satui) Kabupaten Tanah Bumbu | Tender | Pekerjaan Konstruksi | 3538181 | 17673812 | APBD | 10,700,000,000 | 10,699,500,000 | 8,007,338,763 | 8,007,338,763 | 8,007,338,763 | 0 | 0 | 0 | 2018-03-22 11:00:00 | 2018-04-23 | 01.137.507.8-731.000 | PT. Apu Stiants | 2,692,661,237 | 25.17 % | ||||
58 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Daerah Irigasi Kinarum 1.004 Ha Kabupaten Tabalong | Tender | Pekerjaan Konstruksi | 3539181 | 17673748 | APBD | 10,170,000,000 | 10,169,995,000 | 9,395,185,330 | 9,395,185,330 | 9,395,185,330 | 0 | 0 | 0 | 2018-03-22 11:00:00 | 2018-04-23 | 01.407.735.8-711.000 | PT.ARGO SANJOYO ADHITAMA | 774,814,670 | 7.62 % | ||||
59 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehab Gedung Mess Biliton dan TMII | Tender | Pekerjaan Konstruksi | 3576181 | 17679009 | APBD | 4,690,100,000 | 4,659,189,000 | 4,307,367,000 | 4,307,367,000 | 4,307,367,000 | 0 | 0 | 0 | 2018-04-05 12:00:00 | 2018-06-07 | 02.708.995.2-731.000 | PT. LIAN KAMALA | 382,733,000 | 8.16 % | ||||
60 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Kiram-Gunung Mawar (DID) | Tender | Pekerjaan Konstruksi | 3577181 | 17708219 | APBDP | 10,000,000,000 | 9,517,025,000 | 8,914,917,640 | 8,914,917,640 | 8,914,917,640 | 0 | 0 | 0 | 2018-04-17 12:00:00 | 2018-05-23 | 70.694.710.8-732.000 | PT.TANJUNG RAYA BERSAMA | 1,085,082,360 | 10.85 % | ||||
61 | 2018 | KEBUN RAYA BANUA | Belanja Modal Pengadaan Instalasi Listrik | Tender | Pekerjaan Konstruksi | 3585181 | 17536021 | APBD | 3,301,000,000 | 3,257,449,925 | 3,191,237,757 | 3,191,237,757 | 3,191,237,757 | 0 | 0 | 0 | 2018-04-27 08:00:00 | 2018-05-21 | 80.257.244.6-609.000 | PT ARGE HABRO SOLUTIO | 109,762,243 | 3.33 % | ||||
62 | 2018 | DINAS PERTANIAN DAN KETAHANAN PANGAN | Pengadaan Sarana Produksi Pengembangan Kacang Tanah | Tender | Pengadaan Barang | 3588181 | 14882475 | APBD | 983,660,000 | 983,454,500 | 971,590,300 | 971,590,300 | 971,590,300 | 0 | 0 | 0 | 2018-04-12 10:00:00 | 2018-04-26 | 03.255.474.3-732.000 | CV. ANUGRAH LESTARI | 12,069,700 | 1.23 % | ||||
63 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Gedung BPSDM Prov. Kalsel di Banjarbaru | Tender | Pekerjaan Konstruksi | 3589181 | 14761859 | APBD | 24,281,000,000 | 24,239,008,000 | 22,394,916,000 | 22,394,916,000 | 22,394,916,000 | 0 | 0 | 0 | 2018-04-16 10:20:00 | 2018-05-16 | 02.708.996.0-731.000 | PT.CHARIA BENEFIT UTAMA | 1,886,084,000 | 7.77 % | ||||
64 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Toliet dan Rehabilitasi Halaman Masjid Raya Sabilal Muhtadin di Banjarmasin | Tender | Pekerjaan Konstruksi | 3591181 | 18092214 | APBD | 1,876,050,000 | 1,849,855,000 | 1,495,601,096 | 1,495,601,096 | 1,495,601,096 | 0 | 0 | 0 | 2018-04-13 15:00:00 | 2018-05-04 | 01.879.396.8-731.000 | CV. EDNA BERSAUDARA | 380,448,904 | 20.28 % | ||||
65 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Gunung Kupang-Kiram (DID) | Tender | Pekerjaan Konstruksi | 3593181 | 17710812 | APBDP | 2,500,000,000 | 2,471,750,000 | 2,001,138,536 | 2,001,138,536 | 2,001,138,536 | 0 | 0 | 0 | 2018-04-17 14:00:00 | 2018-05-18 | 74.117.390.0-732.000 | MIRZA UTAMA MARGA | 498,861,464 | 19.95 % | ||||
66 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Paramasan Bawah-Paramasan Atas (DID) | Tender | Pekerjaan Konstruksi | 3594181 | 17708118 | APBDP | 2,000,000,000 | 1,647,253,000 | 1,596,507,072 | 1,596,507,072 | 1,596,507,072 | 0 | 0 | 0 | 2018-04-17 16:00:00 | 2018-05-18 | 01.124.716.0-731.000 | CV. DUA MAS | 403,492,928 | 20.17 % | ||||
67 | 2018 | DINAS PERKEBUNAN DAN PETERNAKAN | Pengadaan Peralatan dan Mesin Pembuatan RSS | Tender | Pengadaan Barang | 3611181 | 18048700 | APBN | 500,000,000 | 451,000,000 | 440,000,000 | 440,000,000 | 431,750,000 | 0 | 0 | 0 | 2018-04-24 10:00:00 | 2018-05-05 | 03.202.301.2-731.000 | CV. MAKMUR BANUA | 60,000,000 | 12 % | ||||
68 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi DI. Intangan Kabupaten Hulu Sungai Tengah | Tender | Pekerjaan Konstruksi | 3612181 | 14757215 | APBD | 1,300,000,000 | 1,299,992,873 | 1,013,292,066 | 1,013,292,066 | 1,013,292,066 | 0 | 0 | 0 | 2018-04-27 08:00:00 | 2018-05-26 | 72.232.474.6-733.000 | CV. MIRANTI | 286,707,934 | 22.05 % | ||||
69 | 2018 | DINAS PERKEBUNAN DAN PETERNAKAN | Belanja barang fisik lainnya untuk diserahkan kepada masyarakat/Pemda Pengadaan Container Lapang 3 Liter dan Container Depo N2 Cair 50 Liter | Tender | Pengadaan Barang | 3613181 | 18147038 | APBN | 547,350,000 | 547,184,000 | 521,950,000 | 521,950,000 | 521,950,000 | 0 | 0 | 0 | 2018-04-25 00:00:00 | 2018-05-15 | 70.405.861.9-615.000 | CV. MITRA BERKAH SEJAHTERA | 25,400,000 | 4.64 % | ||||
70 | 2018 | SEKRETARIAT DPRD | Pengadaan Pakaian Dinas Beserta Kelengkapannnya | Tender | Pengadaan Barang | 3621181 | 14973958 | APBD | 1,349,750,000 | 1,325,499,975 | 1,179,750,000 | 1,179,750,000 | 1,179,750,000 | 0 | 0 | 0 | 2018-05-14 12:00:00 | 2018-06-02 | 80.073.039.2-731.000 | CV. TATA BUSANA RUDY DAN FAMILY | 170,000,000 | 12.59 % | ||||
71 | 2018 | RUMAH SAKIT UMUM DR. H. MOCH ANSARI SALEH | Pengadaan Pneumatic Tube System | Tender | Pengadaan Barang | 3626181 | 14786588 | APBD | 3,420,000,000 | 2,767,780,000 | 2,214,298,900 | 2,214,298,900 | 2,214,298,900 | 0 | 0 | 0 | 2018-05-18 11:00:00 | 2018-07-05 | 02.625.153.8-504.000 | SURYA GAS INDUSTRI | 1,205,701,100 | 35.25 % | ||||
72 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Kantor Samsat Kandangan | Tender | Pekerjaan Konstruksi | 3631181 | 16032314 | APBD | 8,658,175,000 | 8,585,865,000 | 8,052,015,000 | 8,052,015,000 | 8,052,015,000 | 0 | 0 | 0 | 2018-05-18 10:00:00 | 2018-05-30 | 80.680.022.3-731.000 | PT.HAMIRI BANGUN MANDIRI | 606,160,000 | 7 % | ||||
73 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Kantor Samsat Tanjung | Tender | Pekerjaan Konstruksi | 3634181 | 14765233 | APBD | 7,683,175,000 | 7,553,895,000 | 6,795,743,000 | 6,795,743,000 | 6,795,743,000 | 0 | 0 | 0 | 2018-05-18 10:00:00 | 2018-06-22 | 01.124.865.5-731.000 | PT. PARTNER KEMENANGAN | 887,432,000 | 11.55 % | ||||
74 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Sarana dan Prasarana Penunjang Gedung Kantor Gubernur Kalsel di Banjarmasin | Tender | Pekerjaan Konstruksi | 3636181 | 18212962 | APBD | 7,732,302,500 | 7,640,321,000 | 7,077,706,000 | 7,077,706,000 | 7,077,706,000 | 0 | 0 | 0 | 2018-05-18 10:00:00 | 2018-05-30 | 72.871.311.6-731.000 | PT. HAMIRI ARTHA MULIA | 654,596,500 | 8.47 % | ||||
75 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Gedung Rapat BAKEUDA | Tender | Pekerjaan Konstruksi | 3637181 | 17678349 | APBD | 4,811,750,000 | 4,704,252,000 | 4,057,593,000 | 4,057,593,000 | 4,057,593,000 | 0 | 0 | 0 | 2018-05-18 10:00:00 | 2018-05-31 | 01.322.015.7-009.000 | PT. JOGLO MULTI AYU | 754,157,000 | 15.67 % | ||||
76 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan dan Jembatan Sei Mandala - Sei Buluh | Tender | Pekerjaan Konstruksi | 3638181 | 14821172 | APBD | 4,906,505,000 | 4,906,505,000 | 4,750,030,967 | 4,750,030,967 | 4,750,030,967 | 0 | 0 | 0 | 2018-05-18 15:00:00 | 2018-05-31 | 01.137.533.4-731.000 | PT. PUTRA KANCA | 156,474,033 | 3.19 % | ||||
77 | 2018 | DINAS ENERGI DAN SUMBER DAYA MINERAL | Pengadaan PLTS Terpusat off Grid di Kabupaten Tabalong | Tender | Pekerjaan Konstruksi | 3640181 | 15350095 | APBD | 4,557,563,400 | 4,532,630,300 | 4,371,826,800 | 4,371,826,800 | 4,371,826,800 | 0 | 0 | 0 | 2018-05-21 10:00:00 | 2018-07-02 | 03.185.590.1-733.000 | PT. DANIAL ARRAHMAN | 185,736,600 | 4.08 % | ||||
78 | 2018 | DINAS ENERGI DAN SUMBER DAYA MINERAL | Pembangunan Pembangkit PLTS Terpusat Off Grid di Kabupaten Tanah Bumbu | Tender | Pekerjaan Konstruksi | 3641181 | 18028593 | APBDP | 4,534,350,000 | 3,533,691,700 | 3,401,359,500 | 3,401,359,500 | 3,401,359,500 | 0 | 0 | 0 | 2018-05-21 10:00:00 | 2018-06-27 | 03.122.205.2-732.000 | PT. SENTRAL UTAMA TEKNIKAL MANDIRI | 1,132,990,500 | 24.99 % | ||||
79 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Renovasi/ Rehab Rumah Jabatan / Dinas Ess I di banjarbaru | Tender | Pekerjaan Konstruksi | 3643181 | 14763125 | APBD | 4,784,025,000 | 4,784,025,000 | 4,704,911,000 | 4,704,911,000 | 4,704,911,000 | 0 | 0 | 0 | 2018-05-20 14:00:00 | 2018-05-31 | 02.048.394.7-217.000 | PT. SUMBER ALAM SEJAHTERA | 79,114,000 | 1.65 % | ||||
80 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembuatan Kantor dan Laboratorium Unit Pelayanan Jasa Sumber Daya Mineral dan Energi | Tender | Pekerjaan Konstruksi | 3644181 | 14765193 | APBD | 2,871,750,000 | 2,763,493,000 | 2,482,319,000 | 2,482,319,000 | 2,482,319,000 | 0 | 0 | 0 | 2018-05-21 08:00:00 | 2018-06-27 | 02.531.377.6-731.000 | PT. SESTRA JENDRA | 389,431,000 | 13.56 % | ||||
81 | 2018 | RUMAH SAKIT JIWA SAMBANG LIHUM | Konstruksi Pembangunan Taman Air | Tender | Pekerjaan Konstruksi | 3646181 | 15433050 | APBD | 4,314,720,000 | 4,206,277,214 | 3,907,919,711 | 3,907,919,711 | 3,907,919,711 | 0 | 0 | 0 | 2018-06-01 11:00:00 | 2018-07-07 | 73.442.192.8-731.000 | KARYA ABU FADHIL | 406,800,289 | 9.43 % | ||||
82 | 2018 | DINAS KEPEMUDAAN DAN OLAHRAGA | Konsumsi Atlet Pada PPLP Prov. Kalsel | Tender | Pengadaan Barang | 3647181 | 16517459 | APBN | 1,101,600,000 | 716,040,000 | 668,304,000 | 668,304,000 | 668,304,000 | 0 | 0 | 0 | 2018-05-31 12:00:00 | 2018-06-24 | 02.531.536.7-731.000 | CV. AGRA NISRINA | 433,296,000 | 39.33 % | ||||
83 | 2018 | DINAS PERPUSTAKAAN DAN KEARSIPAN | Belanja Modal Pengadaan Konstruksi/ Pembelian Gedung Kantor (Pembangunan Depo Arsip Daerah Prov. Kalsel (Biaya Konstruksi Fisik)) | Tender | Pekerjaan Konstruksi | 3648181 | 15345953 | APBD | 9,292,886,653 | 9,275,728,382 | 8,647,903,589 | 8,647,903,589 | 8,647,903,589 | 0 | 0 | 0 | 2018-06-05 22:00:00 | 2018-07-10 | 75.003.859.8-701.000 | PT. NAIRUZ SYIFA MUMTAZA | 644,983,064 | 6.94 % | ||||
84 | 2018 | DINAS PARIWISATA | Belanja Konstruksi Revitalisasi Rumah Adat | Tender | Pekerjaan Konstruksi | 3649181 | 15031000 | APBD | 774,170,000 | 774,169,235 | 767,213,697 | 767,213,697 | 767,213,697 | 0 | 0 | 0 | 2018-06-18 08:00:00 | 2018-07-19 | 02.613.883.4-731.000 | CV. MEGA BERSAUDARA | 6,956,303 | 0.9 % | ||||
85 | 2018 | DINAS SOSIAL | Pembangunan Rumah Sederhana Desa Hinas Kanan Kec. Hantakan Kab. Hulu Sungai Tengah Luas 30 m2 sebanyak 39 unit | Tender | Pekerjaan Konstruksi | 3652181 | 18157963 | APBN | 1,638,000,000 | 1,637,930,056 | 1,151,885,117 | 1,151,885,117 | 1,151,885,117 | 0 | 0 | 0 | 2018-06-02 20:00:00 | 2018-07-03 | 02.300.399.9-735.000 | CV. RIZKI NOOR FAJAR | 486,114,883 | 29.68 % | ||||
86 | 2018 | DINAS PENDIDIKAN DAN KEBUDAYAAN | Penataan Kawasan Taman Budaya dan Gedung Sultan Suriansyah | Tender | Pekerjaan Konstruksi | 3653181 | 18253157 | APBD | 622,600,000 | 622,599,919 | 547,726,580 | 547,726,580 | 547,726,580 | 0 | 0 | 0 | 2018-06-25 08:00:00 | 2018-08-06 | 02.708.747.7-731.000 | CV.SURYA PUTERA | 74,873,420 | 12.03 % | ||||
87 | 2018 | BADAN PENGEMBANGAN SUMBER DAYA MANUSIA | Pengadaan Makan Minum Peserta dan Panitia PIM II Tahun 2018 (1 Angk) | Tender | Jasa Lainnya | 3654181 | 15424029 | APBD | 275,400,000 | 270,810,000 | 235,926,000 | 235,926,000 | 235,926,000 | 0 | 0 | 0 | 2018-05-28 12:00:00 | 2018-06-08 | 03.202.364.0-731.000 | PT FOKUS PRIMA TALENTA | 39,474,000 | 14.33 % | ||||
88 | 2018 | DINAS PENDIDIKAN DAN KEBUDAYAAN | Penataan Kawasan Makam Syech M. Arsyad Al-Banjari | Tender | Pekerjaan Konstruksi | 3656181 | 18234433 | APBD | 8,828,600,000 | 8,824,017,000 | 8,383,800,000 | 8,383,800,000 | 8,383,800,000 | 0 | 0 | 0 | 2018-06-18 08:00:00 | 2018-07-04 | 01.124.865.5-731.000 | PT. PARTNER KEMENANGAN | 444,800,000 | 5.04 % | ||||
89 | 2018 | DINAS PENDIDIKAN DAN KEBUDAYAAN | Pembangunan Ruang Kelas Baru (RKB) SLBN Pelambuan Kota Banjarmasin | Tender | Pekerjaan Konstruksi | 3660181 | 16620662 | APBD | 775,250,000 | 775,246,747 | 611,995,424 | 611,995,424 | 611,995,424 | 0 | 0 | 0 | 2018-07-01 20:00:00 | 2018-08-14 | 72.010.859.6-731.000 | CV. 2 NANANG | 163,254,576 | 21.06 % | ||||
90 | 2018 | DINAS PERKEBUNAN DAN PETERNAKAN | Pengadaan Alat Pengolahan Tanaman Karet | Tender | Pengadaan Barang | 3663181 | 18049933 | APBN | 377,250,000 | 362,037,500 | 351,114,500 | 351,114,500 | 350,014,500 | 0 | 0 | 0 | 2018-06-18 08:00:00 | 2018-07-03 | 03.202.301.2-731.000 | CV. MAKMUR BANUA | 26,135,500 | 6.93 % | ||||
91 | 2018 | DINAS KELAUTAN DAN PERIKANAN | Pembangunan Kantor Pengelola Konservasi Perairan daerah (PKPD). | Tender | Pekerjaan Konstruksi | 3671181 | 18292916 | APBD | 821,949,000 | 757,047,073 | 722,683,304 | 722,683,304 | 722,683,304 | 0 | 0 | 0 | 2018-06-15 00:00:00 | 2018-07-04 | 83.644.357.2-731.000 | CV ARAFAT UTAMA | 99,265,696 | 12.08 % | ||||
92 | 2018 | DINAS PERHUBUNGAN | Sewa Ponton dan Alat Penggerak | Tender | Jasa Lainnya | 3672181 | 18143934 | APBD | 966,000,000 | 956,340,000 | 935,431,200 | 935,431,200 | 935,431,200 | 0 | 0 | 0 | 2018-06-23 13:00:00 | 2018-07-12 | 02.708.975.4-731.000 | CV.PUTERA BANYIUR | 30,568,800 | 3.16 % | ||||
93 | 2018 | DINAS PERHUBUNGAN | Sewa Exavator Berserta Operator | Tender | Jasa Lainnya | 3674181 | 18132119 | APBD | 736,000,000 | 667,920,000 | 647,680,000 | 647,680,000 | 647,680,000 | 0 | 0 | 0 | 2018-06-23 13:00:00 | 2018-07-12 | 02.614.034.3-731.000 | CV. GEMILANG RIZKI | 88,320,000 | 12 % | ||||
94 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan DIR. Polder Bakar Kabupaten Hulu Sungai Utara | Tender | Pekerjaan Konstruksi | 3681181 | 17673833 | APBD | 5,000,000,000 | 4,999,994,000 | 4,772,075,000 | 4,772,075,000 | 4,772,075,000 | 0 | 0 | 0 | 2018-06-22 19:00:00 | 2018-07-04 | 73.215.057.8-731.000 | PT. ADERUS WIRA PERSADA | 227,925,000 | 4.56 % | ||||
95 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi DIR. Tanggul Lungau Kabupaten Hulu Sungai Selatan | Tender | Pekerjaan Konstruksi | 3682181 | 17673880 | APBD | 3,000,000,000 | 2,999,380,000 | 2,542,499,000 | 2,542,499,000 | 2,542,499,000 | 0 | 0 | 0 | 2018-06-22 19:00:00 | 2018-07-11 | 76.644.426.9-733.000 | PT. DATU MULIA BORNEO | 457,501,000 | 15.25 % | ||||
96 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Daerah Irigasi Rawa Danda Besar Kabupaten Barito Kuala | Tender | Pekerjaan Konstruksi | 3683181 | 17674358 | APBD | 5,235,000,000 | 5,234,997,000 | 4,379,080,000 | 4,379,080,000 | 4,379,080,000 | 0 | 0 | 0 | 2018-06-22 19:00:00 | 2018-07-19 | 02.531.377.6-731.000 | PT. SESTRA JENDRA | 855,920,000 | 16.35 % | ||||
97 | 2018 | DINAS PENDIDIKAN DAN KEBUDAYAAN | Pengadaan Peralatan Pendidikan | Tender | Pengadaan Barang | 3685181 | 18165631 | APBD | 4,651,710,000 | 4,632,916,350 | 4,150,228,280 | 4,150,228,280 | 4,150,228,280 | 0 | 0 | 0 | 2018-07-02 21:15:00 | 2018-07-13 | 31.560.597.2-606.000 | PT DELTA SARANA MEDIKA | 501,481,720 | 10.78 % | ||||
98 | 2018 | DINAS PENDIDIKAN DAN KEBUDAYAAN | Rehabilitasi Ruang Kelas SMAN 6 Banjarmasin | Tender | Pekerjaan Konstruksi | 3686181 | 18318877 | APBD | 1,400,000,000 | 1,399,999,669 | 1,119,858,179 | 1,119,858,179 | 1,119,858,179 | 0 | 0 | 0 | 2018-06-30 20:00:00 | 2018-07-21 | 02.708.992.9-731.000 | CV. MITRA SEJAHTERA MANDIRI | 280,141,821 | 20.01 % | ||||
99 | 2018 | DINAS KELAUTAN DAN PERIKANAN | Pengadaan Alat Tangkap Ikan Gillnet untuk Pendukung Kapal > 10 GT | Tender | Pengadaan Barang | 3690181 | 15385840 | APBD | 2,227,500,000 | 2,224,073,775 | 2,109,329,475 | 2,109,329,475 | 2,109,329,475 | 0 | 0 | 0 | 2018-06-28 08:00:00 | 2018-07-20 | 82.742.775.8-731.000 | CV. BANGKIT BANGUN PERSADA | 118,170,525 | 5.31 % | ||||
100 | 2018 | DINAS SOSIAL | Pembangunan Rumah Sederhana Desa Hinas Kiri Kec. Batang Alai Timur Kab. Hulu Sungai Tengah luas 30 m2 sebanyak 39 unit | Tender | Pekerjaan Konstruksi | 3691181 | 18157971 | APBN | 1,638,000,000 | 1,637,752,456 | 1,303,250,708 | 1,303,250,708 | 1,303,250,708 | 0 | 0 | 0 | 2018-07-02 10:00:00 | 2018-07-30 | 03.185.597.6-733.000 | cv.dua putra batara | 334,749,292 | 20.44 % | ||||
101 | 2018 | DINAS KELAUTAN DAN PERIKANAN | Pembangunan KAPAL Fiber > 10 GT dan Mesin | Tender | Pekerjaan Konstruksi | 3692181 | 15385660 | APBD | 10,500,000,000 | 10,473,573,000 | 10,159,380,000 | 10,159,380,000 | 10,109,715,000 | 0 | 0 | 0 | 2018-06-26 12:00:00 | 2018-07-13 | 01.474.138.3-731.000 | PT. PERMATA BARITO SHIPYARD & ENGINEERING | 340,620,000 | 3.24 % | ||||
102 | 2018 | SEKRETARIAT DPRD | Pengadaan Alat-alat Studio untuk Sekretariat DPRD Provinsi Kalimantan Selatan | Tender | Pengadaan Barang | 3694181 | 18306394 | APBD | 1,551,541,600 | 1,523,801,000 | 1,445,378,880 | 1,445,378,880 | 1,445,378,880 | 0 | 0 | 0 | 2018-06-30 10:00:00 | 2018-07-18 | 03.318.046.4-731.000 | CV. KENCANA KARYA | 106,162,720 | 6.84 % | ||||
103 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Pintu Gerbang Kantor Kws. Perkantoran di Banjarbaru | Tender | Pekerjaan Konstruksi | 3703181 | 16032641 | APBD | 4,852,000,000 | 4,410,781,966 | 4,271,465,394 | 4,271,465,394 | 4,271,465,394 | 0 | 0 | 0 | 2018-07-13 08:00:00 | 2018-07-31 | 02.902.233.2-009.000 | PT. BAHANA KRIDA NUSANTARA | 580,534,606 | 11.96 % | ||||
104 | 2018 | RUMAH SAKIT JIWA SAMBANG LIHUM | Konstruksi Rehab Bangunan IGD | Tender | Pekerjaan Konstruksi | 3710181 | 18154515 | APBD | 2,215,059,119 | 2,215,000,001 | 2,023,520,300 | 2,023,520,300 | 2,023,520,300 | 0 | 0 | 0 | 2018-07-29 01:00:00 | 2018-09-25 | 72.019.782.1-735.000 | CV.ORTANG UTAMA | 191,538,819 | 8.65 % | ||||
105 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehab Gedung Kantor Setda Provinsi Kalsel di Banjarbaru | Tender | Pekerjaan Konstruksi | 3719181 | 14780477 | APBD | 1,167,202,000 | 1,118,661,070 | 1,057,394,715 | 1,057,394,715 | 1,055,350,000 | 0 | 0 | 0 | 2018-07-13 08:00:00 | 2018-07-25 | 66.139.132.6-733.000 | CV. AL MADINAH | 109,807,285 | 9.41 % | ||||
106 | 2018 | RUMAH SAKIT JIWA SAMBANG LIHUM | Pekerjaan Fisik Rehabilitasi, Renovasi, Restorasi Bangunan, Ruangan, Bangsal, Bangunan Penunjang | Tender | Pekerjaan Konstruksi | 3720181 | 15432728 | APBD | 4,458,153,000 | 4,458,024,005 | 4,133,486,837 | 4,133,486,837 | 4,133,486,837 | 0 | 0 | 0 | 2018-07-16 08:00:00 | 2018-07-27 | 76.608.413.1-731.000 | PT.SUGIWAN BERSAUDARA | 324,666,163 | 7.28 % | ||||
107 | 2018 | DINAS PARIWISATA | Belanja Jasa Konstruksi | Tender | Pekerjaan Konstruksi | 3721181 | 15034812 | APBD | 285,080,000 | 285,079,365 | 231,261,107 | 231,261,107 | 231,261,107 | 0 | 0 | 0 | 2018-08-01 10:00:00 | 2018-08-24 | 73.857.383.1-735.000 | CV. HARAPAN MASA | 53,818,893 | 18.88 % | ||||
108 | 2018 | BADAN RISET DAN INOVASI DAERAH | Belanja Modal Pembuatan Embung dan Siring | Tender | Pekerjaan Konstruksi | 3722181 | 17746951 | APBD | 829,500,000 | 826,686,259 | 0 | 0 | 0 | 0 | 0 | 0 | 2018-08-06 10:00:00 | 2018-09-21 | 01.214.209.7-732.000 | CV. YUDI | 829,500,000 | 100 % | ||||
109 | 2018 | SEKRETARIAT DPRD | Belanja Modal Pengadaan Penghias Ruangan Rumah tangga | Tender | Pekerjaan Konstruksi | 3724181 | 18299892 | APBD | 681,490,375 | 404,177,552 | 324,439,887 | 324,439,887 | 324,439,887 | 0 | 0 | 0 | 2018-07-14 08:00:00 | 2018-07-27 | 83.377.589.3-732.000 | PT. SIS Karya Utama | 357,050,488 | 52.39 % | ||||
110 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Perbaikan Sarana dan Prasarana WC/KM Masyarakat Pekauman, Kec. Martapura Timur, di Kabupaten Banjar | Tender | Pekerjaan Konstruksi | 3734181 | 16032045 | APBD | 954,225,000 | 927,146,507 | 833,388,248 | 833,388,248 | 833,388,248 | 0 | 0 | 0 | 2018-07-18 13:00:00 | 2018-07-30 | 81.162.895.7-731.000 | cv. usaha umat | 120,836,752 | 12.66 % | ||||
111 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Perbaikan Sarana dan Prasarana WC/KM Masyarakat Sungai Bilu, Kec. Banjarmasin di Kab/Kota Banjarmasin | Tender | Pekerjaan Konstruksi | 3735181 | 16031962 | APBD | 954,225,000 | 789,080,877 | 721,967,273 | 721,967,273 | 721,967,273 | 0 | 0 | 0 | 2018-07-18 13:00:00 | 2018-07-30 | 81.162.895.7-731.000 | cv. usaha umat | 232,257,727 | 24.34 % | ||||
112 | 2018 | DINAS PENDIDIKAN DAN KEBUDAYAAN | Pembangunan Unit Sekolah Baru SMA Sungai Rangas (Kab. Banjar) | Tender | Pekerjaan Konstruksi | 3736181 | 18321661 | APBD | 1,500,000,000 | 1,378,742,503 | 1,214,534,499 | 1,214,534,499 | 1,214,534,499 | 0 | 0 | 0 | 2018-07-16 08:00:00 | 2018-08-01 | 02.362.068.5-731.000 | CV. BANGUN SELARAS | 285,465,501 | 19.03 % | ||||
113 | 2018 | DINAS PARIWISATA | Belanja Konstruksi Pembuatan Halaman, Bangunan, Tugu dan Siring | Tender | Pekerjaan Konstruksi | 3737181 | 15028148 | APBD | 1,840,650,000 | 1,364,809,970 | 1,228,473,175 | 1,228,473,175 | 1,228,473,175 | 0 | 0 | 0 | 2018-08-01 10:00:00 | 2018-08-21 | 02.216.306.7-732.000 | CV. RAHIMAH | 612,176,825 | 33.26 % | ||||
114 | 2018 | DINAS KEHUTANAN | Penanaman Sepanjang Jalur Kawasan Perkantoran Pemprov Kalsel | Tender | Jasa Lainnya | 3742181 | 15472304 | APBD | 1,408,600,000 | 1,408,113,000 | 1,274,333,000 | 1,274,333,000 | 1,274,333,000 | 0 | 0 | 0 | 2018-07-25 08:00:00 | 2018-08-07 | 01.424.490.9-731.000 | TIGA DARA | 134,267,000 | 9.53 % | ||||
115 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Halaman Rumah Dinas Kediaman Gubernur di Banjarmasin | Tender | Pekerjaan Konstruksi | 3751181 | 17678537 | APBD | 435,750,000 | 432,864,280 | 399,329,528 | 399,329,528 | 399,326,928 | 0 | 0 | 0 | 2018-07-30 08:00:00 | 2018-08-15 | 73.471.507.1-731.000 | CV.MAWADDAH | 36,420,472 | 8.36 % | ||||
116 | 2018 | TAMAN HUTAN RAYA SULTAN ADAM | Pembangunan Kantor RPH (Dana DAK) | Tender | Pekerjaan Konstruksi | 3752181 | 18232574 | APBDP | 900,000,000 | 899,986,056 | 821,727,986 | 821,727,986 | 810,636,000 | 0 | 0 | 0 | 2018-07-25 08:00:00 | 2018-08-07 | 02.910.439.5-732.000 | CV. MAJAPAHIT | 78,272,014 | 8.7 % | ||||
117 | 2018 | DINAS ENERGI DAN SUMBER DAYA MINERAL | Pembangunan Sumur Pantau di Kabupaten Tanah Laut | Tender | Pekerjaan Konstruksi | 3753181 | 15414322 | APBD | 501,830,000 | 497,299,470 | 476,644,353 | 476,644,353 | 467,918,000 | 0 | 0 | 0 | 2018-07-28 14:00:00 | 2018-08-17 | 31.355.455.2-429.000 | CV. Persada Cipta Pesona | 25,185,647 | 5.02 % | ||||
118 | 2018 | LABORATORIUM ENERGI DAN SUMBER DAYA MINERAL | Pengadaan Atomic Absorption Spectrophotometer (AAS) | Tender | Pengadaan Barang | 3756181 | 14458599 | APBD | 1,326,918,000 | 1,323,314,300 | 1,281,500,000 | 1,281,500,000 | 1,281,500,000 | 1,281,500,000 | 0 | 0 | 2018-08-07 22:00:00 | 2018-09-07 | 2018-09-24 | 02.090.307.6-731.000 | CV. IFSAN PRATAMA | 02.090.307.6-731.000 | CV. IFSAN PRATAMA | 45,418,000 | 3.42 % | |
119 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Desa Bahandang-Desa Keliling Benteng | Tender | Pekerjaan Konstruksi | 3757181 | 18376222 | APBDP | 5,881,500,000 | 5,881,500,000 | 5,500,276,756 | 5,500,276,756 | 5,500,276,756 | 0 | 0 | 0 | 2018-07-27 15:00:00 | 2018-08-27 | 70.694.710.8-732.000 | PT.TANJUNG RAYA BERSAMA | 381,223,244 | 6.48 % | ||||
120 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Ray 7-Desa Bahandang | Tender | Pekerjaan Konstruksi | 3758181 | 18376199 | APBDP | 4,781,500,000 | 4,781,500,000 | 4,411,466,366 | 4,411,466,366 | 4,411,466,366 | 0 | 0 | 0 | 2018-07-27 15:00:00 | 2018-08-23 | 03.265.981.5-731.000 | PT. Pandji Pratama Indonesia | 370,033,634 | 7.74 % | ||||
121 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Jejangkit Muara-Ray 7 | Tender | Pekerjaan Konstruksi | 3759181 | 18376171 | APBDP | 4,181,500,000 | 4,181,500,000 | 3,906,023,082 | 3,906,023,082 | 3,906,023,082 | 0 | 0 | 0 | 2018-07-27 15:00:00 | 2018-08-13 | 01.124.946.3-731.000 | PT. ADIMANUNGGAL CIPTA PADUNUSA | 275,476,918 | 6.59 % | ||||
122 | 2018 | DINAS PARIWISATA | Penataan Kawasan Wisata Budaya Candi Agung | Tender | Pekerjaan Konstruksi | 3760181 | 15014035;15014312;15014747;15015185;15015351;15028782 | APBD | 417,070,000 | 417,069,689 | 347,841,563 | 347,841,563 | 295,732,544 | 0 | 0 | 0 | 2018-07-31 14:30:00 | 2018-08-20 | 72.140.732.8-735.000 | CV. KARYA AMANAH | 69,228,438 | 16.6 % | ||||
123 | 2018 | TAMAN HUTAN RAYA SULTAN ADAM | Pengadaan Bibit Tanaman dan Pengadaan Tanaman Sulaman | Tender | Pengadaan Barang | 3762181 | 18387886 | APBDP | 317,625,000 | 317,625,000 | 293,803,125 | 293,803,125 | 293,803,125 | 0 | 0 | 0 | 2018-08-01 22:00:00 | 2018-08-13 | 01.424.490.9-731.000 | TIGA DARA | 23,821,875 | 7.5 % | ||||
124 | 2018 | BLUD BALAI PENGELOLAAN AIR MINUM BANJARBAKULA | Pembangunan Gudang Bahan Kimia dan Dinding Penahan Backwash dan Dinding Ruang Garam | Tender | Pekerjaan Konstruksi | 3763181 | 15233398;15233539 | APBD | 500,000,000 | 499,970,420 | 450,065,237 | 450,065,237 | 450,065,237 | 0 | 0 | 0 | 2018-08-03 14:00:00 | 2018-08-30 | 02.243.078.9-732.000 | PT. Indah Perkasa Konstruksi | 49,934,763 | 9.99 % | ||||
125 | 2018 | LABORATORIUM KESEHATAN | Pengadaan Alat-alat Laboratorium Kimia | Tender | Pengadaan Barang | 3769181 | 15333285 | APBD | 1,072,000,000 | 1,071,269,073 | 1,019,016,900 | 1,019,016,900 | 1,019,016,900 | 0 | 0 | 0 | 2018-08-07 20:00:00 | 2018-08-15 | 66.511.969.9-731.000 | PT VISADA PRATAMA INDONESIA | 52,983,100 | 4.94 % | ||||
126 | 2018 | TAMAN HUTAN RAYA SULTAN ADAM | Pembangunan Dermaga di Pulau Bekantan | Tender | Pekerjaan Konstruksi | 3771181 | 18342224 | APBDP | 1,300,000,000 | 1,299,969,990 | 1,262,722,670 | 1,262,722,670 | 1,262,722,670 | 0 | 0 | 0 | 2018-08-07 22:00:00 | 2018-08-27 | 75.429.932.9-731.000 | CV. DUTA KARYA ADHITAMA | 37,277,330 | 2.87 % | ||||
127 | 2018 | DINAS PERINDUSTRIAN | Pemeliharaan atap, plafon, dan pengecetan gedung dekranasda | Tender | Pekerjaan Konstruksi | 3772181 | 18282740 | APBD | 445,992,000 | 445,991,995 | 366,700,783 | 366,700,783 | 366,700,783 | 0 | 0 | 0 | 2018-08-07 14:00:00 | 2018-08-23 | 02.362.068.5-731.000 | CV. BANGUN SELARAS | 79,291,217 | 17.78 % | ||||
128 | 2018 | TAMAN HUTAN RAYA SULTAN ADAM | Pembangunan Dermaga Wisata Bukit Batu di Tahura Sultan Adam | Tender | Pekerjaan Konstruksi | 3773181 | 18342188 | APBDP | 1,000,000,000 | 997,289,444 | 927,567,032 | 927,567,032 | 927,567,032 | 0 | 0 | 0 | 2018-08-09 08:00:00 | 2018-08-25 | 01.879.380.2-731.000 | ARUNG SAMUDRA | 72,432,968 | 7.24 % | ||||
129 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengadaan Alat Hidrologi (Telemetri) AWLR Intake DI. Haruyan Dayak Kab. Hulu Sungai Tengah dan Sungai WS. Cengal Batulicin | Tender | Pekerjaan Konstruksi | 3774181 | 17674508 | APBD | 600,000,000 | 599,854,479 | 539,101,200 | 539,101,200 | 539,101,200 | 0 | 0 | 0 | 2018-08-07 15:00:00 | 2018-08-28 | 02.342.725.5-733.000 | CV. SAKA PERSADA | 60,898,800 | 10.15 % | ||||
130 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penataan Kualitas Permukiman Kumuh Kab. HSS | Tender | Pekerjaan Konstruksi | 3779181 | 14712662 | APBD | 1,242,500,000 | 1,239,232,350 | 1,090,505,364 | 1,090,505,364 | 1,090,505,364 | 0 | 0 | 0 | 2018-08-08 14:00:00 | 2018-09-08 | 82.936.017.1-731.000 | Cv. Borneo Surya Mandiri | 151,994,636 | 12.23 % | ||||
131 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penanganan Jalan Permukiman Sekumpul di Kabupaten Banjar | Tender | Pekerjaan Konstruksi | 3780181 | 18314308 | APBD | 1,800,000,000 | 1,789,281,352 | 1,432,434,756 | 1,432,434,756 | 1,432,434,756 | 0 | 0 | 0 | 2018-08-10 16:00:00 | 2018-09-03 | 01.110.797.6-732.000 | CV. BERINGIN JAYA | 367,565,244 | 20.42 % | ||||
132 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penanganan Jalan Komplek Amanah di Kabupaten Banjar | Tender | Pekerjaan Konstruksi | 3781181 | 18314293 | APBD | 1,500,000,000 | 1,418,932,191 | 1,012,771,031 | 1,012,771,031 | 1,012,771,031 | 0 | 0 | 0 | 2018-08-17 15:00:00 | 2018-09-12 | 02.043.060.9-731.000 | CV. SHELMA MITRA | 487,228,969 | 32.48 % | ||||
133 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penataan Kualitas Permukiman Kumuh Kab. HST | Tender | Pekerjaan Konstruksi | 3783181 | 14713127 | APBD | 765,700,000 | 763,422,529 | 611,940,790 | 611,940,790 | 611,940,790 | 0 | 0 | 0 | 2018-08-19 12:00:00 | 2018-09-06 | 02.590.775.9-733.000 | CV. PRIMA ROSA | 153,759,210 | 20.08 % | ||||
134 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Peningkatan Kualitas Permukiman Kumuh Kab Banjar | Tender | Pekerjaan Konstruksi | 3784181 | 14710286 | APBD | 912,550,000 | 905,782,707 | 725,385,386 | 725,385,386 | 725,385,386 | 0 | 0 | 0 | 2018-08-19 12:00:00 | 2018-09-05 | 83.644.357.2-731.000 | CV ARAFAT UTAMA | 187,164,614 | 20.51 % | ||||
135 | 2018 | DINAS KELAUTAN DAN PERIKANAN | Pengadaan Pengembangan Budidaya Laut (Bibit Rumput Laut Eucheuma Cottoni Culture Jaringan) Luar Daerah | Tender | Pengadaan Barang | 3793181 | 15389773 | APBD | 276,000,000 | 266,859,700 | 234,135,000 | 234,135,000 | 234,135,000 | 0 | 0 | 0 | 2018-08-20 16:00:00 | 2018-09-24 | 85.111.672.3-732.000 | cv.asmi yuna | 41,865,000 | 15.17 % | ||||
136 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penanganan Jalan Pesona Bakti Persada di Kota Banjarmasin | Tender | Pekerjaan Konstruksi | 3799181 | 18314110 | APBD | 300,000,000 | 234,553,000 | 204,889,000 | 204,889,000 | 204,889,000 | 0 | 0 | 0 | 2018-08-14 18:00:00 | 2018-08-30 | 02.614.136.6-731.000 | CV. KARYA PANGESTU | 95,111,000 | 31.7 % | ||||
137 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Peningkatan Kualitas Permukiman Kumuh Kota Banjarmasin | Tender | Pekerjaan Konstruksi | 3800181 | 14709310 | APBD | 1,949,300,000 | 1,745,100,000 | 1,498,165,000 | 1,498,165,000 | 1,498,165,000 | 0 | 0 | 0 | 2018-08-14 16:31:00 | 2018-08-31 | 31.662.570.6-731.000 | CV HASDON JAYA | 451,135,000 | 23.14 % | ||||
138 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penataan Kualitas Permukiman Kumuh Kab. Tabalong | Tender | Pekerjaan Konstruksi | 3801181 | 15462592 | APBD | 1,303,100,000 | 1,296,312,562 | 1,098,362,663 | 1,098,362,663 | 1,096,802,919 | 0 | 0 | 0 | 2018-08-20 17:00:00 | 2018-09-05 | 73.623.688.6-735.000 | CV. BUDI KARYA MANDIRI | 204,737,337 | 15.71 % | ||||
139 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penataan Kualitas Permukiman Kumuh Kab Barito Kuala | Tender | Pekerjaan Konstruksi | 3802181 | 14711244 | APBD | 1,120,300,000 | 1,116,013,704 | 912,908,968 | 912,908,968 | 912,908,968 | 0 | 0 | 0 | 2018-08-20 15:00:00 | 2018-09-18 | 02.019.140.9-731.000 | CV. MULIA JAYA | 207,391,032 | 18.51 % | ||||
140 | 2018 | TAMAN HUTAN RAYA SULTAN ADAM | Konstruksi Musholla,Pembangunan Shelter Pada kegiatan Pembangunan dan pemeliharaan sarana dan Prasarana,Pembangunan Rumah Jaga Pada kegiatan Pembangunan dan pemeliharaan sarana dan Prasarana | Tender | Pekerjaan Konstruksi | 3804181 | 17563935;17564089;17564181 | APBD | 369,500,000 | 369,499,542 | 333,101,694 | 333,101,694 | 333,101,694 | 0 | 0 | 0 | 2018-08-17 23:00:00 | 2018-08-23 | 75.146.078.3-728.000 | CV. INSAN CITA MANDIRI | 36,398,306 | 9.85 % | ||||
141 | 2018 | DINAS PERHUBUNGAN | Pengadaan dan Pemasangan Warning Light | Tender | Pekerjaan Konstruksi | 3805181 | 15283279 | APBD | 336,000,000 | 328,593,560 | 312,204,604 | 312,204,604 | 312,204,604 | 0 | 0 | 0 | 2018-08-23 09:30:00 | 2018-09-13 | 01.860.453.8-731.000 | CV. ARUM SEJAHTERA | 23,795,396 | 7.08 % | ||||
142 | 2018 | DINAS KEHUTANAN | Pengadaan Pupuk,Pengadaan Bibit Tanaman Kehutanan,Belanja Bahan/Bibit - Belanja Bibit Kegiatan RHL | Tender | Pengadaan Barang | 3808181 | 15473833;15474511;15475245 | APBD | 1,521,700,000 | 1,105,277,250 | 911,132,000 | 911,132,000 | 911,132,000 | 0 | 0 | 0 | 2018-08-21 20:00:00 | 2018-08-31 | 02.237.173.6-732.000 | CV. Nusantara Asri | 610,568,000 | 40.12 % | ||||
143 | 2018 | DINAS KEPEMUDAAN DAN OLAHRAGA | Rehabilitasi Asrama PPLP dan Lingkungan Sekitar | Tender | Pekerjaan Konstruksi | 3809181 | 14773977 | APBD | 871,940,000 | 853,444,793 | 753,647,917 | 753,647,917 | 753,647,917 | 0 | 0 | 0 | 2018-08-24 09:00:00 | 2018-09-07 | 02.043.385.0-731.000 | CV. Amanat Anugrah Karya | 118,292,083 | 13.57 % | ||||
144 | 2018 | DINAS PERHUBUNGAN | Pengadaan dan pemasangan marka jalan | Tender | Pekerjaan Konstruksi | 3815181 | 15096784 | APBD | 663,100,000 | 659,207,038 | 621,680,199 | 621,680,199 | 621,680,199 | 0 | 0 | 0 | 2018-08-28 09:00:00 | 2018-09-18 | 01.860.453.8-731.000 | CV. ARUM SEJAHTERA | 41,419,801 | 6.25 % | ||||
145 | 2018 | TAMAN HUTAN RAYA SULTAN ADAM | Pembuatan Pagar | Tender | Pekerjaan Konstruksi | 3816181 | 16847121 | APBD | 809,400,000 | 743,642,090 | 561,146,316 | 561,146,316 | 561,146,316 | 0 | 0 | 0 | 2018-08-24 10:00:00 | 2018-09-24 | 02.708.976.2-731.000 | CV. AUDI VINA | 248,253,684 | 30.67 % | ||||
146 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan HELIPAD di Jejangkit | Tender | Pekerjaan Konstruksi | 3820181 | 18420609 | APBDP | 1,550,000,000 | 1,531,724,500 | 1,463,455,082 | 1,463,455,082 | 1,463,455,082 | 0 | 0 | 0 | 2018-08-25 18:00:00 | 2018-09-16 | 31.245.996.9-731.000 | CV.RIDHEVAL HANDIL BHAKTI | 86,544,918 | 5.58 % | ||||
147 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Angkipih-Paramasan Bawah-Paramasan Atas | Tender | Pekerjaan Konstruksi | 3821181 | 18410837 | APBDP | 4,861,335,000 | 4,861,329,665 | 4,519,228,279 | 4,519,228,279 | 4,519,228,279 | 0 | 0 | 0 | 2018-08-25 20:00:00 | 2018-09-14 | 01.141.113.9-651.000 | PT. KARYA TUNGGAL MULYA ABADI | 342,106,721 | 7.04 % | ||||
148 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Perbaikan/Renovasi BRIMOB | Tender | Pekerjaan Konstruksi | 3823181 | 18420593 | APBDP | 935,000,000 | 925,344,400 | 740,035,192 | 740,035,192 | 731,330,297 | 0 | 0 | 0 | 2018-08-25 16:00:00 | 2018-09-10 | 71.462.122.4-732.000 | CV. Salma Aulia | 194,964,808 | 20.85 % | ||||
149 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Tanjung Serdang-Lontar II | Tender | Pekerjaan Konstruksi | 3829181 | 18410685 | APBDP | 4,469,818,000 | 4,469,817,737 | 4,440,624,241 | 4,440,624,000 | 4,440,624,000 | 0 | 0 | 0 | 2018-08-31 08:15:00 | 2018-09-17 | 02.216.301.8-734.000 | PT. Arta Cipta Permata | 29,193,759 | 0.65 % | ||||
150 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Batulicin-Mekarsari-Mentewe | Tender | Pekerjaan Konstruksi | 3832181 | 18410700 | APBDP | 14,851,585,000 | 14,851,584,856 | 14,073,727,541 | 14,073,727,541 | 14,050,688,106 | 0 | 0 | 0 | 2018-08-27 13:00:00 | 2018-09-15 | 02.421.791.1-734.000 | pt hm family | 777,857,459 | 5.24 % | ||||
151 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penanganan PSU Perumahan di Permukiman Kab. Tapin | Tender | Pekerjaan Konstruksi | 3833181 | 14716981 | APBD | 736,000,000 | 735,999,155 | 589,122,205 | 589,122,205 | 589,122,205 | 0 | 0 | 0 | 2018-09-03 11:00:00 | 2018-09-19 | 73.857.383.1-735.000 | CV. HARAPAN MASA | 146,877,795 | 19.96 % | ||||
152 | 2018 | DINAS PERTANIAN DAN KETAHANAN PANGAN | Pengadaan Power Thresher | Tender | Pengadaan Barang | 3836181 | 17924306 | APBN | 896,000,000 | 525,183,615 | 514,800,000 | 514,800,000 | 514,800,000 | 0 | 0 | 0 | 2018-09-07 15:00:00 | 2018-09-28 | 01.124.774.9-731.000 | CV. SYARIAAT | 381,200,000 | 42.54 % | ||||
153 | 2018 | DINAS KOMUNIKASI DAN INFORMATIKA | Belanja Modal Pengadaan Peralatan Kantor,Belanja Modal Pengadaan Komputer | Tender | Pengadaan Barang | 3837181 | 14724836;14725231 | APBD | 1,678,900,000 | 1,678,388,800 | 1,491,003,633 | 1,491,003,633 | 1,491,003,633 | 0 | 0 | 0 | 2018-09-03 09:00:00 | 2018-09-24 | 72.329.230.6-086.000 | Gunung Emas Ekaputra | 187,896,367 | 11.19 % | ||||
154 | 2018 | DINAS PARIWISATA | Belanja Konstruksi,Belanja Pengadaan Plang Nama | Tender | Pekerjaan Konstruksi | 3842181 | 15028395;15028782 | APBD | 412,850,000 | 404,050,999 | 0 | 0 | 0 | 0 | 0 | 0 | 2018-08-29 13:00:00 | 2018-09-05 | 412,850,000 | 100 % | ||||||
155 | 2018 | TAMAN HUTAN RAYA SULTAN ADAM | Konstruksi Pembangunan Sarana dan Prasarana Wisata Lembah Kahung - Belangian | Tender | Pekerjaan Konstruksi | 3850181 | 14239650;14239917;14240045;16929816;16929890 | APBD | 1,930,000,000 | 1,929,774,662 | 1,815,876,679 | 1,815,876,678 | 1,815,876,678 | 0 | 0 | 0 | 2018-08-31 13:00:00 | 2018-09-14 | 72.296.686.8-732.000 | CV. BARAKAT MANDIRI TEKNIK | 114,123,321 | 5.91 % | ||||
156 | 2018 | DINAS PERPUSTAKAAN DAN KEARSIPAN | Belanja Modal Pengadaan Buku Ilmu Pengetahuan Umum (Belanja Bahan Pustaka Umum) | Tender | Pengadaan Barang | 3851181 | 15345037 | APBD | 1,007,500,000 | 991,326,300 | 971,197,200 | 971,197,200 | 971,197,200 | 0 | 0 | 0 | 2018-10-02 10:00:00 | 2018-10-22 | 73.391.015.2-616.000 | CV.SARANA SUKSES SEJAHTERA | 36,302,800 | 3.6 % | ||||
157 | 2018 | DINAS PERPUSTAKAAN DAN KEARSIPAN | Belanja Modal Pengadaan Buku Ilmu Pengetahuan Umum (Bahan Pustaka untuk Layanan Umum) | Tender | Pengadaan Barang | 3852181 | 15338997 | APBD | 1,000,000,000 | 982,779,300 | 928,178,600 | 928,178,600 | 928,178,600 | 0 | 0 | 0 | 2018-10-02 10:00:00 | 2018-10-22 | 66.576.596.2-625.000 | CV.DUTA SARANA SEJAHTERA | 71,821,400 | 7.18 % | ||||
158 | 2018 | DINAS KESEHATAN | Pengadaan Tablet Tambah Darah Remaja Puteri | Tender | Pengadaan Barang | 3854181 | 14935124 | APBD | 455,392,600 | 455,392,600 | 447,302,684 | 447,302,684 | 447,301,800 | 0 | 0 | 0 | 2018-09-06 14:00:00 | 2018-09-17 | 01.061.248.9-051.000 | Rajawali Nusindo | 8,089,916 | 1.78 % | ||||
159 | 2018 | DINAS PERPUSTAKAAN DAN KEARSIPAN | Pengadaan Videotron. | Tender | Pengadaan Barang | 3856181 | 15182652 | APBD | 1,000,000,000 | 989,999,930 | 731,429,954 | 731,429,954 | 731,429,954 | 0 | 0 | 0 | 2018-09-05 08:00:00 | 2018-09-23 | 03.094.249.4-732.000 | CV. Fingers Buana Angkasa | 268,570,046 | 26.86 % | ||||
160 | 2018 | DINAS PERHUBUNGAN | Pengadaan dan Pemasangan Lampu Penerangan Jalan SolarCell | Tender | Pekerjaan Konstruksi | 3857181 | 15280558 | APBD | 1,755,000,000 | 1,698,603,093 | 1,684,780,559 | 1,684,780,559 | 1,684,780,559 | 0 | 0 | 0 | 2018-09-09 08:00:00 | 2018-09-25 | 02.215.967.7-731.000 | CV. BANJARBARU UTAMA | 70,219,441 | 4 % | ||||
161 | 2018 | DINAS KEHUTANAN | Pemeliharaan/Pembersihan PMUMHM | Tender | Jasa Lainnya | 3859181 | 18421878 | APBD | 306,000,000 | 303,120,048 | 278,520,000 | 278,520,000 | 278,520,000 | 0 | 0 | 0 | 2018-09-07 11:00:00 | 2018-09-25 | 81.748.223.5-733.000 | CV.TELAGA SARI | 27,480,000 | 8.98 % | ||||
162 | 2018 | DINAS PERPUSTAKAAN DAN KEARSIPAN | Belanja Barang Penunjang Kegiatan Dekonsentrasi untuk diserahkan Kepada Pemerintah Daerah (Bantuan Buku Siap Layan untuk diHibahkan ke Perpustakaan Desa) | Tender | Pengadaan Barang | 3861181 | 18324307 | APBN | 536,000,000 | 466,747,200 | 459,190,800 | 459,190,800 | 459,190,800 | 0 | 0 | 0 | 2018-09-05 23:00:00 | 2018-09-21 | 03.018.204.2-732.000 | CV. ANEKA JASA | 76,809,200 | 14.33 % | ||||
163 | 2018 | PANTI PERLINDUNGAN DAN REHABILITASI SOSIAL ANAK DAN REMAJA MULIA SATRIA | Pengadaan Perlengkapan Kantor dan Pengadaan Mebeulair | Tender | Pengadaan Barang | 3864181 | 18325809 | APBD | 465,500,000 | 435,033,500 | 355,520,000 | 355,520,000 | 355,520,000 | 0 | 0 | 0 | 2018-09-06 14:00:00 | 2018-09-25 | 02.531.293.5-731.000 | CV.SORAYA UTAMA | 109,980,000 | 23.63 % | ||||
164 | 2018 | LABORATORIUM KESEHATAN DAN KESELAMATAN KERJA | Belanja modal pengadaan alat-alat laboratorium | Tender | Pengadaan Barang | 3865181 | 18429748 | APBD | 3,046,275,000 | 2,990,000,001 | 2,960,100,000 | 2,960,100,000 | 2,960,100,000 | 0 | 0 | 0 | 2018-09-06 17:00:00 | 2018-09-23 | 03.153.699.8-604.000 | PT. DESINA DEWA RIZKY | 86,175,000 | 2.83 % | ||||
165 | 2018 | DINAS PERPUSTAKAAN DAN KEARSIPAN | Belanja Modal Pengadaan Buku Ilmu Pengetahuan Umum (Pembelian Bahan untuk Referensi) | Tender | Pengadaan Barang | 3866181 | 15344511 | APBD | 1,000,000,000 | 984,001,900 | 929,673,200 | 929,673,200 | 929,673,200 | 0 | 0 | 0 | 2018-10-05 11:00:00 | 2018-10-23 | 66.576.596.2-625.000 | CV.DUTA SARANA SEJAHTERA | 70,326,800 | 7.03 % | ||||
166 | 2018 | DINAS PERPUSTAKAAN DAN KEARSIPAN | Belanja Modal Rehab Sedang/ Berat Gedung Pertemuan (Rehab Desain Interior Dinas Perpustakaan dan Kearsipan (Konstruksi)) | Tender | Pekerjaan Konstruksi | 3869181 | 15335876 | APBD | 876,250,000 | 869,941,349 | 768,391,998 | 768,391,998 | 768,391,998 | 0 | 0 | 0 | 2018-09-18 10:00:00 | 2018-10-05 | 02.614.219.0-731.000 | CV. Anggun Membangun | 107,858,002 | 12.31 % | ||||
167 | 2018 | DINAS PERPUSTAKAAN DAN KEARSIPAN | Belanja Modal Pengadaan Mesin Fotocopy | Tender | Pengadaan Barang | 3872181 | 15490760 | APBD | 450,000,000 | 435,000,001 | 400,785,000 | 400,785,000 | 400,785,000 | 0 | 0 | 0 | 2018-09-12 08:00:00 | 2018-10-03 | 31.821.374.1-731.000 | CV. KIARATAMA PERSADA | 49,215,000 | 10.94 % | ||||
168 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Simpang 3 Tahura-Mandiangin | Tender | Pekerjaan Konstruksi | 3875181 | 18425381 | APBDP | 9,877,725,000 | 9,877,720,641 | 8,218,382,336 | 8,218,382,336 | 8,218,382,336 | 0 | 0 | 0 | 2018-09-13 12:00:00 | 2018-10-01 | 70.694.710.8-732.000 | PT.TANJUNG RAYA BERSAMA | 1,659,342,664 | 16.8 % | ||||
169 | 2018 | DINAS PERHUBUNGAN | Pengadaan dan pemasangan Pagar Pengaman Jalan | Tender | Pekerjaan Konstruksi | 3876181 | 15103208 | APBD | 760,320,000 | 741,262,399 | 724,400,798 | 724,400,798 | 724,400,798 | 0 | 0 | 0 | 2018-09-16 08:00:00 | 2018-10-10 | 81.189.188.6-731.000 | cv. inti bumi | 35,919,202 | 4.72 % | ||||
170 | 2018 | BADAN PENGELOLAAN KEUANGAN DAN ASET DAERAH | Surat Ketetapan Pajak Daerah (SKPD) | Tender | Jasa Lainnya | 3877181 | 14385288 | APBD | 1,350,000,000 | 1,262,250,000 | 1,195,425,000 | 1,195,425,000 | 1,195,425,000 | 0 | 0 | 0 | 2018-09-17 10:00:00 | 2018-10-12 | 01.531.261.4-054.000 | PT JASUINDO TIGA PERKASA TBK | 154,575,000 | 11.45 % | ||||
171 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penanganan PSU Perumahan di Permukiman Kab. Tabalong | Tender | Pekerjaan Konstruksi | 3878181 | 14716499 | APBD | 484,000,000 | 483,000,751 | 384,647,865 | 384,647,865 | 384,647,865 | 0 | 0 | 0 | 2018-09-17 08:00:00 | 2018-10-01 | 75.896.565.8-733.000 | CV.SHAFIRA MULIA | 99,352,135 | 20.53 % | ||||
172 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penanganan Jalan Griya Alam Pemurus di Kabupaten Banjar. | Tender | Pekerjaan Konstruksi | 3879181 | 18314297 | APBD | 800,000,000 | 747,524,241 | 645,119,890 | 645,119,000 | 645,119,000 | 0 | 0 | 0 | 2018-09-20 14:00:00 | 2018-10-09 | 02.675.124.8-734.000 | PUTRA DEWATA | 154,880,110 | 19.36 % | ||||
173 | 2018 | SEKRETARIAT DPRD | Belanja Modal Pengadaan Perlengkapan kantor | Tender | Pengadaan Barang | 3881181 | 18306357 | APBD | 5,083,340,625 | 4,904,415,180 | 4,504,654,000 | 4,504,654,000 | 4,504,654,000 | 0 | 0 | 0 | 2018-09-27 10:00:00 | 2018-10-15 | 74.883.402.5-732.000 | PT. AMEIDHO PUTERA PERDANA | 578,686,625 | 11.38 % | ||||
174 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penanganan Jalan Warga Indah V di Kota Banjarmasin | Tender | Pekerjaan Konstruksi | 3884181 | 18419010 | APBD | 440,000,000 | 439,958,280 | 352,127,310 | 352,127,000 | 352,127,000 | 0 | 0 | 0 | 2018-09-20 14:00:00 | 2018-10-09 | 74.832.861.4-734.000 | AGRA NUSANTARA | 87,872,690 | 19.97 % | ||||
175 | 2018 | DINAS PERPUSTAKAAN DAN KEARSIPAN | Belanja Modal Rehab Sedang/ Berat Gedung Pertemuan (Belanja Rehab Sedang/ Berat Gedung Kantor Perpustakaan Kantor Km.6 (Perbaikan Atap, Palpon, Lantai dan Dinding) (Biaya Konstruksi)) | Tender | Pekerjaan Konstruksi | 3885181 | 15270339 | APBD | 2,270,500,000 | 2,223,163,353 | 2,008,299,362 | 2,008,299,362 | 2,008,299,362 | 0 | 0 | 0 | 2018-09-21 20:00:00 | 2018-10-04 | 02.362.068.5-731.000 | CV. BANGUN SELARAS | 262,200,638 | 11.55 % | ||||
176 | 2018 | DINAS SOSIAL | Pemenuhan pangan Lanjut Usia dalam rangka Hari Kesetiakawanan Sosial (HKSN) | Tender | Pengadaan Barang | 3889181 | 18450773 | APBDP | 442,000,000 | 441,557,116 | 419,347,500 | 419,347,500 | 419,347,500 | 0 | 0 | 0 | 2018-09-27 07:00:00 | 2018-10-10 | 80.422.291.7-731.000 | CV. BAROKAH MANDIRI SEJAHTERA | 22,652,500 | 5.13 % | ||||
177 | 2018 | DINAS PARIWISATA | Belanja Pengadaan Jukung | Tender | Pengadaan Barang | 3890181 | 15038762 | APBD | 695,500,000 | 695,500,000 | 660,725,000 | 660,725,000 | 660,725,000 | 0 | 0 | 0 | 2018-09-27 10:00:00 | 2018-10-11 | 02.708.747.7-731.000 | CV.SURYA PUTERA | 34,775,000 | 5 % | ||||
178 | 2018 | DINAS SOSIAL | Pemberdayaan Fakir Miskin Pedesaan | Tender | Pengadaan Barang | 3891181 | 18450859 | APBDP | 505,000,000 | 504,493,990 | 483,840,500 | 483,840,500 | 483,840,500 | 0 | 0 | 0 | 2018-09-27 09:00:00 | 2018-10-10 | 80.406.318.8-731.000 | CV. Fauzan Faris | 21,159,500 | 4.19 % | ||||
179 | 2018 | DINAS SOSIAL | Belanja Bantuan Sosial Barang | Tender | Pengadaan Barang | 3892181 | 18450822 | APBDP | 820,000,000 | 819,999,180 | 737,610,500 | 737,610,500 | 737,610,500 | 0 | 0 | 0 | 2018-09-27 09:00:00 | 2018-10-10 | 02.489.908.0-731.000 | CV. GIZA EMERALD | 82,389,500 | 10.05 % | ||||
180 | 2018 | DINAS PARIWISATA | Belanja Konstruksi Toilet,Belanja Pengadaan Plang Nama,Belanja Konstruksi Pintu Gerbang | Tender | Pekerjaan Konstruksi | 3893181 | 15038395;15038523;15038968 | APBD | 257,100,000 | 257,064,490 | 220,902,839 | 220,902,839 | 220,902,839 | 0 | 0 | 0 | 2018-10-01 17:00:00 | 2018-10-15 | 02.531.654.8-731.000 | CV. MACRO PERKASA | 36,197,161 | 14.08 % | ||||
181 | 2018 | DINAS PARIWISATA | Penataan Kawasan Wisata Budaya Sei. Jingah Banjarmasin (Kota Pusaka) | Tender | Pekerjaan Konstruksi | 3896181 | 18469556 | APBD | 444,750,000 | 444,504,160 | 405,874,608 | 405,874,608 | 405,874,608 | 0 | 0 | 0 | 2018-10-08 12:00:00 | 2018-10-20 | 03.202.468.9-731.000 | CV. AR RAZAK | 38,875,392 | 8.74 % | ||||
182 | 2018 | DINAS TENAGA KERJA DAN TRANSMIGRASI | Pengembangan Usaha Transmigrasi / Pengadaan Rumah RMU di KTM Cahaya Baru | Tender | Pekerjaan Konstruksi | 3897181 | 18485249 | APBN | 387,400,000 | 387,382,951 | 306,978,177 | 306,978,177 | 306,978,177 | 0 | 0 | 0 | 2018-10-04 20:00:00 | 2018-10-23 | 02.531.536.7-731.000 | CV. AGRA NISRINA | 80,421,823 | 20.76 % | ||||
183 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Peningkatan Jalan Perumahan Mustika Abadi Griyatma Kota Banjarbaru | Tender | Pekerjaan Konstruksi | 3900181 | 18314253 | APBD | 1,100,000,000 | 1,098,281,562 | 822,843,877 | 822,843,877 | 822,843,877 | 0 | 0 | 0 | 2018-10-09 20:00:00 | 2018-10-31 | 74.916.754.0-733.000 | AL HIDAYAH, CV | 277,156,123 | 25.2 % | ||||
184 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penanganan Jalan Kruwing Indah 4 Kabupaten Barito Kuala | Tender | Pekerjaan Konstruksi | 3901181 | 18314144 | APBD | 370,000,000 | 369,944,873 | 307,935,611 | 307,935,611 | 307,935,611 | 0 | 0 | 0 | 2018-10-09 20:00:00 | 2018-10-26 | 02.675.124.8-734.000 | PUTRA DEWATA | 62,064,389 | 16.77 % | ||||
185 | 2018 | DINAS KESEHATAN | Pengadaan obat penunjang | Tender | Pengadaan Barang | 3902181 | 14929776 | APBD | 907,500,000 | 907,354,325 | 874,350,950 | 874,350,950 | 874,350,950 | 0 | 0 | 0 | 2018-10-11 12:00:00 | 2018-10-22 | 01.106.301.3-441.000 | PT. Sapta Sari Tama | 33,149,050 | 3.65 % | ||||
186 | 2018 | DINAS PERKEBUNAN DAN PETERNAKAN | Pengadaan Tanaman Intercroping pada Intensifikasi Tanaman Karet | Tender | Pengadaan Barang | 3904181 | 18441016 | APBN | 451,700,000 | 398,926,000 | 394,570,000 | 394,570,000 | 394,570,000 | 0 | 0 | 0 | 2018-10-16 14:00:00 | 2018-10-30 | 81.163.850.1-731.000 | CV. Dapat Tarus | 57,130,000 | 12.65 % | ||||
187 | 2018 | TAMAN HUTAN RAYA SULTAN ADAM | Pengadaan Bahan / Bibit Tanaman | Tender | Pengadaan Barang | 3905181 | 18536306 | APBDP | 376,725,000 | 251,565,000 | 238,986,000 | 238,986,000 | 238,986,000 | 0 | 0 | 0 | 2018-10-23 08:00:00 | 2018-10-31 | 01.424.490.9-731.000 | TIGA DARA | 137,739,000 | 36.56 % | ||||
188 | 2018 | BIRO PERLENGKAPAN DAN LAYANAN PENGADAAN BARANG JASA SETDA PROVINSI KALSEL | Pengadaan Televisi (Videotron Mahligai) | Tender | Pengadaan Barang | 3906181 | 18544938 | APBDP | 1,000,000,000 | 999,900,000 | 985,050,000 | 985,050,000 | 985,050,000 | 0 | 0 | 0 | 2018-10-22 23:00:00 | 2018-12-03 | 66.726.236.4-604.000 | PT. BIAN INDAH SANTOSA | 14,950,000 | 1.5 % | ||||
189 | 2018 | BIRO PERLENGKAPAN DAN LAYANAN PENGADAAN BARANG JASA SETDA PROVINSI KALSEL | Pengadaan Mesin Generator/Genset | Tender | Pengadaan Barang | 3907181 | 18545074 | APBDP | 999,999,980 | 990,000,000 | 925,100,000 | 925,100,000 | 925,100,000 | 0 | 0 | 0 | 2018-10-22 23:05:00 | 2018-11-08 | 80.406.318.8-731.000 | CV. Fauzan Faris | 74,899,980 | 7.49 % | ||||
190 | 2018 | SEKRETARIAT DPRD | Belanja Modal Pengadaan Penghias Ruangan Rumah tangga | Tender | Pekerjaan Konstruksi | 3908181 | 18299892 | APBD | 681,490,375 | 404,177,552 | 396,016,877 | 396,016,877 | 396,016,877 | 0 | 0 | 0 | 2018-10-23 21:00:00 | 2018-11-01 | 01.534.417.9-732.000 | CV. VASUNDAN ELC | 285,473,498 | 41.89 % | ||||
191 | 2018 | DINAS TENAGA KERJA DAN TRANSMIGRASI | Pengembangan usaha transmigrasi/Pengadaan alat penangkapan ikan di Kimtrans Angsana | Tender | Pengadaan Barang | 3909181 | 18485356 | APBN | 253,125,000 | 253,044,000 | 251,831,250 | 251,831,250 | 251,831,250 | 0 | 0 | 0 | 2018-10-29 15:30:00 | 2018-11-13 | 02.237.586.9-732.000 | CV. IHSAN MUFAKAT | 1,293,750 | 0.51 % | ||||
192 | 2018 | TAMAN HUTAN RAYA SULTAN ADAM | Pembangunan Dermaga Belangian | Tender | Pekerjaan Konstruksi | 3912181 | 18517249 | APBDP | 1,200,000,000 | 1,168,644,581 | 1,166,523,979 | 1,166,523,979 | 1,166,000,000 | 0 | 0 | 0 | 2018-10-24 10:00:00 | 2018-11-16 | 02.039.406.0-722.000 | NAUFAL LIBRA JAYA, CV | 33,476,021 | 2.79 % | ||||
193 | 2018 | DINAS PARIWISATA | Belanja Konstruksi,Belanja Pengadaan Plang Nama | Tender | Pekerjaan Konstruksi | 3914181 | 15028395;15028782 | APBD | 412,850,000 | 411,530,999 | 390,632,644 | 390,632,644 | 390,632,644 | 0 | 0 | 0 | 2018-10-25 10:00:00 | 2018-11-05 | 03.185.597.6-733.000 | cv.dua putra batara | 22,217,356 | 5.38 % | ||||
194 | 2018 | DINAS PERKEBUNAN DAN PETERNAKAN | Pengadaan Obat Pelapuk Kayu (Peremajaan Tanaman Karet) di Kab. Tanbu, HST, Tabalong dan Balangan | Tender | Pengadaan Barang | 3915181 | 18555957 | APBN | 340,000,000 | 339,995,920 | 297,704,000 | 297,704,000 | 297,704,000 | 0 | 0 | 0 | 2018-10-25 22:00:00 | 2018-11-07 | 03.282.504.4-732.000 | CV. Hervi Transseed | 42,296,000 | 12.44 % | ||||
195 | 2018 | DINAS KOMUNIKASI DAN INFORMATIKA | Belanja Modal Pengadaan Komputer,Belanja Modal Pengadaan Sound System,Belanja Modal Pengadaan Alat-alat Studio | Tender | Pengadaan Barang | 3918181 | 15699613;15699621;15699904;15699908 | APBD | 680,165,000 | 497,255,000 | 493,350,000 | 493,350,000 | 493,350,000 | 0 | 0 | 0 | 2018-11-07 13:00:00 | 2018-11-22 | 02.796.695.1-013.000 | CV. MAHADEWI PERTIWI | 186,815,000 | 27.47 % | ||||
196 | 2018 | DINAS PARIWISATA | Belanja Konstruksi Pembuatan Toilet / Kamar Ganti,Belanja Konstruksi Pembuatan Panggung,Pengadaan Dermaga Apung,Pengadaan Plang Nama,Pengadaan Gazebo | Tender | Pekerjaan Konstruksi | 3919181 | 15018380;15018787;15018969;15019389;15019708 | APBD | 495,280,000 | 492,811,389 | 457,920,785 | 457,920,785 | 457,920,785 | 0 | 0 | 0 | 2018-11-01 16:20:00 | 2018-11-09 | 31.725.819.2-731.000 | CV. ADHI KARYA MANDIRI | 37,359,215 | 7.54 % | ||||
197 | 2018 | RUMAH SAKIT UMUM DAERAH ULIN BANJARMASIN | Pembangunan Gedung SMF Rawat Inap | Tender | Pekerjaan Konstruksi | 3922181 | 18605676 | APBDP | 107,736,613,800 | 107,378,459,727 | 100,210,636,833 | 100,210,636,833 | 100,210,636,833 | 0 | 0 | 0 | 2018-11-02 17:00:00 | 2018-11-20 | 01.362.643.7-054.000 | PT. Jaya Konstruksi Manggala Pratama, Tbk | 7,525,976,967 | 6.99 % | ||||
198 | 2018 | DINAS PERKEBUNAN DAN PETERNAKAN | Pengadaan Pupuk Organik, NPK, Fungisida, Herbisida dan Insektisida (Perluasan Tanaman Kakao di Kab. Banjar) | Tender | Pengadaan Barang | 3924181 | 18656695 | APBN | 260,500,000 | 226,450,950 | 0 | 0 | 0 | 0 | 0 | 0 | 2018-11-15 14:30:00 | 2018-11-30 | 260,500,000 | 100 % | ||||||
199 | 2018 | DINAS KELAUTAN DAN PERIKANAN | Pengadaan Mesin Kapal Nelayan dan Alat Tangkap Ikan Tramel Net | Tender | Pengadaan Barang | 3927181 | 15386054 | APBD | 859,000,000 | 854,326,000 | 821,216,000 | 821,216,000 | 821,216,000 | 0 | 0 | 0 | 2018-11-21 22:00:00 | 2018-12-06 | 85.206.556.4-731.000 | CV. MAKMUR ABADI SEJAHTERA | 37,784,000 | 4.4 % | ||||
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 2018 | RUMAH SAKIT UMUM DAERAH ULIN BANJARMASIN | Manajemen Konstruksi Gedung CSSD/Laundry Rumah Sakit | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3340181 | 14898376 | APBD | 265,098,106 | 263,007,800 | 210,060,400 | 210,060,400 | 210,060,400 | 0 | 0 | 0 | 2018-01-22 15:00:00 | 2018-02-27 | 01.860.230.0-731.000 | CV PRAKTIRA KONSULTAN | 55,037,706 | 20.76 % | ||||
2 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Lingkar Binuang | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3409181 | 14822718 | APBD | 350,000,000 | 346,390,000 | 294,096,000 | 294,096,000 | 294,096,000 | 0 | 0 | 0 | 2018-02-27 10:50:00 | 2018-04-16 | 01.489.654.2-711.000 | PT.TEMA KARYA MANDIRI | 55,904,000 | 15.97 % | ||||
3 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Angsana | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3411181 | 14822267 | APBD | 350,000,000 | 346,390,000 | 337,260,000 | 337,260,000 | 337,260,000 | 0 | 0 | 0 | 2018-02-27 10:50:00 | 2018-04-16 | 95.412.417.8-731.000 | PT. Prisma Jasa Konsulindo | 12,740,000 | 3.64 % | ||||
4 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Rantau - Muara Muning Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3412181 | 14822863 | APBD | 450,000,000 | 443,850,000 | 419,815,000 | 419,815,000 | 419,815,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-17 | 02.531.704.1-731.000 | CV. FIAZTA MATRIX CONSULTANT | 30,185,000 | 6.71 % | ||||
5 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Banjang - Pulau Nyiur - Batumandi Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3426181 | 14822408 | APBD | 450,000,000 | 396,330,000 | 380,000,500 | 380,000,500 | 380,000,500 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-17 | 02.531.483.2-731.000 | MANDIRI cipta PRATAMA | 69,999,500 | 15.56 % | ||||
6 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Birayang - Tariwin - Lok Batu - Batumandi | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3445181 | 14822528 | APBD | 350,000,000 | 348,040,000 | 336,105,000 | 336,105,000 | 336,105,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-17 | 02.090.318.3-731.000 | CV. Inditec Consultant | 13,895,000 | 3.97 % | ||||
7 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Anjir Pasar - Marabahan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3449181 | 14822318 | APBD | 350,000,000 | 348,040,000 | 337,865,000 | 337,865,000 | 337,865,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-17 | 01.854.518.6-711.000 | CV. KARYA PERDANA KONSULTAN | 12,135,000 | 3.47 % | ||||
8 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan dan Jembatan Lumpangi - Loksado | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3450181 | 14823056 | APBD | 350,000,000 | 349,855,000 | 339,350,000 | 339,350,000 | 339,350,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-17 | 76.010.632.8-711.000 | PT Prakarsa Desain Konsultan | 10,650,000 | 3.04 % | ||||
9 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Simpang 3 Lingkar Utara - Simpang 3 Jalan Golf - Jalan Kasturi (Paket I) Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3451181 | 14822117 | APBD | 450,000,000 | 435,380,000 | 432,320,000 | 432,320,000 | 432,320,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-17 | 01.879.315.8-731.000 | CV. ADIHANMAN TATA RANCANG | 17,680,000 | 3.93 % | ||||
10 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Kandangan - Negara Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3452181 | 14822655 | APBD | 500,000,000 | 498,080,000 | 476,790,000 | 476,790,000 | 476,790,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-17 | 02.708.931.7-731.000 | CV. DIAN MITRA TEKNIKA | 23,210,000 | 4.64 % | ||||
11 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Gunung Kupang - Kiram - Tambang Ulang Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3453181 | 14822039 | APBD | 450,000,000 | 430,100,000 | 415,360,000 | 415,360,000 | 415,360,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-17 | 02.050.569.9-731.000 | CV. Dharma Cipta Pratama | 34,640,000 | 7.7 % | ||||
12 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Simpang 4 Gatot Subroto - Lingkar Dalam Selatan Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3454181 | 14822177 | APBD | 450,000,000 | 377,520,000 | 350,070,000 | 350,070,000 | 350,070,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-17 | 02.050.569.9-731.000 | CV. Dharma Cipta Pratama | 99,930,000 | 22.21 % | ||||
13 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Batulicin - Mekarsari - Mentewe Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3455181 | 14822432 | APBD | 500,000,000 | 496,925,000 | 472,065,000 | 472,065,000 | 472,065,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-17 | 01.517.846.0-731.000 | PT. WINAYA KONTEKS KHARISMA | 27,935,000 | 5.59 % | ||||
14 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Tanjung - Muara Uya Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3456181 | 14822907 | APBD | 450,000,000 | 396,330,000 | 372,680,000 | 372,680,000 | 372,680,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-17 | 02.531.704.1-731.000 | CV. FIAZTA MATRIX CONSULTANT | 77,320,000 | 17.18 % | ||||
15 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Pelaihari - Batakan Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3457181 | 14822817 | APBD | 450,000,000 | 422,840,000 | 401,555,000 | 401,555,000 | 401,555,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-13 | 01.517.846.0-731.000 | PT. WINAYA KONTEKS KHARISMA | 48,445,000 | 10.77 % | ||||
16 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Banjarbaru - Simpang 3 Tahura - Aranio Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3458181 | 14822475 | APBD | 450,000,000 | 435,380,000 | 412,060,000 | 412,060,000 | 412,060,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-17 | 02.050.569.9-731.000 | CV. Dharma Cipta Pratama | 37,940,000 | 8.43 % | ||||
17 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Gambut - Pulau Sari Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3460181 | 14822554 | APBD | 450,000,000 | 377,520,000 | 353,485,000 | 353,485,000 | 353,485,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-13 | 80.562.640.5-731.000 | CV. RAMIER JAYA ARKANANTA | 96,515,000 | 21.45 % | ||||
18 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Jalan Bebas Hambatan Tol Banjarbaru - Batulicin | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3461181 | 14818573 | APBD | 4,898,725,000 | 4,892,578,000 | 4,525,469,300 | 4,525,469,300 | 4,525,469,300 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-17 | 01.124.766.5-731.000 | PT.WIRA WIDYATAMA | 373,255,700 | 7.62 % | ||||
19 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Paringin - Halong Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3462181 | 14822758 | APBD | 400,000,000 | 385,715,000 | 384,780,000 | 384,780,000 | 384,780,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-13 | 02.708.931.7-731.000 | CV. DIAN MITRA TEKNIKA | 15,220,000 | 3.81 % | ||||
20 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Golf Banjarbaru Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3463181 | 14822613 | APBD | 450,000,000 | 430,100,000 | 411,070,000 | 411,070,000 | 411,070,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-13 | 76.010.632.8-711.000 | PT Prakarsa Desain Konsultan | 38,930,000 | 8.65 % | ||||
21 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penyusunan Identifikasi dan Kajian Teknis Rumah Susun Kalimantan Selatan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3464181 | 14718658 | APBD | 482,000,000 | 481,946,190 | 400,125,000 | 400,125,000 | 400,125,000 | 0 | 0 | 0 | 2018-03-01 12:00:00 | 2018-03-29 | 01.548.564.2-424.000 | PT. Belaputera Interplan | 81,875,000 | 16.99 % | ||||
22 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penyusunan DED Kawasan Permukiman Kumuh Kewenangan Provinsi Kalimantan Selatan (Paket 5 : Kabupaten Hulu Sungai Tengah dan Kabupaten Hulu Sungai Utara) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3465181 | 17264619 | APBD | 200,000,000 | 199,498,640 | 198,385,000 | 198,385,000 | 198,385,000 | 0 | 0 | 0 | 2018-03-05 08:00:00 | 2018-03-27 | 03.242.995.3-731.000 | CV. DIGDAYA MAHARDIKA | 1,615,000 | 0.81 % | ||||
23 | 2018 | DINAS PERHUBUNGAN | Penyusunan Review Jaringan Trayek Angkutan Antar Kota Dalam Provinsi (AKDP) Tahap I ( Banua Anam ) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3466181 | 15284275 | APBD | 213,180,000 | 213,056,800 | 172,535,000 | 172,535,000 | 172,535,000 | 0 | 0 | 0 | 2018-03-12 08:00:00 | 2018-04-22 | 02.108.378.7-429.000 | PT. Munasa Kreasi Nusantara | 40,645,000 | 19.07 % | ||||
24 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penyusunan DED Kawasan Permukiman Kumuh Kewenangan Provinsi Kalimantan Selatan (Paket 2 : Kab. Tanah Bumbu dan Kabupaten Kotabaru) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3467181 | 17263826 | APBD | 200,000,000 | 199,498,640 | 197,670,000 | 197,670,000 | 197,670,000 | 0 | 0 | 0 | 2018-03-07 08:00:00 | 2018-03-24 | 02.215.319.1-732.000 | CV. POLA ARSITEK KONSULTAN | 2,330,000 | 1.17 % | ||||
25 | 2018 | DINAS PERHUBUNGAN | Penyusunan Kebutuhan Kuota Angkutan Orang Provinsi Kalimantan Selatan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3471181 | 15284368 | APBD | 300,000,000 | 299,999,920 | 267,118,500 | 267,118,500 | 267,118,500 | 0 | 0 | 0 | 2018-03-07 08:00:00 | 2018-04-11 | 02.108.378.7-429.000 | PT. Munasa Kreasi Nusantara | 32,881,500 | 10.96 % | ||||
26 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penyusunan DED Kawasan Permukiman Kumuh Kewenangan Provinsi Kalimantan Selatan (Paket 1 : Kab. Barito Kuala, Kota Banjarmasin, Kota Banjarbaru) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3472181 | 17255427 | APBD | 200,000,000 | 199,498,772 | 195,442,500 | 195,442,500 | 195,442,500 | 0 | 0 | 0 | 2018-03-09 14:00:00 | 2018-03-26 | 01.984.994.2-429.000 | PT. GENTA PERTIWI KONSULTAN | 4,557,500 | 2.28 % | ||||
27 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Supervisi Pembangunan Daerah Irigasi Kinarum 1.004 Ha Kabupaten Tabalong | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3473181 | 14756085 | APBD | 700,000,000 | 699,996,000 | 682,467,000 | 682,467,000 | 682,467,000 | 0 | 0 | 0 | 2018-03-15 12:00:00 | 2018-05-11 | 02.172.574.2-731.000 | CV. ANDALUSIA | 17,533,000 | 2.5 % | ||||
28 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Survey Identifikasi dan Evaluasi Jaringan Tersier DI. Haruyan Dayak Kabupaten Hulu Sungai Tengah | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3475181 | 14759300 | APBD | 1,500,000,000 | 1,499,987,500 | 1,477,465,000 | 1,477,465,000 | 1,477,465,000 | 0 | 0 | 0 | 2018-03-15 10:00:00 | 2018-05-18 | 01.844.485.1-015.000 | PT INAKKO Internasional Konsulindo | 22,535,000 | 1.5 % | ||||
29 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Supervisi Pembangunan Embung Landasan Ulin Kota Banjarbaru | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3476181 | 14756347 | APBD | 200,000,000 | 199,000,000 | 191,100,000 | 191,100,000 | 191,100,000 | 0 | 0 | 0 | 2018-03-15 16:00:00 | 2018-04-16 | 02.531.704.1-731.000 | CV. FIAZTA MATRIX CONSULTANT | 8,900,000 | 4.45 % | ||||
30 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Rehabilitasi Jaringan Daerah Irigasi Rawa Tanggul Martapura Kabupaten Banjar | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3477181 | 14759484 | APBD | 1,000,000,000 | 999,949,500 | 990,000,000 | 990,000,000 | 990,000,000 | 0 | 0 | 0 | 2018-03-15 10:00:00 | 2018-05-18 | 01.469.763.5-428.000 | PT. VITRAHA CONSINDOTAMA | 10,000,000 | 1 % | ||||
31 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Outline Plan Penyediaan Air Baku Kab. Tanah Laut, Kab. Tanah Bumbu dan Kab. Kota Baru | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3478181 | 14759648 | APBD | 1,500,000,000 | 1,499,999,600 | 1,474,000,000 | 1,474,000,000 | 1,474,000,000 | 0 | 0 | 0 | 2018-03-16 20:00:00 | 2018-05-15 | 01.554.042.0-121.000 | PT. ALLES KLAR PRIMA | 26,000,000 | 1.73 % | ||||
32 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Pengawas Pembangunan Kantor Samsat Tanjung | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3479181 | 14772503 | APBD | 260,000,000 | 259,677,000 | 235,455,000 | 235,455,000 | 235,455,000 | 0 | 0 | 0 | 2018-03-15 10:00:00 | 2018-05-18 | 02.050.569.9-731.000 | CV. Dharma Cipta Pratama | 24,545,000 | 9.44 % | ||||
33 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Pengawas Rehab Gedung Mess Biliton dan TMII | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3480181 | 14780220 | APBD | 150,000,000 | 149,770,000 | 134,659,800 | 134,659,800 | 134,659,800 | 0 | 0 | 0 | 2018-03-15 12:30:00 | 2018-04-17 | 01.860.230.0-731.000 | CV PRAKTIRA KONSULTAN | 15,340,200 | 10.23 % | ||||
34 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Pengawas Pembangunan Gedung Rapat BAKEUDA | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3481181 | 14772568 | APBD | 150,000,000 | 149,770,000 | 147,730,000 | 147,730,000 | 147,730,000 | 0 | 0 | 0 | 2018-03-15 12:00:00 | 2018-04-17 | 03.025.627.5-731.000 | SADWA RAMA CONSULTANT | 2,270,000 | 1.51 % | ||||
35 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Pengawas Pembangunan Gedung BPSDM Prov. Kalsel di Banjarbaru | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3482181 | 14772364 | APBD | 664,000,000 | 663,610,000 | 560,005,600 | 560,005,600 | 560,005,600 | 0 | 0 | 0 | 2018-03-15 10:00:00 | 2018-05-21 | 01.860.230.0-731.000 | CV PRAKTIRA KONSULTAN | 103,994,400 | 15.66 % | ||||
36 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Revisi rancangan Pola Pengelolaan WS. Cengal Batulicin | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3483181 | 14759161 | APBD | 2,050,000,000 | 2,049,987,500 | 1,966,100,000 | 1,966,100,000 | 1,966,100,000 | 0 | 0 | 0 | 2018-03-15 12:00:00 | 2018-05-23 | 01.646.915.7-009.000 | PT. SUPRAHARMONIA CONSULTINDO | 83,900,000 | 4.09 % | ||||
37 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Perencana Review Penyusunan Masterplan Sport Center | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3484181 | 14772089 | APBD | 1,464,250,000 | 1,464,241,000 | 1,342,423,500 | 1,342,423,500 | 1,342,423,500 | 0 | 0 | 0 | 2018-03-15 12:00:00 | 2018-05-15 | 01.309.520.3-062.000 | PT. PERENTJANA DJAJA | 121,826,500 | 8.32 % | ||||
38 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Perencana Review Masterplan Masjid Raya Sabilal Muhtadin di Banjarmasin | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3485181 | 14780772 | APBD | 240,750,000 | 240,747,000 | 224,537,000 | 224,537,000 | 224,537,000 | 0 | 0 | 0 | 2018-03-15 12:00:00 | 2018-05-21 | 02.108.378.7-429.000 | PT. Munasa Kreasi Nusantara | 16,213,000 | 6.73 % | ||||
39 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Perencana DED Monomen Pal Nol | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3486181 | 16033291 | APBD | 980,500,000 | 980,430,000 | 931,279,800 | 931,279,800 | 931,279,800 | 0 | 0 | 0 | 2018-03-15 12:00:00 | 2018-05-23 | 01.455.616.1-441.000 | PT. DAYA CIPTA DIANRANCANA | 49,220,200 | 5.02 % | ||||
40 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penyusunan Rencana Pembangunan dan Pengembangan Perumahan dan Kawasan Permukiman Daerah Provinsi Kalimantan Selatan (Tahap II) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3487181 | 14718949 | APBD | 987,000,000 | 986,973,658 | 915,365,000 | 915,365,000 | 915,365,000 | 0 | 0 | 0 | 2018-03-07 12:10:00 | 2018-04-28 | 02.430.817.3-731.000 | PT. KINARYA ALAM RAYA | 71,635,000 | 7.26 % | ||||
41 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penyusunan DED Kawasan Permukiman Kumuh Kewenangan Provinsi Kalimantan Selatan (Paket 6 : Kabupaten Balangan dan Kabupaten Tabalong) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3492181 | 17264742 | APBD | 200,000,000 | 199,498,640 | 195,442,500 | 195,442,500 | 195,442,500 | 0 | 0 | 0 | 2018-03-16 16:00:00 | 2018-03-29 | 01.984.994.2-429.000 | PT. GENTA PERTIWI KONSULTAN | 4,557,500 | 2.28 % | ||||
42 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Pengawas Kantor Samsat Kandangan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3493181 | 16243279 | APBD | 285,000,000 | 284,251,000 | 248,600,000 | 248,600,000 | 248,600,000 | 0 | 0 | 0 | 2018-03-16 15:00:00 | 2018-04-16 | 01.585.258.5-731.000 | CV. ASRINDO GRAHA CONSULTANT | 36,400,000 | 12.77 % | ||||
43 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Rehabilitasi Jaringan Daerah Irigasi Rawa Polder Tambak Hanyar Kabupaten Banjar | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3496181 | 14759536 | APBD | 1,000,000,000 | 999,982,000 | 976,250,000 | 976,250,000 | 976,250,000 | 0 | 0 | 0 | 2018-03-16 07:30:00 | 2018-05-07 | 01.426.908.8-441.000 | PT. SARANA BHUANA JAYA | 23,750,000 | 2.38 % | ||||
44 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Rehabilitasi Jaringan Daerah Irigasi Rawa Alalak Padang Kabupaten Banjar | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3503181 | 14759430 | APBD | 1,000,000,000 | 999,955,000 | 975,232,000 | 975,232,000 | 975,232,000 | 0 | 0 | 0 | 2018-03-15 12:00:00 | 2018-05-08 | 02.429.467.0-015.000 | PT. Mitratama Asia Pasific | 24,768,000 | 2.48 % | ||||
45 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Pengendali Banjir Kabupaten Hulu Sungai Tengah - Kabupaten Hulu Sungai Selatan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3506181 | 14759816 | APBD | 496,000,000 | 495,990,000 | 470,600,000 | 470,600,000 | 470,600,000 | 0 | 0 | 0 | 2018-03-15 12:00:00 | 2018-05-11 | 01.646.915.7-009.000 | PT. SUPRAHARMONIA CONSULTINDO | 25,400,000 | 5.12 % | ||||
46 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Perencana Review Masterplan dan Penyusunan Masterplan Drainase dan Penghijauan di Kawasan Perkantoran di Banjarbaru | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3508181 | 14772161 | APBD | 1,484,250,000 | 1,483,744,000 | 1,359,473,000 | 1,359,473,000 | 1,359,473,000 | 0 | 0 | 0 | 2018-03-15 13:00:00 | 2018-05-15 | 01.309.520.3-062.000 | PT. PERENTJANA DJAJA | 124,777,000 | 8.41 % | ||||
47 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Supervisi Pembangunan Sarana dan Prasarana RTH Kantor Gubernur di Banjarmasin | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3510181 | 14780380 | APBD | 250,000,000 | 249,029,000 | 230,873,000 | 230,873,000 | 230,873,000 | 0 | 0 | 0 | 2018-03-15 23:45:00 | 2018-05-03 | 01.534.559.8-731.000 | PT TECTAMA KARYA | 19,127,000 | 7.65 % | ||||
48 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Embung Kampung Banjar | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3517181 | 17778484 | APBD | 400,000,000 | 399,987,500 | 390,500,000 | 390,500,000 | 390,500,000 | 0 | 0 | 0 | 2018-03-16 12:00:00 | 2018-05-11 | 01.469.763.5-428.000 | PT. VITRAHA CONSINDOTAMA | 9,500,000 | 2.38 % | ||||
49 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Supervisi Rehabilitasi DIR. Tanggul Lungau Kabupaten Hulu Sungai Selatan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3528181 | 17673900 | APBD | 300,000,000 | 299,915,000 | 284,765,000 | 284,765,000 | 284,765,000 | 0 | 0 | 0 | 2018-03-22 12:00:00 | 2018-05-11 | 02.531.704.1-731.000 | CV. FIAZTA MATRIX CONSULTANT | 15,235,000 | 5.08 % | ||||
50 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Outline Plan Sistem Drainase Kota Kabupaten Tanah Laut | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3533181 | 17224277 | APBD | 850,000,000 | 849,997,500 | 838,695,000 | 838,695,000 | 838,695,000 | 0 | 0 | 0 | 2018-03-22 16:00:00 | 2018-05-04 | 01.131.029.9-441.000 | PT. RAYAKONSULT | 11,305,000 | 1.33 % | ||||
51 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penyusunan Identifikasi dan Kajian Teknis Rumah Khusus | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3537181 | 14717888 | APBD | 482,000,000 | 481,946,190 | 457,435,000 | 457,435,000 | 457,435,000 | 0 | 0 | 0 | 2018-03-23 16:00:00 | 2018-05-08 | 02.241.591.3-424.000 | PT. WINAGUNA SARANA TEKNIK | 24,565,000 | 5.1 % | ||||
52 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Supervisi Normalisasi Sungai Jepana (DAS Satui) Kabupaten Tanah Bumbu | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3540181 | 14756679 | APBD | 700,000,000 | 699,990,000 | 663,245,000 | 663,245,000 | 663,245,000 | 0 | 0 | 0 | 2018-03-22 16:00:00 | 2018-05-08 | 01.455.616.1-441.000 | PT. DAYA CIPTA DIANRANCANA | 36,755,000 | 5.25 % | ||||
53 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penyusunan Identifikasi dan Verifikasi Rumah Swadaya Tidak Layak Huni (RTLH) Kabupaten Tapin, HSS dan HST | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3541181 | 14717735 | APBD | 432,000,000 | 430,712,073 | 400,537,500 | 400,537,500 | 400,537,500 | 0 | 0 | 0 | 2018-04-02 09:00:00 | 2018-05-08 | 02.089.773.2-733.000 | PT. TECHNIKATAMA JASA KONSULTAN | 31,462,500 | 7.28 % | ||||
54 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penyusunan Identifikasi dan Verifikasi Rumah Swadaya Tidak Layak Huni (RTLH) Kabupaten Tanah Laut, Tanah Bumbu dan Kotabaru | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3542181 | 14718149 | APBD | 482,000,000 | 481,946,190 | 467,775,000 | 467,775,000 | 467,775,000 | 0 | 0 | 0 | 2018-04-02 08:00:00 | 2018-05-14 | 02.089.773.2-733.000 | PT. TECHNIKATAMA JASA KONSULTAN | 14,225,000 | 2.95 % | ||||
55 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Supervisi Daerah Irigasi Rawa Danda Besar Kabupaten Barito Kuala | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3543181 | 17045839 | APBD | 199,702,000 | 199,650,000 | 186,716,000 | 186,716,000 | 186,716,000 | 0 | 0 | 0 | 2018-03-23 11:10:00 | 2018-04-16 | 02.090.106.2-732.000 | CV. FAJAR KARYA PRATAMA | 12,986,000 | 6.5 % | ||||
56 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Pembuatan Sistem Informasi Perumahan dan Kawasan Permukiman Provinsi Kalimantan Selatan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3546181 | 14718442 | APBD | 731,000,000 | 730,922,918 | 717,200,000 | 717,200,000 | 714,147,500 | 0 | 0 | 0 | 2018-03-26 22:00:00 | 2018-05-01 | 02.430.817.3-731.000 | PT. KINARYA ALAM RAYA | 13,800,000 | 1.89 % | ||||
57 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penyusunan Identifikasi Penanganan Rumah Umum & Rumah Korban Bencana Alam Provinsi Kalimantan Selatan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3548181 | 14718258 | APBD | 482,000,000 | 481,643,778 | 453,750,000 | 453,750,000 | 453,750,000 | 0 | 0 | 0 | 2018-04-02 08:00:00 | 2018-04-24 | 02.430.817.3-731.000 | PT. KINARYA ALAM RAYA | 28,250,000 | 5.86 % | ||||
58 | 2018 | TAMAN HUTAN RAYA SULTAN ADAM | Belanja Jasa Konsultan Perencana Sarpras Wisata lembah Kahung Belangian | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3550181 | 17567135 | APBD | 101,500,000 | 100,551,000 | 99,110,000 | 99,110,000 | 99,110,000 | 0 | 0 | 0 | 2018-04-02 08:00:00 | 2018-04-11 | 02.215.319.1-732.000 | CV. POLA ARSITEK KONSULTAN | 2,390,000 | 2.35 % | ||||
59 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penyusunan DED Kawasan Permukiman Kumuh Kewenangan Provinsi Kalimantan Selatan (Paket 3 : Kab. Banjar dan Kab. Tanah Laut) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3551181 | 17264320 | APBD | 200,000,000 | 199,498,640 | 194,865,000 | 194,865,000 | 194,865,000 | 0 | 0 | 0 | 2018-03-27 14:00:00 | 2018-04-06 | 01.534.546.5-731.000 | CV. PRESMATEK CONSULTANT | 5,135,000 | 2.57 % | ||||
60 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Supervisi Rehabilitasi DI. Intangan Kabupaten Hulu Sungai Tengah | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3554181 | 17673918 | APBD | 200,000,000 | 199,980,000 | 182,655,000 | 182,655,000 | 182,655,000 | 0 | 0 | 0 | 2018-03-29 13:00:00 | 2018-04-18 | 02.043.129.2-731.000 | CV. GANESHA TEKNIK | 17,345,000 | 8.67 % | ||||
61 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penyusunan Identifikasi Data dan Kajian Teknis Perumahan untuk mendukung PSU di Permukiman Kota Banjarmasin dan Kabupaten Barito Kuala | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3562181 | 17972166 | APBD | 473,562,500 | 473,475,816 | 399,905,000 | 399,905,000 | 399,905,000 | 0 | 0 | 0 | 2018-04-20 09:00:00 | 2018-07-05 | 02.089.773.2-733.000 | PT. TECHNIKATAMA JASA KONSULTAN | 73,657,500 | 15.55 % | ||||
62 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penyusunan Identifikasi Data dan Kajian Teknis Perumahan untuk mendukung PSU di Permukiman Kabupaten Tapin dan Kabupaten Hulu Sungai Selatan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3563181 | 17972118 | APBD | 473,562,500 | 473,475,816 | 275,858,000 | 275,858,000 | 275,858,000 | 0 | 0 | 0 | 2018-04-20 09:00:00 | 2018-07-05 | 01.860.272.2-731.000 | CV. DAYAKARSA MADYA Consultant | 197,704,500 | 41.75 % | ||||
63 | 2018 | DINAS ENERGI DAN SUMBER DAYA MINERAL | Pemetaan zona konservasi air tanah wilayah CAT Pagatan Tahap II (Kab. Kotabaru) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3568181 | 15411505 | APBD | 600,000,000 | 599,981,800 | 584,779,800 | 584,779,800 | 584,955,800 | 0 | 0 | 0 | 2018-04-02 08:00:00 | 2018-05-04 | 02.265.266.3-541.000 | CV. Madani Callysta Saibuyun | 15,220,200 | 2.54 % | ||||
64 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Pengawas Toilet dan Rehabilitasi Halaman Masjid Raya Sabilal Muhtadin di Banjarmasin | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3569181 | 17678897 | APBD | 75,000,000 | 74,981,000 | 57,560,000 | 57,560,000 | 57,560,000 | 0 | 0 | 0 | 2018-04-03 18:00:00 | 2018-04-25 | 80.263.300.8-732.000 | CV. INDISIGN CONSULINDO | 17,440,000 | 23.25 % | ||||
65 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Perencana Pembuatan Trotoar dan Pagar Keliling di Lingkungan Setda Prov. Kalsel di Banjarbaru | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3571181 | 17679278 | APBD | 125,000,000 | 124,949,000 | 124,162,000 | 124,162,000 | 124,162,000 | 0 | 0 | 0 | 2018-04-03 18:00:00 | 2018-04-25 | 02.090.106.2-732.000 | CV. FAJAR KARYA PRATAMA | 838,000 | 0.67 % | ||||
66 | 2018 | DINAS PERHUBUNGAN | Study Kebutuhan dan Perencanaan Teknis Perlengkapan Keselamtan Jalan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3572181 | 15283571 | APBD | 125,000,000 | 124,997,950 | 117,551,500 | 117,551,500 | 117,551,500 | 0 | 0 | 0 | 2018-05-16 15:00:00 | 2018-06-23 | 03.025.809.9-731.000 | CV. SETIA JASA UTAMA | 7,448,500 | 5.96 % | ||||
67 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Kiram-Gunung Mawar Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3573181 | 17730711 | APBDP | 450,000,000 | 435,380,000 | 409,200,000 | 409,200,000 | 409,200,000 | 0 | 0 | 0 | 2018-04-03 16:00:00 | 2018-05-21 | 80.562.640.5-731.000 | CV. RAMIER JAYA ARKANANTA | 40,800,000 | 9.07 % | ||||
68 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Paramasan Bawah-Paramasan Atas | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3574181 | 17734511 | APBDP | 300,000,000 | 191,950,000 | 186,065,000 | 186,065,000 | 186,065,000 | 0 | 0 | 0 | 2018-04-03 16:00:00 | 2018-04-25 | 03.025.627.5-731.000 | SADWA RAMA CONSULTANT | 113,935,000 | 37.98 % | ||||
69 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Pengawas Pembuatan Kantor dan Laboratorium Unit Pelayanan Jasa Sumber Daya Mineral dan Energi | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3575181 | 17678785 | APBD | 100,000,000 | 100,000,000 | 98,972,000 | 98,972,000 | 98,972,000 | 0 | 0 | 0 | 2018-04-03 18:00:00 | 2018-04-25 | 01.860.308.4-731.000 | CV. KARYASA CONSULINDO | 1,028,000 | 1.03 % | ||||
70 | 2018 | DINAS ENERGI DAN SUMBER DAYA MINERAL | Pemetaan zona konservasi air tanah wilayah CAT Pagatan Tahap II (Kab. Tanah Laut) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3579181 | 15411451 | APBD | 600,000,000 | 599,981,800 | 582,532,500 | 582,532,500 | 582,532,500 | 0 | 0 | 0 | 2018-04-07 14:00:00 | 2018-05-08 | 02.265.266.3-541.000 | CV. Madani Callysta Saibuyun | 17,467,500 | 2.91 % | ||||
71 | 2018 | DINAS PERHUBUNGAN | Penyusunan Rencana Induk Lalu Lintas Angkutan Jalan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3581181 | 15279192 | APBD | 380,000,000 | 379,980,700 | 330,660,000 | 330,660,000 | 330,660,000 | 0 | 0 | 0 | 2018-04-24 14:00:00 | 2018-06-18 | 02.108.378.7-429.000 | PT. Munasa Kreasi Nusantara | 49,340,000 | 12.98 % | ||||
72 | 2018 | DINAS ENERGI DAN SUMBER DAYA MINERAL | Konsultansi penyusunan dokumen RUED Prov. Kalsel | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3584181 | 15436748 | APBD | 377,000,000 | 373,972,500 | 315,450,000 | 315,450,000 | 315,450,000 | 0 | 0 | 0 | 2018-04-26 09:00:00 | 2018-05-30 | 01.118.674.9-441.000 | PT. HEGAR DAYA | 61,550,000 | 16.33 % | ||||
73 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penyusunan Identifikasi Data dan Kajian Teknis Perumahan untuk mendukung PSU di Permukiman Kabupaten Tanah Laut dan Kabupaten Tanah Bumbu | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3599181 | 17972275 | APBD | 473,562,500 | 473,475,816 | 448,360,000 | 448,360,000 | 448,360,000 | 0 | 0 | 0 | 2018-04-24 14:00:00 | 2018-06-13 | 02.430.817.3-731.000 | PT. KINARYA ALAM RAYA | 25,202,500 | 5.32 % | ||||
74 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penyusunan Identifikasi Data dan Kajian Teknis Perumahan untuk mendukung PSU di Permukiman Kabupaten Tabalong dan Kabupaten Hulu Sungai Utara | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3600181 | 17972250 | APBD | 473,562,500 | 473,475,816 | 431,915,000 | 431,915,000 | 431,915,000 | 0 | 0 | 0 | 2018-04-24 14:00:00 | 2018-06-13 | 03.242.995.3-731.000 | CV. DIGDAYA MAHARDIKA | 41,647,500 | 8.79 % | ||||
75 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penyusunan DED Kawasan Permukiman Kumuh Kewenangan Provinsi Kalimantan Selatan (Paket 4 : Kabupaten Tapin dan Kabupaten Hulu Sungai Selatan) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3601181 | 17264188 | APBD | 200,000,000 | 199,498,640 | 192,170,000 | 192,170,000 | 192,170,000 | 0 | 0 | 0 | 2018-04-20 23:00:00 | 2018-07-02 | 01.815.062.3-731.000 | CV. ITNASINDO | 7,830,000 | 3.92 % | ||||
76 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Perencanaan dan Kajian Teknis Pengembangan Kampung Berbasis Karakter Tradisional | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3605181 | 14719549 | APBD | 940,590,000 | 940,157,350 | 800,360,000 | 800,360,000 | 800,360,000 | 0 | 0 | 0 | 2018-04-26 10:00:00 | 2018-06-07 | 01.455.616.1-441.000 | PT. DAYA CIPTA DIANRANCANA | 140,230,000 | 14.91 % | ||||
77 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penyusunan Identifikasi Kawasan Permukiman Kumuh Kewenangan Provinsi Kalimantan Selatan (Paket 3) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3607181 | 18155726 | APBD | 900,000,000 | 899,079,478 | 810,480,000 | 810,480,000 | 810,480,000 | 0 | 0 | 0 | 2018-05-01 13:30:00 | 2018-06-25 | 02.430.817.3-731.000 | PT. KINARYA ALAM RAYA | 89,520,000 | 9.95 % | ||||
78 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penyusunan Identifikasi Kawasan Permukiman Kumuh Kewenangan Provinsi Kalimantan Selatan (Paket 2) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3608181 | 18155712 | APBD | 900,000,000 | 899,079,478 | 800,635,000 | 800,635,000 | 800,635,000 | 0 | 0 | 0 | 2018-04-24 14:00:00 | 2018-06-12 | 01.455.616.1-441.000 | PT. DAYA CIPTA DIANRANCANA | 99,365,000 | 11.04 % | ||||
79 | 2018 | RUMAH SAKIT JIWA SAMBANG LIHUM | Perencanaan Rehabilitasi, Renovasi, Restorasi Bangunan, Ruangan, Bangsal, Bangunan Penunjang | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3609181 | 15432795 | APBD | 150,000,000 | 149,859,600 | 148,362,500 | 148,362,500 | 148,362,500 | 0 | 0 | 0 | 2018-04-25 17:00:00 | 2018-05-14 | 03.025.627.5-731.000 | SADWA RAMA CONSULTANT | 1,637,500 | 1.09 % | ||||
80 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penyusunan Identifikasi Kawasan Permukiman Kumuh Kewenangan Provinsi Kalimantan Selatan (Paket 1) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3614181 | 18155704 | APBD | 900,000,000 | 899,079,000 | 791,120,000 | 791,120,000 | 791,120,000 | 0 | 0 | 0 | 2018-04-25 10:00:00 | 2018-06-27 | 01.534.559.8-731.000 | PT TECTAMA KARYA | 108,880,000 | 12.1 % | ||||
81 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Penyusunan Materi Teknis dan Naskah Akademis Rancangan Peraturan Daerah tentang Penyelenggaraan Perumahan dan Kawasan Permukiman di Provinsi Kalimantan Selatan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3615181 | 15461712 | APBD | 300,000,000 | 188,952,654 | 180,592,500 | 180,592,500 | 180,592,500 | 0 | 0 | 0 | 2018-04-27 08:00:00 | 2018-05-21 | 02.089.773.2-733.000 | PT. TECHNIKATAMA JASA KONSULTAN | 119,407,500 | 39.8 % | ||||
82 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Perencanaan dan Kajian Teknis Penataan Lingkungan Permukiman Komunitas Adat Tertinggal | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3617181 | 14719733 | APBD | 934,350,000 | 933,557,350 | 831,270,000 | 831,270,000 | 831,270,000 | 0 | 0 | 0 | 2018-04-26 14:00:00 | 2018-06-22 | 01.118.581.6-428.000 | PT. BIRO ARSITEK DAN INSINJUR SANGKURIANG | 103,080,000 | 11.03 % | ||||
83 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Pengawas Pembangunan Pintu Gerbang Kantor Kawasan Perkantoran di Banjarbaru | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3620181 | 17678695 | APBD | 133,142,500 | 133,133,000 | 120,945,000 | 120,945,000 | 120,945,000 | 0 | 0 | 0 | 2018-05-19 00:59:00 | 2018-06-05 | 01.585.258.5-731.000 | CV. ASRINDO GRAHA CONSULTANT | 12,197,500 | 9.16 % | ||||
84 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Pengawas Pembangunan Taman Edukasi Lalu Lintas | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3624181 | 17678744 | APBD | 150,000,000 | 149,765,000 | 98,505,000 | 98,505,000 | 98,505,000 | 0 | 0 | 0 | 2018-05-20 14:00:00 | 2018-06-21 | 01.860.272.2-731.000 | CV. DAYAKARSA MADYA Consultant | 51,495,000 | 34.33 % | ||||
85 | 2018 | DINAS PERPUSTAKAAN DAN KEARSIPAN | Belanja Modal Pengadaan Konstruksi/ Pembelian Gedung Kantor (Pembangunan Depo Arsip Daerah Prov. Kalsel (Biaya Konsultan Pengawas)) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3625181 | 15345814 | APBD | 216,594,263 | 199,963,500 | 175,408,750 | 175,408,750 | 175,408,750 | 0 | 0 | 0 | 2018-05-22 10:00:00 | 2018-06-05 | 02.708.989.5-731.000 | CV. MANDIRI TATA SARANA CONSULTANT | 41,185,513 | 19.02 % | ||||
86 | 2018 | DINAS ENERGI DAN SUMBER DAYA MINERAL | Konsultansi pengawas pekerjaan pembangunan PLTS Terpusat di Desa Pulau Panjang KEc. Simpang Empat Kab. Tanah Bumbu | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3639181 | 15349779 | APBD | 136,700,000 | 136,494,600 | 135,905,000 | 135,905,000 | 135,905,000 | 0 | 0 | 0 | 2018-05-21 10:00:00 | 2018-06-23 | 03.025.627.5-731.000 | SADWA RAMA CONSULTANT | 795,000 | 0.58 % | ||||
87 | 2018 | DINAS ENERGI DAN SUMBER DAYA MINERAL | Pengawasan Pekerjaan Pembangunan PLTS Terpusat Desa Sungai Kumap Kec. Muara Uya Kab. Tabalong | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3642181 | 18028667 | APBDP | 143,000,000 | 136,494,600 | 135,905,000 | 135,905,000 | 135,905,000 | 0 | 0 | 0 | 2018-05-21 10:00:00 | 2018-06-23 | 03.025.627.5-731.000 | SADWA RAMA CONSULTANT | 7,095,000 | 4.96 % | ||||
88 | 2018 | DINAS PENDIDIKAN DAN KEBUDAYAAN | Pengawasan Penataan Kawasan Syech M. Arsyad Al-Banjari | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3659181 | 18253161 | APBD | 500,000,000 | 414,611,984 | 353,411,344 | 353,411,344 | 353,411,344 | 0 | 0 | 0 | 2018-06-18 08:00:00 | 2018-07-13 | 03.025.627.5-731.000 | SADWA RAMA CONSULTANT | 146,588,656 | 29.32 % | ||||
89 | 2018 | DINAS LINGKUNGAN HIDUP | Belanja Jasa Konsultan Perencanaan Penyusunan Dokumen Andalalin TPA Regional Banjarbakula (Lelang Ulang) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3670181 | 18273795 | APBD | 275,000,000 | 274,302,050 | 266,475,000 | 266,475,000 | 266,475,000 | 0 | 0 | 0 | 2018-06-18 08:00:00 | 2018-07-10 | 01.216.271.5-441.000 | PT. INTIMULYA MULTIKENCANA | 8,525,000 | 3.1 % | ||||
90 | 2018 | DINAS KELAUTAN DAN PERIKANAN | Belanja Modal Jasa Konsultan (Pekerjaan Jasa Konsultan Upaya Kelolaan Lingkungan (UKL) dan Upaya Pemantauan Lingkungan (UPL) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3689181 | 15386330 | APBD | 325,000,000 | 127,765,000 | 126,170,000 | 126,170,000 | 126,170,000 | 0 | 0 | 0 | 2018-06-29 08:00:00 | 2018-07-24 | 01.815.062.3-731.000 | CV. ITNASINDO | 198,830,000 | 61.18 % | ||||
91 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Supervisi Peningkatan DIR. Polder Bakar Kabupaten Hulu Sungai Utara | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3695181 | 14756929 | APBD | 300,000,000 | 299,970,000 | 284,935,200 | 284,935,200 | 284,935,200 | 0 | 0 | 0 | 2018-06-28 22:00:00 | 2018-08-03 | 01.141.524.7-731.000 | CV. BINA BANUA | 15,064,800 | 5.02 % | ||||
92 | 2018 | TAMAN HUTAN RAYA SULTAN ADAM | Perencanaan Masterplan Lembah Kahung Belangin (Lanscape, Site plan, DED) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3709181 | 17565836 | APBD | 500,000,000 | 499,191,000 | 474,732,500 | 474,732,500 | 474,732,500 | 0 | 0 | 0 | 2018-07-12 08:00:00 | 2018-07-31 | 01.119.163.2-424.000 | PT. SECON DWITUNGGAL PUTRA | 25,267,500 | 5.05 % | ||||
93 | 2018 | DINAS KELAUTAN DAN PERIKANAN | Jasa Konsultan Pengawasan Pembangunan Kapal Fiber >10 GT dan Mesin | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3711181 | 15385505 | APBD | 180,000,000 | 179,685,000 | 177,375,000 | 177,375,000 | 177,375,000 | 0 | 0 | 0 | 2018-07-12 08:00:00 | 2018-07-24 | 75.718.181.3-001.000 | PT. SENTA SEA MANAJEMEN | 2,625,000 | 1.46 % | ||||
94 | 2018 | RUMAH SAKIT UMUM DAERAH ULIN BANJARMASIN | Manajemen Konstruksi Pembangunan Gd. SMF Rawat Inap Kelas I | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3723181 | 18016619 | APBD | 1,717,419,000 | 1,714,597,500 | 1,641,035,000 | 1,641,035,000 | 1,641,035,000 | 0 | 0 | 0 | 2018-07-13 19:00:00 | 2018-08-17 | 01.000.012.3-093.000 | PT Indah Karya (Persero) | 76,384,000 | 4.45 % | ||||
95 | 2018 | DINAS PEMBERDAYAAN MASYARAKAT DAN DESA | DED/FS Pembangunan Jalan Ruas Banjar-Batulicin Provinsi Kalimantan Selatan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3739181 | 18292716 | APBD | 550,000,000 | 548,825,475 | 536,195,000 | 536,195,000 | 536,195,000 | 0 | 0 | 0 | 2018-07-18 10:00:00 | 2018-08-28 | 01.719.362.4-732.000 | CV. SENTRATECS | 13,805,000 | 2.51 % | ||||
96 | 2018 | DINAS PERHUBUNGAN | Penyusunan Kebutuhan Feeder dan Kelayakan Angkutan Massal BRT Banjarbakula | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3744181 | 15091232 | APBD | 258,500,000 | 258,439,500 | 244,024,000 | 244,024,000 | 244,024,000 | 0 | 0 | 0 | 2018-08-03 12:00:00 | 2018-09-07 | 02.090.318.3-731.000 | CV. Inditec Consultant | 14,476,000 | 5.6 % | ||||
97 | 2018 | DINAS PEMBERDAYAAN MASYARAKAT DAN DESA | Penyusunan Dokumen AMDAL Pembangunan Jalan Ruas Banjar-Batulicin Provinsi Kalimantan Selatan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3745181 | 18292710 | APBD | 900,000,000 | 893,640,000 | 883,190,000 | 883,190,000 | 884,400,000 | 0 | 0 | 0 | 2018-07-31 15:30:00 | 2018-09-03 | 01.719.362.4-732.000 | CV. SENTRATECS | 16,810,000 | 1.87 % | ||||
98 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Penyusunan Pergub tentang Peraturan Zonasi Lintas Kabupaten Kota (Kawasan Strategis Provinsi Rawa Batang Banyu) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3764181 | 18392489 | APBD | 399,960,000 | 399,960,000 | 365,530,000 | 365,530,000 | 365,530,000 | 0 | 0 | 0 | 2018-08-06 09:00:00 | 2018-09-03 | 02.108.378.7-429.000 | PT. Munasa Kreasi Nusantara | 34,430,000 | 8.61 % | ||||
99 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Orthorektifikasi Peta (Dasar) Rencana Tata Ruang Kawasan Strategis Provinsi Rawa Batang Banyu | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3765181 | 18392492 | APBD | 199,980,000 | 199,980,000 | 188,540,000 | 188,540,000 | 188,540,000 | 0 | 0 | 0 | 2018-08-06 09:00:00 | 2018-09-03 | 02.980.044.8-404.000 | PT. Komperji Nusaraya | 11,440,000 | 5.72 % | ||||
100 | 2018 | DINAS ENERGI DAN SUMBER DAYA MINERAL | Konsultansi penyusunan dokumen mineral dan batubara | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3770181 | 15440147 | APBD | 434,500,000 | 433,482,500 | 426,008,500 | 426,008,500 | 428,197,000 | 0 | 0 | 0 | 2018-08-07 10:00:00 | 2018-08-24 | 75.545.223.2-517.000 | PT. JAVA DESAIN CONSULTAN | 8,491,500 | 1.95 % | ||||
101 | 2018 | DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN | Konsultan Pengawas Penanganan PSU di Permukiman Prov. Kalsel | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3795181 | 18314321 | APBD | 142,050,000 | 140,866,000 | 129,998,825 | 129,998,825 | 129,998,825 | 0 | 0 | 0 | 2018-08-13 09:00:00 | 2018-09-17 | 01.463.263.2-731.000 | PT. MATRA ESTETIKA REKAYASA | 12,051,175 | 8.48 % | ||||
102 | 2018 | DINAS LINGKUNGAN HIDUP | Belanja Jasa Konsultan Perencanaan Dokumen Kajian Masterplan Persampahan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3798181 | 18273770 | APBD | 209,935,000 | 205,768,200 | 184,070,000 | 184,070,000 | 191,565,000 | 0 | 0 | 0 | 2018-08-18 09:00:00 | 2018-09-19 | 01.119.163.2-424.000 | PT. SECON DWITUNGGAL PUTRA | 25,865,000 | 12.32 % | ||||
103 | 2018 | DINAS KOMUNIKASI DAN INFORMATIKA | Pengembangan dan Penata Kelolaan E-Government | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3817181 | 18422861 | APBD | 150,000,000 | 148,830,000 | 140,965,000 | 140,965,000 | 140,965,000 | 0 | 0 | 0 | 2018-08-24 00:00:00 | 2018-09-17 | 02.369.197.5-541.000 | PT. GAMATECHNO INDONESIA | 9,035,000 | 6.02 % | ||||
104 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Jembatan Batulicin-Mentewe | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3826181 | 18410823 | APBDP | 662,818,000 | 657,052,000 | 649,345,500 | 649,345,500 | 650,545,500 | 0 | 0 | 0 | 2018-08-28 17:00:00 | 2018-10-16 | 02.613.877.6-731.000 | CV SEMBILAN SATU ENGINEERING | 13,472,500 | 2.03 % | ||||
105 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Taman Budaya Baru di Kawasan Perkantoran Pemprov. Kalsel | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3827181 | 18420334 | APBDP | 390,000,000 | 389,953,300 | 346,280,000 | 346,280,000 | 370,370,000 | 0 | 0 | 0 | 2018-08-27 12:00:00 | 2018-09-27 | 01.455.616.1-441.000 | PT. DAYA CIPTA DIANRANCANA | 43,720,000 | 11.21 % | ||||
106 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Istana Mahligai Rakyat | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3828181 | 18420291 | APBDP | 191,500,000 | 191,405,500 | 154,628,925 | 154,628,925 | 154,628,925 | 0 | 0 | 0 | 2018-08-27 16:00:00 | 2018-10-20 | 01.463.263.2-731.000 | PT. MATRA ESTETIKA REKAYASA | 36,871,075 | 19.25 % | ||||
107 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Jalan Alternatif ke Makam Syech M. Arsyad Al-Banjari dan DED Jembatan Jalan Pendidikan Sekumpul | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3835181 | 18420292 | APBDP | 396,250,000 | 395,164,000 | 358,325,000 | 358,325,000 | 369,270,000 | 0 | 0 | 0 | 2018-08-28 16:00:00 | 2018-10-26 | 01.489.654.2-711.000 | PT.TEMA KARYA MANDIRI | 37,925,000 | 9.57 % | ||||
108 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Lanjutan Makam Syeh Arsyad Al Banjari | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3839181 | 18420341 | APBDP | 390,000,000 | 389,953,300 | 300,008,500 | 300,008,500 | 300,008,500 | 0 | 0 | 0 | 2018-08-27 23:55:00 | 2018-10-30 | 02.050.569.9-731.000 | CV. Dharma Cipta Pratama | 89,991,500 | 23.07 % | ||||
109 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Jaringan Listrik Kawasan Perkantoran Pemprov. Kalsel | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3840181 | 18420374 | APBDP | 540,000,000 | 539,990,000 | 341,000,000 | 341,000,000 | 523,600,000 | 0 | 0 | 0 | 2018-08-29 09:00:00 | 2018-10-17 | 02.883.220.2-731.000 | CV. RIA KONSULTAN | 199,000,000 | 36.85 % | ||||
110 | 2018 | DINAS PERINDUSTRIAN | Pekerjaan Pengadaan Jasa Tim Appraisal (Jasa Penilai) Bidang Tanah Sertifikat HPL No. 00001 Tahun 2012 | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3868181 | 14248620 | APBD | 600,000,000 | 597,162,500 | 417,280,000 | 417,280,000 | 417,280,000 | 0 | 0 | 0 | 2018-09-10 16:00:00 | 2018-10-26 | 21.061.218.0-526.000 | KJPP Sih Wiryadi & Rekan | 182,720,000 | 30.45 % | ||||
111 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Study Pendahuluan Sport City | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3873181 | 18446564 | APBDP | 240,000,000 | 239,965,000 | 221,705,000 | 221,705,000 | 221,705,000 | 176,158,400 | 0 | 0 | 2018-09-13 12:00:00 | 2018-11-02 | 2018-11-15 | 01.548.564.2-424.000 | PT. Belaputera Interplan | 01.548.564.2-424.000 | PT. Belaputera Interplan | 18,295,000 | 7.62 % | |
112 | 2018 | DINAS KOMUNIKASI DAN INFORMATIKA | Pembuatan Masterplan TV Banua | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3882181 | 18440704 | APBD | 357,700,000 | 356,180,000 | 328,735,000 | 328,735,000 | 328,735,000 | 0 | 0 | 0 | 2018-09-21 16:00:00 | 2018-11-06 | 31.552.819.0-423.000 | PT. Sisarti Baksya Asasta | 28,965,000 | 8.1 % | ||||
113 | 2018 | DINAS PERPUSTAKAAN DAN KEARSIPAN | Belanja Modal Pengadaan Konstruksi/ Pembelian Gedung Kantor (Pembangunan Depo Arsip Daerah Prov. Kalsel (Biaya Konsultan Perencanaan)) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3887181 | 15345678 | APBD | 312,488,805 | 310,737,075 | 230,925,000 | 230,925,000 | 232,925,000 | 0 | 0 | 0 | 2018-09-21 23:00:00 | 2018-10-31 | 02.050.569.9-731.000 | CV. Dharma Cipta Pratama | 81,563,805 | 26.1 % | ||||
114 | 2018 | DINAS TENAGA KERJA DAN TRANSMIGRASI | Pengurusan Sertifikat Tanah Transmigrasi/IPL Kab. Barito Kuala | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3898181 | 18446695 | APBN | 147,840,000 | 147,840,000 | 143,880,000 | 143,880,000 | 143,880,000 | 0 | 0 | 0 | 2018-10-09 14:00:00 | 2018-11-08 | 01.563.866.1-701.000 | PT. Tiara Pilar Kreasi | 3,960,000 | 2.68 % | ||||
115 | 2018 | DINAS TENAGA KERJA DAN TRANSMIGRASI | Pengurusan Sertifikat Tanah Transmigrasi/IPL Kab. Tanah Bumbu | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3899181 | 18446678 | APBN | 193,040,000 | 193,030,200 | 188,980,000 | 188,980,000 | 188,980,000 | 0 | 0 | 0 | 2018-10-09 14:00:00 | 2018-11-08 | 01.563.866.1-701.000 | PT. Tiara Pilar Kreasi | 4,060,000 | 2.1 % | ||||
116 | 2018 | DINAS KOMUNIKASI DAN INFORMATIKA | Masterplan Smart Province Kalimantan Selatan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3903181 | 18493266 | APBDP | 360,575,000 | 354,105,290 | 326,205,000 | 326,205,000 | 326,205,000 | 0 | 0 | 0 | 2018-10-15 10:00:00 | 2018-11-16 | 02.542.161.1-541.000 | PT. Inixindo Widya Iswara Nusantara | 34,370,000 | 9.53 % | ||||
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 2018 | DINAS KESEHATAN PROVINSI KALIMANTAN SELATAN-03 | Pengadaan Distribusi PMT Ibu Hamil KEK (3.753 Bumil KEK x 9 Kg) | Tender Cepat | Jasa Lainnya | 3500181 | 17422249 | APBN | 506,700,000 | 506,700,000 | 0 | 0 | 0 | 0 | 0 | 0 | 2018-03-23 08:00:00 | 2018-03-29 | 506,700,000 | 100 % | ||||||
2 | 2018 | DINAS KESEHATAN PROVINSI KALIMANTAN SELATAN-03 | Pengadaan Distribusi PMT Balita (3.887 Balita x 10,8 Kg) | Tender Cepat | Jasa Lainnya | 3501181 | 17423825 | APBN | 629,850,000 | 629,850,000 | 0 | 0 | 0 | 0 | 0 | 0 | 2018-03-23 08:00:00 | 2018-03-29 | 629,850,000 | 100 % | ||||||
3 | 2018 | TAMAN HUTAN RAYA SULTAN ADAM | Pembangunan Fasilitas parkir | Tender Cepat | Pekerjaan Konstruksi | 3552181 | 14240346 | APBD | 1,092,500,000 | 1,090,646,617 | 988,575,478 | 988,575,478 | 988,575,478 | 0 | 0 | 0 | 2018-03-28 10:00:00 | 2018-04-02 | 03.297.153.3-728.000 | CV. PUTRA SAMBOJA | 103,924,522 | 9.51 % | ||||
4 | 2018 | DINAS PERTANIAN DAN KETAHANAN PANGAN | Pengadaan sarana pasca panen berupa power thresher | Tender Cepat | Pengadaan Barang | 3559181 | 14927577 | APBD | 479,250,000 | 479,160,000 | 478,714,500 | 478,714,500 | 478,714,500 | 0 | 0 | 0 | 2018-04-02 10:00:00 | 2018-04-04 | 02.753.642.4-732.000 | CV.RESAGRI JAYA | 535,500 | 0.11 % | ||||
5 | 2018 | DINAS KESEHATAN PROVINSI KALIMANTAN SELATAN-03 | Pengadaan Distribusi PMT Balita (3.887 Balita x 10,8 Kg) | Tender Cepat | Jasa Lainnya | 3566181 | 17423825 | APBN | 629,850,000 | 629,850,000 | 346,417,500 | 346,417,500 | 346,417,500 | 0 | 0 | 0 | 2018-04-02 08:00:00 | 2018-04-05 | 81.519.949.2-407.000 | PT ARTHA INOVA ABADI | 283,432,500 | 45 % | ||||
6 | 2018 | DINAS KESEHATAN PROVINSI KALIMANTAN SELATAN-03 | Pengadaan Distribusi PMT Ibu Hamil KEK (3.753 Bumil KEK x 9 Kg) | Tender Cepat | Jasa Lainnya | 3567181 | 17422249 | APBN | 506,700,000 | 506,700,000 | 278,685,000 | 278,685,000 | 278,685,000 | 0 | 0 | 0 | 2018-04-02 08:00:00 | 2018-04-05 | 81.519.949.2-407.000 | PT ARTHA INOVA ABADI | 228,015,000 | 45 % | ||||
7 | 2018 | DINAS PERTANIAN DAN KETAHANAN PANGAN | Pengadaan Power Thresher | Tender Cepat | Pengadaan Barang | 3583181 | 17924306 | APBN | 896,000,000 | 459,976,000 | 459,800,000 | 459,800,000 | 459,800,000 | 0 | 0 | 0 | 2018-04-09 10:00:00 | 2018-04-12 | 02.753.642.4-732.000 | CV.RESAGRI JAYA | 436,200,000 | 48.68 % | ||||
8 | 2018 | KEBUN RAYA BANUA | Belanja Modal Pengadaan Instalasi Listrik | Tender Cepat | Jasa Konsultansi Badan Usaha Non Konstruksi | 3587181 | 17536305 | APBD | 100,000,000 | 99,874,225 | 98,450,000 | 98,450,000 | 98,450,000 | 0 | 0 | 0 | 2018-04-11 09:00:00 | 2018-04-17 | 03.025.627.5-731.000 | SADWA RAMA CONSULTANT | 1,550,000 | 1.55 % | ||||
9 | 2018 | DINAS PERTANIAN DAN KETAHANAN PANGAN | Pengadaan Sarana Produksi Pengembangan Bawang Merah seluas 20 HA | Tender Cepat | Pengadaan Barang | 3603181 | 14926995 | APBD | 900,000,000 | 857,799,970 | 763,000,000 | 763,000,000 | 763,000,000 | 0 | 0 | 0 | 2018-04-25 09:00:00 | 2018-04-27 | 70.057.665.5-732.000 | CV. Rizki Banua Borneo | 137,000,000 | 15.22 % | ||||
10 | 2018 | DINAS PERTANIAN DAN KETAHANAN PANGAN | Pengadaan Sarana Produksi Pengembangan Tanaman Cabe Besar Seluas 80 HA | Tender Cepat | Pengadaan Barang | 3604181 | 14903871 | APBD | 806,000,000 | 784,899,976 | 744,856,000 | 744,856,000 | 744,856,000 | 0 | 0 | 0 | 2018-04-25 09:00:00 | 2018-04-27 | 03.282.504.4-732.000 | CV. Hervi Transseed | 61,144,000 | 7.59 % | ||||
11 | 2018 | DINAS PERKEBUNAN DAN PETERNAKAN | Pengadaan Benih/Bibit Kakao Unggul | Tender Cepat | Pengadaan Barang | 3622181 | 14457917 | APBN | 800,000,000 | 725,000,000 | 696,900,000 | 696,900,000 | 696,900,000 | 0 | 0 | 0 | 2018-05-02 09:00:00 | 2018-05-07 | 02.237.261.9-732.000 | CV. GUNUNG PUTRI | 103,100,000 | 12.89 % | ||||
12 | 2018 | DINAS PERTANIAN DAN KETAHANAN PANGAN | Pengadaan Sarana Produksi untuk Pemberdayaan Penangkar Benih Kacang Tanah | Tender Cepat | Pengadaan Barang | 3623181 | 14883764 | APBD | 260,700,000 | 251,893,950 | 250,965,000 | 250,965,000 | 250,965,000 | 0 | 0 | 0 | 2018-05-08 09:00:00 | 2018-05-11 | 03.255.474.3-732.000 | CV. ANUGRAH LESTARI | 9,735,000 | 3.73 % | ||||
13 | 2018 | RUMAH SAKIT JIWA SAMBANG LIHUM | Pengadaan Mobile File | Tender Cepat | Pengadaan Barang | 3627181 | 15432653 | APBD | 260,200,000 | 260,188,200 | 259,600,000 | 259,600,000 | 259,600,000 | 0 | 0 | 0 | 2018-05-22 11:00:00 | 2018-05-24 | 01.124.774.9-731.000 | CV. SYARIAAT | 600,000 | 0.23 % | ||||
14 | 2018 | DINAS PERKEBUNAN DAN PETERNAKAN | Pengadaan benih kopi unggul | Tender Cepat | Pengadaan Barang | 3628181 | 14492011 | APBN | 495,000,000 | 495,000,000 | 494,395,000 | 494,395,000 | 494,395,000 | 0 | 0 | 0 | 2018-05-15 09:00:00 | 2018-05-21 | 02.753.911.3-732.000 | CV.Putra Mandiri | 605,000 | 0.12 % | ||||
15 | 2018 | DINAS PERKEBUNAN DAN PETERNAKAN | Pengadaan benih kopi unggul | Tender Cepat | Pengadaan Barang | 3629181 | 14499171 | APBN | 495,000,000 | 495,000,000 | 494,950,500 | 494,950,500 | 494,950,500 | 0 | 0 | 0 | 2018-05-15 09:00:00 | 2018-05-21 | 02.753.911.3-732.000 | CV.Putra Mandiri | 49,500 | 0.01 % | ||||
16 | 2018 | DINAS PERKEBUNAN DAN PETERNAKAN | Pengadaan Pupuk NPK, Fungisida, dan Herbisida untuk peremajaan tanaman karet kab. Balangan | Tender Cepat | Pengadaan Barang | 3630181 | 18086419 | APBN | 272,000,000 | 242,265,760 | 239,597,600 | 239,597,600 | 239,597,600 | 0 | 0 | 0 | 2018-05-21 09:00:00 | 2018-05-24 | 03.282.504.4-732.000 | CV. Hervi Transseed | 32,402,400 | 11.91 % | ||||
17 | 2018 | UPT LABORATORIUM LINGKUNGAN | Pengadaan Alat-Alat Laboratorium Untuk Pengujian Air Dan Udara | Tender Cepat | Pengadaan Barang | 3650181 | 16528433 | APBD | 950,000,000 | 927,999,999 | 918,500,000 | 918,500,000 | 918,500,000 | 0 | 0 | 0 | 2018-05-28 10:00:00 | 2018-05-31 | 72.173.656.9-407.000 | PT. Manunggaling Karsa Persada | 31,500,000 | 3.32 % | ||||
18 | 2018 | DINAS PERTANIAN DAN KETAHANAN PANGAN | Pengadaan Sarana Produksi Pengembangan Kawasan Cabe Rawit (Paket 1) | Tender Cepat | Pengadaan Barang | 3657181 | 15432185 | APBN | 3,089,375,000 | 1,531,798,125 | 1,514,963,698 | 1,514,963,698 | 1,514,963,698 | 0 | 0 | 0 | 2018-05-30 09:00:00 | 2018-06-04 | 03.282.504.4-732.000 | CV. Hervi Transseed | 1,574,411,303 | 50.96 % | ||||
19 | 2018 | DINAS PERTANIAN DAN KETAHANAN PANGAN | Pengadaan Sarana Produksi Pengembangan Kawasan Cabe Besar | Tender Cepat | Pengadaan Barang | 3658181 | 15431904 | APBN | 3,418,750,000 | 846,890,000 | 828,967,040 | 828,967,040 | 828,967,040 | 0 | 0 | 0 | 2018-05-30 09:00:00 | 2018-06-06 | 03.282.504.4-732.000 | CV. Hervi Transseed | 2,589,782,960 | 75.75 % | ||||
20 | 2018 | DINAS PERKEBUNAN DAN PETERNAKAN | Pengadaan Pupuk | Tender Cepat | Pengadaan Barang | 3661181 | 18086428 | APBN | 680,000,000 | 605,664,400 | 593,890,000 | 593,890,000 | 593,890,000 | 0 | 0 | 0 | 2018-06-02 09:00:00 | 2018-06-05 | 81.189.188.6-731.000 | cv. inti bumi | 86,110,000 | 12.66 % | ||||
21 | 2018 | DINAS PERKEBUNAN DAN PETERNAKAN | Pengadaan Pupuk | Tender Cepat | Pengadaan Barang | 3662181 | 18086423 | APBN | 272,000,000 | 242,265,760 | 234,520,000 | 234,520,000 | 234,520,000 | 0 | 0 | 0 | 2018-06-02 09:00:00 | 2018-06-05 | 81.189.188.6-731.000 | cv. inti bumi | 37,480,000 | 13.78 % | ||||
22 | 2018 | TAMAN HUTAN RAYA SULTAN ADAM | Belanja Modal Pengadaan Instalasi Listrik dan Telpon | Tender Cepat | Pekerjaan Konstruksi | 3666181 | 16929763 | APBD | 361,050,000 | 338,447,486 | 337,271,470 | 337,271,470 | 337,271,470 | 0 | 0 | 0 | 2018-06-20 09:00:00 | 2018-06-25 | 03.204.115.4-722.000 | cv.Iqbal Iqram Bersaudara | 23,778,530 | 6.59 % | ||||
23 | 2018 | DINAS PERKEBUNAN DAN PETERNAKAN | Pengadaan Pupuk | Tender Cepat | Pengadaan Barang | 3676181 | 18083792 | APBN | 625,600,000 | 557,211,248 | 536,049,316 | 536,049,316 | 536,049,316 | 0 | 0 | 0 | 2018-06-22 09:00:00 | 2018-06-26 | 03.282.504.4-732.000 | CV. Hervi Transseed | 89,550,684 | 14.31 % | ||||
24 | 2018 | TAMAN HUTAN RAYA SULTAN ADAM | Konstruksi bangunan Workshop dan alat berat | Tender Cepat | Pekerjaan Konstruksi | 3684181 | 16841079 | APBD | 803,250,000 | 802,722,042 | 724,309,179 | 724,309,179 | 724,309,179 | 0 | 0 | 0 | 2018-07-05 08:00:00 | 2018-07-09 | 03.181.364.5-728.000 | CV. MEGAH KARYA MANDIRI | 78,940,821 | 9.83 % | ||||
25 | 2018 | DINAS KEHUTANAN | Pengadaan Konstruksi Gedung Kantor KPH Pulau Laut Sebuku | Tender Cepat | Pekerjaan Konstruksi | 3700181 | 15471619 | APBD | 930,000,000 | 929,917,925 | 665,649,533 | 665,649,533 | 665,649,533 | 0 | 0 | 0 | 2018-07-07 09:00:00 | 2018-07-11 | 73.184.099.7-734.000 | CV. BANUA JAYA SAIJAAN | 264,350,467 | 28.42 % | ||||
26 | 2018 | DINAS KEHUTANAN | Pengadaan Konstruksi Gedung Kantor KPH Balangan | Tender Cepat | Pekerjaan Konstruksi | 3701181 | 15470850 | APBD | 750,000,000 | 749,877,647 | 667,113,700 | 667,113,700 | 667,113,700 | 0 | 0 | 0 | 2018-07-07 12:00:00 | 2018-07-10 | 75.146.078.3-728.000 | CV. INSAN CITA MANDIRI | 82,886,300 | 11.05 % | ||||
27 | 2018 | DINAS KEHUTANAN | Pembuatan Sarana Prasarana Persemaian Permanen | Tender Cepat | Pekerjaan Konstruksi | 3702181 | 15259907 | APBD | 819,260,000 | 818,961,316 | 716,937,880 | 716,937,880 | 716,937,880 | 0 | 0 | 0 | 2018-07-13 08:00:00 | 2018-07-16 | 02.531.645.6-731.000 | BIRU LANGIT.CV | 102,322,120 | 12.49 % | ||||
28 | 2018 | TAMAN HUTAN RAYA SULTAN ADAM | Instalasi Air | Tender Cepat | Pekerjaan Konstruksi | 3706181 | 16929933 | APBD | 500,000,000 | 470,412,984 | 0 | 0 | 0 | 0 | 0 | 0 | 2018-07-11 08:30:00 | 2018-07-14 | 500,000,000 | 100 % | ||||||
29 | 2018 | BIRO PERLENGKAPAN DAN LAYANAN PENGADAAN BARANG JASA SETDA PROVINSI KALSEL | Pengadaan Karpet Untuk Gedung Ideham Khalid | Tender Cepat | Pengadaan Barang | 3933181 | 18706606 | APBDP | 525,000,000 | 524,656,000 | 485,903,000 | 485,903,000 | 485,903,000 | 0 | 0 | 0 | 2018-11-29 12:00:00 | 2018-12-04 | 02.489.908.0-731.000 | CV. GIZA EMERALD | 39,097,000 | 7.45 % | ||||
30 | 2018 | TAMAN HUTAN RAYA SULTAN ADAM | Pagar Keliling Pulau Bekantan | Tender Cepat | Pekerjaan Konstruksi | 3935181 | 18639462 | APBDP | 315,000,000 | 314,990,115 | 0 | 0 | 0 | 0 | 0 | 0 | 2018-11-26 08:00:00 | 2018-11-28 | 315,000,000 | 100 % | ||||||
31 | 2018 | DINAS KELAUTAN DAN PERIKANAN | Pengadaan Keramba Jaring Apung Aquatec | Tender Cepat | Pengadaan Barang | 3937181 | 18507694 | APBD | 500,000,000 | 249,955,433 | 245,000,000 | 245,000,000 | 245,000,000 | 0 | 0 | 0 | 2018-11-28 15:30:00 | 2018-12-03 | 81.364.488.7-808.000 | cv Tunisanga | 255,000,000 | 51 % | ||||
32 | 2018 | BIRO PERLENGKAPAN DAN LAYANAN PENGADAAN BARANG JASA SETDA PROVINSI KALSEL | Pengadaan Lift Setda | Tender Cepat | Pengadaan Barang | 3938181 | 18545037 | APBDP | 1,800,000,000 | 1,799,600,000 | 1,713,800,000 | 1,713,800,000 | 1,713,800,000 | 0 | 0 | 0 | 2018-11-27 09:00:00 | 2018-11-30 | 02.184.852.8-061.000 | PT AKINDO PURNA PRATAMA | 86,200,000 | 4.79 % | ||||
33 | 2018 | SEKRETARIAT PROVINSI KALIMANTAN SELATAN | Belanja Sewa Kendaraan Operasional Roda 4 Bawaslu Kab/Kota | Tender Cepat | Jasa Lainnya | 3942181 | 18696130 | APBN | 7,569,580,000 | 7,569,232,000 | 0 | 0 | 0 | 0 | 0 | 0 | 2018-12-05 08:00:00 | 2018-12-07 | 7,569,580,000 | 100 % | ||||||
34 | 2018 | DINAS PENDIDIKAN DAN KEBUDAYAAN | Pengadaan Mesin Genset | Tender Cepat | Pengadaan Barang | 3944181 | 18855887 | APBDP | 600,000,000 | 587,400,000 | 571,450,000 | 571,450,000 | 571,450,000 | 0 | 0 | 0 | 2018-12-12 08:00:00 | 2018-12-14 | 81.364.488.7-808.000 | cv Tunisanga | 28,550,000 | 4.76 % | ||||
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |