No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Batulicin - Mekarsari - Mentewe | Tender | Pekerjaan Konstruksi | 3408181 | 14823154 | APBD | 34,396,755,000 | 34,396,755,000 | 33,812,113,294 | 33,812,113,294 | 33,812,113,294 | 0 | 0 | 0 | 2018-02-27 11:00:00 | 2018-04-02 | 03.169.298.1-734.000 | PT.BATULICIN BETON ASPHALT | 584,641,706 | 1.7 % | ||||
2 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Lingkar Binuang | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3409181 | 14822718 | APBD | 350,000,000 | 346,390,000 | 294,096,000 | 294,096,000 | 294,096,000 | 0 | 0 | 0 | 2018-02-27 10:50:00 | 2018-04-16 | 01.489.654.2-711.000 | PT.TEMA KARYA MANDIRI | 55,904,000 | 15.97 % | ||||
3 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Anjir Pasar - Marabahan | Tender | Pekerjaan Konstruksi | 3410181 | 14821819 | APBD | 24,546,755,000 | 24,546,755,000 | 23,689,070,581 | 23,689,070,581 | 23,689,070,581 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-16 | 03.265.981.5-731.000 | PT. Pandji Pratama Indonesia | 857,684,419 | 3.49 % | ||||
4 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Angsana | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3411181 | 14822267 | APBD | 350,000,000 | 346,390,000 | 337,260,000 | 337,260,000 | 337,260,000 | 0 | 0 | 0 | 2018-02-27 10:50:00 | 2018-04-16 | 95.412.417.8-731.000 | PT. Prisma Jasa Konsulindo | 12,740,000 | 3.64 % | ||||
5 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Rantau - Muara Muning Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3412181 | 14822863 | APBD | 450,000,000 | 443,850,000 | 419,815,000 | 419,815,000 | 419,815,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-17 | 02.531.704.1-731.000 | CV. FIAZTA MATRIX CONSULTANT | 30,185,000 | 6.71 % | ||||
6 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Rantau - Muara Muning | Tender | Pekerjaan Konstruksi | 3413181 | 14820451 | APBD | 4,467,471,000 | 4,467,465,000 | 3,911,156,404 | 3,911,156,404 | 3,911,156,404 | 0 | 0 | 0 | 2018-02-27 10:50:00 | 2018-04-17 | 80.203.029.6-731.000 | PT. WAJI PUTERA KARYA MANDIRI | 556,314,596 | 12.45 % | ||||
7 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Angsana | Tender | Pekerjaan Konstruksi | 3415181 | 14819063 | APBD | 4,567,471,000 | 4,567,471,000 | 4,325,315,880 | 4,325,315,880 | 4,325,315,880 | 0 | 0 | 0 | 2018-02-27 11:00:00 | 2018-04-19 | 02.216.301.8-734.000 | PT. Arta Cipta Permata | 242,155,120 | 5.3 % | ||||
8 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Pandahan - Margasari dan Penyelesaian Pile Slab | Tender | Pekerjaan Konstruksi | 3416181 | 14820217 | APBD | 4,906,505,000 | 4,906,495,000 | 4,270,910,613 | 4,270,910,613 | 4,270,910,613 | 0 | 0 | 0 | 2018-02-27 10:50:00 | 2018-04-13 | 02.237.343.5-733.000 | PT.Bina Bangun Banua Bersama | 635,594,387 | 12.95 % | ||||
9 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Lingkar Binuang | Tender | Pekerjaan Konstruksi | 3417181 | 14820107 | APBD | 4,567,471,000 | 4,567,471,000 | 4,322,129,000 | 4,322,129,000 | 4,322,129,000 | 0 | 0 | 0 | 2018-02-27 10:50:00 | 2018-04-13 | 01.137.511.0-731.000 | PT. SAMA SENTRAL SWA SEMBADA | 245,342,000 | 5.37 % | ||||
10 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Kasturi - Jalan Akses Bandara - Jalan Lingkar Utara Banjarbaru(Paket II) | Tender | Pekerjaan Konstruksi | 3418181 | 14818611 | APBD | 11,465,000,000 | 11,465,000,000 | 9,683,749,950 | 9,683,749,950 | 9,683,749,950 | 0 | 0 | 0 | 2018-02-27 11:00:00 | 2018-04-13 | 02.172.893.6-731.000 | PT IRINA PERKASA | 1,781,250,050 | 15.54 % | ||||
11 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Dahai - Tanjung | Tender | Pekerjaan Konstruksi | 3420181 | 14819498 | APBD | 4,906,505,000 | 4,906,505,000 | 4,651,671,930 | 4,651,671,930 | 4,651,671,930 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-02 | 02.746.857.8-735.000 | PT. Sinar Mahaputera Mandaga Bakti | 254,833,070 | 5.19 % | ||||
12 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Amuntai - Lampihong - Paringin | Tender | Pekerjaan Konstruksi | 3421181 | 14818966 | APBD | 4,906,505,000 | 4,906,505,000 | 4,639,595,545 | 4,639,595,545 | 4,639,595,545 | 0 | 0 | 0 | 2018-02-27 10:50:00 | 2018-04-17 | 01.124.238.5-735.000 | PT. ULIN SUBUR | 266,909,455 | 5.44 % | ||||
13 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan dan Jembatan Batulicin-Mentewe (DAK) | Tender | Pekerjaan Konstruksi | 3422181 | 15148955 | APBD | 11,130,000,000 | 11,130,000,000 | 10,848,356,660 | 10,848,356,660 | 10,848,356,660 | 0 | 0 | 0 | 2018-02-27 11:00:00 | 2018-04-13 | 03.169.298.1-734.000 | PT.BATULICIN BETON ASPHALT | 281,643,340 | 2.53 % | ||||
14 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Poros, Lingkungan Perkantoran Prov. Kalsel | Tender | Pekerjaan Konstruksi | 3423181 | 14820351 | APBD | 6,972,525,000 | 6,972,525,000 | 6,610,065,823 | 6,610,065,823 | 6,610,065,823 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-02 | 31.635.224.4-731.000 | PT. MULTI USAHA PEMBANGUNAN | 362,459,177 | 5.2 % | ||||
15 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Trikora | Tender | Pekerjaan Konstruksi | 3424181 | 14820658 | APBD | 4,974,750,000 | 4,974,750,000 | 4,725,257,000 | 4,725,257,000 | 4,725,257,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-16 | 01.222.209.7-731.000 | PT. PERDANA PANSELLA | 249,493,000 | 5.02 % | ||||
16 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Banjang - Pulau Nyiur - Batumandi | Tender | Pekerjaan Konstruksi | 3425181 | 14819294 | APBD | 4,467,471,000 | 4,467,471,000 | 3,870,342,459 | 3,870,342,459 | 3,870,342,459 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-05-18 | 73.271.215.3-733.000 | PT. KARYA ANNISA GEMILANG | 597,128,541 | 13.37 % | ||||
17 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Banjang - Pulau Nyiur - Batumandi Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3426181 | 14822408 | APBD | 450,000,000 | 396,330,000 | 380,000,500 | 380,000,500 | 380,000,500 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-17 | 02.531.483.2-731.000 | MANDIRI cipta PRATAMA | 69,999,500 | 15.56 % | ||||
18 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan dan Jembatan Lumpangi - Loksado | Tender | Pekerjaan Konstruksi | 3427181 | 14820801 | APBD | 6,554,280,000 | 6,554,280,000 | 6,059,052,350 | 6,059,052,350 | 6,059,052,350 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-18 | 02.014.742.7-714.000 | PT. RAHMAT AGUNG UTAMA | 495,227,650 | 7.56 % | ||||
19 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Birayang - Tariwin - Lok Batu - Batumandi | Tender | Pekerjaan Konstruksi | 3428181 | 14819454 | APBD | 5,554,280,000 | 5,554,280,000 | 4,858,205,000 | 4,858,205,000 | 4,858,205,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-13 | 01.124.058.7-733.000 | AIRA DUTA MURAKATA. PT | 696,075,000 | 12.53 % | ||||
20 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Guntung - Panaitan - Lampihong | Tender | Pekerjaan Konstruksi | 3429181 | 14819806 | APBD | 4,906,505,000 | 4,906,505,000 | 4,659,645,137 | 4,659,645,137 | 4,659,645,137 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-16 | 01.124.098.3-735.000 | PT. CAHAYA MENTARI | 246,859,863 | 5.03 % | ||||
21 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Tanjung - Muara Uya | Tender | Pekerjaan Konstruksi | 3430181 | 14820593 | APBD | 6,454,280,000 | 6,454,280,000 | 5,808,114,242 | 5,808,114,242 | 5,808,114,242 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-02 | 02.590.754.4-735.000 | PT. TABALONG JAYA MARGA BERSAMA | 646,165,758 | 10.01 % | ||||
22 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Banjarbaru - Simpang 3 Tahura - Aranio | Tender | Pekerjaan Konstruksi | 3432181 | 14819355 | APBD | 5,522,525,000 | 5,522,525,000 | 5,097,062,906 | 5,097,062,906 | 5,097,062,906 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-02 | 31.704.295.0-732.000 | PT. KELANA MULTI KONSTRUKSI | 425,462,094 | 7.7 % | ||||
23 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Dalam Kota Banjarmasin | Tender | Pekerjaan Konstruksi | 3433181 | 14819539 | APBD | 4,974,750,000 | 4,974,750,000 | 4,774,925,149 | 4,774,925,149 | 4,774,925,149 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-16 | 01.424.331.5-732.000 | PT. JATI BARU | 199,824,851 | 4.02 % | ||||
24 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Kiram - Simpang 3 Tahura - Mandiangin | Tender | Pekerjaan Konstruksi | 3434181 | 14820050 | APBD | 4,974,750,000 | 4,974,750,000 | 4,872,898,891 | 4,872,898,891 | 4,872,898,891 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-16 | 03.018.148.1-732.000 | PT. ADJI PERKASA | 101,851,109 | 2.05 % | ||||
25 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Gambut - Pulau Sari | Tender | Pekerjaan Konstruksi | 3435181 | 14819632 | APBD | 4,524,750,000 | 4,524,750,000 | 4,365,176,985 | 4,365,176,985 | 4,365,176,985 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-16 | 01.137.533.4-731.000 | PT. PUTRA KANCA | 159,573,015 | 3.53 % | ||||
26 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Tanjung Serdang - Lontar | Tender | Pekerjaan Konstruksi | 3436181 | 14820534 | APBD | 4,903,925,000 | 4,903,925,000 | 4,847,744,000 | 4,847,744,000 | 4,847,744,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-13 | 02.216.301.8-734.000 | PT. Arta Cipta Permata | 56,181,000 | 1.15 % | ||||
27 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Paringin - Halong | Tender | Pekerjaan Konstruksi | 3437181 | 14820304 | APBD | 6,454,280,000 | 6,454,280,000 | 6,187,609,759 | 6,187,609,759 | 6,187,609,759 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-24 | 01.124.098.3-735.000 | PT. CAHAYA MENTARI | 266,670,241 | 4.13 % | ||||
28 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Kandangan - Negara | Tender | Pekerjaan Konstruksi | 3438181 | 14819866 | APBD | 5,404,280,000 | 5,404,000,000 | 4,917,636,279 | 4,917,636,279 | 4,917,636,279 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-13 | 01.124.396.1-733.000 | PT. KARYA MAWAR LESTARI | 486,643,721 | 9 % | ||||
29 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Simpang 3 Lingkar Utara - Simpang 3 Jalan Golf - Jalan Kasturi (Paket I) | Tender | Pekerjaan Konstruksi | 3439181 | 14818665 | APBD | 11,015,000,000 | 11,015,000,000 | 10,090,308,687 | 10,090,308,687 | 10,090,308,687 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-19 | 01.124.946.3-731.000 | PT. ADIMANUNGGAL CIPTA PADUNUSA | 924,691,313 | 8.39 % | ||||
30 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan dan Jembatan Pelaihari-Batakan (DAK) | Tender | Pekerjaan Konstruksi | 3441181 | 15149206 | APBD | 9,700,000,000 | 9,700,000,000 | 8,696,700,000 | 8,696,700,000 | 8,696,700,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-13 | 01.141.578.3-732.000 | PT. SARANA DOA BERSAMA | 1,003,300,000 | 10.34 % | ||||
31 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Pelaihari - Batakan | Tender | Pekerjaan Konstruksi | 3442181 | 14822007 | APBD | 9,454,280,000 | 9,454,280,000 | 9,020,605,059 | 9,020,605,059 | 9,020,605,059 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-13 | 01.322.015.7-009.000 | PT. JOGLO MULTI AYU | 433,674,941 | 4.59 % | ||||
32 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Golf Banjarbaru | Tender | Pekerjaan Konstruksi | 3443181 | 14819742 | APBD | 6,522,525,000 | 6,522,525,000 | 5,782,218,261 | 5,782,218,261 | 5,782,218,261 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-16 | 01.434.922.9-731.000 | PT. MERCU JAYA BUANA | 740,306,739 | 11.35 % | ||||
33 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Simpang 4 Gatot Subroto - Lingkar Dalam Selatan | Tender | Pekerjaan Konstruksi | 3444181 | 14818839 | APBD | 5,522,525,000 | 5,522,525,000 | 4,752,361,474 | 4,752,361,474 | 4,752,361,474 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-17 | 72.196.664.6-731.000 | BIMO LAKSANA GROUP | 770,163,526 | 13.95 % | ||||
34 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Birayang - Tariwin - Lok Batu - Batumandi | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3445181 | 14822528 | APBD | 350,000,000 | 348,040,000 | 336,105,000 | 336,105,000 | 336,105,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-17 | 02.090.318.3-731.000 | CV. Inditec Consultant | 13,895,000 | 3.97 % | ||||
35 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Negara - Muara Tapus | Tender | Pekerjaan Konstruksi | 3446181 | 14820134 | APBD | 5,904,280,000 | 5,904,280,000 | 5,606,756,728 | 5,606,756,728 | 5,606,756,728 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-16 | 01.134.056.9-733.000 | PT. ASIA TIMUR KONSTRUKSI | 297,523,272 | 5.04 % | ||||
36 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Gunung Kupang - Kiram - Tambang Ulang | Tender | Pekerjaan Konstruksi | 3447181 | 14818515 | APBD | 14,515,000,000 | 14,515,000,000 | 14,199,402,386 | 14,199,402,386 | 14,199,402,386 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-13 | 70.694.710.8-732.000 | PT.TANJUNG RAYA BERSAMA | 315,597,614 | 2.17 % | ||||
37 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Banjarmasin - Martapura | Tender | Pekerjaan Konstruksi | 3448181 | 14819422 | APBD | 5,972,525,000 | 5,972,525,000 | 5,702,383,679 | 5,702,383,679 | 5,702,383,679 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-16 | 01.133.868.8-731.000 | PT. HM Taher | 270,141,321 | 4.52 % | ||||
38 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Anjir Pasar - Marabahan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3449181 | 14822318 | APBD | 350,000,000 | 348,040,000 | 337,865,000 | 337,865,000 | 337,865,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-17 | 01.854.518.6-711.000 | CV. KARYA PERDANA KONSULTAN | 12,135,000 | 3.47 % | ||||
39 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan dan Jembatan Lumpangi - Loksado | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3450181 | 14823056 | APBD | 350,000,000 | 349,855,000 | 339,350,000 | 339,350,000 | 339,350,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-17 | 76.010.632.8-711.000 | PT Prakarsa Desain Konsultan | 10,650,000 | 3.04 % | ||||
40 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Simpang 3 Lingkar Utara - Simpang 3 Jalan Golf - Jalan Kasturi (Paket I) Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3451181 | 14822117 | APBD | 450,000,000 | 435,380,000 | 432,320,000 | 432,320,000 | 432,320,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-17 | 01.879.315.8-731.000 | CV. ADIHANMAN TATA RANCANG | 17,680,000 | 3.93 % | ||||
41 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Kandangan - Negara Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3452181 | 14822655 | APBD | 500,000,000 | 498,080,000 | 476,790,000 | 476,790,000 | 476,790,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-17 | 02.708.931.7-731.000 | CV. DIAN MITRA TEKNIKA | 23,210,000 | 4.64 % | ||||
42 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Gunung Kupang - Kiram - Tambang Ulang Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3453181 | 14822039 | APBD | 450,000,000 | 430,100,000 | 415,360,000 | 415,360,000 | 415,360,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-17 | 02.050.569.9-731.000 | CV. Dharma Cipta Pratama | 34,640,000 | 7.7 % | ||||
43 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Simpang 4 Gatot Subroto - Lingkar Dalam Selatan Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3454181 | 14822177 | APBD | 450,000,000 | 377,520,000 | 350,070,000 | 350,070,000 | 350,070,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-17 | 02.050.569.9-731.000 | CV. Dharma Cipta Pratama | 99,930,000 | 22.21 % | ||||
44 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Batulicin - Mekarsari - Mentewe Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3455181 | 14822432 | APBD | 500,000,000 | 496,925,000 | 472,065,000 | 472,065,000 | 472,065,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-17 | 01.517.846.0-731.000 | PT. WINAYA KONTEKS KHARISMA | 27,935,000 | 5.59 % | ||||
45 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Tanjung - Muara Uya Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3456181 | 14822907 | APBD | 450,000,000 | 396,330,000 | 372,680,000 | 372,680,000 | 372,680,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-17 | 02.531.704.1-731.000 | CV. FIAZTA MATRIX CONSULTANT | 77,320,000 | 17.18 % | ||||
46 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Pelaihari - Batakan Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3457181 | 14822817 | APBD | 450,000,000 | 422,840,000 | 401,555,000 | 401,555,000 | 401,555,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-13 | 01.517.846.0-731.000 | PT. WINAYA KONTEKS KHARISMA | 48,445,000 | 10.77 % | ||||
47 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Banjarbaru - Simpang 3 Tahura - Aranio Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3458181 | 14822475 | APBD | 450,000,000 | 435,380,000 | 412,060,000 | 412,060,000 | 412,060,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-17 | 02.050.569.9-731.000 | CV. Dharma Cipta Pratama | 37,940,000 | 8.43 % | ||||
48 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Gambut - Pulau Sari Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3460181 | 14822554 | APBD | 450,000,000 | 377,520,000 | 353,485,000 | 353,485,000 | 353,485,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-13 | 80.562.640.5-731.000 | CV. RAMIER JAYA ARKANANTA | 96,515,000 | 21.45 % | ||||
49 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Jalan Bebas Hambatan Tol Banjarbaru - Batulicin | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3461181 | 14818573 | APBD | 4,898,725,000 | 4,892,578,000 | 4,525,469,300 | 4,525,469,300 | 4,525,469,300 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-17 | 01.124.766.5-731.000 | PT.WIRA WIDYATAMA | 373,255,700 | 7.62 % | ||||
50 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Paringin - Halong Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3462181 | 14822758 | APBD | 400,000,000 | 385,715,000 | 384,780,000 | 384,780,000 | 384,780,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-13 | 02.708.931.7-731.000 | CV. DIAN MITRA TEKNIKA | 15,220,000 | 3.81 % | ||||
51 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Golf Banjarbaru Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3463181 | 14822613 | APBD | 450,000,000 | 430,100,000 | 411,070,000 | 411,070,000 | 411,070,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-13 | 76.010.632.8-711.000 | PT Prakarsa Desain Konsultan | 38,930,000 | 8.65 % | ||||
52 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Supervisi Pembangunan Daerah Irigasi Kinarum 1.004 Ha Kabupaten Tabalong | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3473181 | 14756085 | APBD | 700,000,000 | 699,996,000 | 682,467,000 | 682,467,000 | 682,467,000 | 0 | 0 | 0 | 2018-03-15 12:00:00 | 2018-05-11 | 02.172.574.2-731.000 | CV. ANDALUSIA | 17,533,000 | 2.5 % | ||||
53 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Survey Identifikasi dan Evaluasi Jaringan Tersier DI. Haruyan Dayak Kabupaten Hulu Sungai Tengah | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3475181 | 14759300 | APBD | 1,500,000,000 | 1,499,987,500 | 1,477,465,000 | 1,477,465,000 | 1,477,465,000 | 0 | 0 | 0 | 2018-03-15 10:00:00 | 2018-05-18 | 01.844.485.1-015.000 | PT INAKKO Internasional Konsulindo | 22,535,000 | 1.5 % | ||||
54 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Supervisi Pembangunan Embung Landasan Ulin Kota Banjarbaru | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3476181 | 14756347 | APBD | 200,000,000 | 199,000,000 | 191,100,000 | 191,100,000 | 191,100,000 | 0 | 0 | 0 | 2018-03-15 16:00:00 | 2018-04-16 | 02.531.704.1-731.000 | CV. FIAZTA MATRIX CONSULTANT | 8,900,000 | 4.45 % | ||||
55 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Rehabilitasi Jaringan Daerah Irigasi Rawa Tanggul Martapura Kabupaten Banjar | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3477181 | 14759484 | APBD | 1,000,000,000 | 999,949,500 | 990,000,000 | 990,000,000 | 990,000,000 | 0 | 0 | 0 | 2018-03-15 10:00:00 | 2018-05-18 | 01.469.763.5-428.000 | PT. VITRAHA CONSINDOTAMA | 10,000,000 | 1 % | ||||
56 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Outline Plan Penyediaan Air Baku Kab. Tanah Laut, Kab. Tanah Bumbu dan Kab. Kota Baru | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3478181 | 14759648 | APBD | 1,500,000,000 | 1,499,999,600 | 1,474,000,000 | 1,474,000,000 | 1,474,000,000 | 0 | 0 | 0 | 2018-03-16 20:00:00 | 2018-05-15 | 01.554.042.0-121.000 | PT. ALLES KLAR PRIMA | 26,000,000 | 1.73 % | ||||
57 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Pengawas Pembangunan Kantor Samsat Tanjung | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3479181 | 14772503 | APBD | 260,000,000 | 259,677,000 | 235,455,000 | 235,455,000 | 235,455,000 | 0 | 0 | 0 | 2018-03-15 10:00:00 | 2018-05-18 | 02.050.569.9-731.000 | CV. Dharma Cipta Pratama | 24,545,000 | 9.44 % | ||||
58 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Pengawas Rehab Gedung Mess Biliton dan TMII | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3480181 | 14780220 | APBD | 150,000,000 | 149,770,000 | 134,659,800 | 134,659,800 | 134,659,800 | 0 | 0 | 0 | 2018-03-15 12:30:00 | 2018-04-17 | 01.860.230.0-731.000 | CV PRAKTIRA KONSULTAN | 15,340,200 | 10.23 % | ||||
59 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Pengawas Pembangunan Gedung Rapat BAKEUDA | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3481181 | 14772568 | APBD | 150,000,000 | 149,770,000 | 147,730,000 | 147,730,000 | 147,730,000 | 0 | 0 | 0 | 2018-03-15 12:00:00 | 2018-04-17 | 03.025.627.5-731.000 | SADWA RAMA CONSULTANT | 2,270,000 | 1.51 % | ||||
60 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Pengawas Pembangunan Gedung BPSDM Prov. Kalsel di Banjarbaru | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3482181 | 14772364 | APBD | 664,000,000 | 663,610,000 | 560,005,600 | 560,005,600 | 560,005,600 | 0 | 0 | 0 | 2018-03-15 10:00:00 | 2018-05-21 | 01.860.230.0-731.000 | CV PRAKTIRA KONSULTAN | 103,994,400 | 15.66 % | ||||
61 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Revisi rancangan Pola Pengelolaan WS. Cengal Batulicin | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3483181 | 14759161 | APBD | 2,050,000,000 | 2,049,987,500 | 1,966,100,000 | 1,966,100,000 | 1,966,100,000 | 0 | 0 | 0 | 2018-03-15 12:00:00 | 2018-05-23 | 01.646.915.7-009.000 | PT. SUPRAHARMONIA CONSULTINDO | 83,900,000 | 4.09 % | ||||
62 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Perencana Review Penyusunan Masterplan Sport Center | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3484181 | 14772089 | APBD | 1,464,250,000 | 1,464,241,000 | 1,342,423,500 | 1,342,423,500 | 1,342,423,500 | 0 | 0 | 0 | 2018-03-15 12:00:00 | 2018-05-15 | 01.309.520.3-062.000 | PT. PERENTJANA DJAJA | 121,826,500 | 8.32 % | ||||
63 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Perencana Review Masterplan Masjid Raya Sabilal Muhtadin di Banjarmasin | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3485181 | 14780772 | APBD | 240,750,000 | 240,747,000 | 224,537,000 | 224,537,000 | 224,537,000 | 0 | 0 | 0 | 2018-03-15 12:00:00 | 2018-05-21 | 02.108.378.7-429.000 | PT. Munasa Kreasi Nusantara | 16,213,000 | 6.73 % | ||||
64 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Perencana DED Monomen Pal Nol | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3486181 | 16033291 | APBD | 980,500,000 | 980,430,000 | 931,279,800 | 931,279,800 | 931,279,800 | 0 | 0 | 0 | 2018-03-15 12:00:00 | 2018-05-23 | 01.455.616.1-441.000 | PT. DAYA CIPTA DIANRANCANA | 49,220,200 | 5.02 % | ||||
65 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Pengawas Kantor Samsat Kandangan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3493181 | 16243279 | APBD | 285,000,000 | 284,251,000 | 248,600,000 | 248,600,000 | 248,600,000 | 0 | 0 | 0 | 2018-03-16 15:00:00 | 2018-04-16 | 01.585.258.5-731.000 | CV. ASRINDO GRAHA CONSULTANT | 36,400,000 | 12.77 % | ||||
66 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Rehabilitasi Jaringan Daerah Irigasi Rawa Polder Tambak Hanyar Kabupaten Banjar | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3496181 | 14759536 | APBD | 1,000,000,000 | 999,982,000 | 976,250,000 | 976,250,000 | 976,250,000 | 0 | 0 | 0 | 2018-03-16 07:30:00 | 2018-05-07 | 01.426.908.8-441.000 | PT. SARANA BHUANA JAYA | 23,750,000 | 2.38 % | ||||
67 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Rehabilitasi Jaringan Daerah Irigasi Rawa Alalak Padang Kabupaten Banjar | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3503181 | 14759430 | APBD | 1,000,000,000 | 999,955,000 | 975,232,000 | 975,232,000 | 975,232,000 | 0 | 0 | 0 | 2018-03-15 12:00:00 | 2018-05-08 | 02.429.467.0-015.000 | PT. Mitratama Asia Pasific | 24,768,000 | 2.48 % | ||||
68 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Pengendali Banjir Kabupaten Hulu Sungai Tengah - Kabupaten Hulu Sungai Selatan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3506181 | 14759816 | APBD | 496,000,000 | 495,990,000 | 470,600,000 | 470,600,000 | 470,600,000 | 0 | 0 | 0 | 2018-03-15 12:00:00 | 2018-05-11 | 01.646.915.7-009.000 | PT. SUPRAHARMONIA CONSULTINDO | 25,400,000 | 5.12 % | ||||
69 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Perencana Review Masterplan dan Penyusunan Masterplan Drainase dan Penghijauan di Kawasan Perkantoran di Banjarbaru | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3508181 | 14772161 | APBD | 1,484,250,000 | 1,483,744,000 | 1,359,473,000 | 1,359,473,000 | 1,359,473,000 | 0 | 0 | 0 | 2018-03-15 13:00:00 | 2018-05-15 | 01.309.520.3-062.000 | PT. PERENTJANA DJAJA | 124,777,000 | 8.41 % | ||||
70 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Supervisi Pembangunan Sarana dan Prasarana RTH Kantor Gubernur di Banjarmasin | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3510181 | 14780380 | APBD | 250,000,000 | 249,029,000 | 230,873,000 | 230,873,000 | 230,873,000 | 0 | 0 | 0 | 2018-03-15 23:45:00 | 2018-05-03 | 01.534.559.8-731.000 | PT TECTAMA KARYA | 19,127,000 | 7.65 % | ||||
71 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Embung Kampung Banjar | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3517181 | 17778484 | APBD | 400,000,000 | 399,987,500 | 390,500,000 | 390,500,000 | 390,500,000 | 0 | 0 | 0 | 2018-03-16 12:00:00 | 2018-05-11 | 01.469.763.5-428.000 | PT. VITRAHA CONSINDOTAMA | 9,500,000 | 2.38 % | ||||
72 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Embung Landasan Ulin Kota Banjarbaru | Tender | Pekerjaan Konstruksi | 3524181 | 14756274 | APBD | 1,880,000,000 | 1,879,960,000 | 1,719,700,000 | 1,719,700,000 | 1,719,700,000 | 0 | 0 | 0 | 2018-03-26 23:59:00 | 2018-04-27 | 02.019.281.1-731.000 | CV. OKTAVIANCA | 160,300,000 | 8.53 % | ||||
73 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Supervisi Rehabilitasi DIR. Tanggul Lungau Kabupaten Hulu Sungai Selatan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3528181 | 17673900 | APBD | 300,000,000 | 299,915,000 | 284,765,000 | 284,765,000 | 284,765,000 | 0 | 0 | 0 | 2018-03-22 12:00:00 | 2018-05-11 | 02.531.704.1-731.000 | CV. FIAZTA MATRIX CONSULTANT | 15,235,000 | 5.08 % | ||||
74 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Outline Plan Sistem Drainase Kota Kabupaten Tanah Laut | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3533181 | 17224277 | APBD | 850,000,000 | 849,997,500 | 838,695,000 | 838,695,000 | 838,695,000 | 0 | 0 | 0 | 2018-03-22 16:00:00 | 2018-05-04 | 01.131.029.9-441.000 | PT. RAYAKONSULT | 11,305,000 | 1.33 % | ||||
75 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Normalisasi Sungai Jepana (DAS Satui) Kabupaten Tanah Bumbu | Tender | Pekerjaan Konstruksi | 3538181 | 17673812 | APBD | 10,700,000,000 | 10,699,500,000 | 8,007,338,763 | 8,007,338,763 | 8,007,338,763 | 0 | 0 | 0 | 2018-03-22 11:00:00 | 2018-04-23 | 01.137.507.8-731.000 | PT. Apu Stiants | 2,692,661,237 | 25.17 % | ||||
76 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Daerah Irigasi Kinarum 1.004 Ha Kabupaten Tabalong | Tender | Pekerjaan Konstruksi | 3539181 | 17673748 | APBD | 10,170,000,000 | 10,169,995,000 | 9,395,185,330 | 9,395,185,330 | 9,395,185,330 | 0 | 0 | 0 | 2018-03-22 11:00:00 | 2018-04-23 | 01.407.735.8-711.000 | PT.ARGO SANJOYO ADHITAMA | 774,814,670 | 7.62 % | ||||
77 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Supervisi Normalisasi Sungai Jepana (DAS Satui) Kabupaten Tanah Bumbu | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3540181 | 14756679 | APBD | 700,000,000 | 699,990,000 | 663,245,000 | 663,245,000 | 663,245,000 | 0 | 0 | 0 | 2018-03-22 16:00:00 | 2018-05-08 | 01.455.616.1-441.000 | PT. DAYA CIPTA DIANRANCANA | 36,755,000 | 5.25 % | ||||
78 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Supervisi Daerah Irigasi Rawa Danda Besar Kabupaten Barito Kuala | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3543181 | 17045839 | APBD | 199,702,000 | 199,650,000 | 186,716,000 | 186,716,000 | 186,716,000 | 0 | 0 | 0 | 2018-03-23 11:10:00 | 2018-04-16 | 02.090.106.2-732.000 | CV. FAJAR KARYA PRATAMA | 12,986,000 | 6.5 % | ||||
79 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Supervisi Rehabilitasi DI. Intangan Kabupaten Hulu Sungai Tengah | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3554181 | 17673918 | APBD | 200,000,000 | 199,980,000 | 182,655,000 | 182,655,000 | 182,655,000 | 0 | 0 | 0 | 2018-03-29 13:00:00 | 2018-04-18 | 02.043.129.2-731.000 | CV. GANESHA TEKNIK | 17,345,000 | 8.67 % | ||||
80 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Pengawas Toilet dan Rehabilitasi Halaman Masjid Raya Sabilal Muhtadin di Banjarmasin | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3569181 | 17678897 | APBD | 75,000,000 | 74,981,000 | 57,560,000 | 57,560,000 | 57,560,000 | 0 | 0 | 0 | 2018-04-03 18:00:00 | 2018-04-25 | 80.263.300.8-732.000 | CV. INDISIGN CONSULINDO | 17,440,000 | 23.25 % | ||||
81 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Perencana Pembuatan Trotoar dan Pagar Keliling di Lingkungan Setda Prov. Kalsel di Banjarbaru | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3571181 | 17679278 | APBD | 125,000,000 | 124,949,000 | 124,162,000 | 124,162,000 | 124,162,000 | 0 | 0 | 0 | 2018-04-03 18:00:00 | 2018-04-25 | 02.090.106.2-732.000 | CV. FAJAR KARYA PRATAMA | 838,000 | 0.67 % | ||||
82 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Kiram-Gunung Mawar Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3573181 | 17730711 | APBDP | 450,000,000 | 435,380,000 | 409,200,000 | 409,200,000 | 409,200,000 | 0 | 0 | 0 | 2018-04-03 16:00:00 | 2018-05-21 | 80.562.640.5-731.000 | CV. RAMIER JAYA ARKANANTA | 40,800,000 | 9.07 % | ||||
83 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Paramasan Bawah-Paramasan Atas | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3574181 | 17734511 | APBDP | 300,000,000 | 191,950,000 | 186,065,000 | 186,065,000 | 186,065,000 | 0 | 0 | 0 | 2018-04-03 16:00:00 | 2018-04-25 | 03.025.627.5-731.000 | SADWA RAMA CONSULTANT | 113,935,000 | 37.98 % | ||||
84 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Pengawas Pembuatan Kantor dan Laboratorium Unit Pelayanan Jasa Sumber Daya Mineral dan Energi | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3575181 | 17678785 | APBD | 100,000,000 | 100,000,000 | 98,972,000 | 98,972,000 | 98,972,000 | 0 | 0 | 0 | 2018-04-03 18:00:00 | 2018-04-25 | 01.860.308.4-731.000 | CV. KARYASA CONSULINDO | 1,028,000 | 1.03 % | ||||
85 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehab Gedung Mess Biliton dan TMII | Tender | Pekerjaan Konstruksi | 3576181 | 17679009 | APBD | 4,690,100,000 | 4,659,189,000 | 4,307,367,000 | 4,307,367,000 | 4,307,367,000 | 0 | 0 | 0 | 2018-04-05 12:00:00 | 2018-06-07 | 02.708.995.2-731.000 | PT. LIAN KAMALA | 382,733,000 | 8.16 % | ||||
86 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Kiram-Gunung Mawar (DID) | Tender | Pekerjaan Konstruksi | 3577181 | 17708219 | APBDP | 10,000,000,000 | 9,517,025,000 | 8,914,917,640 | 8,914,917,640 | 8,914,917,640 | 0 | 0 | 0 | 2018-04-17 12:00:00 | 2018-05-23 | 70.694.710.8-732.000 | PT.TANJUNG RAYA BERSAMA | 1,085,082,360 | 10.85 % | ||||
87 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Gedung BPSDM Prov. Kalsel di Banjarbaru | Tender | Pekerjaan Konstruksi | 3589181 | 14761859 | APBD | 24,281,000,000 | 24,239,008,000 | 22,394,916,000 | 22,394,916,000 | 22,394,916,000 | 0 | 0 | 0 | 2018-04-16 10:20:00 | 2018-05-16 | 02.708.996.0-731.000 | PT.CHARIA BENEFIT UTAMA | 1,886,084,000 | 7.77 % | ||||
88 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Toliet dan Rehabilitasi Halaman Masjid Raya Sabilal Muhtadin di Banjarmasin | Tender | Pekerjaan Konstruksi | 3591181 | 18092214 | APBD | 1,876,050,000 | 1,849,855,000 | 1,495,601,096 | 1,495,601,096 | 1,495,601,096 | 0 | 0 | 0 | 2018-04-13 15:00:00 | 2018-05-04 | 01.879.396.8-731.000 | CV. EDNA BERSAUDARA | 380,448,904 | 20.28 % | ||||
89 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Gunung Kupang-Kiram (DID) | Tender | Pekerjaan Konstruksi | 3593181 | 17710812 | APBDP | 2,500,000,000 | 2,471,750,000 | 2,001,138,536 | 2,001,138,536 | 2,001,138,536 | 0 | 0 | 0 | 2018-04-17 14:00:00 | 2018-05-18 | 74.117.390.0-732.000 | MIRZA UTAMA MARGA | 498,861,464 | 19.95 % | ||||
90 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Paramasan Bawah-Paramasan Atas (DID) | Tender | Pekerjaan Konstruksi | 3594181 | 17708118 | APBDP | 2,000,000,000 | 1,647,253,000 | 1,596,507,072 | 1,596,507,072 | 1,596,507,072 | 0 | 0 | 0 | 2018-04-17 16:00:00 | 2018-05-18 | 01.124.716.0-731.000 | CV. DUA MAS | 403,492,928 | 20.17 % | ||||
91 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi DI. Intangan Kabupaten Hulu Sungai Tengah | Tender | Pekerjaan Konstruksi | 3612181 | 14757215 | APBD | 1,300,000,000 | 1,299,992,873 | 1,013,292,066 | 1,013,292,066 | 1,013,292,066 | 0 | 0 | 0 | 2018-04-27 08:00:00 | 2018-05-26 | 72.232.474.6-733.000 | CV. MIRANTI | 286,707,934 | 22.05 % | ||||
92 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Pengawas Pembangunan Pintu Gerbang Kantor Kawasan Perkantoran di Banjarbaru | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3620181 | 17678695 | APBD | 133,142,500 | 133,133,000 | 120,945,000 | 120,945,000 | 120,945,000 | 0 | 0 | 0 | 2018-05-19 00:59:00 | 2018-06-05 | 01.585.258.5-731.000 | CV. ASRINDO GRAHA CONSULTANT | 12,197,500 | 9.16 % | ||||
93 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Pengawas Pembangunan Taman Edukasi Lalu Lintas | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3624181 | 17678744 | APBD | 150,000,000 | 149,765,000 | 98,505,000 | 98,505,000 | 98,505,000 | 0 | 0 | 0 | 2018-05-20 14:00:00 | 2018-06-21 | 01.860.272.2-731.000 | CV. DAYAKARSA MADYA Consultant | 51,495,000 | 34.33 % | ||||
94 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Kantor Samsat Kandangan | Tender | Pekerjaan Konstruksi | 3631181 | 16032314 | APBD | 8,658,175,000 | 8,585,865,000 | 8,052,015,000 | 8,052,015,000 | 8,052,015,000 | 0 | 0 | 0 | 2018-05-18 10:00:00 | 2018-05-30 | 80.680.022.3-731.000 | PT.HAMIRI BANGUN MANDIRI | 606,160,000 | 7 % | ||||
95 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Kantor Samsat Tanjung | Tender | Pekerjaan Konstruksi | 3634181 | 14765233 | APBD | 7,683,175,000 | 7,553,895,000 | 6,795,743,000 | 6,795,743,000 | 6,795,743,000 | 0 | 0 | 0 | 2018-05-18 10:00:00 | 2018-06-22 | 01.124.865.5-731.000 | PT. PARTNER KEMENANGAN | 887,432,000 | 11.55 % | ||||
96 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Sarana dan Prasarana Penunjang Gedung Kantor Gubernur Kalsel di Banjarmasin | Tender | Pekerjaan Konstruksi | 3636181 | 18212962 | APBD | 7,732,302,500 | 7,640,321,000 | 7,077,706,000 | 7,077,706,000 | 7,077,706,000 | 0 | 0 | 0 | 2018-05-18 10:00:00 | 2018-05-30 | 72.871.311.6-731.000 | PT. HAMIRI ARTHA MULIA | 654,596,500 | 8.47 % | ||||
97 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Gedung Rapat BAKEUDA | Tender | Pekerjaan Konstruksi | 3637181 | 17678349 | APBD | 4,811,750,000 | 4,704,252,000 | 4,057,593,000 | 4,057,593,000 | 4,057,593,000 | 0 | 0 | 0 | 2018-05-18 10:00:00 | 2018-05-31 | 01.322.015.7-009.000 | PT. JOGLO MULTI AYU | 754,157,000 | 15.67 % | ||||
98 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan dan Jembatan Sei Mandala - Sei Buluh | Tender | Pekerjaan Konstruksi | 3638181 | 14821172 | APBD | 4,906,505,000 | 4,906,505,000 | 4,750,030,967 | 4,750,030,967 | 4,750,030,967 | 0 | 0 | 0 | 2018-05-18 15:00:00 | 2018-05-31 | 01.137.533.4-731.000 | PT. PUTRA KANCA | 156,474,033 | 3.19 % | ||||
99 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Renovasi/ Rehab Rumah Jabatan / Dinas Ess I di banjarbaru | Tender | Pekerjaan Konstruksi | 3643181 | 14763125 | APBD | 4,784,025,000 | 4,784,025,000 | 4,704,911,000 | 4,704,911,000 | 4,704,911,000 | 0 | 0 | 0 | 2018-05-20 14:00:00 | 2018-05-31 | 02.048.394.7-217.000 | PT. SUMBER ALAM SEJAHTERA | 79,114,000 | 1.65 % | ||||
100 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembuatan Kantor dan Laboratorium Unit Pelayanan Jasa Sumber Daya Mineral dan Energi | Tender | Pekerjaan Konstruksi | 3644181 | 14765193 | APBD | 2,871,750,000 | 2,763,493,000 | 2,482,319,000 | 2,482,319,000 | 2,482,319,000 | 0 | 0 | 0 | 2018-05-21 08:00:00 | 2018-06-27 | 02.531.377.6-731.000 | PT. SESTRA JENDRA | 389,431,000 | 13.56 % | ||||
101 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan DIR. Polder Bakar Kabupaten Hulu Sungai Utara | Tender | Pekerjaan Konstruksi | 3681181 | 17673833 | APBD | 5,000,000,000 | 4,999,994,000 | 4,772,075,000 | 4,772,075,000 | 4,772,075,000 | 0 | 0 | 0 | 2018-06-22 19:00:00 | 2018-07-04 | 73.215.057.8-731.000 | PT. ADERUS WIRA PERSADA | 227,925,000 | 4.56 % | ||||
102 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi DIR. Tanggul Lungau Kabupaten Hulu Sungai Selatan | Tender | Pekerjaan Konstruksi | 3682181 | 17673880 | APBD | 3,000,000,000 | 2,999,380,000 | 2,542,499,000 | 2,542,499,000 | 2,542,499,000 | 0 | 0 | 0 | 2018-06-22 19:00:00 | 2018-07-11 | 76.644.426.9-733.000 | PT. DATU MULIA BORNEO | 457,501,000 | 15.25 % | ||||
103 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Daerah Irigasi Rawa Danda Besar Kabupaten Barito Kuala | Tender | Pekerjaan Konstruksi | 3683181 | 17674358 | APBD | 5,235,000,000 | 5,234,997,000 | 4,379,080,000 | 4,379,080,000 | 4,379,080,000 | 0 | 0 | 0 | 2018-06-22 19:00:00 | 2018-07-19 | 02.531.377.6-731.000 | PT. SESTRA JENDRA | 855,920,000 | 16.35 % | ||||
104 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Supervisi Peningkatan DIR. Polder Bakar Kabupaten Hulu Sungai Utara | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3695181 | 14756929 | APBD | 300,000,000 | 299,970,000 | 284,935,200 | 284,935,200 | 284,935,200 | 0 | 0 | 0 | 2018-06-28 22:00:00 | 2018-08-03 | 01.141.524.7-731.000 | CV. BINA BANUA | 15,064,800 | 5.02 % | ||||
105 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Pintu Gerbang Kantor Kws. Perkantoran di Banjarbaru | Tender | Pekerjaan Konstruksi | 3703181 | 16032641 | APBD | 4,852,000,000 | 4,410,781,966 | 4,271,465,394 | 4,271,465,394 | 4,271,465,394 | 0 | 0 | 0 | 2018-07-13 08:00:00 | 2018-07-31 | 02.902.233.2-009.000 | PT. BAHANA KRIDA NUSANTARA | 580,534,606 | 11.96 % | ||||
106 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehab Gedung Kantor Setda Provinsi Kalsel di Banjarbaru | Tender | Pekerjaan Konstruksi | 3719181 | 14780477 | APBD | 1,167,202,000 | 1,118,661,070 | 1,057,394,715 | 1,057,394,715 | 1,055,350,000 | 0 | 0 | 0 | 2018-07-13 08:00:00 | 2018-07-25 | 66.139.132.6-733.000 | CV. AL MADINAH | 109,807,285 | 9.41 % | ||||
107 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Perbaikan Sarana dan Prasarana WC/KM Masyarakat Pekauman, Kec. Martapura Timur, di Kabupaten Banjar | Tender | Pekerjaan Konstruksi | 3734181 | 16032045 | APBD | 954,225,000 | 927,146,507 | 833,388,248 | 833,388,248 | 833,388,248 | 0 | 0 | 0 | 2018-07-18 13:00:00 | 2018-07-30 | 81.162.895.7-731.000 | cv. usaha umat | 120,836,752 | 12.66 % | ||||
108 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Perbaikan Sarana dan Prasarana WC/KM Masyarakat Sungai Bilu, Kec. Banjarmasin di Kab/Kota Banjarmasin | Tender | Pekerjaan Konstruksi | 3735181 | 16031962 | APBD | 954,225,000 | 789,080,877 | 721,967,273 | 721,967,273 | 721,967,273 | 0 | 0 | 0 | 2018-07-18 13:00:00 | 2018-07-30 | 81.162.895.7-731.000 | cv. usaha umat | 232,257,727 | 24.34 % | ||||
109 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Halaman Rumah Dinas Kediaman Gubernur di Banjarmasin | Tender | Pekerjaan Konstruksi | 3751181 | 17678537 | APBD | 435,750,000 | 432,864,280 | 399,329,528 | 399,329,528 | 399,326,928 | 0 | 0 | 0 | 2018-07-30 08:00:00 | 2018-08-15 | 73.471.507.1-731.000 | CV.MAWADDAH | 36,420,472 | 8.36 % | ||||
110 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Desa Bahandang-Desa Keliling Benteng | Tender | Pekerjaan Konstruksi | 3757181 | 18376222 | APBDP | 5,881,500,000 | 5,881,500,000 | 5,500,276,756 | 5,500,276,756 | 5,500,276,756 | 0 | 0 | 0 | 2018-07-27 15:00:00 | 2018-08-27 | 70.694.710.8-732.000 | PT.TANJUNG RAYA BERSAMA | 381,223,244 | 6.48 % | ||||
111 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Ray 7-Desa Bahandang | Tender | Pekerjaan Konstruksi | 3758181 | 18376199 | APBDP | 4,781,500,000 | 4,781,500,000 | 4,411,466,366 | 4,411,466,366 | 4,411,466,366 | 0 | 0 | 0 | 2018-07-27 15:00:00 | 2018-08-23 | 03.265.981.5-731.000 | PT. Pandji Pratama Indonesia | 370,033,634 | 7.74 % | ||||
112 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Jejangkit Muara-Ray 7 | Tender | Pekerjaan Konstruksi | 3759181 | 18376171 | APBDP | 4,181,500,000 | 4,181,500,000 | 3,906,023,082 | 3,906,023,082 | 3,906,023,082 | 0 | 0 | 0 | 2018-07-27 15:00:00 | 2018-08-13 | 01.124.946.3-731.000 | PT. ADIMANUNGGAL CIPTA PADUNUSA | 275,476,918 | 6.59 % | ||||
113 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Penyusunan Pergub tentang Peraturan Zonasi Lintas Kabupaten Kota (Kawasan Strategis Provinsi Rawa Batang Banyu) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3764181 | 18392489 | APBD | 399,960,000 | 399,960,000 | 365,530,000 | 365,530,000 | 365,530,000 | 0 | 0 | 0 | 2018-08-06 09:00:00 | 2018-09-03 | 02.108.378.7-429.000 | PT. Munasa Kreasi Nusantara | 34,430,000 | 8.61 % | ||||
114 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Orthorektifikasi Peta (Dasar) Rencana Tata Ruang Kawasan Strategis Provinsi Rawa Batang Banyu | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3765181 | 18392492 | APBD | 199,980,000 | 199,980,000 | 188,540,000 | 188,540,000 | 188,540,000 | 0 | 0 | 0 | 2018-08-06 09:00:00 | 2018-09-03 | 02.980.044.8-404.000 | PT. Komperji Nusaraya | 11,440,000 | 5.72 % | ||||
115 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengadaan Alat Hidrologi (Telemetri) AWLR Intake DI. Haruyan Dayak Kab. Hulu Sungai Tengah dan Sungai WS. Cengal Batulicin | Tender | Pekerjaan Konstruksi | 3774181 | 17674508 | APBD | 600,000,000 | 599,854,479 | 539,101,200 | 539,101,200 | 539,101,200 | 0 | 0 | 0 | 2018-08-07 15:00:00 | 2018-08-28 | 02.342.725.5-733.000 | CV. SAKA PERSADA | 60,898,800 | 10.15 % | ||||
116 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan HELIPAD di Jejangkit | Tender | Pekerjaan Konstruksi | 3820181 | 18420609 | APBDP | 1,550,000,000 | 1,531,724,500 | 1,463,455,082 | 1,463,455,082 | 1,463,455,082 | 0 | 0 | 0 | 2018-08-25 18:00:00 | 2018-09-16 | 31.245.996.9-731.000 | CV.RIDHEVAL HANDIL BHAKTI | 86,544,918 | 5.58 % | ||||
117 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Angkipih-Paramasan Bawah-Paramasan Atas | Tender | Pekerjaan Konstruksi | 3821181 | 18410837 | APBDP | 4,861,335,000 | 4,861,329,665 | 4,519,228,279 | 4,519,228,279 | 4,519,228,279 | 0 | 0 | 0 | 2018-08-25 20:00:00 | 2018-09-14 | 01.141.113.9-651.000 | PT. KARYA TUNGGAL MULYA ABADI | 342,106,721 | 7.04 % | ||||
118 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Perbaikan/Renovasi BRIMOB | Tender | Pekerjaan Konstruksi | 3823181 | 18420593 | APBDP | 935,000,000 | 925,344,400 | 740,035,192 | 740,035,192 | 731,330,297 | 0 | 0 | 0 | 2018-08-25 16:00:00 | 2018-09-10 | 71.462.122.4-732.000 | CV. Salma Aulia | 194,964,808 | 20.85 % | ||||
119 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Jembatan Batulicin-Mentewe | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3826181 | 18410823 | APBDP | 662,818,000 | 657,052,000 | 649,345,500 | 649,345,500 | 650,545,500 | 0 | 0 | 0 | 2018-08-28 17:00:00 | 2018-10-16 | 02.613.877.6-731.000 | CV SEMBILAN SATU ENGINEERING | 13,472,500 | 2.03 % | ||||
120 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Taman Budaya Baru di Kawasan Perkantoran Pemprov. Kalsel | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3827181 | 18420334 | APBDP | 390,000,000 | 389,953,300 | 346,280,000 | 346,280,000 | 370,370,000 | 0 | 0 | 0 | 2018-08-27 12:00:00 | 2018-09-27 | 01.455.616.1-441.000 | PT. DAYA CIPTA DIANRANCANA | 43,720,000 | 11.21 % | ||||
121 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Istana Mahligai Rakyat | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3828181 | 18420291 | APBDP | 191,500,000 | 191,405,500 | 154,628,925 | 154,628,925 | 154,628,925 | 0 | 0 | 0 | 2018-08-27 16:00:00 | 2018-10-20 | 01.463.263.2-731.000 | PT. MATRA ESTETIKA REKAYASA | 36,871,075 | 19.25 % | ||||
122 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Tanjung Serdang-Lontar II | Tender | Pekerjaan Konstruksi | 3829181 | 18410685 | APBDP | 4,469,818,000 | 4,469,817,737 | 4,440,624,241 | 4,440,624,000 | 4,440,624,000 | 0 | 0 | 0 | 2018-08-31 08:15:00 | 2018-09-17 | 02.216.301.8-734.000 | PT. Arta Cipta Permata | 29,193,759 | 0.65 % | ||||
123 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Batulicin-Mekarsari-Mentewe | Tender | Pekerjaan Konstruksi | 3832181 | 18410700 | APBDP | 14,851,585,000 | 14,851,584,856 | 14,073,727,541 | 14,073,727,541 | 14,050,688,106 | 0 | 0 | 0 | 2018-08-27 13:00:00 | 2018-09-15 | 02.421.791.1-734.000 | pt hm family | 777,857,459 | 5.24 % | ||||
124 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Jalan Alternatif ke Makam Syech M. Arsyad Al-Banjari dan DED Jembatan Jalan Pendidikan Sekumpul | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3835181 | 18420292 | APBDP | 396,250,000 | 395,164,000 | 358,325,000 | 358,325,000 | 369,270,000 | 0 | 0 | 0 | 2018-08-28 16:00:00 | 2018-10-26 | 01.489.654.2-711.000 | PT.TEMA KARYA MANDIRI | 37,925,000 | 9.57 % | ||||
125 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Lanjutan Makam Syeh Arsyad Al Banjari | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3839181 | 18420341 | APBDP | 390,000,000 | 389,953,300 | 300,008,500 | 300,008,500 | 300,008,500 | 0 | 0 | 0 | 2018-08-27 23:55:00 | 2018-10-30 | 02.050.569.9-731.000 | CV. Dharma Cipta Pratama | 89,991,500 | 23.07 % | ||||
126 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Jaringan Listrik Kawasan Perkantoran Pemprov. Kalsel | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3840181 | 18420374 | APBDP | 540,000,000 | 539,990,000 | 341,000,000 | 341,000,000 | 523,600,000 | 0 | 0 | 0 | 2018-08-29 09:00:00 | 2018-10-17 | 02.883.220.2-731.000 | CV. RIA KONSULTAN | 199,000,000 | 36.85 % | ||||
127 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Study Pendahuluan Sport City | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3873181 | 18446564 | APBDP | 240,000,000 | 239,965,000 | 221,705,000 | 221,705,000 | 221,705,000 | 176,158,400 | 0 | 0 | 2018-09-13 12:00:00 | 2018-11-02 | 2018-11-15 | 01.548.564.2-424.000 | PT. Belaputera Interplan | 01.548.564.2-424.000 | PT. Belaputera Interplan | 18,295,000 | 7.62 % | |
128 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Simpang 3 Tahura-Mandiangin | Tender | Pekerjaan Konstruksi | 3875181 | 18425381 | APBDP | 9,877,725,000 | 9,877,720,641 | 8,218,382,336 | 8,218,382,336 | 8,218,382,336 | 0 | 0 | 0 | 2018-09-13 12:00:00 | 2018-10-01 | 70.694.710.8-732.000 | PT.TANJUNG RAYA BERSAMA | 1,659,342,664 | 16.8 % | ||||
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Batulicin - Mekarsari - Mentewe | Tender | Pekerjaan Konstruksi | 3408181 | 14823154 | APBD | 34,396,755,000 | 34,396,755,000 | 33,812,113,294 | 33,812,113,294 | 33,812,113,294 | 0 | 0 | 0 | 2018-02-27 11:00:00 | 2018-04-02 | 03.169.298.1-734.000 | PT.BATULICIN BETON ASPHALT | 584,641,706 | 1.7 % | ||||
2 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Anjir Pasar - Marabahan | Tender | Pekerjaan Konstruksi | 3410181 | 14821819 | APBD | 24,546,755,000 | 24,546,755,000 | 23,689,070,581 | 23,689,070,581 | 23,689,070,581 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-16 | 03.265.981.5-731.000 | PT. Pandji Pratama Indonesia | 857,684,419 | 3.49 % | ||||
3 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Rantau - Muara Muning | Tender | Pekerjaan Konstruksi | 3413181 | 14820451 | APBD | 4,467,471,000 | 4,467,465,000 | 3,911,156,404 | 3,911,156,404 | 3,911,156,404 | 0 | 0 | 0 | 2018-02-27 10:50:00 | 2018-04-17 | 80.203.029.6-731.000 | PT. WAJI PUTERA KARYA MANDIRI | 556,314,596 | 12.45 % | ||||
4 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Angsana | Tender | Pekerjaan Konstruksi | 3415181 | 14819063 | APBD | 4,567,471,000 | 4,567,471,000 | 4,325,315,880 | 4,325,315,880 | 4,325,315,880 | 0 | 0 | 0 | 2018-02-27 11:00:00 | 2018-04-19 | 02.216.301.8-734.000 | PT. Arta Cipta Permata | 242,155,120 | 5.3 % | ||||
5 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Pandahan - Margasari dan Penyelesaian Pile Slab | Tender | Pekerjaan Konstruksi | 3416181 | 14820217 | APBD | 4,906,505,000 | 4,906,495,000 | 4,270,910,613 | 4,270,910,613 | 4,270,910,613 | 0 | 0 | 0 | 2018-02-27 10:50:00 | 2018-04-13 | 02.237.343.5-733.000 | PT.Bina Bangun Banua Bersama | 635,594,387 | 12.95 % | ||||
6 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Lingkar Binuang | Tender | Pekerjaan Konstruksi | 3417181 | 14820107 | APBD | 4,567,471,000 | 4,567,471,000 | 4,322,129,000 | 4,322,129,000 | 4,322,129,000 | 0 | 0 | 0 | 2018-02-27 10:50:00 | 2018-04-13 | 01.137.511.0-731.000 | PT. SAMA SENTRAL SWA SEMBADA | 245,342,000 | 5.37 % | ||||
7 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Kasturi - Jalan Akses Bandara - Jalan Lingkar Utara Banjarbaru(Paket II) | Tender | Pekerjaan Konstruksi | 3418181 | 14818611 | APBD | 11,465,000,000 | 11,465,000,000 | 9,683,749,950 | 9,683,749,950 | 9,683,749,950 | 0 | 0 | 0 | 2018-02-27 11:00:00 | 2018-04-13 | 02.172.893.6-731.000 | PT IRINA PERKASA | 1,781,250,050 | 15.54 % | ||||
8 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Dahai - Tanjung | Tender | Pekerjaan Konstruksi | 3420181 | 14819498 | APBD | 4,906,505,000 | 4,906,505,000 | 4,651,671,930 | 4,651,671,930 | 4,651,671,930 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-02 | 02.746.857.8-735.000 | PT. Sinar Mahaputera Mandaga Bakti | 254,833,070 | 5.19 % | ||||
9 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Amuntai - Lampihong - Paringin | Tender | Pekerjaan Konstruksi | 3421181 | 14818966 | APBD | 4,906,505,000 | 4,906,505,000 | 4,639,595,545 | 4,639,595,545 | 4,639,595,545 | 0 | 0 | 0 | 2018-02-27 10:50:00 | 2018-04-17 | 01.124.238.5-735.000 | PT. ULIN SUBUR | 266,909,455 | 5.44 % | ||||
10 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan dan Jembatan Batulicin-Mentewe (DAK) | Tender | Pekerjaan Konstruksi | 3422181 | 15148955 | APBD | 11,130,000,000 | 11,130,000,000 | 10,848,356,660 | 10,848,356,660 | 10,848,356,660 | 0 | 0 | 0 | 2018-02-27 11:00:00 | 2018-04-13 | 03.169.298.1-734.000 | PT.BATULICIN BETON ASPHALT | 281,643,340 | 2.53 % | ||||
11 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Poros, Lingkungan Perkantoran Prov. Kalsel | Tender | Pekerjaan Konstruksi | 3423181 | 14820351 | APBD | 6,972,525,000 | 6,972,525,000 | 6,610,065,823 | 6,610,065,823 | 6,610,065,823 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-02 | 31.635.224.4-731.000 | PT. MULTI USAHA PEMBANGUNAN | 362,459,177 | 5.2 % | ||||
12 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Trikora | Tender | Pekerjaan Konstruksi | 3424181 | 14820658 | APBD | 4,974,750,000 | 4,974,750,000 | 4,725,257,000 | 4,725,257,000 | 4,725,257,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-16 | 01.222.209.7-731.000 | PT. PERDANA PANSELLA | 249,493,000 | 5.02 % | ||||
13 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Banjang - Pulau Nyiur - Batumandi | Tender | Pekerjaan Konstruksi | 3425181 | 14819294 | APBD | 4,467,471,000 | 4,467,471,000 | 3,870,342,459 | 3,870,342,459 | 3,870,342,459 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-05-18 | 73.271.215.3-733.000 | PT. KARYA ANNISA GEMILANG | 597,128,541 | 13.37 % | ||||
14 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan dan Jembatan Lumpangi - Loksado | Tender | Pekerjaan Konstruksi | 3427181 | 14820801 | APBD | 6,554,280,000 | 6,554,280,000 | 6,059,052,350 | 6,059,052,350 | 6,059,052,350 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-18 | 02.014.742.7-714.000 | PT. RAHMAT AGUNG UTAMA | 495,227,650 | 7.56 % | ||||
15 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Birayang - Tariwin - Lok Batu - Batumandi | Tender | Pekerjaan Konstruksi | 3428181 | 14819454 | APBD | 5,554,280,000 | 5,554,280,000 | 4,858,205,000 | 4,858,205,000 | 4,858,205,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-13 | 01.124.058.7-733.000 | AIRA DUTA MURAKATA. PT | 696,075,000 | 12.53 % | ||||
16 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Guntung - Panaitan - Lampihong | Tender | Pekerjaan Konstruksi | 3429181 | 14819806 | APBD | 4,906,505,000 | 4,906,505,000 | 4,659,645,137 | 4,659,645,137 | 4,659,645,137 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-16 | 01.124.098.3-735.000 | PT. CAHAYA MENTARI | 246,859,863 | 5.03 % | ||||
17 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Tanjung - Muara Uya | Tender | Pekerjaan Konstruksi | 3430181 | 14820593 | APBD | 6,454,280,000 | 6,454,280,000 | 5,808,114,242 | 5,808,114,242 | 5,808,114,242 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-02 | 02.590.754.4-735.000 | PT. TABALONG JAYA MARGA BERSAMA | 646,165,758 | 10.01 % | ||||
18 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Banjarbaru - Simpang 3 Tahura - Aranio | Tender | Pekerjaan Konstruksi | 3432181 | 14819355 | APBD | 5,522,525,000 | 5,522,525,000 | 5,097,062,906 | 5,097,062,906 | 5,097,062,906 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-02 | 31.704.295.0-732.000 | PT. KELANA MULTI KONSTRUKSI | 425,462,094 | 7.7 % | ||||
19 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Dalam Kota Banjarmasin | Tender | Pekerjaan Konstruksi | 3433181 | 14819539 | APBD | 4,974,750,000 | 4,974,750,000 | 4,774,925,149 | 4,774,925,149 | 4,774,925,149 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-16 | 01.424.331.5-732.000 | PT. JATI BARU | 199,824,851 | 4.02 % | ||||
20 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Kiram - Simpang 3 Tahura - Mandiangin | Tender | Pekerjaan Konstruksi | 3434181 | 14820050 | APBD | 4,974,750,000 | 4,974,750,000 | 4,872,898,891 | 4,872,898,891 | 4,872,898,891 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-16 | 03.018.148.1-732.000 | PT. ADJI PERKASA | 101,851,109 | 2.05 % | ||||
21 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Gambut - Pulau Sari | Tender | Pekerjaan Konstruksi | 3435181 | 14819632 | APBD | 4,524,750,000 | 4,524,750,000 | 4,365,176,985 | 4,365,176,985 | 4,365,176,985 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-16 | 01.137.533.4-731.000 | PT. PUTRA KANCA | 159,573,015 | 3.53 % | ||||
22 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Tanjung Serdang - Lontar | Tender | Pekerjaan Konstruksi | 3436181 | 14820534 | APBD | 4,903,925,000 | 4,903,925,000 | 4,847,744,000 | 4,847,744,000 | 4,847,744,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-13 | 02.216.301.8-734.000 | PT. Arta Cipta Permata | 56,181,000 | 1.15 % | ||||
23 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Paringin - Halong | Tender | Pekerjaan Konstruksi | 3437181 | 14820304 | APBD | 6,454,280,000 | 6,454,280,000 | 6,187,609,759 | 6,187,609,759 | 6,187,609,759 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-24 | 01.124.098.3-735.000 | PT. CAHAYA MENTARI | 266,670,241 | 4.13 % | ||||
24 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Kandangan - Negara | Tender | Pekerjaan Konstruksi | 3438181 | 14819866 | APBD | 5,404,280,000 | 5,404,000,000 | 4,917,636,279 | 4,917,636,279 | 4,917,636,279 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-13 | 01.124.396.1-733.000 | PT. KARYA MAWAR LESTARI | 486,643,721 | 9 % | ||||
25 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Simpang 3 Lingkar Utara - Simpang 3 Jalan Golf - Jalan Kasturi (Paket I) | Tender | Pekerjaan Konstruksi | 3439181 | 14818665 | APBD | 11,015,000,000 | 11,015,000,000 | 10,090,308,687 | 10,090,308,687 | 10,090,308,687 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-19 | 01.124.946.3-731.000 | PT. ADIMANUNGGAL CIPTA PADUNUSA | 924,691,313 | 8.39 % | ||||
26 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan dan Jembatan Pelaihari-Batakan (DAK) | Tender | Pekerjaan Konstruksi | 3441181 | 15149206 | APBD | 9,700,000,000 | 9,700,000,000 | 8,696,700,000 | 8,696,700,000 | 8,696,700,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-13 | 01.141.578.3-732.000 | PT. SARANA DOA BERSAMA | 1,003,300,000 | 10.34 % | ||||
27 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Pelaihari - Batakan | Tender | Pekerjaan Konstruksi | 3442181 | 14822007 | APBD | 9,454,280,000 | 9,454,280,000 | 9,020,605,059 | 9,020,605,059 | 9,020,605,059 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-13 | 01.322.015.7-009.000 | PT. JOGLO MULTI AYU | 433,674,941 | 4.59 % | ||||
28 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Golf Banjarbaru | Tender | Pekerjaan Konstruksi | 3443181 | 14819742 | APBD | 6,522,525,000 | 6,522,525,000 | 5,782,218,261 | 5,782,218,261 | 5,782,218,261 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-16 | 01.434.922.9-731.000 | PT. MERCU JAYA BUANA | 740,306,739 | 11.35 % | ||||
29 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Simpang 4 Gatot Subroto - Lingkar Dalam Selatan | Tender | Pekerjaan Konstruksi | 3444181 | 14818839 | APBD | 5,522,525,000 | 5,522,525,000 | 4,752,361,474 | 4,752,361,474 | 4,752,361,474 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-17 | 72.196.664.6-731.000 | BIMO LAKSANA GROUP | 770,163,526 | 13.95 % | ||||
30 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Negara - Muara Tapus | Tender | Pekerjaan Konstruksi | 3446181 | 14820134 | APBD | 5,904,280,000 | 5,904,280,000 | 5,606,756,728 | 5,606,756,728 | 5,606,756,728 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-16 | 01.134.056.9-733.000 | PT. ASIA TIMUR KONSTRUKSI | 297,523,272 | 5.04 % | ||||
31 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Gunung Kupang - Kiram - Tambang Ulang | Tender | Pekerjaan Konstruksi | 3447181 | 14818515 | APBD | 14,515,000,000 | 14,515,000,000 | 14,199,402,386 | 14,199,402,386 | 14,199,402,386 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-13 | 70.694.710.8-732.000 | PT.TANJUNG RAYA BERSAMA | 315,597,614 | 2.17 % | ||||
32 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Banjarmasin - Martapura | Tender | Pekerjaan Konstruksi | 3448181 | 14819422 | APBD | 5,972,525,000 | 5,972,525,000 | 5,702,383,679 | 5,702,383,679 | 5,702,383,679 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-16 | 01.133.868.8-731.000 | PT. HM Taher | 270,141,321 | 4.52 % | ||||
33 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Embung Landasan Ulin Kota Banjarbaru | Tender | Pekerjaan Konstruksi | 3524181 | 14756274 | APBD | 1,880,000,000 | 1,879,960,000 | 1,719,700,000 | 1,719,700,000 | 1,719,700,000 | 0 | 0 | 0 | 2018-03-26 23:59:00 | 2018-04-27 | 02.019.281.1-731.000 | CV. OKTAVIANCA | 160,300,000 | 8.53 % | ||||
34 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Normalisasi Sungai Jepana (DAS Satui) Kabupaten Tanah Bumbu | Tender | Pekerjaan Konstruksi | 3538181 | 17673812 | APBD | 10,700,000,000 | 10,699,500,000 | 8,007,338,763 | 8,007,338,763 | 8,007,338,763 | 0 | 0 | 0 | 2018-03-22 11:00:00 | 2018-04-23 | 01.137.507.8-731.000 | PT. Apu Stiants | 2,692,661,237 | 25.17 % | ||||
35 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Daerah Irigasi Kinarum 1.004 Ha Kabupaten Tabalong | Tender | Pekerjaan Konstruksi | 3539181 | 17673748 | APBD | 10,170,000,000 | 10,169,995,000 | 9,395,185,330 | 9,395,185,330 | 9,395,185,330 | 0 | 0 | 0 | 2018-03-22 11:00:00 | 2018-04-23 | 01.407.735.8-711.000 | PT.ARGO SANJOYO ADHITAMA | 774,814,670 | 7.62 % | ||||
36 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehab Gedung Mess Biliton dan TMII | Tender | Pekerjaan Konstruksi | 3576181 | 17679009 | APBD | 4,690,100,000 | 4,659,189,000 | 4,307,367,000 | 4,307,367,000 | 4,307,367,000 | 0 | 0 | 0 | 2018-04-05 12:00:00 | 2018-06-07 | 02.708.995.2-731.000 | PT. LIAN KAMALA | 382,733,000 | 8.16 % | ||||
37 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Kiram-Gunung Mawar (DID) | Tender | Pekerjaan Konstruksi | 3577181 | 17708219 | APBDP | 10,000,000,000 | 9,517,025,000 | 8,914,917,640 | 8,914,917,640 | 8,914,917,640 | 0 | 0 | 0 | 2018-04-17 12:00:00 | 2018-05-23 | 70.694.710.8-732.000 | PT.TANJUNG RAYA BERSAMA | 1,085,082,360 | 10.85 % | ||||
38 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Gedung BPSDM Prov. Kalsel di Banjarbaru | Tender | Pekerjaan Konstruksi | 3589181 | 14761859 | APBD | 24,281,000,000 | 24,239,008,000 | 22,394,916,000 | 22,394,916,000 | 22,394,916,000 | 0 | 0 | 0 | 2018-04-16 10:20:00 | 2018-05-16 | 02.708.996.0-731.000 | PT.CHARIA BENEFIT UTAMA | 1,886,084,000 | 7.77 % | ||||
39 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Toliet dan Rehabilitasi Halaman Masjid Raya Sabilal Muhtadin di Banjarmasin | Tender | Pekerjaan Konstruksi | 3591181 | 18092214 | APBD | 1,876,050,000 | 1,849,855,000 | 1,495,601,096 | 1,495,601,096 | 1,495,601,096 | 0 | 0 | 0 | 2018-04-13 15:00:00 | 2018-05-04 | 01.879.396.8-731.000 | CV. EDNA BERSAUDARA | 380,448,904 | 20.28 % | ||||
40 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Gunung Kupang-Kiram (DID) | Tender | Pekerjaan Konstruksi | 3593181 | 17710812 | APBDP | 2,500,000,000 | 2,471,750,000 | 2,001,138,536 | 2,001,138,536 | 2,001,138,536 | 0 | 0 | 0 | 2018-04-17 14:00:00 | 2018-05-18 | 74.117.390.0-732.000 | MIRZA UTAMA MARGA | 498,861,464 | 19.95 % | ||||
41 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Paramasan Bawah-Paramasan Atas (DID) | Tender | Pekerjaan Konstruksi | 3594181 | 17708118 | APBDP | 2,000,000,000 | 1,647,253,000 | 1,596,507,072 | 1,596,507,072 | 1,596,507,072 | 0 | 0 | 0 | 2018-04-17 16:00:00 | 2018-05-18 | 01.124.716.0-731.000 | CV. DUA MAS | 403,492,928 | 20.17 % | ||||
42 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi DI. Intangan Kabupaten Hulu Sungai Tengah | Tender | Pekerjaan Konstruksi | 3612181 | 14757215 | APBD | 1,300,000,000 | 1,299,992,873 | 1,013,292,066 | 1,013,292,066 | 1,013,292,066 | 0 | 0 | 0 | 2018-04-27 08:00:00 | 2018-05-26 | 72.232.474.6-733.000 | CV. MIRANTI | 286,707,934 | 22.05 % | ||||
43 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Kantor Samsat Kandangan | Tender | Pekerjaan Konstruksi | 3631181 | 16032314 | APBD | 8,658,175,000 | 8,585,865,000 | 8,052,015,000 | 8,052,015,000 | 8,052,015,000 | 0 | 0 | 0 | 2018-05-18 10:00:00 | 2018-05-30 | 80.680.022.3-731.000 | PT.HAMIRI BANGUN MANDIRI | 606,160,000 | 7 % | ||||
44 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Kantor Samsat Tanjung | Tender | Pekerjaan Konstruksi | 3634181 | 14765233 | APBD | 7,683,175,000 | 7,553,895,000 | 6,795,743,000 | 6,795,743,000 | 6,795,743,000 | 0 | 0 | 0 | 2018-05-18 10:00:00 | 2018-06-22 | 01.124.865.5-731.000 | PT. PARTNER KEMENANGAN | 887,432,000 | 11.55 % | ||||
45 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Sarana dan Prasarana Penunjang Gedung Kantor Gubernur Kalsel di Banjarmasin | Tender | Pekerjaan Konstruksi | 3636181 | 18212962 | APBD | 7,732,302,500 | 7,640,321,000 | 7,077,706,000 | 7,077,706,000 | 7,077,706,000 | 0 | 0 | 0 | 2018-05-18 10:00:00 | 2018-05-30 | 72.871.311.6-731.000 | PT. HAMIRI ARTHA MULIA | 654,596,500 | 8.47 % | ||||
46 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Gedung Rapat BAKEUDA | Tender | Pekerjaan Konstruksi | 3637181 | 17678349 | APBD | 4,811,750,000 | 4,704,252,000 | 4,057,593,000 | 4,057,593,000 | 4,057,593,000 | 0 | 0 | 0 | 2018-05-18 10:00:00 | 2018-05-31 | 01.322.015.7-009.000 | PT. JOGLO MULTI AYU | 754,157,000 | 15.67 % | ||||
47 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan dan Jembatan Sei Mandala - Sei Buluh | Tender | Pekerjaan Konstruksi | 3638181 | 14821172 | APBD | 4,906,505,000 | 4,906,505,000 | 4,750,030,967 | 4,750,030,967 | 4,750,030,967 | 0 | 0 | 0 | 2018-05-18 15:00:00 | 2018-05-31 | 01.137.533.4-731.000 | PT. PUTRA KANCA | 156,474,033 | 3.19 % | ||||
48 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Renovasi/ Rehab Rumah Jabatan / Dinas Ess I di banjarbaru | Tender | Pekerjaan Konstruksi | 3643181 | 14763125 | APBD | 4,784,025,000 | 4,784,025,000 | 4,704,911,000 | 4,704,911,000 | 4,704,911,000 | 0 | 0 | 0 | 2018-05-20 14:00:00 | 2018-05-31 | 02.048.394.7-217.000 | PT. SUMBER ALAM SEJAHTERA | 79,114,000 | 1.65 % | ||||
49 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembuatan Kantor dan Laboratorium Unit Pelayanan Jasa Sumber Daya Mineral dan Energi | Tender | Pekerjaan Konstruksi | 3644181 | 14765193 | APBD | 2,871,750,000 | 2,763,493,000 | 2,482,319,000 | 2,482,319,000 | 2,482,319,000 | 0 | 0 | 0 | 2018-05-21 08:00:00 | 2018-06-27 | 02.531.377.6-731.000 | PT. SESTRA JENDRA | 389,431,000 | 13.56 % | ||||
50 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan DIR. Polder Bakar Kabupaten Hulu Sungai Utara | Tender | Pekerjaan Konstruksi | 3681181 | 17673833 | APBD | 5,000,000,000 | 4,999,994,000 | 4,772,075,000 | 4,772,075,000 | 4,772,075,000 | 0 | 0 | 0 | 2018-06-22 19:00:00 | 2018-07-04 | 73.215.057.8-731.000 | PT. ADERUS WIRA PERSADA | 227,925,000 | 4.56 % | ||||
51 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi DIR. Tanggul Lungau Kabupaten Hulu Sungai Selatan | Tender | Pekerjaan Konstruksi | 3682181 | 17673880 | APBD | 3,000,000,000 | 2,999,380,000 | 2,542,499,000 | 2,542,499,000 | 2,542,499,000 | 0 | 0 | 0 | 2018-06-22 19:00:00 | 2018-07-11 | 76.644.426.9-733.000 | PT. DATU MULIA BORNEO | 457,501,000 | 15.25 % | ||||
52 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Daerah Irigasi Rawa Danda Besar Kabupaten Barito Kuala | Tender | Pekerjaan Konstruksi | 3683181 | 17674358 | APBD | 5,235,000,000 | 5,234,997,000 | 4,379,080,000 | 4,379,080,000 | 4,379,080,000 | 0 | 0 | 0 | 2018-06-22 19:00:00 | 2018-07-19 | 02.531.377.6-731.000 | PT. SESTRA JENDRA | 855,920,000 | 16.35 % | ||||
53 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Pintu Gerbang Kantor Kws. Perkantoran di Banjarbaru | Tender | Pekerjaan Konstruksi | 3703181 | 16032641 | APBD | 4,852,000,000 | 4,410,781,966 | 4,271,465,394 | 4,271,465,394 | 4,271,465,394 | 0 | 0 | 0 | 2018-07-13 08:00:00 | 2018-07-31 | 02.902.233.2-009.000 | PT. BAHANA KRIDA NUSANTARA | 580,534,606 | 11.96 % | ||||
54 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehab Gedung Kantor Setda Provinsi Kalsel di Banjarbaru | Tender | Pekerjaan Konstruksi | 3719181 | 14780477 | APBD | 1,167,202,000 | 1,118,661,070 | 1,057,394,715 | 1,057,394,715 | 1,055,350,000 | 0 | 0 | 0 | 2018-07-13 08:00:00 | 2018-07-25 | 66.139.132.6-733.000 | CV. AL MADINAH | 109,807,285 | 9.41 % | ||||
55 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Perbaikan Sarana dan Prasarana WC/KM Masyarakat Pekauman, Kec. Martapura Timur, di Kabupaten Banjar | Tender | Pekerjaan Konstruksi | 3734181 | 16032045 | APBD | 954,225,000 | 927,146,507 | 833,388,248 | 833,388,248 | 833,388,248 | 0 | 0 | 0 | 2018-07-18 13:00:00 | 2018-07-30 | 81.162.895.7-731.000 | cv. usaha umat | 120,836,752 | 12.66 % | ||||
56 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Perbaikan Sarana dan Prasarana WC/KM Masyarakat Sungai Bilu, Kec. Banjarmasin di Kab/Kota Banjarmasin | Tender | Pekerjaan Konstruksi | 3735181 | 16031962 | APBD | 954,225,000 | 789,080,877 | 721,967,273 | 721,967,273 | 721,967,273 | 0 | 0 | 0 | 2018-07-18 13:00:00 | 2018-07-30 | 81.162.895.7-731.000 | cv. usaha umat | 232,257,727 | 24.34 % | ||||
57 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Halaman Rumah Dinas Kediaman Gubernur di Banjarmasin | Tender | Pekerjaan Konstruksi | 3751181 | 17678537 | APBD | 435,750,000 | 432,864,280 | 399,329,528 | 399,329,528 | 399,326,928 | 0 | 0 | 0 | 2018-07-30 08:00:00 | 2018-08-15 | 73.471.507.1-731.000 | CV.MAWADDAH | 36,420,472 | 8.36 % | ||||
58 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Desa Bahandang-Desa Keliling Benteng | Tender | Pekerjaan Konstruksi | 3757181 | 18376222 | APBDP | 5,881,500,000 | 5,881,500,000 | 5,500,276,756 | 5,500,276,756 | 5,500,276,756 | 0 | 0 | 0 | 2018-07-27 15:00:00 | 2018-08-27 | 70.694.710.8-732.000 | PT.TANJUNG RAYA BERSAMA | 381,223,244 | 6.48 % | ||||
59 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Ray 7-Desa Bahandang | Tender | Pekerjaan Konstruksi | 3758181 | 18376199 | APBDP | 4,781,500,000 | 4,781,500,000 | 4,411,466,366 | 4,411,466,366 | 4,411,466,366 | 0 | 0 | 0 | 2018-07-27 15:00:00 | 2018-08-23 | 03.265.981.5-731.000 | PT. Pandji Pratama Indonesia | 370,033,634 | 7.74 % | ||||
60 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Jejangkit Muara-Ray 7 | Tender | Pekerjaan Konstruksi | 3759181 | 18376171 | APBDP | 4,181,500,000 | 4,181,500,000 | 3,906,023,082 | 3,906,023,082 | 3,906,023,082 | 0 | 0 | 0 | 2018-07-27 15:00:00 | 2018-08-13 | 01.124.946.3-731.000 | PT. ADIMANUNGGAL CIPTA PADUNUSA | 275,476,918 | 6.59 % | ||||
61 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengadaan Alat Hidrologi (Telemetri) AWLR Intake DI. Haruyan Dayak Kab. Hulu Sungai Tengah dan Sungai WS. Cengal Batulicin | Tender | Pekerjaan Konstruksi | 3774181 | 17674508 | APBD | 600,000,000 | 599,854,479 | 539,101,200 | 539,101,200 | 539,101,200 | 0 | 0 | 0 | 2018-08-07 15:00:00 | 2018-08-28 | 02.342.725.5-733.000 | CV. SAKA PERSADA | 60,898,800 | 10.15 % | ||||
62 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan HELIPAD di Jejangkit | Tender | Pekerjaan Konstruksi | 3820181 | 18420609 | APBDP | 1,550,000,000 | 1,531,724,500 | 1,463,455,082 | 1,463,455,082 | 1,463,455,082 | 0 | 0 | 0 | 2018-08-25 18:00:00 | 2018-09-16 | 31.245.996.9-731.000 | CV.RIDHEVAL HANDIL BHAKTI | 86,544,918 | 5.58 % | ||||
63 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Angkipih-Paramasan Bawah-Paramasan Atas | Tender | Pekerjaan Konstruksi | 3821181 | 18410837 | APBDP | 4,861,335,000 | 4,861,329,665 | 4,519,228,279 | 4,519,228,279 | 4,519,228,279 | 0 | 0 | 0 | 2018-08-25 20:00:00 | 2018-09-14 | 01.141.113.9-651.000 | PT. KARYA TUNGGAL MULYA ABADI | 342,106,721 | 7.04 % | ||||
64 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Perbaikan/Renovasi BRIMOB | Tender | Pekerjaan Konstruksi | 3823181 | 18420593 | APBDP | 935,000,000 | 925,344,400 | 740,035,192 | 740,035,192 | 731,330,297 | 0 | 0 | 0 | 2018-08-25 16:00:00 | 2018-09-10 | 71.462.122.4-732.000 | CV. Salma Aulia | 194,964,808 | 20.85 % | ||||
65 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Tanjung Serdang-Lontar II | Tender | Pekerjaan Konstruksi | 3829181 | 18410685 | APBDP | 4,469,818,000 | 4,469,817,737 | 4,440,624,241 | 4,440,624,000 | 4,440,624,000 | 0 | 0 | 0 | 2018-08-31 08:15:00 | 2018-09-17 | 02.216.301.8-734.000 | PT. Arta Cipta Permata | 29,193,759 | 0.65 % | ||||
66 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Batulicin-Mekarsari-Mentewe | Tender | Pekerjaan Konstruksi | 3832181 | 18410700 | APBDP | 14,851,585,000 | 14,851,584,856 | 14,073,727,541 | 14,073,727,541 | 14,050,688,106 | 0 | 0 | 0 | 2018-08-27 13:00:00 | 2018-09-15 | 02.421.791.1-734.000 | pt hm family | 777,857,459 | 5.24 % | ||||
67 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Simpang 3 Tahura-Mandiangin | Tender | Pekerjaan Konstruksi | 3875181 | 18425381 | APBDP | 9,877,725,000 | 9,877,720,641 | 8,218,382,336 | 8,218,382,336 | 8,218,382,336 | 0 | 0 | 0 | 2018-09-13 12:00:00 | 2018-10-01 | 70.694.710.8-732.000 | PT.TANJUNG RAYA BERSAMA | 1,659,342,664 | 16.8 % | ||||
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Lingkar Binuang | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3409181 | 14822718 | APBD | 350,000,000 | 346,390,000 | 294,096,000 | 294,096,000 | 294,096,000 | 0 | 0 | 0 | 2018-02-27 10:50:00 | 2018-04-16 | 01.489.654.2-711.000 | PT.TEMA KARYA MANDIRI | 55,904,000 | 15.97 % | ||||
2 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Angsana | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3411181 | 14822267 | APBD | 350,000,000 | 346,390,000 | 337,260,000 | 337,260,000 | 337,260,000 | 0 | 0 | 0 | 2018-02-27 10:50:00 | 2018-04-16 | 95.412.417.8-731.000 | PT. Prisma Jasa Konsulindo | 12,740,000 | 3.64 % | ||||
3 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Rantau - Muara Muning Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3412181 | 14822863 | APBD | 450,000,000 | 443,850,000 | 419,815,000 | 419,815,000 | 419,815,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-17 | 02.531.704.1-731.000 | CV. FIAZTA MATRIX CONSULTANT | 30,185,000 | 6.71 % | ||||
4 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Banjang - Pulau Nyiur - Batumandi Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3426181 | 14822408 | APBD | 450,000,000 | 396,330,000 | 380,000,500 | 380,000,500 | 380,000,500 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-17 | 02.531.483.2-731.000 | MANDIRI cipta PRATAMA | 69,999,500 | 15.56 % | ||||
5 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Birayang - Tariwin - Lok Batu - Batumandi | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3445181 | 14822528 | APBD | 350,000,000 | 348,040,000 | 336,105,000 | 336,105,000 | 336,105,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-17 | 02.090.318.3-731.000 | CV. Inditec Consultant | 13,895,000 | 3.97 % | ||||
6 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Anjir Pasar - Marabahan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3449181 | 14822318 | APBD | 350,000,000 | 348,040,000 | 337,865,000 | 337,865,000 | 337,865,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-17 | 01.854.518.6-711.000 | CV. KARYA PERDANA KONSULTAN | 12,135,000 | 3.47 % | ||||
7 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan dan Jembatan Lumpangi - Loksado | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3450181 | 14823056 | APBD | 350,000,000 | 349,855,000 | 339,350,000 | 339,350,000 | 339,350,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-17 | 76.010.632.8-711.000 | PT Prakarsa Desain Konsultan | 10,650,000 | 3.04 % | ||||
8 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Simpang 3 Lingkar Utara - Simpang 3 Jalan Golf - Jalan Kasturi (Paket I) Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3451181 | 14822117 | APBD | 450,000,000 | 435,380,000 | 432,320,000 | 432,320,000 | 432,320,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-17 | 01.879.315.8-731.000 | CV. ADIHANMAN TATA RANCANG | 17,680,000 | 3.93 % | ||||
9 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Kandangan - Negara Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3452181 | 14822655 | APBD | 500,000,000 | 498,080,000 | 476,790,000 | 476,790,000 | 476,790,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-17 | 02.708.931.7-731.000 | CV. DIAN MITRA TEKNIKA | 23,210,000 | 4.64 % | ||||
10 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Gunung Kupang - Kiram - Tambang Ulang Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3453181 | 14822039 | APBD | 450,000,000 | 430,100,000 | 415,360,000 | 415,360,000 | 415,360,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-17 | 02.050.569.9-731.000 | CV. Dharma Cipta Pratama | 34,640,000 | 7.7 % | ||||
11 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Simpang 4 Gatot Subroto - Lingkar Dalam Selatan Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3454181 | 14822177 | APBD | 450,000,000 | 377,520,000 | 350,070,000 | 350,070,000 | 350,070,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-17 | 02.050.569.9-731.000 | CV. Dharma Cipta Pratama | 99,930,000 | 22.21 % | ||||
12 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Batulicin - Mekarsari - Mentewe Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3455181 | 14822432 | APBD | 500,000,000 | 496,925,000 | 472,065,000 | 472,065,000 | 472,065,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-17 | 01.517.846.0-731.000 | PT. WINAYA KONTEKS KHARISMA | 27,935,000 | 5.59 % | ||||
13 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Tanjung - Muara Uya Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3456181 | 14822907 | APBD | 450,000,000 | 396,330,000 | 372,680,000 | 372,680,000 | 372,680,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-17 | 02.531.704.1-731.000 | CV. FIAZTA MATRIX CONSULTANT | 77,320,000 | 17.18 % | ||||
14 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Pelaihari - Batakan Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3457181 | 14822817 | APBD | 450,000,000 | 422,840,000 | 401,555,000 | 401,555,000 | 401,555,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-13 | 01.517.846.0-731.000 | PT. WINAYA KONTEKS KHARISMA | 48,445,000 | 10.77 % | ||||
15 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Banjarbaru - Simpang 3 Tahura - Aranio Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3458181 | 14822475 | APBD | 450,000,000 | 435,380,000 | 412,060,000 | 412,060,000 | 412,060,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-17 | 02.050.569.9-731.000 | CV. Dharma Cipta Pratama | 37,940,000 | 8.43 % | ||||
16 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Gambut - Pulau Sari Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3460181 | 14822554 | APBD | 450,000,000 | 377,520,000 | 353,485,000 | 353,485,000 | 353,485,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-13 | 80.562.640.5-731.000 | CV. RAMIER JAYA ARKANANTA | 96,515,000 | 21.45 % | ||||
17 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Jalan Bebas Hambatan Tol Banjarbaru - Batulicin | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3461181 | 14818573 | APBD | 4,898,725,000 | 4,892,578,000 | 4,525,469,300 | 4,525,469,300 | 4,525,469,300 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-17 | 01.124.766.5-731.000 | PT.WIRA WIDYATAMA | 373,255,700 | 7.62 % | ||||
18 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Paringin - Halong Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3462181 | 14822758 | APBD | 400,000,000 | 385,715,000 | 384,780,000 | 384,780,000 | 384,780,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-13 | 02.708.931.7-731.000 | CV. DIAN MITRA TEKNIKA | 15,220,000 | 3.81 % | ||||
19 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Golf Banjarbaru Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3463181 | 14822613 | APBD | 450,000,000 | 430,100,000 | 411,070,000 | 411,070,000 | 411,070,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 2018-04-13 | 76.010.632.8-711.000 | PT Prakarsa Desain Konsultan | 38,930,000 | 8.65 % | ||||
20 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Supervisi Pembangunan Daerah Irigasi Kinarum 1.004 Ha Kabupaten Tabalong | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3473181 | 14756085 | APBD | 700,000,000 | 699,996,000 | 682,467,000 | 682,467,000 | 682,467,000 | 0 | 0 | 0 | 2018-03-15 12:00:00 | 2018-05-11 | 02.172.574.2-731.000 | CV. ANDALUSIA | 17,533,000 | 2.5 % | ||||
21 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Survey Identifikasi dan Evaluasi Jaringan Tersier DI. Haruyan Dayak Kabupaten Hulu Sungai Tengah | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3475181 | 14759300 | APBD | 1,500,000,000 | 1,499,987,500 | 1,477,465,000 | 1,477,465,000 | 1,477,465,000 | 0 | 0 | 0 | 2018-03-15 10:00:00 | 2018-05-18 | 01.844.485.1-015.000 | PT INAKKO Internasional Konsulindo | 22,535,000 | 1.5 % | ||||
22 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Supervisi Pembangunan Embung Landasan Ulin Kota Banjarbaru | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3476181 | 14756347 | APBD | 200,000,000 | 199,000,000 | 191,100,000 | 191,100,000 | 191,100,000 | 0 | 0 | 0 | 2018-03-15 16:00:00 | 2018-04-16 | 02.531.704.1-731.000 | CV. FIAZTA MATRIX CONSULTANT | 8,900,000 | 4.45 % | ||||
23 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Rehabilitasi Jaringan Daerah Irigasi Rawa Tanggul Martapura Kabupaten Banjar | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3477181 | 14759484 | APBD | 1,000,000,000 | 999,949,500 | 990,000,000 | 990,000,000 | 990,000,000 | 0 | 0 | 0 | 2018-03-15 10:00:00 | 2018-05-18 | 01.469.763.5-428.000 | PT. VITRAHA CONSINDOTAMA | 10,000,000 | 1 % | ||||
24 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Outline Plan Penyediaan Air Baku Kab. Tanah Laut, Kab. Tanah Bumbu dan Kab. Kota Baru | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3478181 | 14759648 | APBD | 1,500,000,000 | 1,499,999,600 | 1,474,000,000 | 1,474,000,000 | 1,474,000,000 | 0 | 0 | 0 | 2018-03-16 20:00:00 | 2018-05-15 | 01.554.042.0-121.000 | PT. ALLES KLAR PRIMA | 26,000,000 | 1.73 % | ||||
25 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Pengawas Pembangunan Kantor Samsat Tanjung | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3479181 | 14772503 | APBD | 260,000,000 | 259,677,000 | 235,455,000 | 235,455,000 | 235,455,000 | 0 | 0 | 0 | 2018-03-15 10:00:00 | 2018-05-18 | 02.050.569.9-731.000 | CV. Dharma Cipta Pratama | 24,545,000 | 9.44 % | ||||
26 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Pengawas Rehab Gedung Mess Biliton dan TMII | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3480181 | 14780220 | APBD | 150,000,000 | 149,770,000 | 134,659,800 | 134,659,800 | 134,659,800 | 0 | 0 | 0 | 2018-03-15 12:30:00 | 2018-04-17 | 01.860.230.0-731.000 | CV PRAKTIRA KONSULTAN | 15,340,200 | 10.23 % | ||||
27 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Pengawas Pembangunan Gedung Rapat BAKEUDA | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3481181 | 14772568 | APBD | 150,000,000 | 149,770,000 | 147,730,000 | 147,730,000 | 147,730,000 | 0 | 0 | 0 | 2018-03-15 12:00:00 | 2018-04-17 | 03.025.627.5-731.000 | SADWA RAMA CONSULTANT | 2,270,000 | 1.51 % | ||||
28 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Pengawas Pembangunan Gedung BPSDM Prov. Kalsel di Banjarbaru | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3482181 | 14772364 | APBD | 664,000,000 | 663,610,000 | 560,005,600 | 560,005,600 | 560,005,600 | 0 | 0 | 0 | 2018-03-15 10:00:00 | 2018-05-21 | 01.860.230.0-731.000 | CV PRAKTIRA KONSULTAN | 103,994,400 | 15.66 % | ||||
29 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Revisi rancangan Pola Pengelolaan WS. Cengal Batulicin | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3483181 | 14759161 | APBD | 2,050,000,000 | 2,049,987,500 | 1,966,100,000 | 1,966,100,000 | 1,966,100,000 | 0 | 0 | 0 | 2018-03-15 12:00:00 | 2018-05-23 | 01.646.915.7-009.000 | PT. SUPRAHARMONIA CONSULTINDO | 83,900,000 | 4.09 % | ||||
30 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Perencana Review Penyusunan Masterplan Sport Center | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3484181 | 14772089 | APBD | 1,464,250,000 | 1,464,241,000 | 1,342,423,500 | 1,342,423,500 | 1,342,423,500 | 0 | 0 | 0 | 2018-03-15 12:00:00 | 2018-05-15 | 01.309.520.3-062.000 | PT. PERENTJANA DJAJA | 121,826,500 | 8.32 % | ||||
31 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Perencana Review Masterplan Masjid Raya Sabilal Muhtadin di Banjarmasin | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3485181 | 14780772 | APBD | 240,750,000 | 240,747,000 | 224,537,000 | 224,537,000 | 224,537,000 | 0 | 0 | 0 | 2018-03-15 12:00:00 | 2018-05-21 | 02.108.378.7-429.000 | PT. Munasa Kreasi Nusantara | 16,213,000 | 6.73 % | ||||
32 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Perencana DED Monomen Pal Nol | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3486181 | 16033291 | APBD | 980,500,000 | 980,430,000 | 931,279,800 | 931,279,800 | 931,279,800 | 0 | 0 | 0 | 2018-03-15 12:00:00 | 2018-05-23 | 01.455.616.1-441.000 | PT. DAYA CIPTA DIANRANCANA | 49,220,200 | 5.02 % | ||||
33 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Pengawas Kantor Samsat Kandangan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3493181 | 16243279 | APBD | 285,000,000 | 284,251,000 | 248,600,000 | 248,600,000 | 248,600,000 | 0 | 0 | 0 | 2018-03-16 15:00:00 | 2018-04-16 | 01.585.258.5-731.000 | CV. ASRINDO GRAHA CONSULTANT | 36,400,000 | 12.77 % | ||||
34 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Rehabilitasi Jaringan Daerah Irigasi Rawa Polder Tambak Hanyar Kabupaten Banjar | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3496181 | 14759536 | APBD | 1,000,000,000 | 999,982,000 | 976,250,000 | 976,250,000 | 976,250,000 | 0 | 0 | 0 | 2018-03-16 07:30:00 | 2018-05-07 | 01.426.908.8-441.000 | PT. SARANA BHUANA JAYA | 23,750,000 | 2.38 % | ||||
35 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Rehabilitasi Jaringan Daerah Irigasi Rawa Alalak Padang Kabupaten Banjar | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3503181 | 14759430 | APBD | 1,000,000,000 | 999,955,000 | 975,232,000 | 975,232,000 | 975,232,000 | 0 | 0 | 0 | 2018-03-15 12:00:00 | 2018-05-08 | 02.429.467.0-015.000 | PT. Mitratama Asia Pasific | 24,768,000 | 2.48 % | ||||
36 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Pengendali Banjir Kabupaten Hulu Sungai Tengah - Kabupaten Hulu Sungai Selatan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3506181 | 14759816 | APBD | 496,000,000 | 495,990,000 | 470,600,000 | 470,600,000 | 470,600,000 | 0 | 0 | 0 | 2018-03-15 12:00:00 | 2018-05-11 | 01.646.915.7-009.000 | PT. SUPRAHARMONIA CONSULTINDO | 25,400,000 | 5.12 % | ||||
37 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Perencana Review Masterplan dan Penyusunan Masterplan Drainase dan Penghijauan di Kawasan Perkantoran di Banjarbaru | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3508181 | 14772161 | APBD | 1,484,250,000 | 1,483,744,000 | 1,359,473,000 | 1,359,473,000 | 1,359,473,000 | 0 | 0 | 0 | 2018-03-15 13:00:00 | 2018-05-15 | 01.309.520.3-062.000 | PT. PERENTJANA DJAJA | 124,777,000 | 8.41 % | ||||
38 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Supervisi Pembangunan Sarana dan Prasarana RTH Kantor Gubernur di Banjarmasin | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3510181 | 14780380 | APBD | 250,000,000 | 249,029,000 | 230,873,000 | 230,873,000 | 230,873,000 | 0 | 0 | 0 | 2018-03-15 23:45:00 | 2018-05-03 | 01.534.559.8-731.000 | PT TECTAMA KARYA | 19,127,000 | 7.65 % | ||||
39 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Embung Kampung Banjar | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3517181 | 17778484 | APBD | 400,000,000 | 399,987,500 | 390,500,000 | 390,500,000 | 390,500,000 | 0 | 0 | 0 | 2018-03-16 12:00:00 | 2018-05-11 | 01.469.763.5-428.000 | PT. VITRAHA CONSINDOTAMA | 9,500,000 | 2.38 % | ||||
40 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Supervisi Rehabilitasi DIR. Tanggul Lungau Kabupaten Hulu Sungai Selatan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3528181 | 17673900 | APBD | 300,000,000 | 299,915,000 | 284,765,000 | 284,765,000 | 284,765,000 | 0 | 0 | 0 | 2018-03-22 12:00:00 | 2018-05-11 | 02.531.704.1-731.000 | CV. FIAZTA MATRIX CONSULTANT | 15,235,000 | 5.08 % | ||||
41 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Outline Plan Sistem Drainase Kota Kabupaten Tanah Laut | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3533181 | 17224277 | APBD | 850,000,000 | 849,997,500 | 838,695,000 | 838,695,000 | 838,695,000 | 0 | 0 | 0 | 2018-03-22 16:00:00 | 2018-05-04 | 01.131.029.9-441.000 | PT. RAYAKONSULT | 11,305,000 | 1.33 % | ||||
42 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Supervisi Normalisasi Sungai Jepana (DAS Satui) Kabupaten Tanah Bumbu | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3540181 | 14756679 | APBD | 700,000,000 | 699,990,000 | 663,245,000 | 663,245,000 | 663,245,000 | 0 | 0 | 0 | 2018-03-22 16:00:00 | 2018-05-08 | 01.455.616.1-441.000 | PT. DAYA CIPTA DIANRANCANA | 36,755,000 | 5.25 % | ||||
43 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Supervisi Daerah Irigasi Rawa Danda Besar Kabupaten Barito Kuala | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3543181 | 17045839 | APBD | 199,702,000 | 199,650,000 | 186,716,000 | 186,716,000 | 186,716,000 | 0 | 0 | 0 | 2018-03-23 11:10:00 | 2018-04-16 | 02.090.106.2-732.000 | CV. FAJAR KARYA PRATAMA | 12,986,000 | 6.5 % | ||||
44 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Supervisi Rehabilitasi DI. Intangan Kabupaten Hulu Sungai Tengah | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3554181 | 17673918 | APBD | 200,000,000 | 199,980,000 | 182,655,000 | 182,655,000 | 182,655,000 | 0 | 0 | 0 | 2018-03-29 13:00:00 | 2018-04-18 | 02.043.129.2-731.000 | CV. GANESHA TEKNIK | 17,345,000 | 8.67 % | ||||
45 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Pengawas Toilet dan Rehabilitasi Halaman Masjid Raya Sabilal Muhtadin di Banjarmasin | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3569181 | 17678897 | APBD | 75,000,000 | 74,981,000 | 57,560,000 | 57,560,000 | 57,560,000 | 0 | 0 | 0 | 2018-04-03 18:00:00 | 2018-04-25 | 80.263.300.8-732.000 | CV. INDISIGN CONSULINDO | 17,440,000 | 23.25 % | ||||
46 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Perencana Pembuatan Trotoar dan Pagar Keliling di Lingkungan Setda Prov. Kalsel di Banjarbaru | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3571181 | 17679278 | APBD | 125,000,000 | 124,949,000 | 124,162,000 | 124,162,000 | 124,162,000 | 0 | 0 | 0 | 2018-04-03 18:00:00 | 2018-04-25 | 02.090.106.2-732.000 | CV. FAJAR KARYA PRATAMA | 838,000 | 0.67 % | ||||
47 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Kiram-Gunung Mawar Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3573181 | 17730711 | APBDP | 450,000,000 | 435,380,000 | 409,200,000 | 409,200,000 | 409,200,000 | 0 | 0 | 0 | 2018-04-03 16:00:00 | 2018-05-21 | 80.562.640.5-731.000 | CV. RAMIER JAYA ARKANANTA | 40,800,000 | 9.07 % | ||||
48 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Paramasan Bawah-Paramasan Atas | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3574181 | 17734511 | APBDP | 300,000,000 | 191,950,000 | 186,065,000 | 186,065,000 | 186,065,000 | 0 | 0 | 0 | 2018-04-03 16:00:00 | 2018-04-25 | 03.025.627.5-731.000 | SADWA RAMA CONSULTANT | 113,935,000 | 37.98 % | ||||
49 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Pengawas Pembuatan Kantor dan Laboratorium Unit Pelayanan Jasa Sumber Daya Mineral dan Energi | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3575181 | 17678785 | APBD | 100,000,000 | 100,000,000 | 98,972,000 | 98,972,000 | 98,972,000 | 0 | 0 | 0 | 2018-04-03 18:00:00 | 2018-04-25 | 01.860.308.4-731.000 | CV. KARYASA CONSULINDO | 1,028,000 | 1.03 % | ||||
50 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Pengawas Pembangunan Pintu Gerbang Kantor Kawasan Perkantoran di Banjarbaru | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3620181 | 17678695 | APBD | 133,142,500 | 133,133,000 | 120,945,000 | 120,945,000 | 120,945,000 | 0 | 0 | 0 | 2018-05-19 00:59:00 | 2018-06-05 | 01.585.258.5-731.000 | CV. ASRINDO GRAHA CONSULTANT | 12,197,500 | 9.16 % | ||||
51 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Pengawas Pembangunan Taman Edukasi Lalu Lintas | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3624181 | 17678744 | APBD | 150,000,000 | 149,765,000 | 98,505,000 | 98,505,000 | 98,505,000 | 0 | 0 | 0 | 2018-05-20 14:00:00 | 2018-06-21 | 01.860.272.2-731.000 | CV. DAYAKARSA MADYA Consultant | 51,495,000 | 34.33 % | ||||
52 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Supervisi Peningkatan DIR. Polder Bakar Kabupaten Hulu Sungai Utara | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3695181 | 14756929 | APBD | 300,000,000 | 299,970,000 | 284,935,200 | 284,935,200 | 284,935,200 | 0 | 0 | 0 | 2018-06-28 22:00:00 | 2018-08-03 | 01.141.524.7-731.000 | CV. BINA BANUA | 15,064,800 | 5.02 % | ||||
53 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Penyusunan Pergub tentang Peraturan Zonasi Lintas Kabupaten Kota (Kawasan Strategis Provinsi Rawa Batang Banyu) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3764181 | 18392489 | APBD | 399,960,000 | 399,960,000 | 365,530,000 | 365,530,000 | 365,530,000 | 0 | 0 | 0 | 2018-08-06 09:00:00 | 2018-09-03 | 02.108.378.7-429.000 | PT. Munasa Kreasi Nusantara | 34,430,000 | 8.61 % | ||||
54 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Orthorektifikasi Peta (Dasar) Rencana Tata Ruang Kawasan Strategis Provinsi Rawa Batang Banyu | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3765181 | 18392492 | APBD | 199,980,000 | 199,980,000 | 188,540,000 | 188,540,000 | 188,540,000 | 0 | 0 | 0 | 2018-08-06 09:00:00 | 2018-09-03 | 02.980.044.8-404.000 | PT. Komperji Nusaraya | 11,440,000 | 5.72 % | ||||
55 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Jembatan Batulicin-Mentewe | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3826181 | 18410823 | APBDP | 662,818,000 | 657,052,000 | 649,345,500 | 649,345,500 | 650,545,500 | 0 | 0 | 0 | 2018-08-28 17:00:00 | 2018-10-16 | 02.613.877.6-731.000 | CV SEMBILAN SATU ENGINEERING | 13,472,500 | 2.03 % | ||||
56 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Taman Budaya Baru di Kawasan Perkantoran Pemprov. Kalsel | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3827181 | 18420334 | APBDP | 390,000,000 | 389,953,300 | 346,280,000 | 346,280,000 | 370,370,000 | 0 | 0 | 0 | 2018-08-27 12:00:00 | 2018-09-27 | 01.455.616.1-441.000 | PT. DAYA CIPTA DIANRANCANA | 43,720,000 | 11.21 % | ||||
57 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Istana Mahligai Rakyat | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3828181 | 18420291 | APBDP | 191,500,000 | 191,405,500 | 154,628,925 | 154,628,925 | 154,628,925 | 0 | 0 | 0 | 2018-08-27 16:00:00 | 2018-10-20 | 01.463.263.2-731.000 | PT. MATRA ESTETIKA REKAYASA | 36,871,075 | 19.25 % | ||||
58 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Jalan Alternatif ke Makam Syech M. Arsyad Al-Banjari dan DED Jembatan Jalan Pendidikan Sekumpul | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3835181 | 18420292 | APBDP | 396,250,000 | 395,164,000 | 358,325,000 | 358,325,000 | 369,270,000 | 0 | 0 | 0 | 2018-08-28 16:00:00 | 2018-10-26 | 01.489.654.2-711.000 | PT.TEMA KARYA MANDIRI | 37,925,000 | 9.57 % | ||||
59 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Lanjutan Makam Syeh Arsyad Al Banjari | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3839181 | 18420341 | APBDP | 390,000,000 | 389,953,300 | 300,008,500 | 300,008,500 | 300,008,500 | 0 | 0 | 0 | 2018-08-27 23:55:00 | 2018-10-30 | 02.050.569.9-731.000 | CV. Dharma Cipta Pratama | 89,991,500 | 23.07 % | ||||
60 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Jaringan Listrik Kawasan Perkantoran Pemprov. Kalsel | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3840181 | 18420374 | APBDP | 540,000,000 | 539,990,000 | 341,000,000 | 341,000,000 | 523,600,000 | 0 | 0 | 0 | 2018-08-29 09:00:00 | 2018-10-17 | 02.883.220.2-731.000 | CV. RIA KONSULTAN | 199,000,000 | 36.85 % | ||||
61 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Study Pendahuluan Sport City | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3873181 | 18446564 | APBDP | 240,000,000 | 239,965,000 | 221,705,000 | 221,705,000 | 221,705,000 | 176,158,400 | 0 | 0 | 2018-09-13 12:00:00 | 2018-11-02 | 2018-11-15 | 01.548.564.2-424.000 | PT. Belaputera Interplan | 01.548.564.2-424.000 | PT. Belaputera Interplan | 18,295,000 | 7.62 % | |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Pagu | HPS | Nilai Penawaran | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Batulicin - Mekarsari - Mentewe | Tender | Pekerjaan Konstruksi | 3408181 | 14823154 | 34,396,755,000 | 34,396,755,000 | 33,812,113,294 | 0 | 0 | 0 | 2018-02-27 11:00:00 | 03.169.298.1-734.000 | PT.BATULICIN BETON ASPHALT | 584,641,706 | 1.7 % | |||
2 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Lingkar Binuang | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3409181 | 14822718 | 350,000,000 | 346,390,000 | 294,096,000 | 0 | 0 | 0 | 2018-02-27 10:50:00 | 01.489.654.2-711.000 | PT.TEMA KARYA MANDIRI | 55,904,000 | 15.97 % | |||
3 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Anjir Pasar - Marabahan | Tender | Pekerjaan Konstruksi | 3410181 | 14821819 | 24,546,755,000 | 24,546,755,000 | 23,689,070,581 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 03.265.981.5-731.000 | PT. Pandji Pratama Indonesia | 857,684,419 | 3.49 % | |||
4 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Angsana | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3411181 | 14822267 | 350,000,000 | 346,390,000 | 337,260,000 | 0 | 0 | 0 | 2018-02-27 10:50:00 | 95.412.417.8-731.000 | PT. Prisma Jasa Konsulindo | 12,740,000 | 3.64 % | |||
5 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Rantau - Muara Muning Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3412181 | 14822863 | 450,000,000 | 443,850,000 | 419,815,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 02.531.704.1-731.000 | CV. FIAZTA MATRIX CONSULTANT | 30,185,000 | 6.71 % | |||
6 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Rantau - Muara Muning | Tender | Pekerjaan Konstruksi | 3413181 | 14820451 | 4,467,471,000 | 4,467,465,000 | 3,911,156,404 | 0 | 0 | 0 | 2018-02-27 10:50:00 | 80.203.029.6-731.000 | PT. WAJI PUTERA KARYA MANDIRI | 556,314,596 | 12.45 % | |||
7 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Angsana | Tender | Pekerjaan Konstruksi | 3415181 | 14819063 | 4,567,471,000 | 4,567,471,000 | 4,325,315,880 | 0 | 0 | 0 | 2018-02-27 11:00:00 | 02.216.301.8-734.000 | PT. Arta Cipta Permata | 242,155,120 | 5.3 % | |||
8 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Pandahan - Margasari dan Penyelesaian Pile Slab | Tender | Pekerjaan Konstruksi | 3416181 | 14820217 | 4,906,505,000 | 4,906,495,000 | 4,270,910,613 | 0 | 0 | 0 | 2018-02-27 10:50:00 | 02.237.343.5-733.000 | PT.Bina Bangun Banua Bersama | 635,594,387 | 12.95 % | |||
9 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Lingkar Binuang | Tender | Pekerjaan Konstruksi | 3417181 | 14820107 | 4,567,471,000 | 4,567,471,000 | 4,322,129,000 | 0 | 0 | 0 | 2018-02-27 10:50:00 | 01.137.511.0-731.000 | PT. SAMA SENTRAL SWA SEMBADA | 245,342,000 | 5.37 % | |||
10 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Kasturi - Jalan Akses Bandara - Jalan Lingkar Utara Banjarbaru(Paket II) | Tender | Pekerjaan Konstruksi | 3418181 | 14818611 | 11,465,000,000 | 11,465,000,000 | 9,683,749,950 | 0 | 0 | 0 | 2018-02-27 11:00:00 | 02.172.893.6-731.000 | PT IRINA PERKASA | 1,781,250,050 | 15.54 % | |||
11 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Dahai - Tanjung | Tender | Pekerjaan Konstruksi | 3420181 | 14819498 | 4,906,505,000 | 4,906,505,000 | 4,651,671,930 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 02.746.857.8-735.000 | PT. Sinar Mahaputera Mandaga Bakti | 254,833,070 | 5.19 % | |||
12 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Amuntai - Lampihong - Paringin | Tender | Pekerjaan Konstruksi | 3421181 | 14818966 | 4,906,505,000 | 4,906,505,000 | 4,639,595,545 | 0 | 0 | 0 | 2018-02-27 10:50:00 | 01.124.238.5-735.000 | PT. ULIN SUBUR | 266,909,455 | 5.44 % | |||
13 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan dan Jembatan Batulicin-Mentewe (DAK) | Tender | Pekerjaan Konstruksi | 3422181 | 15148955 | 11,130,000,000 | 11,130,000,000 | 10,848,356,660 | 0 | 0 | 0 | 2018-02-27 11:00:00 | 03.169.298.1-734.000 | PT.BATULICIN BETON ASPHALT | 281,643,340 | 2.53 % | |||
14 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Poros, Lingkungan Perkantoran Prov. Kalsel | Tender | Pekerjaan Konstruksi | 3423181 | 14820351 | 6,972,525,000 | 6,972,525,000 | 6,610,065,823 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 31.635.224.4-731.000 | PT. MULTI USAHA PEMBANGUNAN | 362,459,177 | 5.2 % | |||
15 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Trikora | Tender | Pekerjaan Konstruksi | 3424181 | 14820658 | 4,974,750,000 | 4,974,750,000 | 4,725,257,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 01.222.209.7-731.000 | PT. PERDANA PANSELLA | 249,493,000 | 5.02 % | |||
16 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Banjang - Pulau Nyiur - Batumandi | Tender | Pekerjaan Konstruksi | 3425181 | 14819294 | 4,467,471,000 | 4,467,471,000 | 3,870,342,459 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 73.271.215.3-733.000 | PT. KARYA ANNISA GEMILANG | 597,128,541 | 13.37 % | |||
17 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Banjang - Pulau Nyiur - Batumandi Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3426181 | 14822408 | 450,000,000 | 396,330,000 | 380,000,500 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 02.531.483.2-731.000 | MANDIRI cipta PRATAMA | 69,999,500 | 15.56 % | |||
18 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan dan Jembatan Lumpangi - Loksado | Tender | Pekerjaan Konstruksi | 3427181 | 14820801 | 6,554,280,000 | 6,554,280,000 | 6,059,052,350 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 02.014.742.7-714.000 | PT. RAHMAT AGUNG UTAMA | 495,227,650 | 7.56 % | |||
19 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Birayang - Tariwin - Lok Batu - Batumandi | Tender | Pekerjaan Konstruksi | 3428181 | 14819454 | 5,554,280,000 | 5,554,280,000 | 4,858,205,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 01.124.058.7-733.000 | AIRA DUTA MURAKATA. PT | 696,075,000 | 12.53 % | |||
20 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Guntung - Panaitan - Lampihong | Tender | Pekerjaan Konstruksi | 3429181 | 14819806 | 4,906,505,000 | 4,906,505,000 | 4,659,645,137 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 01.124.098.3-735.000 | PT. CAHAYA MENTARI | 246,859,863 | 5.03 % | |||
21 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Tanjung - Muara Uya | Tender | Pekerjaan Konstruksi | 3430181 | 14820593 | 6,454,280,000 | 6,454,280,000 | 5,808,114,242 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 02.590.754.4-735.000 | PT. TABALONG JAYA MARGA BERSAMA | 646,165,758 | 10.01 % | |||
22 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Banjarbaru - Simpang 3 Tahura - Aranio | Tender | Pekerjaan Konstruksi | 3432181 | 14819355 | 5,522,525,000 | 5,522,525,000 | 5,097,062,906 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 31.704.295.0-732.000 | PT. KELANA MULTI KONSTRUKSI | 425,462,094 | 7.7 % | |||
23 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Dalam Kota Banjarmasin | Tender | Pekerjaan Konstruksi | 3433181 | 14819539 | 4,974,750,000 | 4,974,750,000 | 4,774,925,149 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 01.424.331.5-732.000 | PT. JATI BARU | 199,824,851 | 4.02 % | |||
24 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Kiram - Simpang 3 Tahura - Mandiangin | Tender | Pekerjaan Konstruksi | 3434181 | 14820050 | 4,974,750,000 | 4,974,750,000 | 4,872,898,891 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 03.018.148.1-732.000 | PT. ADJI PERKASA | 101,851,109 | 2.05 % | |||
25 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Gambut - Pulau Sari | Tender | Pekerjaan Konstruksi | 3435181 | 14819632 | 4,524,750,000 | 4,524,750,000 | 4,365,176,985 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 01.137.533.4-731.000 | PT. PUTRA KANCA | 159,573,015 | 3.53 % | |||
26 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Tanjung Serdang - Lontar | Tender | Pekerjaan Konstruksi | 3436181 | 14820534 | 4,903,925,000 | 4,903,925,000 | 4,847,744,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 02.216.301.8-734.000 | PT. Arta Cipta Permata | 56,181,000 | 1.15 % | |||
27 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Paringin - Halong | Tender | Pekerjaan Konstruksi | 3437181 | 14820304 | 6,454,280,000 | 6,454,280,000 | 6,187,609,759 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 01.124.098.3-735.000 | PT. CAHAYA MENTARI | 266,670,241 | 4.13 % | |||
28 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Kandangan - Negara | Tender | Pekerjaan Konstruksi | 3438181 | 14819866 | 5,404,280,000 | 5,404,000,000 | 4,917,636,279 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 01.124.396.1-733.000 | PT. KARYA MAWAR LESTARI | 486,643,721 | 9 % | |||
29 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Simpang 3 Lingkar Utara - Simpang 3 Jalan Golf - Jalan Kasturi (Paket I) | Tender | Pekerjaan Konstruksi | 3439181 | 14818665 | 11,015,000,000 | 11,015,000,000 | 10,090,308,687 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 01.124.946.3-731.000 | PT. ADIMANUNGGAL CIPTA PADUNUSA | 924,691,313 | 8.39 % | |||
30 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan dan Jembatan Pelaihari-Batakan (DAK) | Tender | Pekerjaan Konstruksi | 3441181 | 15149206 | 9,700,000,000 | 9,700,000,000 | 8,696,700,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 01.141.578.3-732.000 | PT. SARANA DOA BERSAMA | 1,003,300,000 | 10.34 % | |||
31 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Pelaihari - Batakan | Tender | Pekerjaan Konstruksi | 3442181 | 14822007 | 9,454,280,000 | 9,454,280,000 | 9,020,605,059 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 01.322.015.7-009.000 | PT. JOGLO MULTI AYU | 433,674,941 | 4.59 % | |||
32 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Golf Banjarbaru | Tender | Pekerjaan Konstruksi | 3443181 | 14819742 | 6,522,525,000 | 6,522,525,000 | 5,782,218,261 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 01.434.922.9-731.000 | PT. MERCU JAYA BUANA | 740,306,739 | 11.35 % | |||
33 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Simpang 4 Gatot Subroto - Lingkar Dalam Selatan | Tender | Pekerjaan Konstruksi | 3444181 | 14818839 | 5,522,525,000 | 5,522,525,000 | 4,752,361,474 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 72.196.664.6-731.000 | BIMO LAKSANA GROUP | 770,163,526 | 13.95 % | |||
34 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Birayang - Tariwin - Lok Batu - Batumandi | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3445181 | 14822528 | 350,000,000 | 348,040,000 | 336,105,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 02.090.318.3-731.000 | CV. Inditec Consultant | 13,895,000 | 3.97 % | |||
35 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Negara - Muara Tapus | Tender | Pekerjaan Konstruksi | 3446181 | 14820134 | 5,904,280,000 | 5,904,280,000 | 5,606,756,728 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 01.134.056.9-733.000 | PT. ASIA TIMUR KONSTRUKSI | 297,523,272 | 5.04 % | |||
36 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Gunung Kupang - Kiram - Tambang Ulang | Tender | Pekerjaan Konstruksi | 3447181 | 14818515 | 14,515,000,000 | 14,515,000,000 | 14,199,402,386 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 70.694.710.8-732.000 | PT.TANJUNG RAYA BERSAMA | 315,597,614 | 2.17 % | |||
37 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Banjarmasin - Martapura | Tender | Pekerjaan Konstruksi | 3448181 | 14819422 | 5,972,525,000 | 5,972,525,000 | 5,702,383,679 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 01.133.868.8-731.000 | PT. HM Taher | 270,141,321 | 4.52 % | |||
38 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Anjir Pasar - Marabahan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3449181 | 14822318 | 350,000,000 | 348,040,000 | 337,865,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 01.854.518.6-711.000 | CV. KARYA PERDANA KONSULTAN | 12,135,000 | 3.47 % | |||
39 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan dan Jembatan Lumpangi - Loksado | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3450181 | 14823056 | 350,000,000 | 349,855,000 | 339,350,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 76.010.632.8-711.000 | PT Prakarsa Desain Konsultan | 10,650,000 | 3.04 % | |||
40 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Simpang 3 Lingkar Utara - Simpang 3 Jalan Golf - Jalan Kasturi (Paket I) Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3451181 | 14822117 | 450,000,000 | 435,380,000 | 432,320,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 01.879.315.8-731.000 | CV. ADIHANMAN TATA RANCANG | 17,680,000 | 3.93 % | |||
41 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Kandangan - Negara Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3452181 | 14822655 | 500,000,000 | 498,080,000 | 476,790,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 02.708.931.7-731.000 | CV. DIAN MITRA TEKNIKA | 23,210,000 | 4.64 % | |||
42 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Gunung Kupang - Kiram - Tambang Ulang Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3453181 | 14822039 | 450,000,000 | 430,100,000 | 415,360,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 02.050.569.9-731.000 | CV. Dharma Cipta Pratama | 34,640,000 | 7.7 % | |||
43 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Simpang 4 Gatot Subroto - Lingkar Dalam Selatan Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3454181 | 14822177 | 450,000,000 | 377,520,000 | 350,070,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 02.050.569.9-731.000 | CV. Dharma Cipta Pratama | 99,930,000 | 22.21 % | |||
44 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Batulicin - Mekarsari - Mentewe Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3455181 | 14822432 | 500,000,000 | 496,925,000 | 472,065,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 01.517.846.0-731.000 | PT. WINAYA KONTEKS KHARISMA | 27,935,000 | 5.59 % | |||
45 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Tanjung - Muara Uya Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3456181 | 14822907 | 450,000,000 | 396,330,000 | 372,680,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 02.531.704.1-731.000 | CV. FIAZTA MATRIX CONSULTANT | 77,320,000 | 17.18 % | |||
46 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Pelaihari - Batakan Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3457181 | 14822817 | 450,000,000 | 422,840,000 | 401,555,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 01.517.846.0-731.000 | PT. WINAYA KONTEKS KHARISMA | 48,445,000 | 10.77 % | |||
47 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Banjarbaru - Simpang 3 Tahura - Aranio Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3458181 | 14822475 | 450,000,000 | 435,380,000 | 412,060,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 02.050.569.9-731.000 | CV. Dharma Cipta Pratama | 37,940,000 | 8.43 % | |||
48 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Gambut - Pulau Sari Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3460181 | 14822554 | 450,000,000 | 377,520,000 | 353,485,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 80.562.640.5-731.000 | CV. RAMIER JAYA ARKANANTA | 96,515,000 | 21.45 % | |||
49 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Jalan Bebas Hambatan Tol Banjarbaru - Batulicin | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3461181 | 14818573 | 4,898,725,000 | 4,892,578,000 | 4,525,469,300 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 01.124.766.5-731.000 | PT.WIRA WIDYATAMA | 373,255,700 | 7.62 % | |||
50 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Paringin - Halong Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3462181 | 14822758 | 400,000,000 | 385,715,000 | 384,780,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 02.708.931.7-731.000 | CV. DIAN MITRA TEKNIKA | 15,220,000 | 3.81 % | |||
51 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Golf Banjarbaru Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3463181 | 14822613 | 450,000,000 | 430,100,000 | 411,070,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 76.010.632.8-711.000 | PT Prakarsa Desain Konsultan | 38,930,000 | 8.65 % | |||
52 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Supervisi Pembangunan Daerah Irigasi Kinarum 1.004 Ha Kabupaten Tabalong | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3473181 | 14756085 | 700,000,000 | 699,996,000 | 682,467,000 | 0 | 0 | 0 | 2018-03-15 12:00:00 | 02.172.574.2-731.000 | CV. ANDALUSIA | 17,533,000 | 2.5 % | |||
53 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Survey Identifikasi dan Evaluasi Jaringan Tersier DI. Haruyan Dayak Kabupaten Hulu Sungai Tengah | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3475181 | 14759300 | 1,500,000,000 | 1,499,987,500 | 1,477,465,000 | 0 | 0 | 0 | 2018-03-15 10:00:00 | 01.844.485.1-015.000 | PT INAKKO Internasional Konsulindo | 22,535,000 | 1.5 % | |||
54 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Supervisi Pembangunan Embung Landasan Ulin Kota Banjarbaru | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3476181 | 14756347 | 200,000,000 | 199,000,000 | 191,100,000 | 0 | 0 | 0 | 2018-03-15 16:00:00 | 02.531.704.1-731.000 | CV. FIAZTA MATRIX CONSULTANT | 8,900,000 | 4.45 % | |||
55 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Rehabilitasi Jaringan Daerah Irigasi Rawa Tanggul Martapura Kabupaten Banjar | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3477181 | 14759484 | 1,000,000,000 | 999,949,500 | 990,000,000 | 0 | 0 | 0 | 2018-03-15 10:00:00 | 01.469.763.5-428.000 | PT. VITRAHA CONSINDOTAMA | 10,000,000 | 1 % | |||
56 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Outline Plan Penyediaan Air Baku Kab. Tanah Laut, Kab. Tanah Bumbu dan Kab. Kota Baru | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3478181 | 14759648 | 1,500,000,000 | 1,499,999,600 | 1,474,000,000 | 0 | 0 | 0 | 2018-03-16 20:00:00 | 01.554.042.0-121.000 | PT. ALLES KLAR PRIMA | 26,000,000 | 1.73 % | |||
57 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Pengawas Pembangunan Kantor Samsat Tanjung | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3479181 | 14772503 | 260,000,000 | 259,677,000 | 235,455,000 | 0 | 0 | 0 | 2018-03-15 10:00:00 | 02.050.569.9-731.000 | CV. Dharma Cipta Pratama | 24,545,000 | 9.44 % | |||
58 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Pengawas Rehab Gedung Mess Biliton dan TMII | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3480181 | 14780220 | 150,000,000 | 149,770,000 | 134,659,800 | 0 | 0 | 0 | 2018-03-15 12:30:00 | 01.860.230.0-731.000 | CV PRAKTIRA KONSULTAN | 15,340,200 | 10.23 % | |||
59 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Pengawas Pembangunan Gedung Rapat BAKEUDA | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3481181 | 14772568 | 150,000,000 | 149,770,000 | 147,730,000 | 0 | 0 | 0 | 2018-03-15 12:00:00 | 03.025.627.5-731.000 | SADWA RAMA CONSULTANT | 2,270,000 | 1.51 % | |||
60 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Pengawas Pembangunan Gedung BPSDM Prov. Kalsel di Banjarbaru | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3482181 | 14772364 | 664,000,000 | 663,610,000 | 560,005,600 | 0 | 0 | 0 | 2018-03-15 10:00:00 | 01.860.230.0-731.000 | CV PRAKTIRA KONSULTAN | 103,994,400 | 15.66 % | |||
61 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Revisi rancangan Pola Pengelolaan WS. Cengal Batulicin | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3483181 | 14759161 | 2,050,000,000 | 2,049,987,500 | 1,966,100,000 | 0 | 0 | 0 | 2018-03-15 12:00:00 | 01.646.915.7-009.000 | PT. SUPRAHARMONIA CONSULTINDO | 83,900,000 | 4.09 % | |||
62 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Perencana Review Penyusunan Masterplan Sport Center | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3484181 | 14772089 | 1,464,250,000 | 1,464,241,000 | 1,342,423,500 | 0 | 0 | 0 | 2018-03-15 12:00:00 | 01.309.520.3-062.000 | PT. PERENTJANA DJAJA | 121,826,500 | 8.32 % | |||
63 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Perencana Review Masterplan Masjid Raya Sabilal Muhtadin di Banjarmasin | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3485181 | 14780772 | 240,750,000 | 240,747,000 | 224,537,000 | 0 | 0 | 0 | 2018-03-15 12:00:00 | 02.108.378.7-429.000 | PT. Munasa Kreasi Nusantara | 16,213,000 | 6.73 % | |||
64 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Perencana DED Monomen Pal Nol | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3486181 | 16033291 | 980,500,000 | 980,430,000 | 931,279,800 | 0 | 0 | 0 | 2018-03-15 12:00:00 | 01.455.616.1-441.000 | PT. DAYA CIPTA DIANRANCANA | 49,220,200 | 5.02 % | |||
65 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Pengawas Kantor Samsat Kandangan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3493181 | 16243279 | 285,000,000 | 284,251,000 | 248,600,000 | 0 | 0 | 0 | 2018-03-16 15:00:00 | 01.585.258.5-731.000 | CV. ASRINDO GRAHA CONSULTANT | 36,400,000 | 12.77 % | |||
66 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Rehabilitasi Jaringan Daerah Irigasi Rawa Polder Tambak Hanyar Kabupaten Banjar | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3496181 | 14759536 | 1,000,000,000 | 999,982,000 | 976,250,000 | 0 | 0 | 0 | 2018-03-16 07:30:00 | 01.426.908.8-441.000 | PT. SARANA BHUANA JAYA | 23,750,000 | 2.38 % | |||
67 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Rehabilitasi Jaringan Daerah Irigasi Rawa Alalak Padang Kabupaten Banjar | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3503181 | 14759430 | 1,000,000,000 | 999,955,000 | 975,232,000 | 0 | 0 | 0 | 2018-03-15 12:00:00 | 02.429.467.0-015.000 | PT. Mitratama Asia Pasific | 24,768,000 | 2.48 % | |||
68 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Pengendali Banjir Kabupaten Hulu Sungai Tengah - Kabupaten Hulu Sungai Selatan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3506181 | 14759816 | 496,000,000 | 495,990,000 | 470,600,000 | 0 | 0 | 0 | 2018-03-15 12:00:00 | 01.646.915.7-009.000 | PT. SUPRAHARMONIA CONSULTINDO | 25,400,000 | 5.12 % | |||
69 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Perencana Review Masterplan dan Penyusunan Masterplan Drainase dan Penghijauan di Kawasan Perkantoran di Banjarbaru | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3508181 | 14772161 | 1,484,250,000 | 1,483,744,000 | 1,359,473,000 | 0 | 0 | 0 | 2018-03-15 13:00:00 | 01.309.520.3-062.000 | PT. PERENTJANA DJAJA | 124,777,000 | 8.41 % | |||
70 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Supervisi Pembangunan Sarana dan Prasarana RTH Kantor Gubernur di Banjarmasin | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3510181 | 14780380 | 250,000,000 | 249,029,000 | 230,873,000 | 0 | 0 | 0 | 2018-03-15 23:45:00 | 01.534.559.8-731.000 | PT TECTAMA KARYA | 19,127,000 | 7.65 % | |||
71 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Embung Kampung Banjar | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3517181 | 17778484 | 400,000,000 | 399,987,500 | 390,500,000 | 0 | 0 | 0 | 2018-03-16 12:00:00 | 01.469.763.5-428.000 | PT. VITRAHA CONSINDOTAMA | 9,500,000 | 2.38 % | |||
72 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Embung Landasan Ulin Kota Banjarbaru | Tender | Pekerjaan Konstruksi | 3524181 | 14756274 | 1,880,000,000 | 1,879,960,000 | 1,719,700,000 | 0 | 0 | 0 | 2018-03-26 23:59:00 | 02.019.281.1-731.000 | CV. OKTAVIANCA | 160,300,000 | 8.53 % | |||
73 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Supervisi Rehabilitasi DIR. Tanggul Lungau Kabupaten Hulu Sungai Selatan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3528181 | 17673900 | 300,000,000 | 299,915,000 | 284,765,000 | 0 | 0 | 0 | 2018-03-22 12:00:00 | 02.531.704.1-731.000 | CV. FIAZTA MATRIX CONSULTANT | 15,235,000 | 5.08 % | |||
74 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Outline Plan Sistem Drainase Kota Kabupaten Tanah Laut | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3533181 | 17224277 | 850,000,000 | 849,997,500 | 838,695,000 | 0 | 0 | 0 | 2018-03-22 16:00:00 | 01.131.029.9-441.000 | PT. RAYAKONSULT | 11,305,000 | 1.33 % | |||
75 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Normalisasi Sungai Jepana (DAS Satui) Kabupaten Tanah Bumbu | Tender | Pekerjaan Konstruksi | 3538181 | 17673812 | 10,700,000,000 | 10,699,500,000 | 8,007,338,763 | 0 | 0 | 0 | 2018-03-22 11:00:00 | 01.137.507.8-731.000 | PT. Apu Stiants | 2,692,661,237 | 25.17 % | |||
76 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Daerah Irigasi Kinarum 1.004 Ha Kabupaten Tabalong | Tender | Pekerjaan Konstruksi | 3539181 | 17673748 | 10,170,000,000 | 10,169,995,000 | 9,395,185,330 | 0 | 0 | 0 | 2018-03-22 11:00:00 | 01.407.735.8-711.000 | PT.ARGO SANJOYO ADHITAMA | 774,814,670 | 7.62 % | |||
77 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Supervisi Normalisasi Sungai Jepana (DAS Satui) Kabupaten Tanah Bumbu | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3540181 | 14756679 | 700,000,000 | 699,990,000 | 663,245,000 | 0 | 0 | 0 | 2018-03-22 16:00:00 | 01.455.616.1-441.000 | PT. DAYA CIPTA DIANRANCANA | 36,755,000 | 5.25 % | |||
78 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Supervisi Daerah Irigasi Rawa Danda Besar Kabupaten Barito Kuala | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3543181 | 17045839 | 199,702,000 | 199,650,000 | 186,716,000 | 0 | 0 | 0 | 2018-03-23 11:10:00 | 02.090.106.2-732.000 | CV. FAJAR KARYA PRATAMA | 12,986,000 | 6.5 % | |||
79 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Supervisi Rehabilitasi DI. Intangan Kabupaten Hulu Sungai Tengah | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3554181 | 17673918 | 200,000,000 | 199,980,000 | 182,655,000 | 0 | 0 | 0 | 2018-03-29 13:00:00 | 02.043.129.2-731.000 | CV. GANESHA TEKNIK | 17,345,000 | 8.67 % | |||
80 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Pengawas Toilet dan Rehabilitasi Halaman Masjid Raya Sabilal Muhtadin di Banjarmasin | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3569181 | 17678897 | 75,000,000 | 74,981,000 | 57,560,000 | 0 | 0 | 0 | 2018-04-03 18:00:00 | 80.263.300.8-732.000 | CV. INDISIGN CONSULINDO | 17,440,000 | 23.25 % | |||
81 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Perencana Pembuatan Trotoar dan Pagar Keliling di Lingkungan Setda Prov. Kalsel di Banjarbaru | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3571181 | 17679278 | 125,000,000 | 124,949,000 | 124,162,000 | 0 | 0 | 0 | 2018-04-03 18:00:00 | 02.090.106.2-732.000 | CV. FAJAR KARYA PRATAMA | 838,000 | 0.67 % | |||
82 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Kiram-Gunung Mawar Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3573181 | 17730711 | 450,000,000 | 435,380,000 | 409,200,000 | 0 | 0 | 0 | 2018-04-03 16:00:00 | 80.562.640.5-731.000 | CV. RAMIER JAYA ARKANANTA | 40,800,000 | 9.07 % | |||
83 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Paramasan Bawah-Paramasan Atas | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3574181 | 17734511 | 300,000,000 | 191,950,000 | 186,065,000 | 0 | 0 | 0 | 2018-04-03 16:00:00 | 03.025.627.5-731.000 | SADWA RAMA CONSULTANT | 113,935,000 | 37.98 % | |||
84 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Pengawas Pembuatan Kantor dan Laboratorium Unit Pelayanan Jasa Sumber Daya Mineral dan Energi | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3575181 | 17678785 | 100,000,000 | 100,000,000 | 98,972,000 | 0 | 0 | 0 | 2018-04-03 18:00:00 | 01.860.308.4-731.000 | CV. KARYASA CONSULINDO | 1,028,000 | 1.03 % | |||
85 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehab Gedung Mess Biliton dan TMII | Tender | Pekerjaan Konstruksi | 3576181 | 17679009 | 4,690,100,000 | 4,659,189,000 | 4,307,367,000 | 0 | 0 | 0 | 2018-04-05 12:00:00 | 02.708.995.2-731.000 | PT. LIAN KAMALA | 382,733,000 | 8.16 % | |||
86 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Kiram-Gunung Mawar (DID) | Tender | Pekerjaan Konstruksi | 3577181 | 17708219 | 10,000,000,000 | 9,517,025,000 | 8,914,917,640 | 0 | 0 | 0 | 2018-04-17 12:00:00 | 70.694.710.8-732.000 | PT.TANJUNG RAYA BERSAMA | 1,085,082,360 | 10.85 % | |||
87 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Gedung BPSDM Prov. Kalsel di Banjarbaru | Tender | Pekerjaan Konstruksi | 3589181 | 14761859 | 24,281,000,000 | 24,239,008,000 | 22,394,916,000 | 0 | 0 | 0 | 2018-04-16 10:20:00 | 02.708.996.0-731.000 | PT.CHARIA BENEFIT UTAMA | 1,886,084,000 | 7.77 % | |||
88 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Toliet dan Rehabilitasi Halaman Masjid Raya Sabilal Muhtadin di Banjarmasin | Tender | Pekerjaan Konstruksi | 3591181 | 18092214 | 1,876,050,000 | 1,849,855,000 | 1,495,601,096 | 0 | 0 | 0 | 2018-04-13 15:00:00 | 01.879.396.8-731.000 | CV. EDNA BERSAUDARA | 380,448,904 | 20.28 % | |||
89 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Gunung Kupang-Kiram (DID) | Tender | Pekerjaan Konstruksi | 3593181 | 17710812 | 2,500,000,000 | 2,471,750,000 | 2,001,138,536 | 0 | 0 | 0 | 2018-04-17 14:00:00 | 74.117.390.0-732.000 | MIRZA UTAMA MARGA | 498,861,464 | 19.95 % | |||
90 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Paramasan Bawah-Paramasan Atas (DID) | Tender | Pekerjaan Konstruksi | 3594181 | 17708118 | 2,000,000,000 | 1,647,253,000 | 1,596,507,072 | 0 | 0 | 0 | 2018-04-17 16:00:00 | 01.124.716.0-731.000 | CV. DUA MAS | 403,492,928 | 20.17 % | |||
91 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi DI. Intangan Kabupaten Hulu Sungai Tengah | Tender | Pekerjaan Konstruksi | 3612181 | 14757215 | 1,300,000,000 | 1,299,992,873 | 1,013,292,066 | 0 | 0 | 0 | 2018-04-27 08:00:00 | 72.232.474.6-733.000 | CV. MIRANTI | 286,707,934 | 22.05 % | |||
92 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Pengawas Pembangunan Pintu Gerbang Kantor Kawasan Perkantoran di Banjarbaru | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3620181 | 17678695 | 133,142,500 | 133,133,000 | 120,945,000 | 0 | 0 | 0 | 2018-05-19 00:59:00 | 01.585.258.5-731.000 | CV. ASRINDO GRAHA CONSULTANT | 12,197,500 | 9.16 % | |||
93 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Pengawas Pembangunan Taman Edukasi Lalu Lintas | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3624181 | 17678744 | 150,000,000 | 149,765,000 | 98,505,000 | 0 | 0 | 0 | 2018-05-20 14:00:00 | 01.860.272.2-731.000 | CV. DAYAKARSA MADYA Consultant | 51,495,000 | 34.33 % | |||
94 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Kantor Samsat Kandangan | Tender | Pekerjaan Konstruksi | 3631181 | 16032314 | 8,658,175,000 | 8,585,865,000 | 8,052,015,000 | 0 | 0 | 0 | 2018-05-18 10:00:00 | 80.680.022.3-731.000 | PT.HAMIRI BANGUN MANDIRI | 606,160,000 | 7 % | |||
95 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Kantor Samsat Tanjung | Tender | Pekerjaan Konstruksi | 3634181 | 14765233 | 7,683,175,000 | 7,553,895,000 | 6,795,743,000 | 0 | 0 | 0 | 2018-05-18 10:00:00 | 01.124.865.5-731.000 | PT. PARTNER KEMENANGAN | 887,432,000 | 11.55 % | |||
96 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Sarana dan Prasarana Penunjang Gedung Kantor Gubernur Kalsel di Banjarmasin | Tender | Pekerjaan Konstruksi | 3636181 | 18212962 | 7,732,302,500 | 7,640,321,000 | 7,077,706,000 | 0 | 0 | 0 | 2018-05-18 10:00:00 | 72.871.311.6-731.000 | PT. HAMIRI ARTHA MULIA | 654,596,500 | 8.47 % | |||
97 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Gedung Rapat BAKEUDA | Tender | Pekerjaan Konstruksi | 3637181 | 17678349 | 4,811,750,000 | 4,704,252,000 | 4,057,593,000 | 0 | 0 | 0 | 2018-05-18 10:00:00 | 01.322.015.7-009.000 | PT. JOGLO MULTI AYU | 754,157,000 | 15.67 % | |||
98 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan dan Jembatan Sei Mandala - Sei Buluh | Tender | Pekerjaan Konstruksi | 3638181 | 14821172 | 4,906,505,000 | 4,906,505,000 | 4,750,030,967 | 0 | 0 | 0 | 2018-05-18 15:00:00 | 01.137.533.4-731.000 | PT. PUTRA KANCA | 156,474,033 | 3.19 % | |||
99 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Renovasi/ Rehab Rumah Jabatan / Dinas Ess I di banjarbaru | Tender | Pekerjaan Konstruksi | 3643181 | 14763125 | 4,784,025,000 | 4,784,025,000 | 4,704,911,000 | 0 | 0 | 0 | 2018-05-20 14:00:00 | 02.048.394.7-217.000 | PT. SUMBER ALAM SEJAHTERA | 79,114,000 | 1.65 % | |||
100 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembuatan Kantor dan Laboratorium Unit Pelayanan Jasa Sumber Daya Mineral dan Energi | Tender | Pekerjaan Konstruksi | 3644181 | 14765193 | 2,871,750,000 | 2,763,493,000 | 2,482,319,000 | 0 | 0 | 0 | 2018-05-21 08:00:00 | 02.531.377.6-731.000 | PT. SESTRA JENDRA | 389,431,000 | 13.56 % | |||
101 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan DIR. Polder Bakar Kabupaten Hulu Sungai Utara | Tender | Pekerjaan Konstruksi | 3681181 | 17673833 | 5,000,000,000 | 4,999,994,000 | 4,772,075,000 | 0 | 0 | 0 | 2018-06-22 19:00:00 | 73.215.057.8-731.000 | PT. ADERUS WIRA PERSADA | 227,925,000 | 4.56 % | |||
102 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi DIR. Tanggul Lungau Kabupaten Hulu Sungai Selatan | Tender | Pekerjaan Konstruksi | 3682181 | 17673880 | 3,000,000,000 | 2,999,380,000 | 2,542,499,000 | 0 | 0 | 0 | 2018-06-22 19:00:00 | 76.644.426.9-733.000 | PT. DATU MULIA BORNEO | 457,501,000 | 15.25 % | |||
103 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Daerah Irigasi Rawa Danda Besar Kabupaten Barito Kuala | Tender | Pekerjaan Konstruksi | 3683181 | 17674358 | 5,235,000,000 | 5,234,997,000 | 4,379,080,000 | 0 | 0 | 0 | 2018-06-22 19:00:00 | 02.531.377.6-731.000 | PT. SESTRA JENDRA | 855,920,000 | 16.35 % | |||
104 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Supervisi Peningkatan DIR. Polder Bakar Kabupaten Hulu Sungai Utara | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3695181 | 14756929 | 300,000,000 | 299,970,000 | 284,935,200 | 0 | 0 | 0 | 2018-06-28 22:00:00 | 01.141.524.7-731.000 | CV. BINA BANUA | 15,064,800 | 5.02 % | |||
105 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Pintu Gerbang Kantor Kws. Perkantoran di Banjarbaru | Tender | Pekerjaan Konstruksi | 3703181 | 16032641 | 4,852,000,000 | 4,410,781,966 | 4,271,465,394 | 0 | 0 | 0 | 2018-07-13 08:00:00 | 02.902.233.2-009.000 | PT. BAHANA KRIDA NUSANTARA | 580,534,606 | 11.96 % | |||
106 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehab Gedung Kantor Setda Provinsi Kalsel di Banjarbaru | Tender | Pekerjaan Konstruksi | 3719181 | 14780477 | 1,167,202,000 | 1,118,661,070 | 1,057,394,715 | 0 | 0 | 0 | 2018-07-13 08:00:00 | 66.139.132.6-733.000 | CV. AL MADINAH | 109,807,285 | 9.41 % | |||
107 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Perbaikan Sarana dan Prasarana WC/KM Masyarakat Pekauman, Kec. Martapura Timur, di Kabupaten Banjar | Tender | Pekerjaan Konstruksi | 3734181 | 16032045 | 954,225,000 | 927,146,507 | 833,388,248 | 0 | 0 | 0 | 2018-07-18 13:00:00 | 81.162.895.7-731.000 | cv. usaha umat | 120,836,752 | 12.66 % | |||
108 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Perbaikan Sarana dan Prasarana WC/KM Masyarakat Sungai Bilu, Kec. Banjarmasin di Kab/Kota Banjarmasin | Tender | Pekerjaan Konstruksi | 3735181 | 16031962 | 954,225,000 | 789,080,877 | 721,967,273 | 0 | 0 | 0 | 2018-07-18 13:00:00 | 81.162.895.7-731.000 | cv. usaha umat | 232,257,727 | 24.34 % | |||
109 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Halaman Rumah Dinas Kediaman Gubernur di Banjarmasin | Tender | Pekerjaan Konstruksi | 3751181 | 17678537 | 435,750,000 | 432,864,280 | 399,329,528 | 0 | 0 | 0 | 2018-07-30 08:00:00 | 73.471.507.1-731.000 | CV.MAWADDAH | 36,420,472 | 8.36 % | |||
110 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Desa Bahandang-Desa Keliling Benteng | Tender | Pekerjaan Konstruksi | 3757181 | 18376222 | 5,881,500,000 | 5,881,500,000 | 5,500,276,756 | 0 | 0 | 0 | 2018-07-27 15:00:00 | 70.694.710.8-732.000 | PT.TANJUNG RAYA BERSAMA | 381,223,244 | 6.48 % | |||
111 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Ray 7-Desa Bahandang | Tender | Pekerjaan Konstruksi | 3758181 | 18376199 | 4,781,500,000 | 4,781,500,000 | 4,411,466,366 | 0 | 0 | 0 | 2018-07-27 15:00:00 | 03.265.981.5-731.000 | PT. Pandji Pratama Indonesia | 370,033,634 | 7.74 % | |||
112 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Jejangkit Muara-Ray 7 | Tender | Pekerjaan Konstruksi | 3759181 | 18376171 | 4,181,500,000 | 4,181,500,000 | 3,906,023,082 | 0 | 0 | 0 | 2018-07-27 15:00:00 | 01.124.946.3-731.000 | PT. ADIMANUNGGAL CIPTA PADUNUSA | 275,476,918 | 6.59 % | |||
113 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Penyusunan Pergub tentang Peraturan Zonasi Lintas Kabupaten Kota (Kawasan Strategis Provinsi Rawa Batang Banyu) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3764181 | 18392489 | 399,960,000 | 399,960,000 | 365,530,000 | 0 | 0 | 0 | 2018-08-06 09:00:00 | 02.108.378.7-429.000 | PT. Munasa Kreasi Nusantara | 34,430,000 | 8.61 % | |||
114 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Orthorektifikasi Peta (Dasar) Rencana Tata Ruang Kawasan Strategis Provinsi Rawa Batang Banyu | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3765181 | 18392492 | 199,980,000 | 199,980,000 | 188,540,000 | 0 | 0 | 0 | 2018-08-06 09:00:00 | 02.980.044.8-404.000 | PT. Komperji Nusaraya | 11,440,000 | 5.72 % | |||
115 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengadaan Alat Hidrologi (Telemetri) AWLR Intake DI. Haruyan Dayak Kab. Hulu Sungai Tengah dan Sungai WS. Cengal Batulicin | Tender | Pekerjaan Konstruksi | 3774181 | 17674508 | 600,000,000 | 599,854,479 | 539,101,200 | 0 | 0 | 0 | 2018-08-07 15:00:00 | 02.342.725.5-733.000 | CV. SAKA PERSADA | 60,898,800 | 10.15 % | |||
116 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan HELIPAD di Jejangkit | Tender | Pekerjaan Konstruksi | 3820181 | 18420609 | 1,550,000,000 | 1,531,724,500 | 1,463,455,082 | 0 | 0 | 0 | 2018-08-25 18:00:00 | 31.245.996.9-731.000 | CV.RIDHEVAL HANDIL BHAKTI | 86,544,918 | 5.58 % | |||
117 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Angkipih-Paramasan Bawah-Paramasan Atas | Tender | Pekerjaan Konstruksi | 3821181 | 18410837 | 4,861,335,000 | 4,861,329,665 | 4,519,228,279 | 0 | 0 | 0 | 2018-08-25 20:00:00 | 01.141.113.9-651.000 | PT. KARYA TUNGGAL MULYA ABADI | 342,106,721 | 7.04 % | |||
118 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Perbaikan/Renovasi BRIMOB | Tender | Pekerjaan Konstruksi | 3823181 | 18420593 | 935,000,000 | 925,344,400 | 740,035,192 | 0 | 0 | 0 | 2018-08-25 16:00:00 | 71.462.122.4-732.000 | CV. Salma Aulia | 194,964,808 | 20.85 % | |||
119 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Jembatan Batulicin-Mentewe | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3826181 | 18410823 | 662,818,000 | 657,052,000 | 649,345,500 | 0 | 0 | 0 | 2018-08-28 17:00:00 | 02.613.877.6-731.000 | CV SEMBILAN SATU ENGINEERING | 13,472,500 | 2.03 % | |||
120 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Taman Budaya Baru di Kawasan Perkantoran Pemprov. Kalsel | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3827181 | 18420334 | 390,000,000 | 389,953,300 | 346,280,000 | 0 | 0 | 0 | 2018-08-27 12:00:00 | 01.455.616.1-441.000 | PT. DAYA CIPTA DIANRANCANA | 43,720,000 | 11.21 % | |||
121 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Istana Mahligai Rakyat | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3828181 | 18420291 | 191,500,000 | 191,405,500 | 154,628,925 | 0 | 0 | 0 | 2018-08-27 16:00:00 | 01.463.263.2-731.000 | PT. MATRA ESTETIKA REKAYASA | 36,871,075 | 19.25 % | |||
122 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Tanjung Serdang-Lontar II | Tender | Pekerjaan Konstruksi | 3829181 | 18410685 | 4,469,818,000 | 4,469,817,737 | 4,440,624,241 | 0 | 0 | 0 | 2018-08-31 08:15:00 | 02.216.301.8-734.000 | PT. Arta Cipta Permata | 29,193,759 | 0.65 % | |||
123 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Batulicin-Mekarsari-Mentewe | Tender | Pekerjaan Konstruksi | 3832181 | 18410700 | 14,851,585,000 | 14,851,584,856 | 14,073,727,541 | 0 | 0 | 0 | 2018-08-27 13:00:00 | 02.421.791.1-734.000 | pt hm family | 777,857,459 | 5.24 % | |||
124 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Jalan Alternatif ke Makam Syech M. Arsyad Al-Banjari dan DED Jembatan Jalan Pendidikan Sekumpul | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3835181 | 18420292 | 396,250,000 | 395,164,000 | 358,325,000 | 0 | 0 | 0 | 2018-08-28 16:00:00 | 01.489.654.2-711.000 | PT.TEMA KARYA MANDIRI | 37,925,000 | 9.57 % | |||
125 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Lanjutan Makam Syeh Arsyad Al Banjari | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3839181 | 18420341 | 390,000,000 | 389,953,300 | 300,008,500 | 0 | 0 | 0 | 2018-08-27 23:55:00 | 02.050.569.9-731.000 | CV. Dharma Cipta Pratama | 89,991,500 | 23.07 % | |||
126 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Jaringan Listrik Kawasan Perkantoran Pemprov. Kalsel | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3840181 | 18420374 | 540,000,000 | 539,990,000 | 341,000,000 | 0 | 0 | 0 | 2018-08-29 09:00:00 | 02.883.220.2-731.000 | CV. RIA KONSULTAN | 199,000,000 | 36.85 % | |||
127 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Simpang 3 Tahura-Mandiangin | Tender | Pekerjaan Konstruksi | 3875181 | 18425381 | 9,877,725,000 | 9,877,720,641 | 8,218,382,336 | 0 | 0 | 0 | 2018-09-13 12:00:00 | 70.694.710.8-732.000 | PT.TANJUNG RAYA BERSAMA | 1,659,342,664 | 16.8 % | |||
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Pagu | HPS | Nilai Penawaran | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Pagu | HPS | Nilai Penawaran | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Batulicin - Mekarsari - Mentewe | Tender | Pekerjaan Konstruksi | 3408181 | 14823154 | 34,396,755,000 | 34,396,755,000 | 33,812,113,294 | 0 | 0 | 0 | 2018-02-27 11:00:00 | 03.169.298.1-734.000 | PT.BATULICIN BETON ASPHALT | 584,641,706 | 1.7 % | |||
2 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Lingkar Binuang | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3409181 | 14822718 | 350,000,000 | 346,390,000 | 294,096,000 | 0 | 0 | 0 | 2018-02-27 10:50:00 | 01.489.654.2-711.000 | PT.TEMA KARYA MANDIRI | 55,904,000 | 15.97 % | |||
3 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Anjir Pasar - Marabahan | Tender | Pekerjaan Konstruksi | 3410181 | 14821819 | 24,546,755,000 | 24,546,755,000 | 23,689,070,581 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 03.265.981.5-731.000 | PT. Pandji Pratama Indonesia | 857,684,419 | 3.49 % | |||
4 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Angsana | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3411181 | 14822267 | 350,000,000 | 346,390,000 | 337,260,000 | 0 | 0 | 0 | 2018-02-27 10:50:00 | 95.412.417.8-731.000 | PT. Prisma Jasa Konsulindo | 12,740,000 | 3.64 % | |||
5 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Rantau - Muara Muning Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3412181 | 14822863 | 450,000,000 | 443,850,000 | 419,815,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 02.531.704.1-731.000 | CV. FIAZTA MATRIX CONSULTANT | 30,185,000 | 6.71 % | |||
6 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Rantau - Muara Muning | Tender | Pekerjaan Konstruksi | 3413181 | 14820451 | 4,467,471,000 | 4,467,465,000 | 3,911,156,404 | 0 | 0 | 0 | 2018-02-27 10:50:00 | 80.203.029.6-731.000 | PT. WAJI PUTERA KARYA MANDIRI | 556,314,596 | 12.45 % | |||
7 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Angsana | Tender | Pekerjaan Konstruksi | 3415181 | 14819063 | 4,567,471,000 | 4,567,471,000 | 4,325,315,880 | 0 | 0 | 0 | 2018-02-27 11:00:00 | 02.216.301.8-734.000 | PT. Arta Cipta Permata | 242,155,120 | 5.3 % | |||
8 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Pandahan - Margasari dan Penyelesaian Pile Slab | Tender | Pekerjaan Konstruksi | 3416181 | 14820217 | 4,906,505,000 | 4,906,495,000 | 4,270,910,613 | 0 | 0 | 0 | 2018-02-27 10:50:00 | 02.237.343.5-733.000 | PT.Bina Bangun Banua Bersama | 635,594,387 | 12.95 % | |||
9 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Lingkar Binuang | Tender | Pekerjaan Konstruksi | 3417181 | 14820107 | 4,567,471,000 | 4,567,471,000 | 4,322,129,000 | 0 | 0 | 0 | 2018-02-27 10:50:00 | 01.137.511.0-731.000 | PT. SAMA SENTRAL SWA SEMBADA | 245,342,000 | 5.37 % | |||
10 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Kasturi - Jalan Akses Bandara - Jalan Lingkar Utara Banjarbaru(Paket II) | Tender | Pekerjaan Konstruksi | 3418181 | 14818611 | 11,465,000,000 | 11,465,000,000 | 9,683,749,950 | 0 | 0 | 0 | 2018-02-27 11:00:00 | 02.172.893.6-731.000 | PT IRINA PERKASA | 1,781,250,050 | 15.54 % | |||
11 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Dahai - Tanjung | Tender | Pekerjaan Konstruksi | 3420181 | 14819498 | 4,906,505,000 | 4,906,505,000 | 4,651,671,930 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 02.746.857.8-735.000 | PT. Sinar Mahaputera Mandaga Bakti | 254,833,070 | 5.19 % | |||
12 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Amuntai - Lampihong - Paringin | Tender | Pekerjaan Konstruksi | 3421181 | 14818966 | 4,906,505,000 | 4,906,505,000 | 4,639,595,545 | 0 | 0 | 0 | 2018-02-27 10:50:00 | 01.124.238.5-735.000 | PT. ULIN SUBUR | 266,909,455 | 5.44 % | |||
13 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan dan Jembatan Batulicin-Mentewe (DAK) | Tender | Pekerjaan Konstruksi | 3422181 | 15148955 | 11,130,000,000 | 11,130,000,000 | 10,848,356,660 | 0 | 0 | 0 | 2018-02-27 11:00:00 | 03.169.298.1-734.000 | PT.BATULICIN BETON ASPHALT | 281,643,340 | 2.53 % | |||
14 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Poros, Lingkungan Perkantoran Prov. Kalsel | Tender | Pekerjaan Konstruksi | 3423181 | 14820351 | 6,972,525,000 | 6,972,525,000 | 6,610,065,823 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 31.635.224.4-731.000 | PT. MULTI USAHA PEMBANGUNAN | 362,459,177 | 5.2 % | |||
15 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Trikora | Tender | Pekerjaan Konstruksi | 3424181 | 14820658 | 4,974,750,000 | 4,974,750,000 | 4,725,257,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 01.222.209.7-731.000 | PT. PERDANA PANSELLA | 249,493,000 | 5.02 % | |||
16 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Banjang - Pulau Nyiur - Batumandi | Tender | Pekerjaan Konstruksi | 3425181 | 14819294 | 4,467,471,000 | 4,467,471,000 | 3,870,342,459 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 73.271.215.3-733.000 | PT. KARYA ANNISA GEMILANG | 597,128,541 | 13.37 % | |||
17 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Banjang - Pulau Nyiur - Batumandi Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3426181 | 14822408 | 450,000,000 | 396,330,000 | 380,000,500 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 02.531.483.2-731.000 | MANDIRI cipta PRATAMA | 69,999,500 | 15.56 % | |||
18 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan dan Jembatan Lumpangi - Loksado | Tender | Pekerjaan Konstruksi | 3427181 | 14820801 | 6,554,280,000 | 6,554,280,000 | 6,059,052,350 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 02.014.742.7-714.000 | PT. RAHMAT AGUNG UTAMA | 495,227,650 | 7.56 % | |||
19 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Birayang - Tariwin - Lok Batu - Batumandi | Tender | Pekerjaan Konstruksi | 3428181 | 14819454 | 5,554,280,000 | 5,554,280,000 | 4,858,205,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 01.124.058.7-733.000 | AIRA DUTA MURAKATA. PT | 696,075,000 | 12.53 % | |||
20 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Guntung - Panaitan - Lampihong | Tender | Pekerjaan Konstruksi | 3429181 | 14819806 | 4,906,505,000 | 4,906,505,000 | 4,659,645,137 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 01.124.098.3-735.000 | PT. CAHAYA MENTARI | 246,859,863 | 5.03 % | |||
21 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Tanjung - Muara Uya | Tender | Pekerjaan Konstruksi | 3430181 | 14820593 | 6,454,280,000 | 6,454,280,000 | 5,808,114,242 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 02.590.754.4-735.000 | PT. TABALONG JAYA MARGA BERSAMA | 646,165,758 | 10.01 % | |||
22 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Banjarbaru - Simpang 3 Tahura - Aranio | Tender | Pekerjaan Konstruksi | 3432181 | 14819355 | 5,522,525,000 | 5,522,525,000 | 5,097,062,906 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 31.704.295.0-732.000 | PT. KELANA MULTI KONSTRUKSI | 425,462,094 | 7.7 % | |||
23 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Dalam Kota Banjarmasin | Tender | Pekerjaan Konstruksi | 3433181 | 14819539 | 4,974,750,000 | 4,974,750,000 | 4,774,925,149 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 01.424.331.5-732.000 | PT. JATI BARU | 199,824,851 | 4.02 % | |||
24 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Kiram - Simpang 3 Tahura - Mandiangin | Tender | Pekerjaan Konstruksi | 3434181 | 14820050 | 4,974,750,000 | 4,974,750,000 | 4,872,898,891 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 03.018.148.1-732.000 | PT. ADJI PERKASA | 101,851,109 | 2.05 % | |||
25 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Gambut - Pulau Sari | Tender | Pekerjaan Konstruksi | 3435181 | 14819632 | 4,524,750,000 | 4,524,750,000 | 4,365,176,985 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 01.137.533.4-731.000 | PT. PUTRA KANCA | 159,573,015 | 3.53 % | |||
26 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Tanjung Serdang - Lontar | Tender | Pekerjaan Konstruksi | 3436181 | 14820534 | 4,903,925,000 | 4,903,925,000 | 4,847,744,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 02.216.301.8-734.000 | PT. Arta Cipta Permata | 56,181,000 | 1.15 % | |||
27 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Paringin - Halong | Tender | Pekerjaan Konstruksi | 3437181 | 14820304 | 6,454,280,000 | 6,454,280,000 | 6,187,609,759 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 01.124.098.3-735.000 | PT. CAHAYA MENTARI | 266,670,241 | 4.13 % | |||
28 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Kandangan - Negara | Tender | Pekerjaan Konstruksi | 3438181 | 14819866 | 5,404,280,000 | 5,404,000,000 | 4,917,636,279 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 01.124.396.1-733.000 | PT. KARYA MAWAR LESTARI | 486,643,721 | 9 % | |||
29 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Simpang 3 Lingkar Utara - Simpang 3 Jalan Golf - Jalan Kasturi (Paket I) | Tender | Pekerjaan Konstruksi | 3439181 | 14818665 | 11,015,000,000 | 11,015,000,000 | 10,090,308,687 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 01.124.946.3-731.000 | PT. ADIMANUNGGAL CIPTA PADUNUSA | 924,691,313 | 8.39 % | |||
30 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan dan Jembatan Pelaihari-Batakan (DAK) | Tender | Pekerjaan Konstruksi | 3441181 | 15149206 | 9,700,000,000 | 9,700,000,000 | 8,696,700,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 01.141.578.3-732.000 | PT. SARANA DOA BERSAMA | 1,003,300,000 | 10.34 % | |||
31 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Pelaihari - Batakan | Tender | Pekerjaan Konstruksi | 3442181 | 14822007 | 9,454,280,000 | 9,454,280,000 | 9,020,605,059 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 01.322.015.7-009.000 | PT. JOGLO MULTI AYU | 433,674,941 | 4.59 % | |||
32 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Golf Banjarbaru | Tender | Pekerjaan Konstruksi | 3443181 | 14819742 | 6,522,525,000 | 6,522,525,000 | 5,782,218,261 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 01.434.922.9-731.000 | PT. MERCU JAYA BUANA | 740,306,739 | 11.35 % | |||
33 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Simpang 4 Gatot Subroto - Lingkar Dalam Selatan | Tender | Pekerjaan Konstruksi | 3444181 | 14818839 | 5,522,525,000 | 5,522,525,000 | 4,752,361,474 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 72.196.664.6-731.000 | BIMO LAKSANA GROUP | 770,163,526 | 13.95 % | |||
34 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Birayang - Tariwin - Lok Batu - Batumandi | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3445181 | 14822528 | 350,000,000 | 348,040,000 | 336,105,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 02.090.318.3-731.000 | CV. Inditec Consultant | 13,895,000 | 3.97 % | |||
35 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Negara - Muara Tapus | Tender | Pekerjaan Konstruksi | 3446181 | 14820134 | 5,904,280,000 | 5,904,280,000 | 5,606,756,728 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 01.134.056.9-733.000 | PT. ASIA TIMUR KONSTRUKSI | 297,523,272 | 5.04 % | |||
36 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Gunung Kupang - Kiram - Tambang Ulang | Tender | Pekerjaan Konstruksi | 3447181 | 14818515 | 14,515,000,000 | 14,515,000,000 | 14,199,402,386 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 70.694.710.8-732.000 | PT.TANJUNG RAYA BERSAMA | 315,597,614 | 2.17 % | |||
37 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Banjarmasin - Martapura | Tender | Pekerjaan Konstruksi | 3448181 | 14819422 | 5,972,525,000 | 5,972,525,000 | 5,702,383,679 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 01.133.868.8-731.000 | PT. HM Taher | 270,141,321 | 4.52 % | |||
38 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Anjir Pasar - Marabahan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3449181 | 14822318 | 350,000,000 | 348,040,000 | 337,865,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 01.854.518.6-711.000 | CV. KARYA PERDANA KONSULTAN | 12,135,000 | 3.47 % | |||
39 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan dan Jembatan Lumpangi - Loksado | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3450181 | 14823056 | 350,000,000 | 349,855,000 | 339,350,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 76.010.632.8-711.000 | PT Prakarsa Desain Konsultan | 10,650,000 | 3.04 % | |||
40 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Simpang 3 Lingkar Utara - Simpang 3 Jalan Golf - Jalan Kasturi (Paket I) Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3451181 | 14822117 | 450,000,000 | 435,380,000 | 432,320,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 01.879.315.8-731.000 | CV. ADIHANMAN TATA RANCANG | 17,680,000 | 3.93 % | |||
41 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Kandangan - Negara Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3452181 | 14822655 | 500,000,000 | 498,080,000 | 476,790,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 02.708.931.7-731.000 | CV. DIAN MITRA TEKNIKA | 23,210,000 | 4.64 % | |||
42 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Gunung Kupang - Kiram - Tambang Ulang Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3453181 | 14822039 | 450,000,000 | 430,100,000 | 415,360,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 02.050.569.9-731.000 | CV. Dharma Cipta Pratama | 34,640,000 | 7.7 % | |||
43 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Simpang 4 Gatot Subroto - Lingkar Dalam Selatan Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3454181 | 14822177 | 450,000,000 | 377,520,000 | 350,070,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 02.050.569.9-731.000 | CV. Dharma Cipta Pratama | 99,930,000 | 22.21 % | |||
44 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Batulicin - Mekarsari - Mentewe Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3455181 | 14822432 | 500,000,000 | 496,925,000 | 472,065,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 01.517.846.0-731.000 | PT. WINAYA KONTEKS KHARISMA | 27,935,000 | 5.59 % | |||
45 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Tanjung - Muara Uya Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3456181 | 14822907 | 450,000,000 | 396,330,000 | 372,680,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 02.531.704.1-731.000 | CV. FIAZTA MATRIX CONSULTANT | 77,320,000 | 17.18 % | |||
46 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Pelaihari - Batakan Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3457181 | 14822817 | 450,000,000 | 422,840,000 | 401,555,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 01.517.846.0-731.000 | PT. WINAYA KONTEKS KHARISMA | 48,445,000 | 10.77 % | |||
47 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Banjarbaru - Simpang 3 Tahura - Aranio Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3458181 | 14822475 | 450,000,000 | 435,380,000 | 412,060,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 02.050.569.9-731.000 | CV. Dharma Cipta Pratama | 37,940,000 | 8.43 % | |||
48 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Gambut - Pulau Sari Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3460181 | 14822554 | 450,000,000 | 377,520,000 | 353,485,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 80.562.640.5-731.000 | CV. RAMIER JAYA ARKANANTA | 96,515,000 | 21.45 % | |||
49 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Jalan Bebas Hambatan Tol Banjarbaru - Batulicin | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3461181 | 14818573 | 4,898,725,000 | 4,892,578,000 | 4,525,469,300 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 01.124.766.5-731.000 | PT.WIRA WIDYATAMA | 373,255,700 | 7.62 % | |||
50 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Paringin - Halong Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3462181 | 14822758 | 400,000,000 | 385,715,000 | 384,780,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 02.708.931.7-731.000 | CV. DIAN MITRA TEKNIKA | 15,220,000 | 3.81 % | |||
51 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Golf Banjarbaru Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3463181 | 14822613 | 450,000,000 | 430,100,000 | 411,070,000 | 0 | 0 | 0 | 2018-02-27 10:00:00 | 76.010.632.8-711.000 | PT Prakarsa Desain Konsultan | 38,930,000 | 8.65 % | |||
52 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Supervisi Pembangunan Daerah Irigasi Kinarum 1.004 Ha Kabupaten Tabalong | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3473181 | 14756085 | 700,000,000 | 699,996,000 | 682,467,000 | 0 | 0 | 0 | 2018-03-15 12:00:00 | 02.172.574.2-731.000 | CV. ANDALUSIA | 17,533,000 | 2.5 % | |||
53 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Survey Identifikasi dan Evaluasi Jaringan Tersier DI. Haruyan Dayak Kabupaten Hulu Sungai Tengah | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3475181 | 14759300 | 1,500,000,000 | 1,499,987,500 | 1,477,465,000 | 0 | 0 | 0 | 2018-03-15 10:00:00 | 01.844.485.1-015.000 | PT INAKKO Internasional Konsulindo | 22,535,000 | 1.5 % | |||
54 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Supervisi Pembangunan Embung Landasan Ulin Kota Banjarbaru | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3476181 | 14756347 | 200,000,000 | 199,000,000 | 191,100,000 | 0 | 0 | 0 | 2018-03-15 16:00:00 | 02.531.704.1-731.000 | CV. FIAZTA MATRIX CONSULTANT | 8,900,000 | 4.45 % | |||
55 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Rehabilitasi Jaringan Daerah Irigasi Rawa Tanggul Martapura Kabupaten Banjar | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3477181 | 14759484 | 1,000,000,000 | 999,949,500 | 990,000,000 | 0 | 0 | 0 | 2018-03-15 10:00:00 | 01.469.763.5-428.000 | PT. VITRAHA CONSINDOTAMA | 10,000,000 | 1 % | |||
56 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Outline Plan Penyediaan Air Baku Kab. Tanah Laut, Kab. Tanah Bumbu dan Kab. Kota Baru | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3478181 | 14759648 | 1,500,000,000 | 1,499,999,600 | 1,474,000,000 | 0 | 0 | 0 | 2018-03-16 20:00:00 | 01.554.042.0-121.000 | PT. ALLES KLAR PRIMA | 26,000,000 | 1.73 % | |||
57 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Pengawas Pembangunan Kantor Samsat Tanjung | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3479181 | 14772503 | 260,000,000 | 259,677,000 | 235,455,000 | 0 | 0 | 0 | 2018-03-15 10:00:00 | 02.050.569.9-731.000 | CV. Dharma Cipta Pratama | 24,545,000 | 9.44 % | |||
58 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Pengawas Rehab Gedung Mess Biliton dan TMII | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3480181 | 14780220 | 150,000,000 | 149,770,000 | 134,659,800 | 0 | 0 | 0 | 2018-03-15 12:30:00 | 01.860.230.0-731.000 | CV PRAKTIRA KONSULTAN | 15,340,200 | 10.23 % | |||
59 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Pengawas Pembangunan Gedung Rapat BAKEUDA | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3481181 | 14772568 | 150,000,000 | 149,770,000 | 147,730,000 | 0 | 0 | 0 | 2018-03-15 12:00:00 | 03.025.627.5-731.000 | SADWA RAMA CONSULTANT | 2,270,000 | 1.51 % | |||
60 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Pengawas Pembangunan Gedung BPSDM Prov. Kalsel di Banjarbaru | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3482181 | 14772364 | 664,000,000 | 663,610,000 | 560,005,600 | 0 | 0 | 0 | 2018-03-15 10:00:00 | 01.860.230.0-731.000 | CV PRAKTIRA KONSULTAN | 103,994,400 | 15.66 % | |||
61 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Revisi rancangan Pola Pengelolaan WS. Cengal Batulicin | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3483181 | 14759161 | 2,050,000,000 | 2,049,987,500 | 1,966,100,000 | 0 | 0 | 0 | 2018-03-15 12:00:00 | 01.646.915.7-009.000 | PT. SUPRAHARMONIA CONSULTINDO | 83,900,000 | 4.09 % | |||
62 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Perencana Review Penyusunan Masterplan Sport Center | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3484181 | 14772089 | 1,464,250,000 | 1,464,241,000 | 1,342,423,500 | 0 | 0 | 0 | 2018-03-15 12:00:00 | 01.309.520.3-062.000 | PT. PERENTJANA DJAJA | 121,826,500 | 8.32 % | |||
63 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Perencana Review Masterplan Masjid Raya Sabilal Muhtadin di Banjarmasin | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3485181 | 14780772 | 240,750,000 | 240,747,000 | 224,537,000 | 0 | 0 | 0 | 2018-03-15 12:00:00 | 02.108.378.7-429.000 | PT. Munasa Kreasi Nusantara | 16,213,000 | 6.73 % | |||
64 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Perencana DED Monomen Pal Nol | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3486181 | 16033291 | 980,500,000 | 980,430,000 | 931,279,800 | 0 | 0 | 0 | 2018-03-15 12:00:00 | 01.455.616.1-441.000 | PT. DAYA CIPTA DIANRANCANA | 49,220,200 | 5.02 % | |||
65 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Pengawas Kantor Samsat Kandangan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3493181 | 16243279 | 285,000,000 | 284,251,000 | 248,600,000 | 0 | 0 | 0 | 2018-03-16 15:00:00 | 01.585.258.5-731.000 | CV. ASRINDO GRAHA CONSULTANT | 36,400,000 | 12.77 % | |||
66 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Rehabilitasi Jaringan Daerah Irigasi Rawa Polder Tambak Hanyar Kabupaten Banjar | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3496181 | 14759536 | 1,000,000,000 | 999,982,000 | 976,250,000 | 0 | 0 | 0 | 2018-03-16 07:30:00 | 01.426.908.8-441.000 | PT. SARANA BHUANA JAYA | 23,750,000 | 2.38 % | |||
67 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Rehabilitasi Jaringan Daerah Irigasi Rawa Alalak Padang Kabupaten Banjar | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3503181 | 14759430 | 1,000,000,000 | 999,955,000 | 975,232,000 | 0 | 0 | 0 | 2018-03-15 12:00:00 | 02.429.467.0-015.000 | PT. Mitratama Asia Pasific | 24,768,000 | 2.48 % | |||
68 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Pengendali Banjir Kabupaten Hulu Sungai Tengah - Kabupaten Hulu Sungai Selatan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3506181 | 14759816 | 496,000,000 | 495,990,000 | 470,600,000 | 0 | 0 | 0 | 2018-03-15 12:00:00 | 01.646.915.7-009.000 | PT. SUPRAHARMONIA CONSULTINDO | 25,400,000 | 5.12 % | |||
69 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Perencana Review Masterplan dan Penyusunan Masterplan Drainase dan Penghijauan di Kawasan Perkantoran di Banjarbaru | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3508181 | 14772161 | 1,484,250,000 | 1,483,744,000 | 1,359,473,000 | 0 | 0 | 0 | 2018-03-15 13:00:00 | 01.309.520.3-062.000 | PT. PERENTJANA DJAJA | 124,777,000 | 8.41 % | |||
70 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Supervisi Pembangunan Sarana dan Prasarana RTH Kantor Gubernur di Banjarmasin | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3510181 | 14780380 | 250,000,000 | 249,029,000 | 230,873,000 | 0 | 0 | 0 | 2018-03-15 23:45:00 | 01.534.559.8-731.000 | PT TECTAMA KARYA | 19,127,000 | 7.65 % | |||
71 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Embung Kampung Banjar | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3517181 | 17778484 | 400,000,000 | 399,987,500 | 390,500,000 | 0 | 0 | 0 | 2018-03-16 12:00:00 | 01.469.763.5-428.000 | PT. VITRAHA CONSINDOTAMA | 9,500,000 | 2.38 % | |||
72 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Embung Landasan Ulin Kota Banjarbaru | Tender | Pekerjaan Konstruksi | 3524181 | 14756274 | 1,880,000,000 | 1,879,960,000 | 1,719,700,000 | 0 | 0 | 0 | 2018-03-26 23:59:00 | 02.019.281.1-731.000 | CV. OKTAVIANCA | 160,300,000 | 8.53 % | |||
73 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Supervisi Rehabilitasi DIR. Tanggul Lungau Kabupaten Hulu Sungai Selatan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3528181 | 17673900 | 300,000,000 | 299,915,000 | 284,765,000 | 0 | 0 | 0 | 2018-03-22 12:00:00 | 02.531.704.1-731.000 | CV. FIAZTA MATRIX CONSULTANT | 15,235,000 | 5.08 % | |||
74 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Outline Plan Sistem Drainase Kota Kabupaten Tanah Laut | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3533181 | 17224277 | 850,000,000 | 849,997,500 | 838,695,000 | 0 | 0 | 0 | 2018-03-22 16:00:00 | 01.131.029.9-441.000 | PT. RAYAKONSULT | 11,305,000 | 1.33 % | |||
75 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Normalisasi Sungai Jepana (DAS Satui) Kabupaten Tanah Bumbu | Tender | Pekerjaan Konstruksi | 3538181 | 17673812 | 10,700,000,000 | 10,699,500,000 | 8,007,338,763 | 0 | 0 | 0 | 2018-03-22 11:00:00 | 01.137.507.8-731.000 | PT. Apu Stiants | 2,692,661,237 | 25.17 % | |||
76 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Daerah Irigasi Kinarum 1.004 Ha Kabupaten Tabalong | Tender | Pekerjaan Konstruksi | 3539181 | 17673748 | 10,170,000,000 | 10,169,995,000 | 9,395,185,330 | 0 | 0 | 0 | 2018-03-22 11:00:00 | 01.407.735.8-711.000 | PT.ARGO SANJOYO ADHITAMA | 774,814,670 | 7.62 % | |||
77 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Supervisi Normalisasi Sungai Jepana (DAS Satui) Kabupaten Tanah Bumbu | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3540181 | 14756679 | 700,000,000 | 699,990,000 | 663,245,000 | 0 | 0 | 0 | 2018-03-22 16:00:00 | 01.455.616.1-441.000 | PT. DAYA CIPTA DIANRANCANA | 36,755,000 | 5.25 % | |||
78 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Supervisi Daerah Irigasi Rawa Danda Besar Kabupaten Barito Kuala | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3543181 | 17045839 | 199,702,000 | 199,650,000 | 186,716,000 | 0 | 0 | 0 | 2018-03-23 11:10:00 | 02.090.106.2-732.000 | CV. FAJAR KARYA PRATAMA | 12,986,000 | 6.5 % | |||
79 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Supervisi Rehabilitasi DI. Intangan Kabupaten Hulu Sungai Tengah | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3554181 | 17673918 | 200,000,000 | 199,980,000 | 182,655,000 | 0 | 0 | 0 | 2018-03-29 13:00:00 | 02.043.129.2-731.000 | CV. GANESHA TEKNIK | 17,345,000 | 8.67 % | |||
80 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Pengawas Toilet dan Rehabilitasi Halaman Masjid Raya Sabilal Muhtadin di Banjarmasin | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3569181 | 17678897 | 75,000,000 | 74,981,000 | 57,560,000 | 0 | 0 | 0 | 2018-04-03 18:00:00 | 80.263.300.8-732.000 | CV. INDISIGN CONSULINDO | 17,440,000 | 23.25 % | |||
81 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Perencana Pembuatan Trotoar dan Pagar Keliling di Lingkungan Setda Prov. Kalsel di Banjarbaru | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3571181 | 17679278 | 125,000,000 | 124,949,000 | 124,162,000 | 0 | 0 | 0 | 2018-04-03 18:00:00 | 02.090.106.2-732.000 | CV. FAJAR KARYA PRATAMA | 838,000 | 0.67 % | |||
82 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Kiram-Gunung Mawar Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3573181 | 17730711 | 450,000,000 | 435,380,000 | 409,200,000 | 0 | 0 | 0 | 2018-04-03 16:00:00 | 80.562.640.5-731.000 | CV. RAMIER JAYA ARKANANTA | 40,800,000 | 9.07 % | |||
83 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Paramasan Bawah-Paramasan Atas | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3574181 | 17734511 | 300,000,000 | 191,950,000 | 186,065,000 | 0 | 0 | 0 | 2018-04-03 16:00:00 | 03.025.627.5-731.000 | SADWA RAMA CONSULTANT | 113,935,000 | 37.98 % | |||
84 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Pengawas Pembuatan Kantor dan Laboratorium Unit Pelayanan Jasa Sumber Daya Mineral dan Energi | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3575181 | 17678785 | 100,000,000 | 100,000,000 | 98,972,000 | 0 | 0 | 0 | 2018-04-03 18:00:00 | 01.860.308.4-731.000 | CV. KARYASA CONSULINDO | 1,028,000 | 1.03 % | |||
85 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehab Gedung Mess Biliton dan TMII | Tender | Pekerjaan Konstruksi | 3576181 | 17679009 | 4,690,100,000 | 4,659,189,000 | 4,307,367,000 | 0 | 0 | 0 | 2018-04-05 12:00:00 | 02.708.995.2-731.000 | PT. LIAN KAMALA | 382,733,000 | 8.16 % | |||
86 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Kiram-Gunung Mawar (DID) | Tender | Pekerjaan Konstruksi | 3577181 | 17708219 | 10,000,000,000 | 9,517,025,000 | 8,914,917,640 | 0 | 0 | 0 | 2018-04-17 12:00:00 | 70.694.710.8-732.000 | PT.TANJUNG RAYA BERSAMA | 1,085,082,360 | 10.85 % | |||
87 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Gedung BPSDM Prov. Kalsel di Banjarbaru | Tender | Pekerjaan Konstruksi | 3589181 | 14761859 | 24,281,000,000 | 24,239,008,000 | 22,394,916,000 | 0 | 0 | 0 | 2018-04-16 10:20:00 | 02.708.996.0-731.000 | PT.CHARIA BENEFIT UTAMA | 1,886,084,000 | 7.77 % | |||
88 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Toliet dan Rehabilitasi Halaman Masjid Raya Sabilal Muhtadin di Banjarmasin | Tender | Pekerjaan Konstruksi | 3591181 | 18092214 | 1,876,050,000 | 1,849,855,000 | 1,495,601,096 | 0 | 0 | 0 | 2018-04-13 15:00:00 | 01.879.396.8-731.000 | CV. EDNA BERSAUDARA | 380,448,904 | 20.28 % | |||
89 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Gunung Kupang-Kiram (DID) | Tender | Pekerjaan Konstruksi | 3593181 | 17710812 | 2,500,000,000 | 2,471,750,000 | 2,001,138,536 | 0 | 0 | 0 | 2018-04-17 14:00:00 | 74.117.390.0-732.000 | MIRZA UTAMA MARGA | 498,861,464 | 19.95 % | |||
90 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Paramasan Bawah-Paramasan Atas (DID) | Tender | Pekerjaan Konstruksi | 3594181 | 17708118 | 2,000,000,000 | 1,647,253,000 | 1,596,507,072 | 0 | 0 | 0 | 2018-04-17 16:00:00 | 01.124.716.0-731.000 | CV. DUA MAS | 403,492,928 | 20.17 % | |||
91 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi DI. Intangan Kabupaten Hulu Sungai Tengah | Tender | Pekerjaan Konstruksi | 3612181 | 14757215 | 1,300,000,000 | 1,299,992,873 | 1,013,292,066 | 0 | 0 | 0 | 2018-04-27 08:00:00 | 72.232.474.6-733.000 | CV. MIRANTI | 286,707,934 | 22.05 % | |||
92 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Pengawas Pembangunan Pintu Gerbang Kantor Kawasan Perkantoran di Banjarbaru | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3620181 | 17678695 | 133,142,500 | 133,133,000 | 120,945,000 | 0 | 0 | 0 | 2018-05-19 00:59:00 | 01.585.258.5-731.000 | CV. ASRINDO GRAHA CONSULTANT | 12,197,500 | 9.16 % | |||
93 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultan Pengawas Pembangunan Taman Edukasi Lalu Lintas | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3624181 | 17678744 | 150,000,000 | 149,765,000 | 98,505,000 | 0 | 0 | 0 | 2018-05-20 14:00:00 | 01.860.272.2-731.000 | CV. DAYAKARSA MADYA Consultant | 51,495,000 | 34.33 % | |||
94 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Kantor Samsat Kandangan | Tender | Pekerjaan Konstruksi | 3631181 | 16032314 | 8,658,175,000 | 8,585,865,000 | 8,052,015,000 | 0 | 0 | 0 | 2018-05-18 10:00:00 | 80.680.022.3-731.000 | PT.HAMIRI BANGUN MANDIRI | 606,160,000 | 7 % | |||
95 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Kantor Samsat Tanjung | Tender | Pekerjaan Konstruksi | 3634181 | 14765233 | 7,683,175,000 | 7,553,895,000 | 6,795,743,000 | 0 | 0 | 0 | 2018-05-18 10:00:00 | 01.124.865.5-731.000 | PT. PARTNER KEMENANGAN | 887,432,000 | 11.55 % | |||
96 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Sarana dan Prasarana Penunjang Gedung Kantor Gubernur Kalsel di Banjarmasin | Tender | Pekerjaan Konstruksi | 3636181 | 18212962 | 7,732,302,500 | 7,640,321,000 | 7,077,706,000 | 0 | 0 | 0 | 2018-05-18 10:00:00 | 72.871.311.6-731.000 | PT. HAMIRI ARTHA MULIA | 654,596,500 | 8.47 % | |||
97 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Gedung Rapat BAKEUDA | Tender | Pekerjaan Konstruksi | 3637181 | 17678349 | 4,811,750,000 | 4,704,252,000 | 4,057,593,000 | 0 | 0 | 0 | 2018-05-18 10:00:00 | 01.322.015.7-009.000 | PT. JOGLO MULTI AYU | 754,157,000 | 15.67 % | |||
98 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan dan Jembatan Sei Mandala - Sei Buluh | Tender | Pekerjaan Konstruksi | 3638181 | 14821172 | 4,906,505,000 | 4,906,505,000 | 4,750,030,967 | 0 | 0 | 0 | 2018-05-18 15:00:00 | 01.137.533.4-731.000 | PT. PUTRA KANCA | 156,474,033 | 3.19 % | |||
99 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Renovasi/ Rehab Rumah Jabatan / Dinas Ess I di banjarbaru | Tender | Pekerjaan Konstruksi | 3643181 | 14763125 | 4,784,025,000 | 4,784,025,000 | 4,704,911,000 | 0 | 0 | 0 | 2018-05-20 14:00:00 | 02.048.394.7-217.000 | PT. SUMBER ALAM SEJAHTERA | 79,114,000 | 1.65 % | |||
100 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembuatan Kantor dan Laboratorium Unit Pelayanan Jasa Sumber Daya Mineral dan Energi | Tender | Pekerjaan Konstruksi | 3644181 | 14765193 | 2,871,750,000 | 2,763,493,000 | 2,482,319,000 | 0 | 0 | 0 | 2018-05-21 08:00:00 | 02.531.377.6-731.000 | PT. SESTRA JENDRA | 389,431,000 | 13.56 % | |||
101 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan DIR. Polder Bakar Kabupaten Hulu Sungai Utara | Tender | Pekerjaan Konstruksi | 3681181 | 17673833 | 5,000,000,000 | 4,999,994,000 | 4,772,075,000 | 0 | 0 | 0 | 2018-06-22 19:00:00 | 73.215.057.8-731.000 | PT. ADERUS WIRA PERSADA | 227,925,000 | 4.56 % | |||
102 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi DIR. Tanggul Lungau Kabupaten Hulu Sungai Selatan | Tender | Pekerjaan Konstruksi | 3682181 | 17673880 | 3,000,000,000 | 2,999,380,000 | 2,542,499,000 | 0 | 0 | 0 | 2018-06-22 19:00:00 | 76.644.426.9-733.000 | PT. DATU MULIA BORNEO | 457,501,000 | 15.25 % | |||
103 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Daerah Irigasi Rawa Danda Besar Kabupaten Barito Kuala | Tender | Pekerjaan Konstruksi | 3683181 | 17674358 | 5,235,000,000 | 5,234,997,000 | 4,379,080,000 | 0 | 0 | 0 | 2018-06-22 19:00:00 | 02.531.377.6-731.000 | PT. SESTRA JENDRA | 855,920,000 | 16.35 % | |||
104 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Supervisi Peningkatan DIR. Polder Bakar Kabupaten Hulu Sungai Utara | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3695181 | 14756929 | 300,000,000 | 299,970,000 | 284,935,200 | 0 | 0 | 0 | 2018-06-28 22:00:00 | 01.141.524.7-731.000 | CV. BINA BANUA | 15,064,800 | 5.02 % | |||
105 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Pintu Gerbang Kantor Kws. Perkantoran di Banjarbaru | Tender | Pekerjaan Konstruksi | 3703181 | 16032641 | 4,852,000,000 | 4,410,781,966 | 4,271,465,394 | 0 | 0 | 0 | 2018-07-13 08:00:00 | 02.902.233.2-009.000 | PT. BAHANA KRIDA NUSANTARA | 580,534,606 | 11.96 % | |||
106 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehab Gedung Kantor Setda Provinsi Kalsel di Banjarbaru | Tender | Pekerjaan Konstruksi | 3719181 | 14780477 | 1,167,202,000 | 1,118,661,070 | 1,057,394,715 | 0 | 0 | 0 | 2018-07-13 08:00:00 | 66.139.132.6-733.000 | CV. AL MADINAH | 109,807,285 | 9.41 % | |||
107 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Perbaikan Sarana dan Prasarana WC/KM Masyarakat Pekauman, Kec. Martapura Timur, di Kabupaten Banjar | Tender | Pekerjaan Konstruksi | 3734181 | 16032045 | 954,225,000 | 927,146,507 | 833,388,248 | 0 | 0 | 0 | 2018-07-18 13:00:00 | 81.162.895.7-731.000 | cv. usaha umat | 120,836,752 | 12.66 % | |||
108 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Perbaikan Sarana dan Prasarana WC/KM Masyarakat Sungai Bilu, Kec. Banjarmasin di Kab/Kota Banjarmasin | Tender | Pekerjaan Konstruksi | 3735181 | 16031962 | 954,225,000 | 789,080,877 | 721,967,273 | 0 | 0 | 0 | 2018-07-18 13:00:00 | 81.162.895.7-731.000 | cv. usaha umat | 232,257,727 | 24.34 % | |||
109 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Halaman Rumah Dinas Kediaman Gubernur di Banjarmasin | Tender | Pekerjaan Konstruksi | 3751181 | 17678537 | 435,750,000 | 432,864,280 | 399,329,528 | 0 | 0 | 0 | 2018-07-30 08:00:00 | 73.471.507.1-731.000 | CV.MAWADDAH | 36,420,472 | 8.36 % | |||
110 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Desa Bahandang-Desa Keliling Benteng | Tender | Pekerjaan Konstruksi | 3757181 | 18376222 | 5,881,500,000 | 5,881,500,000 | 5,500,276,756 | 0 | 0 | 0 | 2018-07-27 15:00:00 | 70.694.710.8-732.000 | PT.TANJUNG RAYA BERSAMA | 381,223,244 | 6.48 % | |||
111 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Ray 7-Desa Bahandang | Tender | Pekerjaan Konstruksi | 3758181 | 18376199 | 4,781,500,000 | 4,781,500,000 | 4,411,466,366 | 0 | 0 | 0 | 2018-07-27 15:00:00 | 03.265.981.5-731.000 | PT. Pandji Pratama Indonesia | 370,033,634 | 7.74 % | |||
112 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Jejangkit Muara-Ray 7 | Tender | Pekerjaan Konstruksi | 3759181 | 18376171 | 4,181,500,000 | 4,181,500,000 | 3,906,023,082 | 0 | 0 | 0 | 2018-07-27 15:00:00 | 01.124.946.3-731.000 | PT. ADIMANUNGGAL CIPTA PADUNUSA | 275,476,918 | 6.59 % | |||
113 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Penyusunan Pergub tentang Peraturan Zonasi Lintas Kabupaten Kota (Kawasan Strategis Provinsi Rawa Batang Banyu) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3764181 | 18392489 | 399,960,000 | 399,960,000 | 365,530,000 | 0 | 0 | 0 | 2018-08-06 09:00:00 | 02.108.378.7-429.000 | PT. Munasa Kreasi Nusantara | 34,430,000 | 8.61 % | |||
114 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Orthorektifikasi Peta (Dasar) Rencana Tata Ruang Kawasan Strategis Provinsi Rawa Batang Banyu | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3765181 | 18392492 | 199,980,000 | 199,980,000 | 188,540,000 | 0 | 0 | 0 | 2018-08-06 09:00:00 | 02.980.044.8-404.000 | PT. Komperji Nusaraya | 11,440,000 | 5.72 % | |||
115 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengadaan Alat Hidrologi (Telemetri) AWLR Intake DI. Haruyan Dayak Kab. Hulu Sungai Tengah dan Sungai WS. Cengal Batulicin | Tender | Pekerjaan Konstruksi | 3774181 | 17674508 | 600,000,000 | 599,854,479 | 539,101,200 | 0 | 0 | 0 | 2018-08-07 15:00:00 | 02.342.725.5-733.000 | CV. SAKA PERSADA | 60,898,800 | 10.15 % | |||
116 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan HELIPAD di Jejangkit | Tender | Pekerjaan Konstruksi | 3820181 | 18420609 | 1,550,000,000 | 1,531,724,500 | 1,463,455,082 | 0 | 0 | 0 | 2018-08-25 18:00:00 | 31.245.996.9-731.000 | CV.RIDHEVAL HANDIL BHAKTI | 86,544,918 | 5.58 % | |||
117 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Angkipih-Paramasan Bawah-Paramasan Atas | Tender | Pekerjaan Konstruksi | 3821181 | 18410837 | 4,861,335,000 | 4,861,329,665 | 4,519,228,279 | 0 | 0 | 0 | 2018-08-25 20:00:00 | 01.141.113.9-651.000 | PT. KARYA TUNGGAL MULYA ABADI | 342,106,721 | 7.04 % | |||
118 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Perbaikan/Renovasi BRIMOB | Tender | Pekerjaan Konstruksi | 3823181 | 18420593 | 935,000,000 | 925,344,400 | 740,035,192 | 0 | 0 | 0 | 2018-08-25 16:00:00 | 71.462.122.4-732.000 | CV. Salma Aulia | 194,964,808 | 20.85 % | |||
119 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Jembatan Batulicin-Mentewe | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3826181 | 18410823 | 662,818,000 | 657,052,000 | 649,345,500 | 0 | 0 | 0 | 2018-08-28 17:00:00 | 02.613.877.6-731.000 | CV SEMBILAN SATU ENGINEERING | 13,472,500 | 2.03 % | |||
120 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Taman Budaya Baru di Kawasan Perkantoran Pemprov. Kalsel | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3827181 | 18420334 | 390,000,000 | 389,953,300 | 346,280,000 | 0 | 0 | 0 | 2018-08-27 12:00:00 | 01.455.616.1-441.000 | PT. DAYA CIPTA DIANRANCANA | 43,720,000 | 11.21 % | |||
121 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Istana Mahligai Rakyat | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3828181 | 18420291 | 191,500,000 | 191,405,500 | 154,628,925 | 0 | 0 | 0 | 2018-08-27 16:00:00 | 01.463.263.2-731.000 | PT. MATRA ESTETIKA REKAYASA | 36,871,075 | 19.25 % | |||
122 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Tanjung Serdang-Lontar II | Tender | Pekerjaan Konstruksi | 3829181 | 18410685 | 4,469,818,000 | 4,469,817,737 | 4,440,624,241 | 0 | 0 | 0 | 2018-08-31 08:15:00 | 02.216.301.8-734.000 | PT. Arta Cipta Permata | 29,193,759 | 0.65 % | |||
123 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Batulicin-Mekarsari-Mentewe | Tender | Pekerjaan Konstruksi | 3832181 | 18410700 | 14,851,585,000 | 14,851,584,856 | 14,073,727,541 | 0 | 0 | 0 | 2018-08-27 13:00:00 | 02.421.791.1-734.000 | pt hm family | 777,857,459 | 5.24 % | |||
124 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Jalan Alternatif ke Makam Syech M. Arsyad Al-Banjari dan DED Jembatan Jalan Pendidikan Sekumpul | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3835181 | 18420292 | 396,250,000 | 395,164,000 | 358,325,000 | 0 | 0 | 0 | 2018-08-28 16:00:00 | 01.489.654.2-711.000 | PT.TEMA KARYA MANDIRI | 37,925,000 | 9.57 % | |||
125 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Lanjutan Makam Syeh Arsyad Al Banjari | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3839181 | 18420341 | 390,000,000 | 389,953,300 | 300,008,500 | 0 | 0 | 0 | 2018-08-27 23:55:00 | 02.050.569.9-731.000 | CV. Dharma Cipta Pratama | 89,991,500 | 23.07 % | |||
126 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Jaringan Listrik Kawasan Perkantoran Pemprov. Kalsel | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3840181 | 18420374 | 540,000,000 | 539,990,000 | 341,000,000 | 0 | 0 | 0 | 2018-08-29 09:00:00 | 02.883.220.2-731.000 | CV. RIA KONSULTAN | 199,000,000 | 36.85 % | |||
127 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Study Pendahuluan Sport City | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3873181 | 18446564 | 240,000,000 | 239,965,000 | 221,705,000 | 176,158,400 | 0 | 0 | 2018-09-13 12:00:00 | 01.548.564.2-424.000 | PT. Belaputera Interplan | 01.548.564.2-424.000 | PT. Belaputera Interplan | 18,295,000 | 7.62 % | |
128 | 2018 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Simpang 3 Tahura-Mandiangin | Tender | Pekerjaan Konstruksi | 3875181 | 18425381 | 9,877,725,000 | 9,877,720,641 | 8,218,382,336 | 0 | 0 | 0 | 2018-09-13 12:00:00 | 70.694.710.8-732.000 | PT.TANJUNG RAYA BERSAMA | 1,659,342,664 | 16.8 % | |||
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Pagu | HPS | Nilai Penawaran | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |