Semua | Belum e-Kontrak | Belum Penilaian Kinerja | Selesai | |||||
---|---|---|---|---|---|---|---|---|
Jenis | Paket | Pagu | Paket | Pagu | Paket | Pagu | Paket | Pagu |
Tender | 4 | 3.610.290.000 | 4 | 3.610.290.000 | 4 | 3.610.290.000 | 0 | 0 |
Seleksi | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Tender Cepat | 3 | 2.499.260.000 | 3 | 2.499.260.000 | 3 | 2.499.260.000 | 0 | 0 |
Total | 7 | 6.109.550.000 | 7 | 6.109.550.000 | 7 | 6.109.550.000 | 0 | 0 |
Persentase | 100 % | 100 % | 0 % |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 2018 | DINAS KEHUTANAN | Pengadaan Bahan dan Media Tanam | Tender | Pengadaan Barang | 3532181 | 17296385 | APBD | 373,990,000 | 339,113,863 | 295,054,000 | 295,054,000 | 295,054,000 | 0 | 0 | 0 | 2018-03-28 20:00:00 | 2018-04-12 | 01.424.490.9-731.000 | TIGA DARA | 78,936,000 | 21.11 % | ||||
2 | 2018 | DINAS KEHUTANAN | Pengadaan Konstruksi Gedung Kantor KPH Pulau Laut Sebuku | Tender Cepat | Pekerjaan Konstruksi | 3700181 | 15471619 | APBD | 930,000,000 | 929,917,925 | 665,649,533 | 665,649,533 | 665,649,533 | 0 | 0 | 0 | 2018-07-07 09:00:00 | 2018-07-11 | 73.184.099.7-734.000 | CV. BANUA JAYA SAIJAAN | 264,350,467 | 28.42 % | ||||
3 | 2018 | DINAS KEHUTANAN | Pengadaan Konstruksi Gedung Kantor KPH Balangan | Tender Cepat | Pekerjaan Konstruksi | 3701181 | 15470850 | APBD | 750,000,000 | 749,877,647 | 667,113,700 | 667,113,700 | 667,113,700 | 0 | 0 | 0 | 2018-07-07 12:00:00 | 2018-07-10 | 75.146.078.3-728.000 | CV. INSAN CITA MANDIRI | 82,886,300 | 11.05 % | ||||
4 | 2018 | DINAS KEHUTANAN | Pembuatan Sarana Prasarana Persemaian Permanen | Tender Cepat | Pekerjaan Konstruksi | 3702181 | 15259907 | APBD | 819,260,000 | 818,961,316 | 716,937,880 | 716,937,880 | 716,937,880 | 0 | 0 | 0 | 2018-07-13 08:00:00 | 2018-07-16 | 02.531.645.6-731.000 | BIRU LANGIT.CV | 102,322,120 | 12.49 % | ||||
5 | 2018 | DINAS KEHUTANAN | Penanaman Sepanjang Jalur Kawasan Perkantoran Pemprov Kalsel | Tender | Jasa Lainnya | 3742181 | 15472304 | APBD | 1,408,600,000 | 1,408,113,000 | 1,274,333,000 | 1,274,333,000 | 1,274,333,000 | 0 | 0 | 0 | 2018-07-25 08:00:00 | 2018-08-07 | 01.424.490.9-731.000 | TIGA DARA | 134,267,000 | 9.53 % | ||||
6 | 2018 | DINAS KEHUTANAN | Pengadaan Pupuk,Pengadaan Bibit Tanaman Kehutanan,Belanja Bahan/Bibit - Belanja Bibit Kegiatan RHL | Tender | Pengadaan Barang | 3808181 | 15473833;15474511;15475245 | APBD | 1,521,700,000 | 1,105,277,250 | 911,132,000 | 911,132,000 | 911,132,000 | 0 | 0 | 0 | 2018-08-21 20:00:00 | 2018-08-31 | 02.237.173.6-732.000 | CV. Nusantara Asri | 610,568,000 | 40.12 % | ||||
7 | 2018 | DINAS KEHUTANAN | Pemeliharaan/Pembersihan PMUMHM | Tender | Jasa Lainnya | 3859181 | 18421878 | APBD | 306,000,000 | 303,120,048 | 278,520,000 | 278,520,000 | 278,520,000 | 0 | 0 | 0 | 2018-09-07 11:00:00 | 2018-09-25 | 81.748.223.5-733.000 | CV.TELAGA SARI | 27,480,000 | 8.98 % | ||||
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 2018 | DINAS KEHUTANAN | Pengadaan Bahan dan Media Tanam | Tender | Pengadaan Barang | 3532181 | 17296385 | APBD | 373,990,000 | 339,113,863 | 295,054,000 | 295,054,000 | 295,054,000 | 0 | 0 | 0 | 2018-03-28 20:00:00 | 2018-04-12 | 01.424.490.9-731.000 | TIGA DARA | 78,936,000 | 21.11 % | ||||
2 | 2018 | DINAS KEHUTANAN | Penanaman Sepanjang Jalur Kawasan Perkantoran Pemprov Kalsel | Tender | Jasa Lainnya | 3742181 | 15472304 | APBD | 1,408,600,000 | 1,408,113,000 | 1,274,333,000 | 1,274,333,000 | 1,274,333,000 | 0 | 0 | 0 | 2018-07-25 08:00:00 | 2018-08-07 | 01.424.490.9-731.000 | TIGA DARA | 134,267,000 | 9.53 % | ||||
3 | 2018 | DINAS KEHUTANAN | Pengadaan Pupuk,Pengadaan Bibit Tanaman Kehutanan,Belanja Bahan/Bibit - Belanja Bibit Kegiatan RHL | Tender | Pengadaan Barang | 3808181 | 15473833;15474511;15475245 | APBD | 1,521,700,000 | 1,105,277,250 | 911,132,000 | 911,132,000 | 911,132,000 | 0 | 0 | 0 | 2018-08-21 20:00:00 | 2018-08-31 | 02.237.173.6-732.000 | CV. Nusantara Asri | 610,568,000 | 40.12 % | ||||
4 | 2018 | DINAS KEHUTANAN | Pemeliharaan/Pembersihan PMUMHM | Tender | Jasa Lainnya | 3859181 | 18421878 | APBD | 306,000,000 | 303,120,048 | 278,520,000 | 278,520,000 | 278,520,000 | 0 | 0 | 0 | 2018-09-07 11:00:00 | 2018-09-25 | 81.748.223.5-733.000 | CV.TELAGA SARI | 27,480,000 | 8.98 % | ||||
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
No data available in table | ||||||||||||||||||||||||||
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 2018 | DINAS KEHUTANAN | Pengadaan Konstruksi Gedung Kantor KPH Pulau Laut Sebuku | Tender Cepat | Pekerjaan Konstruksi | 3700181 | 15471619 | APBD | 930,000,000 | 929,917,925 | 665,649,533 | 665,649,533 | 665,649,533 | 0 | 0 | 0 | 2018-07-07 09:00:00 | 2018-07-11 | 73.184.099.7-734.000 | CV. BANUA JAYA SAIJAAN | 264,350,467 | 28.42 % | ||||
2 | 2018 | DINAS KEHUTANAN | Pengadaan Konstruksi Gedung Kantor KPH Balangan | Tender Cepat | Pekerjaan Konstruksi | 3701181 | 15470850 | APBD | 750,000,000 | 749,877,647 | 667,113,700 | 667,113,700 | 667,113,700 | 0 | 0 | 0 | 2018-07-07 12:00:00 | 2018-07-10 | 75.146.078.3-728.000 | CV. INSAN CITA MANDIRI | 82,886,300 | 11.05 % | ||||
3 | 2018 | DINAS KEHUTANAN | Pembuatan Sarana Prasarana Persemaian Permanen | Tender Cepat | Pekerjaan Konstruksi | 3702181 | 15259907 | APBD | 819,260,000 | 818,961,316 | 716,937,880 | 716,937,880 | 716,937,880 | 0 | 0 | 0 | 2018-07-13 08:00:00 | 2018-07-16 | 02.531.645.6-731.000 | BIRU LANGIT.CV | 102,322,120 | 12.49 % | ||||
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Pagu | HPS | Nilai Penawaran | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 2018 | DINAS KEHUTANAN | Pengadaan Bahan dan Media Tanam | Tender | Pengadaan Barang | 3532181 | 17296385 | 373,990,000 | 339,113,863 | 295,054,000 | 0 | 0 | 0 | 2018-03-28 20:00:00 | 01.424.490.9-731.000 | TIGA DARA | 78,936,000 | 21.11 % | |||
2 | 2018 | DINAS KEHUTANAN | Pengadaan Konstruksi Gedung Kantor KPH Pulau Laut Sebuku | Tender Cepat | Pekerjaan Konstruksi | 3700181 | 15471619 | 930,000,000 | 929,917,925 | 665,649,533 | 0 | 0 | 0 | 2018-07-07 09:00:00 | 73.184.099.7-734.000 | CV. BANUA JAYA SAIJAAN | 264,350,467 | 28.42 % | |||
3 | 2018 | DINAS KEHUTANAN | Pengadaan Konstruksi Gedung Kantor KPH Balangan | Tender Cepat | Pekerjaan Konstruksi | 3701181 | 15470850 | 750,000,000 | 749,877,647 | 667,113,700 | 0 | 0 | 0 | 2018-07-07 12:00:00 | 75.146.078.3-728.000 | CV. INSAN CITA MANDIRI | 82,886,300 | 11.05 % | |||
4 | 2018 | DINAS KEHUTANAN | Pembuatan Sarana Prasarana Persemaian Permanen | Tender Cepat | Pekerjaan Konstruksi | 3702181 | 15259907 | 819,260,000 | 818,961,316 | 716,937,880 | 0 | 0 | 0 | 2018-07-13 08:00:00 | 02.531.645.6-731.000 | BIRU LANGIT.CV | 102,322,120 | 12.49 % | |||
5 | 2018 | DINAS KEHUTANAN | Penanaman Sepanjang Jalur Kawasan Perkantoran Pemprov Kalsel | Tender | Jasa Lainnya | 3742181 | 15472304 | 1,408,600,000 | 1,408,113,000 | 1,274,333,000 | 0 | 0 | 0 | 2018-07-25 08:00:00 | 01.424.490.9-731.000 | TIGA DARA | 134,267,000 | 9.53 % | |||
6 | 2018 | DINAS KEHUTANAN | Pengadaan Pupuk,Pengadaan Bibit Tanaman Kehutanan,Belanja Bahan/Bibit - Belanja Bibit Kegiatan RHL | Tender | Pengadaan Barang | 3808181 | 15473833;15474511;15475245 | 1,521,700,000 | 1,105,277,250 | 911,132,000 | 0 | 0 | 0 | 2018-08-21 20:00:00 | 02.237.173.6-732.000 | CV. Nusantara Asri | 610,568,000 | 40.12 % | |||
7 | 2018 | DINAS KEHUTANAN | Pemeliharaan/Pembersihan PMUMHM | Tender | Jasa Lainnya | 3859181 | 18421878 | 306,000,000 | 303,120,048 | 278,520,000 | 0 | 0 | 0 | 2018-09-07 11:00:00 | 81.748.223.5-733.000 | CV.TELAGA SARI | 27,480,000 | 8.98 % | |||
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Pagu | HPS | Nilai Penawaran | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Pagu | HPS | Nilai Penawaran | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 2018 | DINAS KEHUTANAN | Pengadaan Bahan dan Media Tanam | Tender | Pengadaan Barang | 3532181 | 17296385 | 373,990,000 | 339,113,863 | 295,054,000 | 0 | 0 | 0 | 2018-03-28 20:00:00 | 01.424.490.9-731.000 | TIGA DARA | 78,936,000 | 21.11 % | |||
2 | 2018 | DINAS KEHUTANAN | Pengadaan Konstruksi Gedung Kantor KPH Pulau Laut Sebuku | Tender Cepat | Pekerjaan Konstruksi | 3700181 | 15471619 | 930,000,000 | 929,917,925 | 665,649,533 | 0 | 0 | 0 | 2018-07-07 09:00:00 | 73.184.099.7-734.000 | CV. BANUA JAYA SAIJAAN | 264,350,467 | 28.42 % | |||
3 | 2018 | DINAS KEHUTANAN | Pengadaan Konstruksi Gedung Kantor KPH Balangan | Tender Cepat | Pekerjaan Konstruksi | 3701181 | 15470850 | 750,000,000 | 749,877,647 | 667,113,700 | 0 | 0 | 0 | 2018-07-07 12:00:00 | 75.146.078.3-728.000 | CV. INSAN CITA MANDIRI | 82,886,300 | 11.05 % | |||
4 | 2018 | DINAS KEHUTANAN | Pembuatan Sarana Prasarana Persemaian Permanen | Tender Cepat | Pekerjaan Konstruksi | 3702181 | 15259907 | 819,260,000 | 818,961,316 | 716,937,880 | 0 | 0 | 0 | 2018-07-13 08:00:00 | 02.531.645.6-731.000 | BIRU LANGIT.CV | 102,322,120 | 12.49 % | |||
5 | 2018 | DINAS KEHUTANAN | Penanaman Sepanjang Jalur Kawasan Perkantoran Pemprov Kalsel | Tender | Jasa Lainnya | 3742181 | 15472304 | 1,408,600,000 | 1,408,113,000 | 1,274,333,000 | 0 | 0 | 0 | 2018-07-25 08:00:00 | 01.424.490.9-731.000 | TIGA DARA | 134,267,000 | 9.53 % | |||
6 | 2018 | DINAS KEHUTANAN | Pengadaan Pupuk,Pengadaan Bibit Tanaman Kehutanan,Belanja Bahan/Bibit - Belanja Bibit Kegiatan RHL | Tender | Pengadaan Barang | 3808181 | 15473833;15474511;15475245 | 1,521,700,000 | 1,105,277,250 | 911,132,000 | 0 | 0 | 0 | 2018-08-21 20:00:00 | 02.237.173.6-732.000 | CV. Nusantara Asri | 610,568,000 | 40.12 % | |||
7 | 2018 | DINAS KEHUTANAN | Pemeliharaan/Pembersihan PMUMHM | Tender | Jasa Lainnya | 3859181 | 18421878 | 306,000,000 | 303,120,048 | 278,520,000 | 0 | 0 | 0 | 2018-09-07 11:00:00 | 81.748.223.5-733.000 | CV.TELAGA SARI | 27,480,000 | 8.98 % | |||
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Pagu | HPS | Nilai Penawaran | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |