Semua | Belum e-Kontrak | Belum Penilaian Kinerja | Selesai | |||||
---|---|---|---|---|---|---|---|---|
Jenis | Paket | Pagu | Paket | Pagu | Paket | Pagu | Paket | Pagu |
Tender | 84 | 760.627.476.000 | 15 | 209.598.072.000 | 84 | 760.627.476.000 | 0 | 0 |
Seleksi | 66 | 32.990.065.000 | 43 | 22.344.335.000 | 66 | 32.990.065.000 | 0 | 0 |
Tender Cepat | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Total | 150 | 793.617.541.000 | 58 | 231.942.407.000 | 150 | 793.617.541.000 | 0 | 0 |
Persentase | 38.67 % | 100 % | 0 % |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Sarana dan Prasarana Pendukung Tugu Pal Nol (Konsultan Pengawas) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3960181 | 19023901 | APBD | 400,000,000 | 399,877,500 | 324,274,000 | 324,274,000 | 324,874,000 | 324,274,000 | 0 | 0 | 2019-01-10 11:00:00 | 2019-02-12 | 2019-03-18 | 95.412.417.8-731.000 | PT. Prisma Jasa Konsulindo | 95.412.417.8-731.000 | PT. Prisma Jasa Konsulindo | 75,726,000 | 18.93 % | |
2 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Negara-Muara Tapus | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3962181 | 18972013 | APBD | 250,000,000 | 248,050,000 | 242,880,000 | 242,880,000 | 242,880,000 | 0 | 0 | 0 | 2019-01-24 09:00:00 | 2019-04-02 | 02.089.773.2-733.000 | PT. TECHNIKATAMA JASA KONSULTAN | 7,120,000 | 2.85 % | ||||
3 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Gunung Kupang-Kiram-Tambang Ulang (DAK) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3963181 | 18829733 | APBD | 450,000,000 | 449,350,000 | 399,168,000 | 399,168,000 | 399,168,000 | 0 | 0 | 0 | 2019-01-23 15:30:00 | 2019-03-06 | 03.025.828.9-731.000 | CV. GRIYASHANTA | 50,832,000 | 11.3 % | ||||
4 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Kandangan-Negara (DAK) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3964181 | 18829731 | APBD | 225,000,000 | 224,235,000 | 189,007,500 | 189,007,500 | 189,007,500 | 0 | 0 | 0 | 2019-01-23 13:00:00 | 2019-03-05 | 02.089.773.2-733.000 | PT. TECHNIKATAMA JASA KONSULTAN | 35,992,500 | 16 % | ||||
5 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Amuntai-Lampihong-Paringin-Halong (DAK) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3966181 | 18829725 | APBD | 225,000,000 | 224,235,000 | 212,272,500 | 212,272,500 | 212,272,500 | 0 | 0 | 0 | 2019-01-23 16:00:00 | 2019-03-05 | 03.025.627.5-731.000 | SADWA RAMA CONSULTANT | 12,727,500 | 5.66 % | ||||
6 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Lontar-Tanjung Seloka-Berangas | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3967181 | 18829710 | APBD | 350,000,000 | 348,315,000 | 331,760,000 | 331,760,000 | 331,760,000 | 0 | 0 | 0 | 2019-01-24 09:00:00 | 2019-03-08 | 95.412.417.8-731.000 | PT. Prisma Jasa Konsulindo | 18,240,000 | 5.21 % | ||||
7 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Tanjung Serdang-Lontar | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3968181 | 18829708 | APBD | 350,000,000 | 348,315,000 | 293,387,600 | 293,387,600 | 293,387,600 | 0 | 0 | 0 | 2019-01-24 09:00:00 | 2019-03-13 | 02.778.681.3-423.000 | PT. Gumilang Sajati | 56,612,400 | 16.17 % | ||||
8 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jembatan Sungai Temunih dan Sungai Kusan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3969181 | 18829705 | APBD | 400,000,000 | 398,530,000 | 318,780,000 | 318,780,000 | 318,780,000 | 0 | 0 | 0 | 2019-01-23 15:00:00 | 2019-03-11 | 01.124.509.9-731.000 | PT. SEKTA GUBAH SARANA | 81,220,000 | 20.31 % | ||||
9 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jembatan Desa Sungai Apuy 1 dan Apuy II | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3970181 | 18829700 | APBD | 400,000,000 | 398,530,000 | 370,530,875 | 370,530,875 | 370,530,875 | 0 | 0 | 0 | 2019-01-23 13:00:00 | 2019-03-06 | 01.489.654.2-711.000 | PT.TEMA KARYA MANDIRI | 29,469,125 | 7.37 % | ||||
10 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Suka Damai-Mentewe | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3971181 | 18829698 | APBD | 350,000,000 | 345,840,000 | 331,265,000 | 331,265,000 | 331,265,000 | 0 | 0 | 0 | 2019-01-23 16:00:00 | 2019-03-06 | 95.412.417.8-731.000 | PT. Prisma Jasa Konsulindo | 18,735,000 | 5.35 % | ||||
11 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Mentawakan-Mentewe | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3972181 | 18829696 | APBD | 350,000,000 | 345,840,000 | 318,175,000 | 318,175,000 | 318,175,000 | 0 | 0 | 0 | 2019-01-23 16:00:00 | 2019-03-11 | 80.562.640.5-731.000 | CV. RAMIER JAYA ARKANANTA | 31,825,000 | 9.09 % | ||||
12 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Batulicin-Mentawakan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3973181 | 18829694 | APBD | 400,000,000 | 389,620,000 | 364,952,500 | 364,952,500 | 364,952,500 | 0 | 0 | 0 | 2019-01-23 15:30:00 | 2019-03-04 | 02.090.318.3-731.000 | CV. Inditec Consultant | 35,047,500 | 8.76 % | ||||
13 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Kiram-Gunung Mawar Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3974181 | 18829691 | APBD | 450,000,000 | 441,540,000 | 432,872,000 | 432,872,000 | 432,872,000 | 0 | 0 | 0 | 2019-01-23 16:00:00 | 2019-03-05 | 02.050.569.9-731.000 | CV. Dharma Cipta Pratama | 17,128,000 | 3.81 % | ||||
14 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan dan Jembatan Lumpangi-Loksado | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3976181 | 18829680 | APBD | 350,000,000 | 346,720,000 | 325,875,000 | 325,875,000 | 325,875,000 | 0 | 0 | 0 | 2019-01-24 09:00:00 | 2019-04-05 | 02.531.704.1-731.000 | CV. FIAZTA MATRIX CONSULTANT | 24,125,000 | 6.89 % | ||||
15 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Dahai-Tanjung Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3977181 | 18829677 | APBD | 450,000,000 | 449,570,000 | 425,810,000 | 425,810,000 | 425,810,000 | 0 | 0 | 0 | 2019-01-23 16:00:00 | 2019-03-04 | 02.090.318.3-731.000 | CV. Inditec Consultant | 24,190,000 | 5.38 % | ||||
16 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Lampihong-Mantimin Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3978181 | 18829672 | APBD | 550,000,000 | 549,230,000 | 499,136,000 | 499,136,000 | 499,136,000 | 0 | 0 | 0 | 2019-01-23 16:00:00 | 2019-03-06 | 03.025.828.9-731.000 | CV. GRIYASHANTA | 50,864,000 | 9.25 % | ||||
17 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Birayang-Tariwin-Lok Batu-Batu Mandi Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3979181 | 18827742 | APBD | 450,000,000 | 446,710,000 | 424,330,500 | 424,330,500 | 424,330,500 | 0 | 0 | 0 | 2019-01-18 00:00:00 | 2019-02-15 | 02.050.569.9-731.000 | CV. Dharma Cipta Pratama | 25,669,500 | 5.7 % | ||||
18 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Rantau-Muara Muning Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3980181 | 18827691 | APBD | 550,000,000 | 544,170,000 | 500,665,000 | 500,665,000 | 500,307,500 | 0 | 0 | 0 | 2019-01-24 09:00:00 | 2019-03-06 | 80.562.640.5-731.000 | CV. RAMIER JAYA ARKANANTA | 49,335,000 | 8.97 % | ||||
19 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jembatan Jalan Pendidkan Sekumpul Martapura (Pelebaran) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3981181 | 18827526 | APBD | 350,000,000 | 347,160,000 | 347,050,000 | 347,050,000 | 347,050,000 | 0 | 0 | 0 | 2019-01-11 10:45:00 | 2019-02-15 | 01.517.846.0-731.000 | PT. WINAYA KONTEKS KHARISMA | 2,950,000 | 0.84 % | ||||
20 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Paramasan-Bawah dan Paramasan Atas | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3982181 | 18827436 | APBD | 350,000,000 | 345,675,000 | 319,962,500 | 319,962,500 | 314,187,500 | 0 | 0 | 0 | 2019-01-23 16:00:00 | 2019-03-08 | 03.025.627.5-731.000 | SADWA RAMA CONSULTANT | 30,037,500 | 8.58 % | ||||
21 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Alternatif Makam Syeh Arsyad Al Banjari | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3983181 | 18826684 | APBD | 350,000,000 | 347,160,000 | 238,106,000 | 238,106,000 | 232,276,000 | 0 | 0 | 0 | 2019-01-23 15:30:00 | 2019-04-01 | 02.778.681.3-423.000 | PT. Gumilang Sajati | 111,894,000 | 31.97 % | ||||
22 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Banjarbaru-Bati bati Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3984181 | 18826604 | APBD | 550,000,000 | 510,510,000 | 504,640,070 | 504,640,070 | 504,640,070 | 0 | 0 | 0 | 2019-01-23 15:00:00 | 2019-03-05 | 01.879.315.8-731.000 | CV. ADIHANMAN TATA RANCANG | 45,359,930 | 8.25 % | ||||
23 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Golf Banjarbaru Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3985181 | 18825315 | APBD | 450,000,000 | 441,540,000 | 412,830,000 | 412,830,000 | 412,830,000 | 0 | 0 | 0 | 2019-01-23 15:00:00 | 2019-03-08 | 02.090.318.3-731.000 | CV. Inditec Consultant | 37,170,000 | 8.26 % | ||||
24 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Simpang 3 Golf-Jalan Kasturi (Paket I) Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3986181 | 18824971 | APBD | 550,000,000 | 538,010,000 | 502,755,000 | 502,755,000 | 502,755,000 | 0 | 0 | 0 | 2019-01-23 13:00:00 | 2019-03-06 | 80.562.640.5-731.000 | CV. RAMIER JAYA ARKANANTA | 47,245,000 | 8.59 % | ||||
25 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Simpang 4 Gatot Subroto-Lingkar Dalam Selatan Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3987181 | 18816166 | APBD | 450,000,000 | 443,080,000 | 398,161,500 | 398,161,500 | 388,734,500 | 0 | 0 | 0 | 2019-01-25 12:00:00 | 2019-04-18 | 03.025.809.9-731.000 | CV. SETIA JASA UTAMA | 51,838,500 | 11.52 % | ||||
26 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jembatan Banjarmasin-Martapura | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3988181 | 18816141 | APBD | 350,000,000 | 345,840,000 | 321,227,500 | 321,227,500 | 321,227,500 | 0 | 0 | 0 | 2019-01-23 16:00:00 | 2019-03-04 | 95.412.417.8-731.000 | PT. Prisma Jasa Konsulindo | 28,772,500 | 8.22 % | ||||
27 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Anjir Pasar-Marabahan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3989181 | 18816133 | APBD | 350,000,000 | 348,040,000 | 326,095,000 | 326,095,000 | 326,095,000 | 0 | 0 | 0 | 2019-01-23 12:00:00 | 2019-03-11 | 02.303.631.2-731.000 | CV. AFAPASTA CONSULTANT | 23,905,000 | 6.83 % | ||||
28 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Desa Bahandang-Desa Keliling Benteng Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3990181 | 18816105 | APBD | 550,000,000 | 544,720,000 | 499,180,000 | 499,180,000 | 499,180,000 | 0 | 0 | 0 | 2019-01-23 10:00:00 | 2019-03-08 | 03.025.809.9-731.000 | CV. SETIA JASA UTAMA | 50,820,000 | 9.24 % | ||||
29 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Rehab/Renovasi Gor Hasanuddin di Banjarmasin | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3991181 | 19038407 | APBD | 231,650,000 | 230,906,500 | 204,451,500 | 204,451,500 | 204,451,500 | 204,451,500 | 0 | 0 | 2019-01-10 14:00:00 | 2019-02-22 | 2019-03-18 | 02.050.569.9-731.000 | CV. Dharma Cipta Pratama | 02.050.569.9-731.000 | CV. Dharma Cipta Pratama | 27,198,500 | 11.74 % | |
30 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Rehab/Renovasi Stadion 17 Mei di Banjarmasin | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3994181 | 19039178 | APBD | 481,650,000 | 481,536,000 | 411,831,200 | 411,831,200 | 411,831,200 | 411,831,200 | 0 | 0 | 2019-01-11 10:00:00 | 2019-02-27 | 2019-03-18 | 01.860.230.0-731.000 | CV PRAKTIRA KONSULTAN | 01.860.230.0-731.000 | CV PRAKTIRA KONSULTAN | 69,818,800 | 14.5 % | |
31 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Sarana dan Prasarana Pendukung Tugu Pal Nol | Tender | Pekerjaan Konstruksi | 3995181 | 19038515 | APBD | 12,531,000,000 | 12,459,462,021 | 11,367,410,174 | 11,367,410,174 | 11,367,410,174 | 11,367,410,174 | 0 | 0 | 2019-01-29 15:00:00 | 2019-02-21 | 2019-03-18 | 74.895.338.7-609.000 | PT. DEFANI ENERGI INDONESIA | 74.895.338.7-609.000 | PT. DEFANI ENERGI INDONESIA | 1,163,589,826 | 9.29 % | |
32 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Lanjutan Pembangunan Gedung Bakeuda (Konsultan Pengawas) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3998181 | 19039452 | APBD | 350,000,000 | 349,189,500 | 280,115,000 | 280,115,000 | 263,230,000 | 263,230,000 | 0 | 0 | 2019-01-23 16:10:00 | 2019-03-12 | 2019-04-15 | 71.883.318.9-609.000 | PT. DIRA BINA NUSA | 71.883.318.9-609.000 | PT. DIRA BINA NUSA | 69,885,000 | 19.97 % | |
33 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan dan Jembatan Lumpangi-Loksado | Tender | Pekerjaan Konstruksi | 4000181 | 18829679 | APBD | 4,564,830,000 | 4,564,828,828 | 4,327,546,227 | 4,327,546,227 | 4,299,724,985 | 4,299,724,985 | 0 | 0 | 2019-01-30 14:00:00 | 2019-02-25 | 2019-03-18 | 02.224.175.6-733.000 | PT.MITRA REZKI UTAMA | 02.224.175.6-733.000 | PT.MITRA REZKI UTAMA | 237,283,773 | 5.2 % | |
34 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jembatan Jalan Pendidkan Sekumpul Martapura (Pelebaran) | Tender | Pekerjaan Konstruksi | 4001181 | 18972548 | APBD | 10,615,525,000 | 10,615,525,000 | 9,925,000,165 | 9,925,000,165 | 9,925,000,165 | 9,925,000,165 | 0 | 0 | 2019-01-17 15:00:00 | 2019-03-25 | 2019-04-04 | 01.424.331.5-732.000 | PT. JATI BARU | 01.424.331.5-732.000 | PT. JATI BARU | 690,524,835 | 6.5 % | |
35 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan By Pass-Binderang | Tender | Pekerjaan Konstruksi | 4002181 | 18827707 | APBD | 2,921,550,000 | 2,921,550,000 | 2,829,236,298 | 2,829,236,298 | 2,829,236,298 | 2,829,236,298 | 0 | 0 | 2019-01-30 14:00:00 | 2019-02-25 | 2019-03-18 | 80.203.029.6-731.000 | PT. WAJI PUTERA KARYA MANDIRI | 80.203.029.6-731.000 | PT. WAJI PUTERA KARYA MANDIRI | 92,313,702 | 3.16 % | |
36 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jembatan Desa Sungai Apuy 1 dan Apuy II | Tender | Pekerjaan Konstruksi | 4004181 | 19043697 | APBD | 34,505,080,000 | 34,505,080,000 | 33,666,666,736 | 33,666,666,736 | 33,666,666,000 | 33,666,666,000 | 0 | 0 | 2019-04-22 14:00:00 | 2019-05-13 | 2019-05-22 | 03.265.981.5-731.000 | PT. Pandji Pratama Indonesia | 03.265.981.5-731.000 | PT. Pandji Pratama Indonesia | 838,413,264 | 2.43 % | |
37 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Desa Bahandang-Desa Keliling Benteng | Tender | Pekerjaan Konstruksi | 4005181 | 18816083 | APBD | 6,862,605,000 | 6,862,605,000 | 6,693,446,006 | 6,693,446,006 | 6,681,890,000 | 6,681,890,000 | 0 | 0 | 2019-01-30 14:00:00 | 2019-02-18 | 2019-03-01 | 70.694.710.8-732.000 | PT.TANJUNG RAYA BERSAMA | 70.694.710.8-732.000 | PT.TANJUNG RAYA BERSAMA | 169,158,994 | 2.46 % | |
38 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Gambut-Pulau Sari | Tender | Pekerjaan Konstruksi | 4007181 | 18827641 | APBD | 4,967,750,000 | 4,967,750,000 | 4,682,064,365 | 4,682,064,365 | 4,682,064,365 | 4,682,064,365 | 0 | 0 | 2019-01-30 14:00:00 | 2019-02-25 | 2019-03-18 | 01.137.533.4-731.000 | PT. PUTRA KANCA | 01.137.533.4-731.000 | PT. PUTRA KANCA | 285,685,635 | 5.75 % | |
39 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Ray 7-Desa Bahandang | Tender | Pekerjaan Konstruksi | 4009181 | 18816098 | APBD | 4,914,830,000 | 4,914,830,000 | 4,714,741,067 | 4,714,741,067 | 4,685,220,000 | 4,685,220,000 | 0 | 0 | 2019-01-30 14:00:00 | 2019-02-25 | 2019-03-18 | 03.265.981.5-731.000 | PT. Pandji Pratama Indonesia | 03.265.981.5-731.000 | PT. Pandji Pratama Indonesia | 200,088,933 | 4.07 % | |
40 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Simpang 3 Lingkar Utara-Simpang 3 Jalan Golf | Tender | Pekerjaan Konstruksi | 4014181 | 18824895 | APBD | 9,965,525,000 | 9,965,525,000 | 9,428,570,170 | 9,428,570,170 | 9,428,570,170 | 9,428,570,170 | 0 | 0 | 2019-01-30 14:00:00 | 2019-02-28 | 2019-03-18 | 02.614.233.1-731.000 | PT. MENARA PILAR UTAMA | 02.614.233.1-731.000 | PT. MENARA PILAR UTAMA | 536,954,830 | 5.39 % | |
41 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Kasturi-Jalan Akses Bandara-Jalan Lingkar Utara (Paket II) | Tender | Pekerjaan Konstruksi | 4017181 | 18825091 | APBD | 4,967,750,000 | 4,967,750,000 | 4,764,686,310 | 4,764,686,310 | 4,764,686,310 | 4,764,686,310 | 0 | 0 | 2019-01-30 14:00:00 | 2019-02-26 | 2019-03-18 | 70.733.060.1-731.000 | PT. AQILA AGUNG MULTI PERSADA | 70.733.060.1-731.000 | PT. AQILA AGUNG MULTI PERSADA | 203,063,690 | 4.09 % | |
42 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Suka Damai-Mentewe | Tender | Pekerjaan Konstruksi | 4018181 | 18829697 | APBD | 37,555,080,000 | 37,551,417,484 | 36,038,126,423 | 36,038,126,423 | 35,928,984,159 | 35,928,984,159 | 0 | 0 | 2019-01-30 14:00:00 | 2019-02-25 | 2019-03-18 | 03.169.298.1-734.000 | PT.BATULICIN BETON ASPHALT | 03.169.298.1-734.000 | PT.BATULICIN BETON ASPHALT | 1,516,953,577 | 4.04 % | |
43 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Rantau-Muara Muning | Tender | Pekerjaan Konstruksi | 4037181 | 18827676 | APBD | 4,371,550,000 | 4,371,550,000 | 4,215,791,273 | 4,215,791,273 | 4,215,791,273 | 4,215,791,273 | 0 | 0 | 2019-01-30 14:00:00 | 2019-02-25 | 2019-03-18 | 02.237.343.5-733.000 | PT.Bina Bangun Banua Bersama | 02.237.343.5-733.000 | PT.Bina Bangun Banua Bersama | 155,758,727 | 3.56 % | |
44 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Kiram-Gunung Mawar | Tender | Pekerjaan Konstruksi | 4046181 | 19045657 | APBD | 4,517,750,000 | 4,517,750,000 | 4,402,026,033 | 4,402,026,033 | 4,384,824,982 | 4,384,824,982 | 0 | 0 | 2019-01-30 14:00:00 | 2019-02-25 | 2019-03-18 | 03.018.148.1-732.000 | PT. ADJI PERKASA | 03.018.148.1-732.000 | PT. ADJI PERKASA | 115,723,967 | 2.56 % | |
45 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Kiram-Gunung Coklat | Tender | Pekerjaan Konstruksi | 4049181 | 18827388 | APBD | 5,965,525,000 | 5,965,525,000 | 5,804,918,768 | 5,804,918,768 | 5,783,630,000 | 5,783,630,000 | 0 | 0 | 2019-01-30 17:00:00 | 2019-02-28 | 2019-03-20 | 70.694.710.8-732.000 | PT.TANJUNG RAYA BERSAMA | 70.694.710.8-732.000 | PT.TANJUNG RAYA BERSAMA | 160,606,232 | 2.69 % | |
46 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Kiram-Simpang 3 Tahura-Mandiangin | Tender | Pekerjaan Konstruksi | 4050181 | 18985916 | APBD | 4,717,750,000 | 4,717,750,000 | 4,591,715,628 | 4,591,715,628 | 4,573,435,000 | 4,573,435,000 | 0 | 0 | 2019-01-30 14:00:00 | 2019-02-25 | 2019-03-18 | 76.210.704.3-731.000 | PT.SATRIA BAGUS PERKASA | 76.210.704.3-731.000 | PT.SATRIA BAGUS PERKASA | 126,034,372 | 2.67 % | |
47 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Gunung Kupang-Kiram-Tambang Ulang (DAK) | Tender | Pekerjaan Konstruksi | 4051181 | 18829732 | APBD | 24,050,517,000 | 24,050,517,000 | 23,209,700,904 | 23,209,700,904 | 23,204,630,000 | 0 | 0 | 0 | 2019-02-19 14:35:00 | 2019-03-25 | 70.694.710.8-732.000 | PT.TANJUNG RAYA BERSAMA | 840,816,096 | 3.5 % | ||||
48 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Anjir Pasar-Marabahan | Tender | Pekerjaan Konstruksi | 4053181 | 19045907 | APBD | 13,555,080,000 | 13,555,080,000 | 13,011,226,245 | 13,011,226,245 | 12,701,661,000 | 12,701,661,000 | 0 | 0 | 2019-01-30 14:00:00 | 2019-02-25 | 2019-03-18 | 03.265.981.5-731.000 | PT. Pandji Pratama Indonesia | 03.265.981.5-731.000 | PT. Pandji Pratama Indonesia | 543,853,755 | 4.01 % | |
49 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Jejangkit Muara-Ray 7 | Tender | Pekerjaan Konstruksi | 4054181 | 18816118 | APBD | 6,912,605,000 | 6,912,605,000 | 6,481,878,475 | 6,481,878,475 | 6,481,878,475 | 6,481,878,475 | 0 | 0 | 2019-01-30 14:00:00 | 2019-02-25 | 2019-03-18 | 01.124.946.3-731.000 | PT. ADIMANUNGGAL CIPTA PADUNUSA | 01.124.946.3-731.000 | PT. ADIMANUNGGAL CIPTA PADUNUSA | 430,726,525 | 6.23 % | |
50 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Golf Banjarbaru | Tender | Pekerjaan Konstruksi | 4057181 | 18825221 | APBD | 4,517,750,000 | 4,517,750,000 | 4,313,770,255 | 4,313,770,255 | 4,313,770,255 | 4,313,770,255 | 0 | 0 | 2019-01-30 14:00:00 | 2019-02-25 | 2019-03-18 | 01.133.868.8-731.000 | PT. HM Taher | 01.133.868.8-731.000 | PT. HM Taher | 203,979,745 | 4.52 % | |
51 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Banjarbaru-Simpang 3 Tahura-Aranio | Tender | Pekerjaan Konstruksi | 4058181 | 18825474 | APBD | 4,967,750,000 | 4,967,750,000 | 4,761,972,915 | 4,761,972,915 | 4,761,972,915 | 4,761,972,915 | 0 | 0 | 2019-01-30 14:00:00 | 2019-02-25 | 2019-03-18 | 01.124.866.3-732.000 | PT. VANAGA UTAMA | 01.124.866.3-732.000 | PT. VANAGA UTAMA | 205,777,085 | 4.14 % | |
52 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Kapar Kias-Birayang | Tender | Pekerjaan Konstruksi | 4061181 | 18829686 | APBD | 4,914,830,000 | 4,914,830,000 | 4,563,641,426 | 4,563,641,426 | 4,563,641,426 | 4,563,641,426 | 0 | 0 | 2019-01-30 14:00:00 | 2019-03-01 | 2019-03-21 | 01.124.058.7-733.000 | AIRA DUTA MURAKATA. PT | 01.124.058.7-733.000 | AIRA DUTA MURAKATA. PT | 351,188,574 | 7.15 % | |
53 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Banjang-Pulau Nyiur-Batumandi | Tender | Pekerjaan Konstruksi | 4062181 | 18829689 | APBD | 2,528,270,000 | 2,528,270,000 | 2,387,938,450 | 2,387,938,450 | 2,368,770,000 | 2,368,770,000 | 0 | 0 | 2019-02-15 18:00:00 | 2019-03-07 | 2019-03-18 | 02.896.703.2-733.000 | PT.PUTRA PERDANA PERSADA | 02.896.703.2-733.000 | PT.PUTRA PERDANA PERSADA | 140,331,550 | 5.55 % | |
54 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Lingkar Binuang | Tender | Pekerjaan Konstruksi | 4064181 | 18827664 | APBD | 4,914,830,000 | 4,914,830,000 | 4,710,480,823 | 4,710,480,823 | 4,710,480,823 | 4,710,480,823 | 0 | 0 | 2019-01-30 14:00:00 | 2019-02-25 | 2019-03-18 | 75.222.098.8-331.000 | PT. TOSAMA ADHI JAYA | 75.222.098.8-331.000 | PT. TOSAMA ADHI JAYA | 204,349,177 | 4.16 % | |
55 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Tanjung Serdang-Lontar | Tender | Pekerjaan Konstruksi | 4065181 | 18829706 | APBD | 9,561,525,000 | 9,061,250,286 | 8,770,942,955 | 8,770,942,955 | 8,770,942,955 | 8,770,942,955 | 0 | 0 | 2019-01-30 14:00:00 | 2019-02-25 | 2019-03-15 | 31.807.270.9-731.000 | nawa cipta waradana pt | 31.807.270.9-731.000 | nawa cipta waradana pt | 790,582,045 | 8.27 % | |
56 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Lontar-Tanjung Seloka-Berangas | Tender | Pekerjaan Konstruksi | 4066181 | 18829709 | APBD | 9,561,525,000 | 9,061,525,000 | 8,777,851,045 | 8,777,851,045 | 8,777,851,000,000 | 8,777,851,000,000 | 0 | 0 | 2019-01-30 14:00:00 | 2019-02-26 | 2019-03-15 | 31.807.270.9-731.000 | nawa cipta waradana pt | 31.807.270.9-731.000 | nawa cipta waradana pt | 783,673,955 | 8.2 % | |
57 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Batulicin-Mentawakan | Tender | Pekerjaan Konstruksi | 4067181 | 18829693 | APBD | 39,505,080,000 | 39,505,080,000 | 38,398,917,978 | 38,398,917,978 | 38,303,675,000 | 0 | 0 | 0 | 2019-01-30 14:00:00 | 2019-03-04 | 03.169.298.1-734.000 | PT.BATULICIN BETON ASPHALT | 1,106,162,022 | 2.8 % | ||||
58 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Birayang-Tariwin-Lok Batu-Batu Mandi | Tender | Pekerjaan Konstruksi | 4070181 | 18827723 | APBD | 4,464,830,000 | 4,464,830,000 | 4,149,170,525 | 4,149,170,525 | 4,089,565,000 | 4,089,565,000 | 0 | 0 | 2019-01-30 14:00:00 | 2019-02-26 | 2019-03-18 | 02.942.104.7-731.000 | SAPTA JASA KONSTRUKSI | 02.942.104.7-731.000 | SAPTA JASA KONSTRUKSI | 315,659,475 | 7.07 % | |
59 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Guntung Panaitan-Lampihong | Tender | Pekerjaan Konstruksi | 4074181 | 18829692 | APBD | 2,928,270,000 | 2,928,270,000 | 2,810,126,129 | 2,810,126,129 | 2,810,126,129 | 2,810,126,129 | 0 | 0 | 2019-01-30 14:00:00 | 2019-02-26 | 2019-03-18 | 01.124.098.3-735.000 | PT. CAHAYA MENTARI | 01.124.098.3-735.000 | PT. CAHAYA MENTARI | 118,143,871 | 4.03 % | |
60 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Dahai-Tanjung | Tender | Pekerjaan Konstruksi | 4076181 | 18829676 | APBD | 4,464,830,000 | 4,464,830,000 | 4,247,124,269 | 4,247,124,269 | 4,247,124,269 | 4,247,124,269 | 0 | 0 | 2019-02-15 14:00:00 | 2019-03-05 | 2019-03-18 | 02.746.857.8-735.000 | PT. Sinar Mahaputera Mandaga Bakti | 02.746.857.8-735.000 | PT. Sinar Mahaputera Mandaga Bakti | 217,705,731 | 4.88 % | |
61 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Amuntai-Lampihong-Paringin-Halong (DAK) | Tender | Pekerjaan Konstruksi | 4077181 | 18829724 | APBD | 4,775,000,000 | 4,775,000,000 | 4,579,721,456 | 4,579,721,456 | 4,579,721,456 | 4,579,721,456 | 0 | 0 | 2019-01-30 14:00:00 | 2019-02-26 | 2019-03-18 | 01.124.098.3-735.000 | PT. CAHAYA MENTARI | 01.124.098.3-735.000 | PT. CAHAYA MENTARI | 195,278,544 | 4.09 % | |
62 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Embung Jaro Kabupaten Tabalong | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4081181 | 19014512 | APBD | 1,000,000,000 | 999,999,000 | 955,460,000 | 955,460,000 | 955,460,000 | 955,460,000 | 0 | 0 | 2019-02-11 14:00:00 | 2019-04-08 | 2019-05-10 | 01.426.908.8-441.000 | PT. SARANA BHUANA JAYA | 01.426.908.8-441.000 | PT. SARANA BHUANA JAYA | 44,540,000 | 4.45 % | |
63 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Simpang 3 Golf-Jalan Kasturi (Paket I) | Tender | Pekerjaan Konstruksi | 4082181 | 19046006 | APBD | 18,908,000,000 | 18,908,000,000 | 17,706,696,487 | 17,706,696,487 | 17,706,696,487 | 17,706,696,487 | 0 | 0 | 2019-01-30 14:00:00 | 2019-02-28 | 2019-03-18 | 01.124.946.3-731.000 | PT. ADIMANUNGGAL CIPTA PADUNUSA | 01.124.946.3-731.000 | PT. ADIMANUNGGAL CIPTA PADUNUSA | 1,201,303,513 | 6.35 % | |
64 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Supervisi Rehabillitas DIR. Polder Tambak Hanyar Kab. Banjar | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4086181 | 19014590 | APBD | 250,000,000 | 249,975,000 | 237,380,000 | 237,380,000 | 230,505,000 | 230,505,000 | 0 | 0 | 2019-02-11 14:00:00 | 2019-03-27 | 2019-04-22 | 02.531.704.1-731.000 | CV. FIAZTA MATRIX CONSULTANT | 02.531.704.1-731.000 | CV. FIAZTA MATRIX CONSULTANT | 12,620,000 | 5.05 % | |
65 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Supervisi Peningkatan Polder Mini Daerah Irigasi Rawa Polder Bakar Kabupaten Hulu Sungai Utara | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4093181 | 19014442 | APBD | 650,000,000 | 649,715,000 | 630,465,000 | 630,465,000 | 615,725,000 | 615,725,000 | 0 | 0 | 2019-02-14 11:00:00 | 2019-04-18 | 2019-05-10 | 01.534.559.8-731.000 | PT TECTAMA KARYA | 01.534.559.8-731.000 | PT TECTAMA KARYA | 19,535,000 | 3.01 % | |
66 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Tanjung-Muara Uya | Tender | Pekerjaan Konstruksi | 4094181 | 18829688 | APBD | 4,914,830,000 | 4,914,829,343 | 4,533,040,887 | 4,533,040,887 | 4,533,040,887 | 4,533,040,887 | 0 | 0 | 2019-02-15 14:00:00 | 2019-03-05 | 2019-03-18 | 02.421.761.4-735.000 | PT. PILAR JAYA KONSTRUKSI | 02.421.761.4-735.000 | PT. PILAR JAYA KONSTRUKSI | 381,789,113 | 7.77 % | |
67 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Normalisasi Sungai Saluran Pembuang Embung Landasan Ulin | Tender | Pekerjaan Konstruksi | 4096181 | 19014585 | APBD | 2,000,000,000 | 1,999,997,281 | 1,337,479,716 | 1,337,479,716 | 1,337,479,716 | 1,337,479,716 | 0 | 0 | 2019-02-12 10:00:00 | 2019-03-15 | 2019-04-22 | 02.050.836.2-735.000 | CV.SEPAKAT | 02.050.836.2-735.000 | CV.SEPAKAT | 662,520,284 | 33.13 % | |
68 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jaringan Daerah Irigasi Kinarum 1.004 Ha Kabupaten Tabalong | Tender | Pekerjaan Konstruksi | 4098181 | 19014478 | APBD | 25,472,087,000 | 25,472,055,252 | 22,262,797,099 | 22,262,797,099 | 22,166,354,000 | 22,166,354,000 | 0 | 0 | 2019-02-11 10:00:00 | 2019-03-04 | 2019-03-22 | 01.407.735.8-711.000 | PT.ARGO SANJOYO ADHITAMA | 01.407.735.8-711.000 | PT.ARGO SANJOYO ADHITAMA | 3,209,289,901 | 12.6 % | |
69 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Polder Mini Daerah Irigasi Rawa Polder Bakar Kabupaten Hulu Sungai Utara | Tender | Pekerjaan Konstruksi | 4100181 | 19014465 | APBD | 9,640,000,000 | 9,639,997,036 | 9,152,211,000 | 9,152,211,000 | 9,147,380,000 | 9,147,380,000 | 0 | 0 | 2019-02-11 08:00:00 | 2019-03-11 | 2019-03-28 | 01.424.627.6-733.000 | PT. DIANG PUTRA ANDHIKATAMA | 01.424.627.6-733.000 | PT. DIANG PUTRA ANDHIKATAMA | 487,789,000 | 5.06 % | |
70 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Kandangan-Negara (DAK) | Tender | Pekerjaan Konstruksi | 4104181 | 18829730 | APBD | 4,775,000,000 | 4,774,984,854 | 4,723,219,871 | 4,723,219,871 | 4,572,000,000 | 4,572,000,000 | 0 | 0 | 2019-02-15 18:00:00 | 2019-03-07 | 2019-03-18 | 01.860.696.2-731.000 | PT. SALSABILA ONIRESH NUSANTARA | 01.860.696.2-731.000 | PT. SALSABILA ONIRESH NUSANTARA | 51,780,129 | 1.08 % | |
71 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Jaringan DIR. Alalak Padang Kab. Banjar | Tender | Pekerjaan Konstruksi | 4106181 | 19014610 | APBD | 5,000,000,000 | 4,999,999,639 | 3,740,158,613 | 3,740,158,613 | 3,740,158,613 | 3,740,158,613 | 0 | 0 | 2019-02-11 15:30:00 | 2019-03-05 | 2019-03-28 | 75.733.281.2-731.000 | PT. CIPTA RAYA NUSANTARA | 75.733.281.2-731.000 | PT. CIPTA RAYA NUSANTARA | 1,259,841,387 | 25.2 % | |
72 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Jaringan DIR. Polder Tambak Hanyar Kab. Banjar | Tender | Pekerjaan Konstruksi | 4114181 | 19014597 | APBD | 3,000,000,000 | 2,999,972,842 | 2,732,834,000 | 2,732,834,000 | 2,584,420,677 | 2,584,420,677 | 0 | 0 | 2019-02-12 15:30:00 | 2019-02-27 | 2019-03-22 | 71.698.315.0-733.000 | PT. ARYA JAYA KARYA | 71.698.315.0-733.000 | PT. ARYA JAYA KARYA | 267,166,000 | 8.91 % | |
73 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Paramasan-Bawah dan Paramasan Atas-Angkipih | Tender | Pekerjaan Konstruksi | 4115181 | 18985859 | APBD | 4,464,830,000 | 4,464,829,871 | 4,241,046,538 | 4,241,046,538 | 4,241,046,538 | 4,241,046,538 | 0 | 0 | 2019-02-15 17:00:00 | 2019-03-05 | 2019-03-19 | 02.014.742.7-714.000 | PT. RAHMAT AGUNG UTAMA | 02.014.742.7-714.000 | PT. RAHMAT AGUNG UTAMA | 223,783,462 | 5.01 % | |
74 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Galeri di Mess Billiton dan di Anjungan Kalsel TMII Jakarta (Konsultan Perencana) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4118181 | 19364045 | APBD | 250,000,000 | 247,214,000 | 222,035,000 | 222,035,000 | 215,490,000 | 215,490,000 | 0 | 0 | 2019-02-06 14:00:00 | 2019-03-22 | 2019-04-22 | 71.883.318.9-609.000 | PT. DIRA BINA NUSA | 71.883.318.9-609.000 | PT. DIRA BINA NUSA | 27,965,000 | 11.19 % | |
75 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Gedung Pramuka (Konsultan Pengawas) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4119181 | 19363964 | APBD | 140,000,000 | 139,942,000 | 135,000,800 | 135,000,800 | 135,000,800 | 123,459,600 | 0 | 0 | 2019-02-06 14:00:00 | 2019-04-10 | 2019-05-03 | 02.531.483.2-731.000 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | MANDIRI cipta PRATAMA | 4,999,200 | 3.57 % | |
76 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Gedung Samsat Amuntai (Konsultan Pengawas) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4120181 | 19364012 | APBD | 325,000,000 | 324,698,000 | 316,243,400 | 316,243,400 | 316,243,400 | 283,690,000 | 0 | 0 | 2019-02-06 14:00:00 | 2019-04-10 | 2019-06-19 | 02.531.483.2-731.000 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | MANDIRI cipta PRATAMA | 8,756,600 | 2.69 % | |
77 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Taman Budaya di Kawasan Perkantoran Prov. Kalsel di Banjarbaru (Konsultan Pengawas) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4121181 | 19364039 | APBD | 440,000,000 | 422,928,000 | 393,308,080 | 393,308,080 | 390,660,000 | 0 | 0 | 0 | 2019-02-06 14:00:00 | 2019-03-22 | 01.860.230.0-731.000 | CV PRAKTIRA KONSULTAN | 46,691,920 | 10.61 % | ||||
78 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Banjang-Pulau Nyiur-Batumandi Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4122181 | 18829690 | APBD | 400,000,000 | 399,520,000 | 373,230,000 | 373,230,000 | 373,230,000 | 0 | 0 | 0 | 2019-01-23 16:00:00 | 2019-03-05 | 80.562.640.5-731.000 | CV. RAMIER JAYA ARKANANTA | 26,770,000 | 6.69 % | ||||
79 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Kiram-Simpang 3 Tahura-Mandiangin | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4123181 | 18972161 | APBD | 250,000,000 | 248,820,000 | 242,990,000 | 242,990,000 | 242,990,000 | 0 | 0 | 0 | 2019-01-23 16:20:00 | 2019-03-08 | 01.517.846.0-731.000 | PT. WINAYA KONTEKS KHARISMA | 7,010,000 | 2.8 % | ||||
80 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Lanjutan Pembangunan Gedung Bakeuda | Tender | Pekerjaan Konstruksi | 4124181 | 19039430 | APBD | 8,628,425,000 | 8,623,335,560 | 7,326,620,308 | 7,326,620,308 | 7,326,620,308 | 7,326,620,307 | 0 | 0 | 2019-02-15 16:00:00 | 2019-03-19 | 2019-04-15 | 31.551.576.7-036.000 | PT. ARYSNA MANDIRI | 31.551.576.7-036.000 | PT. ARYSNA MANDIRI | 1,301,804,692 | 15.09 % | |
81 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengadaan dan Pemasangan Assesoris serta Mekanikal Elektrikal Jalur Distribusi Utama Banjarbakula lokasi Banjarbaru dan Kab. Tanah Laut (Konsultan Pengawas) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4128181 | 19038528 | APBD | 182,700,000 | 182,699,000 | 0 | 0 | 0 | 0 | 0 | 0 | 2019-01-30 16:00:00 | 2019-03-01 | 182,700,000 | 100 % | ||||||
82 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Negara-Muara Tapus | Tender | Pekerjaan Konstruksi | 4146181 | 18984374 | APBD | 4,664,830,000 | 4,664,830,000 | 4,471,158,746 | 4,471,158,746 | 4,466,795,000 | 4,466,795,000 | 0 | 0 | 2019-02-11 08:00:00 | 2019-03-11 | 2019-03-22 | 02.215.612.9-735.000 | PT. Pusaka Agung Manunggal | 02.215.612.9-735.000 | PT. Pusaka Agung Manunggal | 193,671,255 | 4.15 % | |
83 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehab Halaman dan Pembangunan Toilet Mesjid Raya Sabilal Muhtadin di Banjarmasin (Tahap II) | Tender | Pekerjaan Konstruksi | 4148181 | 19798611 | APBD | 1,382,400,000 | 1,380,717,010 | 1,091,048,469 | 1,091,048,469 | 1,091,048,469 | 1,091,048,469 | 0 | 0 | 2019-02-01 14:25:00 | 2019-03-12 | 2019-03-27 | 02.708.646.1-731.000 | mulia akbar | 02.708.646.1-731.000 | mulia akbar | 291,351,531 | 21.08 % | |
84 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Amuntai-Lampihong-Paringin | Tender | Pekerjaan Konstruksi | 4149181 | 18829204 | APBD | 4,814,830,000 | 4,813,177,924 | 4,571,276,600 | 4,571,276,600 | 4,571,276,600 | 4,571,276,600 | 0 | 0 | 2019-02-11 14:00:00 | 2019-02-26 | 2019-03-18 | 75.885.417.8-735.000 | PT. Cahaya Sambang Sejahtera | 75.885.417.8-735.000 | PT. Cahaya Sambang Sejahtera | 243,553,400 | 5.06 % | |
85 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Lampihong-Mantimin | Tender | Pekerjaan Konstruksi | 4151181 | 18829666 | APBD | 4,371,550,000 | 4,371,549,482 | 4,135,890,984 | 4,135,890,984 | 4,087,037,000 | 4,087,037,000 | 0 | 0 | 2019-02-15 17:00:00 | 2019-03-05 | 2019-03-20 | 02.590.527.4-735.000 | PT. Prima Mitralindo Utama | 02.590.527.4-735.000 | PT. Prima Mitralindo Utama | 235,659,016 | 5.39 % | |
86 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultansi Perencanaan Survey IRMS dan BMS Database Web GIS | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4227181 | 18829712 | APBD | 1,946,250,000 | 1,945,350,000 | 1,750,870,000 | 1,750,870,000 | 1,729,035,000 | 0 | 0 | 0 | 2019-03-04 16:00:00 | 2019-05-10 | 01.124.766.5-731.000 | PT.WIRA WIDYATAMA | 195,380,000 | 10.04 % | ||||
87 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Jalan Simpang 3 Lingkar Utara-Lingkar Utara Banjarbaru | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4249181 | 18829713 | APBD | 500,000,000 | 498,663,000 | 484,804,100 | 484,804,100 | 483,016,600 | 0 | 0 | 0 | 2019-03-04 12:00:00 | 2019-04-18 | 02.089.773.2-733.000 | PT. TECHNIKATAMA JASA KONSULTAN | 15,195,900 | 3.04 % | ||||
88 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Kajian Pengembangan Jalan Provinsi | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4255181 | 20235939 | APBD | 969,810,000 | 963,105,000 | 865,977,200 | 865,977,200 | 744,779,200 | 0 | 0 | 0 | 2019-03-06 16:00:00 | 2019-05-06 | 01.489.654.2-711.000 | PT.TEMA KARYA MANDIRI | 103,832,800 | 10.71 % | ||||
89 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Jembatan Penyeberangan Orang Tugu Nol | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4268181 | 18829719 | APBD | 350,000,000 | 349,899,000 | 325,809,000 | 325,809,000 | 302,929,000 | 0 | 0 | 0 | 2019-02-28 16:00:00 | 2019-05-08 | 01.249.265.8-731.000 | PT.KALSECO GRAHA | 24,191,000 | 6.91 % | ||||
90 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Sungai Jati-Sungai Ulin-Matraman | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4269181 | 18829717 | APBD | 500,000,000 | 499,015,000 | 467,060,000 | 467,060,000 | 466,565,000 | 0 | 0 | 0 | 2019-03-04 16:00:00 | 2019-05-09 | 72.116.516.5-731.000 | CV. EMPAT BELAS | 32,940,000 | 6.59 % | ||||
91 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Jalan Gunung Kupang-Kiram-Tambang Ulang dan Jalan Kiram-Gunung Mawar | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4270181 | 18829715 | APBD | 500,000,000 | 495,055,000 | 446,941,000 | 446,941,000 | 446,941,000 | 0 | 0 | 0 | 2019-02-27 16:00:00 | 2019-04-22 | 03.268.848.3-444.000 | PT. Arenco Binatama | 53,059,000 | 10.61 % | ||||
92 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Mentawakan-Mentewe | Tender | Pekerjaan Konstruksi | 4292181 | 18829695 | APBD | 31,555,080,000 | 31,555,079,999 | 30,133,983,482 | 30,133,983,482 | 30,109,250,000 | 30,109,250,000 | 0 | 0 | 2019-02-15 08:00:00 | 2019-03-05 | 2019-03-18 | 02.421.791.1-734.000 | pt hm family | 02.421.791.1-734.000 | pt hm family | 1,421,096,518 | 4.5 % | |
93 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Pile Slab Amuntai-Lampihong-Paringin (Longsoran) | Tender | Pekerjaan Konstruksi | 4305181 | 19906855 | APBD | 4,914,830,000 | 4,914,830,000 | 4,668,146,908 | 4,668,146,908 | 4,667,480,000 | 4,667,480,000 | 0 | 0 | 2019-03-01 15:00:00 | 2019-03-19 | 2019-04-04 | 75.885.417.8-735.000 | PT. Cahaya Sambang Sejahtera | 75.885.417.8-735.000 | PT. Cahaya Sambang Sejahtera | 246,683,092 | 5.02 % | |
94 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Gedung Pramuka | Tender | Pekerjaan Konstruksi | 4326181 | 19363965 | APBD | 2,329,700,000 | 2,328,929,003 | 1,791,425,009 | 1,791,425,009 | 1,791,425,009 | 1,791,425,000 | 0 | 0 | 2019-03-04 11:00:00 | 2019-03-28 | 2019-05-03 | 03.207.898.2-731.000 | CV. DWINA PUTRA MANDIRI | 03.207.898.2-731.000 | CV. DWINA PUTRA MANDIRI | 538,274,991 | 23.1 % | |
95 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengadaan dan Pemasangan Assesoris serta Mekanikal Elektrikal Jalur Distribusi Umum Banjarbakula lokasi Banjarbaru dan Kab. Tanah Laut | Tender | Pekerjaan Konstruksi | 4333181 | 18889480 | APBD | 3,242,375,000 | 3,241,375,478 | 3,134,758,380 | 3,134,758,380 | 3,134,758,380 | 2,963,980,000 | 0 | 0 | 2019-03-04 16:00:00 | 2019-04-25 | 2019-06-12 | 01.879.360.4-731.000 | PT. HIRAVEMINDO KARYA BERSAUDARA | 01.879.360.4-731.000 | PT. HIRAVEMINDO KARYA BERSAUDARA | 107,616,620 | 3.32 % | |
96 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Rumah Dinas dan Dapur Kediaman Gubernur Provinsi Kalimantan Selatan di Banjarmasin | Tender | Pekerjaan Konstruksi | 4334181 | 19363996 | APBD | 863,500,000 | 863,488,166 | 796,891,560 | 796,891,560 | 788,936,813 | 788,936,813 | 0 | 0 | 2019-03-04 11:00:00 | 2019-03-28 | 2019-04-18 | 02.362.068.5-731.000 | CV. BANGUN SELARAS | 02.362.068.5-731.000 | CV. BANGUN SELARAS | 66,608,440 | 7.71 % | |
97 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Gedung Samsat Amuntai | Tender | Pekerjaan Konstruksi | 4335181 | 19364010 | APBD | 7,633,800,000 | 7,622,105,568 | 7,398,214,487 | 7,398,214,487 | 7,398,214,000 | 7,398,214,000 | 0 | 0 | 2019-04-24 08:00:00 | 2019-05-16 | 2019-06-19 | 01.124.865.5-731.000 | PT. PARTNER KEMENANGAN | 01.124.865.5-731.000 | PT. PARTNER KEMENANGAN | 235,585,513 | 3.09 % | |
98 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Banjarbaru-Bati bati | Tender | Pekerjaan Konstruksi | 4340181 | 20258666 | APBD | 8,915,525,000 | 8,915,525,000 | 8,049,833,362 | 8,049,833,362 | 8,049,833,361 | 8,049,833,361 | 0 | 0 | 2019-03-01 15:00:00 | 2019-03-22 | 2019-04-04 | 31.704.295.0-732.000 | PT. KELANA MULTI KONSTRUKSI | 31.704.295.0-732.000 | PT. KELANA MULTI KONSTRUKSI | 865,691,638 | 9.71 % | |
99 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Normalisasi DAS Martapura | Tender | Pekerjaan Konstruksi | 4357181 | 19014568 | APBD | 1,875,500,000 | 1,875,491,948 | 1,329,617,003 | 1,329,617,003 | 1,329,617,003 | 1,329,617,003 | 0 | 0 | 2019-04-22 10:00:00 | 2019-05-23 | 2019-07-10 | 03.063.004.0-731.000 | CV.TITIAN MAS | 03.063.004.0-731.000 | CV.TITIAN MAS | 545,882,997 | 29.11 % | |
100 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Simpang 4 Gatot Subroto-Lingkar Dalam Selatan | Tender | Pekerjaan Konstruksi | 4368181 | 19045763 | APBD | 14,008,000,000 | 14,008,000,000 | 13,283,834,732 | 13,283,834,732 | 13,283,834,731 | 0 | 0 | 0 | 2019-03-04 10:00:00 | 2019-03-26 | 72.196.664.6-731.000 | BIMO LAKSANA GROUP | 724,165,268 | 5.17 % | ||||
101 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Matraman-Sei. Ulin (DAK) | Tender | Pekerjaan Konstruksi | 4392181 | 18829726 | APBD | 5,983,407,000 | 5,983,407,000 | 5,661,587,198 | 5,661,587,198 | 5,661,587,000 | 5,661,587,000 | 0 | 0 | 2019-03-20 08:00:00 | 2019-04-11 | 2019-04-23 | 02.303.665.0-731.000 | PT AGRABUDI JALAN BERDIKARI | 02.303.665.0-731.000 | PT AGRABUDI JALAN BERDIKARI | 321,819,802 | 5.38 % | |
102 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Alternatif Makam Syeh Arsyad Al Banjari | Tender | Pekerjaan Konstruksi | 4395181 | 18986203 | APBD | 18,608,000,000 | 18,608,000,000 | 17,551,060,000 | 17,551,060,000 | 17,551,060,000 | 17,551,060,000 | 0 | 0 | 2019-03-19 16:00:00 | 2019-04-16 | 2019-05-08 | 01.141.499.2-731.000 | PT. SALAMANDRA PETRAMUYA | 01.141.499.2-731.000 | PT. SALAMANDRA PETRAMUYA | 1,056,940,000 | 5.68 % | |
103 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Penyusunan DED SPALD Kawasan Perkantoran Prov Kalsel | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4410181 | 19368229 | APBD | 350,000,000 | 349,627,300 | 341,990,000 | 341,990,000 | 336,870,000 | 336,870,000 | 0 | 0 | 2019-03-27 22:00:00 | 2019-06-17 | 2019-07-03 | 02.173.702.8-652.001 | PT. WAHANA PRAKARSA UTAMA CABANG JATIM | 02.173.702.8-652.001 | PT. WAHANA PRAKARSA UTAMA CABANG JATIM | 8,010,000 | 2.29 % | |
104 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Kajian Lingkungan Pembangunan Tugu Pal Nol | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4413181 | 20519974 | APBD | 482,450,000 | 479,138,000 | 433,950,000 | 433,950,000 | 426,800,000 | 0 | 0 | 0 | 2019-03-27 22:00:00 | 2019-06-17 | 02.108.378.7-429.000 | PT. Munasa Kreasi Nusantara | 48,500,000 | 10.05 % | ||||
105 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Awang Bangkal-Temunih | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4417181 | 19800433 | APBD | 400,000,000 | 398,860,000 | 386,815,000 | 386,815,000 | 386,375,000 | 0 | 0 | 0 | 2019-03-27 07:00:00 | 2019-05-31 | 01.517.846.0-731.000 | PT. WINAYA KONTEKS KHARISMA | 13,185,000 | 3.3 % | ||||
106 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Temunih-Kodeco 58 | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4420181 | 19800926 | APBD | 400,000,000 | 398,860,000 | 391,132,500 | 391,132,500 | 391,132,500 | 0 | 0 | 0 | 2019-03-21 12:00:00 | 2019-05-17 | 02.531.483.2-731.000 | MANDIRI cipta PRATAMA | 8,867,500 | 2.22 % | ||||
107 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi / Renovasi Gedung Kantor Ramah Difabel | Tender | Pekerjaan Konstruksi | 4432181 | 19363973 | APBD | 444,150,000 | 437,806,160 | 357,484,859 | 357,484,859 | 357,484,859 | 357,484,000 | 0 | 0 | 2019-04-18 16:00:00 | 2019-05-06 | 2019-06-17 | 73.857.383.1-735.000 | CV. HARAPAN MASA | 73.857.383.1-735.000 | CV. HARAPAN MASA | 86,665,141 | 19.51 % | |
108 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Penyusunan Dokumen Outline Business Case Jalan Bebas Hambatan Banjarbaru-Batulicin | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4433181 | 19801311 | APBD | 2,496,250,000 | 2,489,025,000 | 2,238,500,000 | 2,238,500,000 | 2,238,500,000 | 0 | 0 | 0 | 2019-04-04 16:00:00 | 2019-05-09 | 01.124.766.5-731.000 | PT.WIRA WIDYATAMA | 257,750,000 | 10.33 % | ||||
109 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Review Desain Jalan Bebas Hambatan dan Akses Penunjang | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4447181 | 19801136 | APBD | 1,496,250,000 | 1,489,268,000 | 1,340,273,000 | 1,340,273,000 | 1,340,273,000 | 0 | 0 | 0 | 2019-04-08 20:00:00 | 2019-05-11 | 01.534.629.9-731.000 | WIDYADAYA BANDARAN | 155,977,000 | 10.42 % | ||||
110 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Prasarana Air Baku Sengayam Kabupaten Kotabaru | Tender | Pekerjaan Konstruksi | 4453181 | 19014553 | APBD | 1,500,000,000 | 1,499,938,498 | 1,363,104,731 | 1,363,104,731 | 1,339,557,953 | 1,339,557,953 | 0 | 0 | 2019-05-24 15:00:00 | 2019-06-14 | 2019-07-10 | 02.590.596.7-733.000 | CV. Putera Bayu Perdana | 02.590.596.7-733.000 | CV. Putera Bayu Perdana | 136,895,269 | 9.13 % | |
111 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Penyusunan Rencana Tata Ruang Kawasan Strategis Provinsi (RTR KSP) Kawasan Pegunungan Meratus | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4499181 | 21079890 | APBD | 851,830,000 | 851,675,000 | 764,830,000 | 764,830,000 | 764,830,000 | 764,775,000 | 0 | 0 | 2019-04-18 08:00:00 | 2019-06-03 | 2019-06-24 | 02.108.378.7-429.000 | PT. Munasa Kreasi Nusantara | 02.108.378.7-429.000 | PT. Munasa Kreasi Nusantara | 87,000,000 | 10.21 % | |
112 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Manual OP Daerah Irigasi Haruyan Dayak, Daerah Irigasi Kahakan, Daerah Irigasi Mangunang Kab. HST dan Daerah Irigasi Kinarum Kab. Tabalong | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4589181 | 19014532 | APBD | 200,000,000 | 199,991,000 | 191,840,000 | 191,840,000 | 189,420,000 | 189,420,000 | 0 | 0 | 2019-04-02 15:00:00 | 2019-05-20 | 2019-07-10 | 02.090.318.3-731.000 | CV. Inditec Consultant | 02.090.318.3-731.000 | CV. Inditec Consultant | 8,160,000 | 4.08 % | |
113 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Mesjid di Kawasan Perkantoran Pemprov. Kalsel (Konsultan Perencana) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4620181 | 19367793 | APBD | 727,250,000 | 721,314,000 | 577,857,500 | 577,857,500 | 511,440,000 | 511,440,000 | 0 | 0 | 2019-04-05 15:59:00 | 2019-07-02 | 2019-07-11 | 02.050.569.9-731.000 | CV. Dharma Cipta Pratama | 02.050.569.9-731.000 | CV. Dharma Cipta Pratama | 149,392,500 | 20.54 % | |
114 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Awang Bangkal-Temunih | Tender | Pekerjaan Konstruksi | 4625181 | 19800324 | APBD | 33,502,000,000 | 33,502,000,000 | 31,376,125,000 | 31,376,125,000 | 31,376,125,000 | 0 | 0 | 0 | 2019-04-23 08:00:00 | 2019-05-13 | 03.018.059.0-732.000 | PTADHIEWANGOEN SEDAYA | 2,125,875,000 | 6.35 % | ||||
115 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Temunih-Kodeco 58 | Tender | Pekerjaan Konstruksi | 4626181 | 19800799 | APBD | 33,615,080,000 | 33,502,078,691 | 31,717,571,000 | 31,717,571,000 | 31,607,650,000 | 31,607,650,000 | 0 | 0 | 2019-04-23 08:00:00 | 2019-05-13 | 2019-05-22 | 01.110.775.2-731.000 | SAHABAT BARU | 01.110.775.2-731.000 | SAHABAT BARU | 1,897,509,000 | 5.64 % | |
116 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengadaan dan Pemasangan Assesoris serta Mekanikal Elektrikal Jalur Distribusi Utama Banjarbakula lokasi Banjarbaru dan Kab. Tanah Laut (Konsultan Pengawas) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4641181 | 19038528 | APBD | 182,700,000 | 182,700,000 | 178,112,000 | 178,112,000 | 166,832,499 | 166,832,499 | 0 | 0 | 2019-04-10 09:00:00 | 2019-05-20 | 2019-06-12 | 02.172.574.2-731.000 | CV. ANDALUSIA | 02.172.574.2-731.000 | CV. ANDALUSIA | 4,588,000 | 2.51 % | |
117 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jembatan Sungai Temunih dan Sungai Kusan | Tender | Pekerjaan Konstruksi | 4649181 | 18984775 | APBD | 38,505,080,000 | 36,504,975,720 | 34,577,517,655 | 34,577,517,655 | 34,577,517,000 | 34,577,517,000 | 0 | 0 | 2019-04-23 14:00:00 | 2019-05-13 | 2019-05-22 | 01.124.402.7-731.000 | PT. HASRAT JAYA UTAMA | 01.124.402.7-731.000 | PT. HASRAT JAYA UTAMA | 3,927,562,345 | 10.2 % | |
118 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jembatan Banjarmasin-Martapura | Tender | Pekerjaan Konstruksi | 4652181 | 18816138 | APBD | 19,508,000,000 | 19,508,000,000 | 18,661,138,000 | 18,661,138,000 | 18,661,138,000 | 18,661,138,000 | 0 | 0 | 2019-04-23 08:00:00 | 2019-05-14 | 2019-05-28 | 31.635.224.4-731.000 | PT. MULTI USAHA PEMBANGUNAN | 31.635.224.4-731.000 | PT. MULTI USAHA PEMBANGUNAN | 846,862,000 | 4.34 % | |
119 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Supervisi Pembangunan Prasarana Air Baku Sengayam Kabupaten Kotabaru | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4660181 | 19014543 | APBD | 300,000,000 | 299,970,000 | 261,778,000 | 261,778,000 | 256,140,500 | 256,140,500 | 0 | 0 | 2019-05-22 16:00:00 | 2019-07-16 | 2019-08-20 | 95.412.417.8-731.000 | PT. Prisma Jasa Konsulindo | 95.412.417.8-731.000 | PT. Prisma Jasa Konsulindo | 38,222,000 | 12.74 % | |
120 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Penyusunan RTBL Tugu Pal Nol | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4746181 | 20505540 | APBD | 258,000,000 | 257,658,500 | 227,810,000 | 227,810,000 | 212,520,000 | 212,520,000 | 0 | 0 | 2019-04-22 16:00:00 | 2019-06-12 | 2019-06-21 | 01.548.564.2-424.000 | PT. Belaputera Interplan | 01.548.564.2-424.000 | PT. Belaputera Interplan | 30,190,000 | 11.7 % | |
121 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Mesjid Bambu (DED) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4851181 | 19364052 | APBD | 900,650,000 | 900,504,000 | 868,066,100 | 868,066,100 | 863,110,000 | 863,110,000 | 0 | 0 | 2019-05-03 12:00:00 | 2019-06-24 | 2019-07-04 | 70.095.576.8-643.000 | PT. SIGMA REKATAMA CONSULINDO | 70.095.576.8-643.000 | PT. SIGMA REKATAMA CONSULINDO | 32,583,900 | 3.62 % | |
122 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Supervisi Pembangunan Jaringan Daerah Irigasi Kinarum 1.004 Ha Kabupaten Tabalong | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4856181 | 19014454 | APBD | 1,000,000,000 | 782,485,000 | 900,021,100 | 900,021,100 | 747,740,000 | 747,740,000 | 0 | 0 | 2019-05-04 00:00:00 | 2019-07-08 | 2019-07-19 | 02.172.574.2-731.000 | CV. ANDALUSIA | 02.172.574.2-731.000 | CV. ANDALUSIA | 99,978,900 | 10 % | |
123 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehab Gedung Legiun Veteran RI Kalsel dan Sarana Prasarananya di Banjarmasin | Tender | Pekerjaan Konstruksi | 4868181 | 19364022 | APBD | 1,473,250,000 | 1,432,467,335 | 1,094,586,390 | 1,094,586,390 | 1,094,586,390 | 1,094,586,000 | 0 | 0 | 2019-05-09 09:50:00 | 2019-05-23 | 2019-07-03 | 01.879.339.8-731.000 | CV. HARAPAN BARU | 01.879.339.8-731.000 | CV. HARAPAN BARU | 378,663,610 | 25.7 % | |
124 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pemeliharaan Berkala Saluran Pembuang Daerah Irigasi Haruyan Dayak Kabupaten HST | Tender | Pekerjaan Konstruksi | 5043181 | 19014617 | APBD | 1,500,000,000 | 1,499,945,636 | 1,099,949,056 | 1,099,949,056 | 1,099,949,056 | 1,099,949,056 | 0 | 0 | 2019-05-22 09:00:00 | 2019-06-24 | 2019-07-16 | 02.019.157.3-733.000 | SAHABAT KARYA.CV | 02.019.157.3-733.000 | SAHABAT KARYA.CV | 400,050,944 | 26.67 % | |
125 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Galeri di Mess Billiton dan di Anjungan Kalsel TMII Jakarta | Tender | Pekerjaan Konstruksi | 5250181 | 19364048 | APBD | 1,501,850,000 | 1,500,998,844 | 1,454,471,775 | 1,454,471,775 | 1,454,471,000 | 1,454,471,000 | 0 | 0 | 2019-06-27 18:00:00 | 2019-07-19 | 2019-08-19 | 02.362.068.5-731.000 | CV. BANGUN SELARAS | 02.362.068.5-731.000 | CV. BANGUN SELARAS | 47,378,225 | 3.15 % | |
126 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Galeri di Mess Billiton dan di Anjungan Kalsel TMII Jakarta (Konsultan Pengawas) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 5251181 | 19364050 | APBD | 137,000,000 | 136,917,000 | 116,710,000 | 116,710,000 | 116,710,000 | 113,850,000 | 0 | 0 | 2019-06-27 15:00:00 | 2019-08-06 | 2019-08-19 | 01.860.230.0-731.000 | CV PRAKTIRA KONSULTAN | 01.860.230.0-731.000 | CV PRAKTIRA KONSULTAN | 20,290,000 | 14.81 % | |
127 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Perencanaan Pembentukan BLUD SPAM Regional Banjarbakula | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 5360181 | 21701572 | APBD | 910,000,000 | 368,850,900 | 334,675,000 | 334,675,000 | 324,500,000 | 324,500,000 | 0 | 0 | 2019-06-28 16:00:00 | 2019-08-15 | 2019-08-29 | 02.108.378.7-429.000 | PT. Munasa Kreasi Nusantara | 02.108.378.7-429.000 | PT. Munasa Kreasi Nusantara | 575,325,000 | 63.22 % | |
128 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Review FS dan DED SPAM Regional Kalsel Banjarbakula | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 5361181 | 21701571 | APBD | 400,000,000 | 399,943,500 | 398,684,000 | 398,684,000 | 376,400,000 | 376,400,000 | 0 | 0 | 2019-06-28 18:00:00 | 2019-08-15 | 2019-08-29 | 02.185.071.4-061.000 | PT. PRAKARINDO BUANA | 02.185.071.4-061.000 | PT. PRAKARINDO BUANA | 1,316,000 | 0.33 % | |
129 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Mako Brimob | Tender | Pekerjaan Konstruksi | 5469181 | 19368884 | APBD | 844,000,000 | 841,066,941 | 814,713,839 | 814,713,839 | 814,713,839 | 0 | 0 | 0 | 2019-08-19 12:00:00 | 2019-09-02 | 72.694.383.0-731.000 | CV. SAID KARYA KONSTRUKSI | 29,286,161 | 3.47 % | ||||
130 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Penyusunan DED Rehab Kantor Gubernur di Banjarmasin dan Penyelesaian Sarana penunjangnya | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 5687181 | 21914666 | APBDP | 180,625,000 | 180,092,000 | 151,800,000 | 151,800,000 | 151,800,000 | 0 | 0 | 0 | 2019-08-29 15:00:00 | 2019-10-11 | 01.860.272.2-731.000 | CV. DAYAKARSA MADYA Consultant | 28,825,000 | 15.96 % | ||||
131 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Barabai - Pagat | Tender | Pekerjaan Konstruksi | 5816181 | 21949737 | APBDP | 2,855,150,000 | 2,855,149,279 | 2,681,072,543 | 2,681,072,543 | 2,681,072,543 | 2,681,072,543 | 0 | 0 | 2019-09-23 12:00:00 | 2019-10-10 | 2019-10-18 | 02.342.802.2-735.000 | CV. SANGGA BANUA | 02.342.802.2-735.000 | CV. SANGGA BANUA | 174,077,457 | 6.1 % | |
132 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Angsana | Tender | Pekerjaan Konstruksi | 5855181 | 21950421 | APBDP | 1,857,650,000 | 1,857,649,992 | 1,783,132,596 | 1,783,132,596 | 1,781,626,000 | 0 | 0 | 0 | 2019-09-27 13:00:00 | 2019-10-17 | 91.744.784.9-734.000 | Indo Tama Jaya | 74,517,404 | 4.01 % | ||||
133 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Tanjung Serdang - Lontar | Tender | Pekerjaan Konstruksi | 5858181 | 21950232 | APBDP | 4,855,150,000 | 4,854,385,302 | 4,709,822,955 | 4,709,822,955 | 4,709,422,630 | 0 | 0 | 0 | 2019-10-01 15:00:00 | 2019-10-16 | 91.744.784.9-734.000 | Indo Tama Jaya | 145,327,045 | 2.99 % | ||||
134 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Pelaihari - Takisung & Peningkatan Jalan Pelaihari - Batakan | Tender | Pekerjaan Konstruksi | 5860181 | 21950037 | APBDP | 4,855,150,000 | 4,855,149,990 | 4,756,029,557 | 4,756,029,557 | 4,727,525,000 | 0 | 0 | 0 | 2019-09-26 14:00:00 | 2019-10-18 | 02.521.809.0-732.000 | cv. andhika karya | 99,120,443 | 2.04 % | ||||
135 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan TPA Regional | Tender | Pekerjaan Konstruksi | 5864181 | 22065235 | APBDP | 9,378,525,000 | 9,378,524,828 | 8,867,385,300 | 8,867,385,300 | 8,508,353,000 | 8,508,353,000 | 0 | 0 | 2019-09-26 14:00:00 | 2019-10-14 | 2019-10-24 | 02.431.111.0-731.000 | CV. NAHAP | 02.431.111.0-731.000 | CV. NAHAP | 511,139,700 | 5.45 % | |
136 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Gunung Mawar - Gunung Coklat | Tender | Pekerjaan Konstruksi | 5865181 | 21948067 | APBDP | 4,880,750,000 | 4,879,813,303 | 4,632,406,588 | 4,632,406,588 | 4,579,795,000 | 4,579,795,000 | 0 | 0 | 2019-09-27 15:30:00 | 2019-10-14 | 2019-10-22 | 02.243.078.9-732.000 | PT. Indah Perkasa Konstruksi | 02.243.078.9-732.000 | PT. Indah Perkasa Konstruksi | 248,343,413 | 5.09 % | |
137 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Galam Rabah | Tender | Pekerjaan Konstruksi | 5866181 | 22066804 | APBDP | 2,857,650,000 | 2,856,992,588 | 2,657,731,729 | 2,657,731,729 | 2,649,000,000 | 0 | 0 | 0 | 2019-09-27 17:00:00 | 2019-10-16 | 84.697.060.6-731.000 | PT. Wassenar Karya Marga | 199,918,271 | 7 % | ||||
138 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Mandiangin - Puncak Kolam | Tender | Pekerjaan Konstruksi | 5884181 | 22065121 | APBDP | 5,878,525,000 | 5,877,900,071 | 5,580,753,600 | 5,580,753,600 | 5,566,127,363 | 5,566,127,363 | 0 | 0 | 2019-09-26 18:00:00 | 2019-10-16 | 2019-10-23 | 01.124.690.7-732.000 | AMARTA JAYA TEHNIK | 01.124.690.7-732.000 | AMARTA JAYA TEHNIK | 297,771,400 | 5.07 % | |
139 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Kasturi - Jalan Akses Bandara - Jalan Lingkar Utara Banjarbaru (Paket II) Lanjutan | Tender | Pekerjaan Konstruksi | 5901181 | 21947701 | APBDP | 19,871,000,000 | 19,871,000,000 | 18,762,730,524 | 18,762,730,524 | 18,702,613,000 | 0 | 0 | 0 | 2019-09-27 15:30:00 | 2019-10-18 | 01.124.946.3-731.000 | PT. ADIMANUNGGAL CIPTA PADUNUSA | 1,108,269,476 | 5.58 % | ||||
140 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Lingkungan Kawasan Kebun Raya Banua | Tender | Pekerjaan Konstruksi | 5914181 | 22058489 | APBDP | 4,658,700,000 | 4,658,668,539 | 4,329,548,144 | 4,329,548,144 | 4,306,436,712 | 4,306,436,712 | 0 | 0 | 2019-09-26 14:00:00 | 2019-10-16 | 2019-11-01 | 01.203.944.2-732.000 | CV. Sari Alam Utama | 01.203.944.2-732.000 | CV. Sari Alam Utama | 329,151,856 | 7.07 % | |
141 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Paving di Miniatur Hutan Hujan Tropis | Tender | Pekerjaan Konstruksi | 5915181 | 22058492 | APBDP | 1,857,200,000 | 1,367,125,517 | 1,134,733,725 | 1,134,733,725 | 1,134,733,725 | 1,134,733,725 | 0 | 0 | 2019-09-25 22:10:00 | 2019-10-15 | 2019-11-01 | 01.907.984.1-735.000 | cv.sinar harapan | 01.907.984.1-735.000 | cv.sinar harapan | 722,466,275 | 38.9 % | |
142 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Penataan Halaman Gedung Sultan Suriansyah di Banjarmasin | Tender | Pekerjaan Konstruksi | 5917181 | 22100428 | APBDP | 1,849,200,000 | 1,093,071,308 | 1,067,153,440 | 1,067,153,440 | 1,028,846,000 | 1,028,846,000 | 0 | 0 | 2019-09-26 10:00:00 | 2019-10-23 | 2019-11-01 | 02.242.653.0-732.000 | CV. 313 | 02.242.653.0-732.000 | CV. 313 | 782,046,560 | 42.29 % | |
143 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Lanjutan Pembangunan Toilet Pria Mesjid Raya Sabilal Muhtadin di Banjarmasin | Tender | Pekerjaan Konstruksi | 5918181 | 22058481 | APBDP | 810,250,000 | 809,062,812 | 703,312,291 | 703,312,291 | 645,620,000 | 645,620,000 | 0 | 0 | 2019-09-30 08:00:00 | 2019-10-16 | 2019-11-01 | 02.708.648.7-731.000 | CV. SUBUR MAKMUR KARYA BERSAMA | 02.708.648.7-731.000 | CV. SUBUR MAKMUR KARYA BERSAMA | 106,937,709 | 13.2 % | |
144 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Survei Investigasi Pondok Pasantren Darussalam Kabupaten Banjar | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 5969181 | 22136969 | APBDP | 350,000,000 | 349,999,980 | 323,660,700 | 323,660,700 | 323,660,700 | 323,660,700 | 0 | 0 | 2019-10-09 09:00:00 | 2019-11-11 | 2019-11-25 | 02.809.318.5-711.000 | CV. TIKA KREATIF DESAIN KONSULTAN | 02.809.318.5-711.000 | CV. TIKA KREATIF DESAIN KONSULTAN | 26,339,300 | 7.53 % | |
145 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Mako Brimob | Tender | Pekerjaan Konstruksi | 6003181 | 19368884 | APBD | 844,000,000 | 691,742,017 | 682,867,804 | 682,867,804 | 682,204,000 | 682,204,000 | 0 | 0 | 2019-10-09 10:00:00 | 2019-10-23 | 2019-11-01 | 71.378.880.0-733.000 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | CV. GLOBAL MITRA KARYA | 161,132,196 | 19.09 % | |
146 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jembatan Banjarmasin - Martapura (Lanjutan) | Tender | Pekerjaan Konstruksi | 6054181 | 21947818 | APBDP | 2,883,250,000 | 2,883,234,784 | 2,824,583,471 | 2,824,583,471 | 2,824,583,471 | 0 | 0 | 0 | 2019-10-08 21:00:00 | 2019-10-22 | 80.777.350.2-731.000 | CV. TRI HIDAYAH | 58,666,529 | 2.03 % | ||||
147 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan KM 45 - KM 52 (Ruas Lumpangi - Batulicin) | Tender | Pekerjaan Konstruksi | 6062181 | 21950173 | APBDP | 40,945,400,000 | 40,945,395,325 | 38,651,265,596 | 38,651,265,596 | 38,594,329,684 | 0 | 0 | 0 | 2019-10-11 11:00:00 | 2019-10-25 | 03.169.298.1-734.000 | PT.BATULICIN BETON ASPHALT | 2,294,134,404 | 5.6 % | ||||
148 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Jalan Batulicin - Mentawakan (KM 4 - KM 10) (Lanjutan) | Tender | Pekerjaan Konstruksi | 6075181 | 22065358 | APBDP | 9,852,925,000 | 9,852,911,071 | 9,194,701,010 | 9,194,701,010 | 9,161,792,638 | 0 | 0 | 0 | 2019-10-11 11:00:00 | 2019-10-28 | 01.222.215.4-734.000 | CV. Dewi Indah | 658,223,990 | 6.68 % | ||||
149 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Paramasan dan Angkipih Atas - Paramasan Bawah | Tender | Pekerjaan Konstruksi | 6126181 | 21947979 | APBDP | 4,855,150,000 | 4,852,970,830 | 4,682,129,348 | 4,682,129,348 | 4,682,129,348 | 0 | 0 | 0 | 2019-10-18 12:00:00 | 2019-11-04 | 02.489.989.0-731.000 | CV. SETIAWAN NOOR | 173,020,652 | 3.56 % | ||||
150 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Wisata Goa Liang Bangkai | Tender | Pekerjaan Konstruksi | 6179181 | 22318024 | APBDP | 4,855,150,000 | 4,855,146,372 | 4,622,472,457 | 4,622,472,457 | 4,586,985,000 | 0 | 0 | 0 | 2019-10-24 15:00:00 | 2019-11-05 | 01.222.215.4-734.000 | CV. Dewi Indah | 232,677,543 | 4.79 % | ||||
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Sarana dan Prasarana Pendukung Tugu Pal Nol | Tender | Pekerjaan Konstruksi | 3995181 | 19038515 | APBD | 12,531,000,000 | 12,459,462,021 | 11,367,410,174 | 11,367,410,174 | 11,367,410,174 | 11,367,410,174 | 0 | 0 | 2019-01-29 15:00:00 | 2019-02-21 | 2019-03-18 | 74.895.338.7-609.000 | PT. DEFANI ENERGI INDONESIA | 74.895.338.7-609.000 | PT. DEFANI ENERGI INDONESIA | 1,163,589,826 | 9.29 % | |
2 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan dan Jembatan Lumpangi-Loksado | Tender | Pekerjaan Konstruksi | 4000181 | 18829679 | APBD | 4,564,830,000 | 4,564,828,828 | 4,327,546,227 | 4,327,546,227 | 4,299,724,985 | 4,299,724,985 | 0 | 0 | 2019-01-30 14:00:00 | 2019-02-25 | 2019-03-18 | 02.224.175.6-733.000 | PT.MITRA REZKI UTAMA | 02.224.175.6-733.000 | PT.MITRA REZKI UTAMA | 237,283,773 | 5.2 % | |
3 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jembatan Jalan Pendidkan Sekumpul Martapura (Pelebaran) | Tender | Pekerjaan Konstruksi | 4001181 | 18972548 | APBD | 10,615,525,000 | 10,615,525,000 | 9,925,000,165 | 9,925,000,165 | 9,925,000,165 | 9,925,000,165 | 0 | 0 | 2019-01-17 15:00:00 | 2019-03-25 | 2019-04-04 | 01.424.331.5-732.000 | PT. JATI BARU | 01.424.331.5-732.000 | PT. JATI BARU | 690,524,835 | 6.5 % | |
4 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan By Pass-Binderang | Tender | Pekerjaan Konstruksi | 4002181 | 18827707 | APBD | 2,921,550,000 | 2,921,550,000 | 2,829,236,298 | 2,829,236,298 | 2,829,236,298 | 2,829,236,298 | 0 | 0 | 2019-01-30 14:00:00 | 2019-02-25 | 2019-03-18 | 80.203.029.6-731.000 | PT. WAJI PUTERA KARYA MANDIRI | 80.203.029.6-731.000 | PT. WAJI PUTERA KARYA MANDIRI | 92,313,702 | 3.16 % | |
5 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jembatan Desa Sungai Apuy 1 dan Apuy II | Tender | Pekerjaan Konstruksi | 4004181 | 19043697 | APBD | 34,505,080,000 | 34,505,080,000 | 33,666,666,736 | 33,666,666,736 | 33,666,666,000 | 33,666,666,000 | 0 | 0 | 2019-04-22 14:00:00 | 2019-05-13 | 2019-05-22 | 03.265.981.5-731.000 | PT. Pandji Pratama Indonesia | 03.265.981.5-731.000 | PT. Pandji Pratama Indonesia | 838,413,264 | 2.43 % | |
6 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Desa Bahandang-Desa Keliling Benteng | Tender | Pekerjaan Konstruksi | 4005181 | 18816083 | APBD | 6,862,605,000 | 6,862,605,000 | 6,693,446,006 | 6,693,446,006 | 6,681,890,000 | 6,681,890,000 | 0 | 0 | 2019-01-30 14:00:00 | 2019-02-18 | 2019-03-01 | 70.694.710.8-732.000 | PT.TANJUNG RAYA BERSAMA | 70.694.710.8-732.000 | PT.TANJUNG RAYA BERSAMA | 169,158,994 | 2.46 % | |
7 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Gambut-Pulau Sari | Tender | Pekerjaan Konstruksi | 4007181 | 18827641 | APBD | 4,967,750,000 | 4,967,750,000 | 4,682,064,365 | 4,682,064,365 | 4,682,064,365 | 4,682,064,365 | 0 | 0 | 2019-01-30 14:00:00 | 2019-02-25 | 2019-03-18 | 01.137.533.4-731.000 | PT. PUTRA KANCA | 01.137.533.4-731.000 | PT. PUTRA KANCA | 285,685,635 | 5.75 % | |
8 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Ray 7-Desa Bahandang | Tender | Pekerjaan Konstruksi | 4009181 | 18816098 | APBD | 4,914,830,000 | 4,914,830,000 | 4,714,741,067 | 4,714,741,067 | 4,685,220,000 | 4,685,220,000 | 0 | 0 | 2019-01-30 14:00:00 | 2019-02-25 | 2019-03-18 | 03.265.981.5-731.000 | PT. Pandji Pratama Indonesia | 03.265.981.5-731.000 | PT. Pandji Pratama Indonesia | 200,088,933 | 4.07 % | |
9 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Simpang 3 Lingkar Utara-Simpang 3 Jalan Golf | Tender | Pekerjaan Konstruksi | 4014181 | 18824895 | APBD | 9,965,525,000 | 9,965,525,000 | 9,428,570,170 | 9,428,570,170 | 9,428,570,170 | 9,428,570,170 | 0 | 0 | 2019-01-30 14:00:00 | 2019-02-28 | 2019-03-18 | 02.614.233.1-731.000 | PT. MENARA PILAR UTAMA | 02.614.233.1-731.000 | PT. MENARA PILAR UTAMA | 536,954,830 | 5.39 % | |
10 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Kasturi-Jalan Akses Bandara-Jalan Lingkar Utara (Paket II) | Tender | Pekerjaan Konstruksi | 4017181 | 18825091 | APBD | 4,967,750,000 | 4,967,750,000 | 4,764,686,310 | 4,764,686,310 | 4,764,686,310 | 4,764,686,310 | 0 | 0 | 2019-01-30 14:00:00 | 2019-02-26 | 2019-03-18 | 70.733.060.1-731.000 | PT. AQILA AGUNG MULTI PERSADA | 70.733.060.1-731.000 | PT. AQILA AGUNG MULTI PERSADA | 203,063,690 | 4.09 % | |
11 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Suka Damai-Mentewe | Tender | Pekerjaan Konstruksi | 4018181 | 18829697 | APBD | 37,555,080,000 | 37,551,417,484 | 36,038,126,423 | 36,038,126,423 | 35,928,984,159 | 35,928,984,159 | 0 | 0 | 2019-01-30 14:00:00 | 2019-02-25 | 2019-03-18 | 03.169.298.1-734.000 | PT.BATULICIN BETON ASPHALT | 03.169.298.1-734.000 | PT.BATULICIN BETON ASPHALT | 1,516,953,577 | 4.04 % | |
12 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Rantau-Muara Muning | Tender | Pekerjaan Konstruksi | 4037181 | 18827676 | APBD | 4,371,550,000 | 4,371,550,000 | 4,215,791,273 | 4,215,791,273 | 4,215,791,273 | 4,215,791,273 | 0 | 0 | 2019-01-30 14:00:00 | 2019-02-25 | 2019-03-18 | 02.237.343.5-733.000 | PT.Bina Bangun Banua Bersama | 02.237.343.5-733.000 | PT.Bina Bangun Banua Bersama | 155,758,727 | 3.56 % | |
13 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Kiram-Gunung Mawar | Tender | Pekerjaan Konstruksi | 4046181 | 19045657 | APBD | 4,517,750,000 | 4,517,750,000 | 4,402,026,033 | 4,402,026,033 | 4,384,824,982 | 4,384,824,982 | 0 | 0 | 2019-01-30 14:00:00 | 2019-02-25 | 2019-03-18 | 03.018.148.1-732.000 | PT. ADJI PERKASA | 03.018.148.1-732.000 | PT. ADJI PERKASA | 115,723,967 | 2.56 % | |
14 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Kiram-Gunung Coklat | Tender | Pekerjaan Konstruksi | 4049181 | 18827388 | APBD | 5,965,525,000 | 5,965,525,000 | 5,804,918,768 | 5,804,918,768 | 5,783,630,000 | 5,783,630,000 | 0 | 0 | 2019-01-30 17:00:00 | 2019-02-28 | 2019-03-20 | 70.694.710.8-732.000 | PT.TANJUNG RAYA BERSAMA | 70.694.710.8-732.000 | PT.TANJUNG RAYA BERSAMA | 160,606,232 | 2.69 % | |
15 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Kiram-Simpang 3 Tahura-Mandiangin | Tender | Pekerjaan Konstruksi | 4050181 | 18985916 | APBD | 4,717,750,000 | 4,717,750,000 | 4,591,715,628 | 4,591,715,628 | 4,573,435,000 | 4,573,435,000 | 0 | 0 | 2019-01-30 14:00:00 | 2019-02-25 | 2019-03-18 | 76.210.704.3-731.000 | PT.SATRIA BAGUS PERKASA | 76.210.704.3-731.000 | PT.SATRIA BAGUS PERKASA | 126,034,372 | 2.67 % | |
16 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Gunung Kupang-Kiram-Tambang Ulang (DAK) | Tender | Pekerjaan Konstruksi | 4051181 | 18829732 | APBD | 24,050,517,000 | 24,050,517,000 | 23,209,700,904 | 23,209,700,904 | 23,204,630,000 | 0 | 0 | 0 | 2019-02-19 14:35:00 | 2019-03-25 | 70.694.710.8-732.000 | PT.TANJUNG RAYA BERSAMA | 840,816,096 | 3.5 % | ||||
17 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Anjir Pasar-Marabahan | Tender | Pekerjaan Konstruksi | 4053181 | 19045907 | APBD | 13,555,080,000 | 13,555,080,000 | 13,011,226,245 | 13,011,226,245 | 12,701,661,000 | 12,701,661,000 | 0 | 0 | 2019-01-30 14:00:00 | 2019-02-25 | 2019-03-18 | 03.265.981.5-731.000 | PT. Pandji Pratama Indonesia | 03.265.981.5-731.000 | PT. Pandji Pratama Indonesia | 543,853,755 | 4.01 % | |
18 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Jejangkit Muara-Ray 7 | Tender | Pekerjaan Konstruksi | 4054181 | 18816118 | APBD | 6,912,605,000 | 6,912,605,000 | 6,481,878,475 | 6,481,878,475 | 6,481,878,475 | 6,481,878,475 | 0 | 0 | 2019-01-30 14:00:00 | 2019-02-25 | 2019-03-18 | 01.124.946.3-731.000 | PT. ADIMANUNGGAL CIPTA PADUNUSA | 01.124.946.3-731.000 | PT. ADIMANUNGGAL CIPTA PADUNUSA | 430,726,525 | 6.23 % | |
19 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Golf Banjarbaru | Tender | Pekerjaan Konstruksi | 4057181 | 18825221 | APBD | 4,517,750,000 | 4,517,750,000 | 4,313,770,255 | 4,313,770,255 | 4,313,770,255 | 4,313,770,255 | 0 | 0 | 2019-01-30 14:00:00 | 2019-02-25 | 2019-03-18 | 01.133.868.8-731.000 | PT. HM Taher | 01.133.868.8-731.000 | PT. HM Taher | 203,979,745 | 4.52 % | |
20 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Banjarbaru-Simpang 3 Tahura-Aranio | Tender | Pekerjaan Konstruksi | 4058181 | 18825474 | APBD | 4,967,750,000 | 4,967,750,000 | 4,761,972,915 | 4,761,972,915 | 4,761,972,915 | 4,761,972,915 | 0 | 0 | 2019-01-30 14:00:00 | 2019-02-25 | 2019-03-18 | 01.124.866.3-732.000 | PT. VANAGA UTAMA | 01.124.866.3-732.000 | PT. VANAGA UTAMA | 205,777,085 | 4.14 % | |
21 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Kapar Kias-Birayang | Tender | Pekerjaan Konstruksi | 4061181 | 18829686 | APBD | 4,914,830,000 | 4,914,830,000 | 4,563,641,426 | 4,563,641,426 | 4,563,641,426 | 4,563,641,426 | 0 | 0 | 2019-01-30 14:00:00 | 2019-03-01 | 2019-03-21 | 01.124.058.7-733.000 | AIRA DUTA MURAKATA. PT | 01.124.058.7-733.000 | AIRA DUTA MURAKATA. PT | 351,188,574 | 7.15 % | |
22 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Banjang-Pulau Nyiur-Batumandi | Tender | Pekerjaan Konstruksi | 4062181 | 18829689 | APBD | 2,528,270,000 | 2,528,270,000 | 2,387,938,450 | 2,387,938,450 | 2,368,770,000 | 2,368,770,000 | 0 | 0 | 2019-02-15 18:00:00 | 2019-03-07 | 2019-03-18 | 02.896.703.2-733.000 | PT.PUTRA PERDANA PERSADA | 02.896.703.2-733.000 | PT.PUTRA PERDANA PERSADA | 140,331,550 | 5.55 % | |
23 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Lingkar Binuang | Tender | Pekerjaan Konstruksi | 4064181 | 18827664 | APBD | 4,914,830,000 | 4,914,830,000 | 4,710,480,823 | 4,710,480,823 | 4,710,480,823 | 4,710,480,823 | 0 | 0 | 2019-01-30 14:00:00 | 2019-02-25 | 2019-03-18 | 75.222.098.8-331.000 | PT. TOSAMA ADHI JAYA | 75.222.098.8-331.000 | PT. TOSAMA ADHI JAYA | 204,349,177 | 4.16 % | |
24 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Tanjung Serdang-Lontar | Tender | Pekerjaan Konstruksi | 4065181 | 18829706 | APBD | 9,561,525,000 | 9,061,250,286 | 8,770,942,955 | 8,770,942,955 | 8,770,942,955 | 8,770,942,955 | 0 | 0 | 2019-01-30 14:00:00 | 2019-02-25 | 2019-03-15 | 31.807.270.9-731.000 | nawa cipta waradana pt | 31.807.270.9-731.000 | nawa cipta waradana pt | 790,582,045 | 8.27 % | |
25 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Lontar-Tanjung Seloka-Berangas | Tender | Pekerjaan Konstruksi | 4066181 | 18829709 | APBD | 9,561,525,000 | 9,061,525,000 | 8,777,851,045 | 8,777,851,045 | 8,777,851,000,000 | 8,777,851,000,000 | 0 | 0 | 2019-01-30 14:00:00 | 2019-02-26 | 2019-03-15 | 31.807.270.9-731.000 | nawa cipta waradana pt | 31.807.270.9-731.000 | nawa cipta waradana pt | 783,673,955 | 8.2 % | |
26 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Batulicin-Mentawakan | Tender | Pekerjaan Konstruksi | 4067181 | 18829693 | APBD | 39,505,080,000 | 39,505,080,000 | 38,398,917,978 | 38,398,917,978 | 38,303,675,000 | 0 | 0 | 0 | 2019-01-30 14:00:00 | 2019-03-04 | 03.169.298.1-734.000 | PT.BATULICIN BETON ASPHALT | 1,106,162,022 | 2.8 % | ||||
27 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Birayang-Tariwin-Lok Batu-Batu Mandi | Tender | Pekerjaan Konstruksi | 4070181 | 18827723 | APBD | 4,464,830,000 | 4,464,830,000 | 4,149,170,525 | 4,149,170,525 | 4,089,565,000 | 4,089,565,000 | 0 | 0 | 2019-01-30 14:00:00 | 2019-02-26 | 2019-03-18 | 02.942.104.7-731.000 | SAPTA JASA KONSTRUKSI | 02.942.104.7-731.000 | SAPTA JASA KONSTRUKSI | 315,659,475 | 7.07 % | |
28 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Guntung Panaitan-Lampihong | Tender | Pekerjaan Konstruksi | 4074181 | 18829692 | APBD | 2,928,270,000 | 2,928,270,000 | 2,810,126,129 | 2,810,126,129 | 2,810,126,129 | 2,810,126,129 | 0 | 0 | 2019-01-30 14:00:00 | 2019-02-26 | 2019-03-18 | 01.124.098.3-735.000 | PT. CAHAYA MENTARI | 01.124.098.3-735.000 | PT. CAHAYA MENTARI | 118,143,871 | 4.03 % | |
29 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Dahai-Tanjung | Tender | Pekerjaan Konstruksi | 4076181 | 18829676 | APBD | 4,464,830,000 | 4,464,830,000 | 4,247,124,269 | 4,247,124,269 | 4,247,124,269 | 4,247,124,269 | 0 | 0 | 2019-02-15 14:00:00 | 2019-03-05 | 2019-03-18 | 02.746.857.8-735.000 | PT. Sinar Mahaputera Mandaga Bakti | 02.746.857.8-735.000 | PT. Sinar Mahaputera Mandaga Bakti | 217,705,731 | 4.88 % | |
30 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Amuntai-Lampihong-Paringin-Halong (DAK) | Tender | Pekerjaan Konstruksi | 4077181 | 18829724 | APBD | 4,775,000,000 | 4,775,000,000 | 4,579,721,456 | 4,579,721,456 | 4,579,721,456 | 4,579,721,456 | 0 | 0 | 2019-01-30 14:00:00 | 2019-02-26 | 2019-03-18 | 01.124.098.3-735.000 | PT. CAHAYA MENTARI | 01.124.098.3-735.000 | PT. CAHAYA MENTARI | 195,278,544 | 4.09 % | |
31 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Simpang 3 Golf-Jalan Kasturi (Paket I) | Tender | Pekerjaan Konstruksi | 4082181 | 19046006 | APBD | 18,908,000,000 | 18,908,000,000 | 17,706,696,487 | 17,706,696,487 | 17,706,696,487 | 17,706,696,487 | 0 | 0 | 2019-01-30 14:00:00 | 2019-02-28 | 2019-03-18 | 01.124.946.3-731.000 | PT. ADIMANUNGGAL CIPTA PADUNUSA | 01.124.946.3-731.000 | PT. ADIMANUNGGAL CIPTA PADUNUSA | 1,201,303,513 | 6.35 % | |
32 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Tanjung-Muara Uya | Tender | Pekerjaan Konstruksi | 4094181 | 18829688 | APBD | 4,914,830,000 | 4,914,829,343 | 4,533,040,887 | 4,533,040,887 | 4,533,040,887 | 4,533,040,887 | 0 | 0 | 2019-02-15 14:00:00 | 2019-03-05 | 2019-03-18 | 02.421.761.4-735.000 | PT. PILAR JAYA KONSTRUKSI | 02.421.761.4-735.000 | PT. PILAR JAYA KONSTRUKSI | 381,789,113 | 7.77 % | |
33 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Normalisasi Sungai Saluran Pembuang Embung Landasan Ulin | Tender | Pekerjaan Konstruksi | 4096181 | 19014585 | APBD | 2,000,000,000 | 1,999,997,281 | 1,337,479,716 | 1,337,479,716 | 1,337,479,716 | 1,337,479,716 | 0 | 0 | 2019-02-12 10:00:00 | 2019-03-15 | 2019-04-22 | 02.050.836.2-735.000 | CV.SEPAKAT | 02.050.836.2-735.000 | CV.SEPAKAT | 662,520,284 | 33.13 % | |
34 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jaringan Daerah Irigasi Kinarum 1.004 Ha Kabupaten Tabalong | Tender | Pekerjaan Konstruksi | 4098181 | 19014478 | APBD | 25,472,087,000 | 25,472,055,252 | 22,262,797,099 | 22,262,797,099 | 22,166,354,000 | 22,166,354,000 | 0 | 0 | 2019-02-11 10:00:00 | 2019-03-04 | 2019-03-22 | 01.407.735.8-711.000 | PT.ARGO SANJOYO ADHITAMA | 01.407.735.8-711.000 | PT.ARGO SANJOYO ADHITAMA | 3,209,289,901 | 12.6 % | |
35 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Polder Mini Daerah Irigasi Rawa Polder Bakar Kabupaten Hulu Sungai Utara | Tender | Pekerjaan Konstruksi | 4100181 | 19014465 | APBD | 9,640,000,000 | 9,639,997,036 | 9,152,211,000 | 9,152,211,000 | 9,147,380,000 | 9,147,380,000 | 0 | 0 | 2019-02-11 08:00:00 | 2019-03-11 | 2019-03-28 | 01.424.627.6-733.000 | PT. DIANG PUTRA ANDHIKATAMA | 01.424.627.6-733.000 | PT. DIANG PUTRA ANDHIKATAMA | 487,789,000 | 5.06 % | |
36 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Kandangan-Negara (DAK) | Tender | Pekerjaan Konstruksi | 4104181 | 18829730 | APBD | 4,775,000,000 | 4,774,984,854 | 4,723,219,871 | 4,723,219,871 | 4,572,000,000 | 4,572,000,000 | 0 | 0 | 2019-02-15 18:00:00 | 2019-03-07 | 2019-03-18 | 01.860.696.2-731.000 | PT. SALSABILA ONIRESH NUSANTARA | 01.860.696.2-731.000 | PT. SALSABILA ONIRESH NUSANTARA | 51,780,129 | 1.08 % | |
37 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Jaringan DIR. Alalak Padang Kab. Banjar | Tender | Pekerjaan Konstruksi | 4106181 | 19014610 | APBD | 5,000,000,000 | 4,999,999,639 | 3,740,158,613 | 3,740,158,613 | 3,740,158,613 | 3,740,158,613 | 0 | 0 | 2019-02-11 15:30:00 | 2019-03-05 | 2019-03-28 | 75.733.281.2-731.000 | PT. CIPTA RAYA NUSANTARA | 75.733.281.2-731.000 | PT. CIPTA RAYA NUSANTARA | 1,259,841,387 | 25.2 % | |
38 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Jaringan DIR. Polder Tambak Hanyar Kab. Banjar | Tender | Pekerjaan Konstruksi | 4114181 | 19014597 | APBD | 3,000,000,000 | 2,999,972,842 | 2,732,834,000 | 2,732,834,000 | 2,584,420,677 | 2,584,420,677 | 0 | 0 | 2019-02-12 15:30:00 | 2019-02-27 | 2019-03-22 | 71.698.315.0-733.000 | PT. ARYA JAYA KARYA | 71.698.315.0-733.000 | PT. ARYA JAYA KARYA | 267,166,000 | 8.91 % | |
39 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Paramasan-Bawah dan Paramasan Atas-Angkipih | Tender | Pekerjaan Konstruksi | 4115181 | 18985859 | APBD | 4,464,830,000 | 4,464,829,871 | 4,241,046,538 | 4,241,046,538 | 4,241,046,538 | 4,241,046,538 | 0 | 0 | 2019-02-15 17:00:00 | 2019-03-05 | 2019-03-19 | 02.014.742.7-714.000 | PT. RAHMAT AGUNG UTAMA | 02.014.742.7-714.000 | PT. RAHMAT AGUNG UTAMA | 223,783,462 | 5.01 % | |
40 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Lanjutan Pembangunan Gedung Bakeuda | Tender | Pekerjaan Konstruksi | 4124181 | 19039430 | APBD | 8,628,425,000 | 8,623,335,560 | 7,326,620,308 | 7,326,620,308 | 7,326,620,308 | 7,326,620,307 | 0 | 0 | 2019-02-15 16:00:00 | 2019-03-19 | 2019-04-15 | 31.551.576.7-036.000 | PT. ARYSNA MANDIRI | 31.551.576.7-036.000 | PT. ARYSNA MANDIRI | 1,301,804,692 | 15.09 % | |
41 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Negara-Muara Tapus | Tender | Pekerjaan Konstruksi | 4146181 | 18984374 | APBD | 4,664,830,000 | 4,664,830,000 | 4,471,158,746 | 4,471,158,746 | 4,466,795,000 | 4,466,795,000 | 0 | 0 | 2019-02-11 08:00:00 | 2019-03-11 | 2019-03-22 | 02.215.612.9-735.000 | PT. Pusaka Agung Manunggal | 02.215.612.9-735.000 | PT. Pusaka Agung Manunggal | 193,671,255 | 4.15 % | |
42 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehab Halaman dan Pembangunan Toilet Mesjid Raya Sabilal Muhtadin di Banjarmasin (Tahap II) | Tender | Pekerjaan Konstruksi | 4148181 | 19798611 | APBD | 1,382,400,000 | 1,380,717,010 | 1,091,048,469 | 1,091,048,469 | 1,091,048,469 | 1,091,048,469 | 0 | 0 | 2019-02-01 14:25:00 | 2019-03-12 | 2019-03-27 | 02.708.646.1-731.000 | mulia akbar | 02.708.646.1-731.000 | mulia akbar | 291,351,531 | 21.08 % | |
43 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Amuntai-Lampihong-Paringin | Tender | Pekerjaan Konstruksi | 4149181 | 18829204 | APBD | 4,814,830,000 | 4,813,177,924 | 4,571,276,600 | 4,571,276,600 | 4,571,276,600 | 4,571,276,600 | 0 | 0 | 2019-02-11 14:00:00 | 2019-02-26 | 2019-03-18 | 75.885.417.8-735.000 | PT. Cahaya Sambang Sejahtera | 75.885.417.8-735.000 | PT. Cahaya Sambang Sejahtera | 243,553,400 | 5.06 % | |
44 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Lampihong-Mantimin | Tender | Pekerjaan Konstruksi | 4151181 | 18829666 | APBD | 4,371,550,000 | 4,371,549,482 | 4,135,890,984 | 4,135,890,984 | 4,087,037,000 | 4,087,037,000 | 0 | 0 | 2019-02-15 17:00:00 | 2019-03-05 | 2019-03-20 | 02.590.527.4-735.000 | PT. Prima Mitralindo Utama | 02.590.527.4-735.000 | PT. Prima Mitralindo Utama | 235,659,016 | 5.39 % | |
45 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Mentawakan-Mentewe | Tender | Pekerjaan Konstruksi | 4292181 | 18829695 | APBD | 31,555,080,000 | 31,555,079,999 | 30,133,983,482 | 30,133,983,482 | 30,109,250,000 | 30,109,250,000 | 0 | 0 | 2019-02-15 08:00:00 | 2019-03-05 | 2019-03-18 | 02.421.791.1-734.000 | pt hm family | 02.421.791.1-734.000 | pt hm family | 1,421,096,518 | 4.5 % | |
46 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Pile Slab Amuntai-Lampihong-Paringin (Longsoran) | Tender | Pekerjaan Konstruksi | 4305181 | 19906855 | APBD | 4,914,830,000 | 4,914,830,000 | 4,668,146,908 | 4,668,146,908 | 4,667,480,000 | 4,667,480,000 | 0 | 0 | 2019-03-01 15:00:00 | 2019-03-19 | 2019-04-04 | 75.885.417.8-735.000 | PT. Cahaya Sambang Sejahtera | 75.885.417.8-735.000 | PT. Cahaya Sambang Sejahtera | 246,683,092 | 5.02 % | |
47 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Gedung Pramuka | Tender | Pekerjaan Konstruksi | 4326181 | 19363965 | APBD | 2,329,700,000 | 2,328,929,003 | 1,791,425,009 | 1,791,425,009 | 1,791,425,009 | 1,791,425,000 | 0 | 0 | 2019-03-04 11:00:00 | 2019-03-28 | 2019-05-03 | 03.207.898.2-731.000 | CV. DWINA PUTRA MANDIRI | 03.207.898.2-731.000 | CV. DWINA PUTRA MANDIRI | 538,274,991 | 23.1 % | |
48 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengadaan dan Pemasangan Assesoris serta Mekanikal Elektrikal Jalur Distribusi Umum Banjarbakula lokasi Banjarbaru dan Kab. Tanah Laut | Tender | Pekerjaan Konstruksi | 4333181 | 18889480 | APBD | 3,242,375,000 | 3,241,375,478 | 3,134,758,380 | 3,134,758,380 | 3,134,758,380 | 2,963,980,000 | 0 | 0 | 2019-03-04 16:00:00 | 2019-04-25 | 2019-06-12 | 01.879.360.4-731.000 | PT. HIRAVEMINDO KARYA BERSAUDARA | 01.879.360.4-731.000 | PT. HIRAVEMINDO KARYA BERSAUDARA | 107,616,620 | 3.32 % | |
49 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Rumah Dinas dan Dapur Kediaman Gubernur Provinsi Kalimantan Selatan di Banjarmasin | Tender | Pekerjaan Konstruksi | 4334181 | 19363996 | APBD | 863,500,000 | 863,488,166 | 796,891,560 | 796,891,560 | 788,936,813 | 788,936,813 | 0 | 0 | 2019-03-04 11:00:00 | 2019-03-28 | 2019-04-18 | 02.362.068.5-731.000 | CV. BANGUN SELARAS | 02.362.068.5-731.000 | CV. BANGUN SELARAS | 66,608,440 | 7.71 % | |
50 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Gedung Samsat Amuntai | Tender | Pekerjaan Konstruksi | 4335181 | 19364010 | APBD | 7,633,800,000 | 7,622,105,568 | 7,398,214,487 | 7,398,214,487 | 7,398,214,000 | 7,398,214,000 | 0 | 0 | 2019-04-24 08:00:00 | 2019-05-16 | 2019-06-19 | 01.124.865.5-731.000 | PT. PARTNER KEMENANGAN | 01.124.865.5-731.000 | PT. PARTNER KEMENANGAN | 235,585,513 | 3.09 % | |
51 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Banjarbaru-Bati bati | Tender | Pekerjaan Konstruksi | 4340181 | 20258666 | APBD | 8,915,525,000 | 8,915,525,000 | 8,049,833,362 | 8,049,833,362 | 8,049,833,361 | 8,049,833,361 | 0 | 0 | 2019-03-01 15:00:00 | 2019-03-22 | 2019-04-04 | 31.704.295.0-732.000 | PT. KELANA MULTI KONSTRUKSI | 31.704.295.0-732.000 | PT. KELANA MULTI KONSTRUKSI | 865,691,638 | 9.71 % | |
52 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Normalisasi DAS Martapura | Tender | Pekerjaan Konstruksi | 4357181 | 19014568 | APBD | 1,875,500,000 | 1,875,491,948 | 1,329,617,003 | 1,329,617,003 | 1,329,617,003 | 1,329,617,003 | 0 | 0 | 2019-04-22 10:00:00 | 2019-05-23 | 2019-07-10 | 03.063.004.0-731.000 | CV.TITIAN MAS | 03.063.004.0-731.000 | CV.TITIAN MAS | 545,882,997 | 29.11 % | |
53 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Simpang 4 Gatot Subroto-Lingkar Dalam Selatan | Tender | Pekerjaan Konstruksi | 4368181 | 19045763 | APBD | 14,008,000,000 | 14,008,000,000 | 13,283,834,732 | 13,283,834,732 | 13,283,834,731 | 0 | 0 | 0 | 2019-03-04 10:00:00 | 2019-03-26 | 72.196.664.6-731.000 | BIMO LAKSANA GROUP | 724,165,268 | 5.17 % | ||||
54 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Matraman-Sei. Ulin (DAK) | Tender | Pekerjaan Konstruksi | 4392181 | 18829726 | APBD | 5,983,407,000 | 5,983,407,000 | 5,661,587,198 | 5,661,587,198 | 5,661,587,000 | 5,661,587,000 | 0 | 0 | 2019-03-20 08:00:00 | 2019-04-11 | 2019-04-23 | 02.303.665.0-731.000 | PT AGRABUDI JALAN BERDIKARI | 02.303.665.0-731.000 | PT AGRABUDI JALAN BERDIKARI | 321,819,802 | 5.38 % | |
55 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Alternatif Makam Syeh Arsyad Al Banjari | Tender | Pekerjaan Konstruksi | 4395181 | 18986203 | APBD | 18,608,000,000 | 18,608,000,000 | 17,551,060,000 | 17,551,060,000 | 17,551,060,000 | 17,551,060,000 | 0 | 0 | 2019-03-19 16:00:00 | 2019-04-16 | 2019-05-08 | 01.141.499.2-731.000 | PT. SALAMANDRA PETRAMUYA | 01.141.499.2-731.000 | PT. SALAMANDRA PETRAMUYA | 1,056,940,000 | 5.68 % | |
56 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi / Renovasi Gedung Kantor Ramah Difabel | Tender | Pekerjaan Konstruksi | 4432181 | 19363973 | APBD | 444,150,000 | 437,806,160 | 357,484,859 | 357,484,859 | 357,484,859 | 357,484,000 | 0 | 0 | 2019-04-18 16:00:00 | 2019-05-06 | 2019-06-17 | 73.857.383.1-735.000 | CV. HARAPAN MASA | 73.857.383.1-735.000 | CV. HARAPAN MASA | 86,665,141 | 19.51 % | |
57 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Prasarana Air Baku Sengayam Kabupaten Kotabaru | Tender | Pekerjaan Konstruksi | 4453181 | 19014553 | APBD | 1,500,000,000 | 1,499,938,498 | 1,363,104,731 | 1,363,104,731 | 1,339,557,953 | 1,339,557,953 | 0 | 0 | 2019-05-24 15:00:00 | 2019-06-14 | 2019-07-10 | 02.590.596.7-733.000 | CV. Putera Bayu Perdana | 02.590.596.7-733.000 | CV. Putera Bayu Perdana | 136,895,269 | 9.13 % | |
58 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Awang Bangkal-Temunih | Tender | Pekerjaan Konstruksi | 4625181 | 19800324 | APBD | 33,502,000,000 | 33,502,000,000 | 31,376,125,000 | 31,376,125,000 | 31,376,125,000 | 0 | 0 | 0 | 2019-04-23 08:00:00 | 2019-05-13 | 03.018.059.0-732.000 | PTADHIEWANGOEN SEDAYA | 2,125,875,000 | 6.35 % | ||||
59 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Temunih-Kodeco 58 | Tender | Pekerjaan Konstruksi | 4626181 | 19800799 | APBD | 33,615,080,000 | 33,502,078,691 | 31,717,571,000 | 31,717,571,000 | 31,607,650,000 | 31,607,650,000 | 0 | 0 | 2019-04-23 08:00:00 | 2019-05-13 | 2019-05-22 | 01.110.775.2-731.000 | SAHABAT BARU | 01.110.775.2-731.000 | SAHABAT BARU | 1,897,509,000 | 5.64 % | |
60 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jembatan Sungai Temunih dan Sungai Kusan | Tender | Pekerjaan Konstruksi | 4649181 | 18984775 | APBD | 38,505,080,000 | 36,504,975,720 | 34,577,517,655 | 34,577,517,655 | 34,577,517,000 | 34,577,517,000 | 0 | 0 | 2019-04-23 14:00:00 | 2019-05-13 | 2019-05-22 | 01.124.402.7-731.000 | PT. HASRAT JAYA UTAMA | 01.124.402.7-731.000 | PT. HASRAT JAYA UTAMA | 3,927,562,345 | 10.2 % | |
61 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jembatan Banjarmasin-Martapura | Tender | Pekerjaan Konstruksi | 4652181 | 18816138 | APBD | 19,508,000,000 | 19,508,000,000 | 18,661,138,000 | 18,661,138,000 | 18,661,138,000 | 18,661,138,000 | 0 | 0 | 2019-04-23 08:00:00 | 2019-05-14 | 2019-05-28 | 31.635.224.4-731.000 | PT. MULTI USAHA PEMBANGUNAN | 31.635.224.4-731.000 | PT. MULTI USAHA PEMBANGUNAN | 846,862,000 | 4.34 % | |
62 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehab Gedung Legiun Veteran RI Kalsel dan Sarana Prasarananya di Banjarmasin | Tender | Pekerjaan Konstruksi | 4868181 | 19364022 | APBD | 1,473,250,000 | 1,432,467,335 | 1,094,586,390 | 1,094,586,390 | 1,094,586,390 | 1,094,586,000 | 0 | 0 | 2019-05-09 09:50:00 | 2019-05-23 | 2019-07-03 | 01.879.339.8-731.000 | CV. HARAPAN BARU | 01.879.339.8-731.000 | CV. HARAPAN BARU | 378,663,610 | 25.7 % | |
63 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pemeliharaan Berkala Saluran Pembuang Daerah Irigasi Haruyan Dayak Kabupaten HST | Tender | Pekerjaan Konstruksi | 5043181 | 19014617 | APBD | 1,500,000,000 | 1,499,945,636 | 1,099,949,056 | 1,099,949,056 | 1,099,949,056 | 1,099,949,056 | 0 | 0 | 2019-05-22 09:00:00 | 2019-06-24 | 2019-07-16 | 02.019.157.3-733.000 | SAHABAT KARYA.CV | 02.019.157.3-733.000 | SAHABAT KARYA.CV | 400,050,944 | 26.67 % | |
64 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Galeri di Mess Billiton dan di Anjungan Kalsel TMII Jakarta | Tender | Pekerjaan Konstruksi | 5250181 | 19364048 | APBD | 1,501,850,000 | 1,500,998,844 | 1,454,471,775 | 1,454,471,775 | 1,454,471,000 | 1,454,471,000 | 0 | 0 | 2019-06-27 18:00:00 | 2019-07-19 | 2019-08-19 | 02.362.068.5-731.000 | CV. BANGUN SELARAS | 02.362.068.5-731.000 | CV. BANGUN SELARAS | 47,378,225 | 3.15 % | |
65 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Mako Brimob | Tender | Pekerjaan Konstruksi | 5469181 | 19368884 | APBD | 844,000,000 | 841,066,941 | 814,713,839 | 814,713,839 | 814,713,839 | 0 | 0 | 0 | 2019-08-19 12:00:00 | 2019-09-02 | 72.694.383.0-731.000 | CV. SAID KARYA KONSTRUKSI | 29,286,161 | 3.47 % | ||||
66 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Barabai - Pagat | Tender | Pekerjaan Konstruksi | 5816181 | 21949737 | APBDP | 2,855,150,000 | 2,855,149,279 | 2,681,072,543 | 2,681,072,543 | 2,681,072,543 | 2,681,072,543 | 0 | 0 | 2019-09-23 12:00:00 | 2019-10-10 | 2019-10-18 | 02.342.802.2-735.000 | CV. SANGGA BANUA | 02.342.802.2-735.000 | CV. SANGGA BANUA | 174,077,457 | 6.1 % | |
67 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Angsana | Tender | Pekerjaan Konstruksi | 5855181 | 21950421 | APBDP | 1,857,650,000 | 1,857,649,992 | 1,783,132,596 | 1,783,132,596 | 1,781,626,000 | 0 | 0 | 0 | 2019-09-27 13:00:00 | 2019-10-17 | 91.744.784.9-734.000 | Indo Tama Jaya | 74,517,404 | 4.01 % | ||||
68 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Tanjung Serdang - Lontar | Tender | Pekerjaan Konstruksi | 5858181 | 21950232 | APBDP | 4,855,150,000 | 4,854,385,302 | 4,709,822,955 | 4,709,822,955 | 4,709,422,630 | 0 | 0 | 0 | 2019-10-01 15:00:00 | 2019-10-16 | 91.744.784.9-734.000 | Indo Tama Jaya | 145,327,045 | 2.99 % | ||||
69 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Pelaihari - Takisung & Peningkatan Jalan Pelaihari - Batakan | Tender | Pekerjaan Konstruksi | 5860181 | 21950037 | APBDP | 4,855,150,000 | 4,855,149,990 | 4,756,029,557 | 4,756,029,557 | 4,727,525,000 | 0 | 0 | 0 | 2019-09-26 14:00:00 | 2019-10-18 | 02.521.809.0-732.000 | cv. andhika karya | 99,120,443 | 2.04 % | ||||
70 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan TPA Regional | Tender | Pekerjaan Konstruksi | 5864181 | 22065235 | APBDP | 9,378,525,000 | 9,378,524,828 | 8,867,385,300 | 8,867,385,300 | 8,508,353,000 | 8,508,353,000 | 0 | 0 | 2019-09-26 14:00:00 | 2019-10-14 | 2019-10-24 | 02.431.111.0-731.000 | CV. NAHAP | 02.431.111.0-731.000 | CV. NAHAP | 511,139,700 | 5.45 % | |
71 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Gunung Mawar - Gunung Coklat | Tender | Pekerjaan Konstruksi | 5865181 | 21948067 | APBDP | 4,880,750,000 | 4,879,813,303 | 4,632,406,588 | 4,632,406,588 | 4,579,795,000 | 4,579,795,000 | 0 | 0 | 2019-09-27 15:30:00 | 2019-10-14 | 2019-10-22 | 02.243.078.9-732.000 | PT. Indah Perkasa Konstruksi | 02.243.078.9-732.000 | PT. Indah Perkasa Konstruksi | 248,343,413 | 5.09 % | |
72 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Galam Rabah | Tender | Pekerjaan Konstruksi | 5866181 | 22066804 | APBDP | 2,857,650,000 | 2,856,992,588 | 2,657,731,729 | 2,657,731,729 | 2,649,000,000 | 0 | 0 | 0 | 2019-09-27 17:00:00 | 2019-10-16 | 84.697.060.6-731.000 | PT. Wassenar Karya Marga | 199,918,271 | 7 % | ||||
73 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Mandiangin - Puncak Kolam | Tender | Pekerjaan Konstruksi | 5884181 | 22065121 | APBDP | 5,878,525,000 | 5,877,900,071 | 5,580,753,600 | 5,580,753,600 | 5,566,127,363 | 5,566,127,363 | 0 | 0 | 2019-09-26 18:00:00 | 2019-10-16 | 2019-10-23 | 01.124.690.7-732.000 | AMARTA JAYA TEHNIK | 01.124.690.7-732.000 | AMARTA JAYA TEHNIK | 297,771,400 | 5.07 % | |
74 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Kasturi - Jalan Akses Bandara - Jalan Lingkar Utara Banjarbaru (Paket II) Lanjutan | Tender | Pekerjaan Konstruksi | 5901181 | 21947701 | APBDP | 19,871,000,000 | 19,871,000,000 | 18,762,730,524 | 18,762,730,524 | 18,702,613,000 | 0 | 0 | 0 | 2019-09-27 15:30:00 | 2019-10-18 | 01.124.946.3-731.000 | PT. ADIMANUNGGAL CIPTA PADUNUSA | 1,108,269,476 | 5.58 % | ||||
75 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Lingkungan Kawasan Kebun Raya Banua | Tender | Pekerjaan Konstruksi | 5914181 | 22058489 | APBDP | 4,658,700,000 | 4,658,668,539 | 4,329,548,144 | 4,329,548,144 | 4,306,436,712 | 4,306,436,712 | 0 | 0 | 2019-09-26 14:00:00 | 2019-10-16 | 2019-11-01 | 01.203.944.2-732.000 | CV. Sari Alam Utama | 01.203.944.2-732.000 | CV. Sari Alam Utama | 329,151,856 | 7.07 % | |
76 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Paving di Miniatur Hutan Hujan Tropis | Tender | Pekerjaan Konstruksi | 5915181 | 22058492 | APBDP | 1,857,200,000 | 1,367,125,517 | 1,134,733,725 | 1,134,733,725 | 1,134,733,725 | 1,134,733,725 | 0 | 0 | 2019-09-25 22:10:00 | 2019-10-15 | 2019-11-01 | 01.907.984.1-735.000 | cv.sinar harapan | 01.907.984.1-735.000 | cv.sinar harapan | 722,466,275 | 38.9 % | |
77 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Penataan Halaman Gedung Sultan Suriansyah di Banjarmasin | Tender | Pekerjaan Konstruksi | 5917181 | 22100428 | APBDP | 1,849,200,000 | 1,093,071,308 | 1,067,153,440 | 1,067,153,440 | 1,028,846,000 | 1,028,846,000 | 0 | 0 | 2019-09-26 10:00:00 | 2019-10-23 | 2019-11-01 | 02.242.653.0-732.000 | CV. 313 | 02.242.653.0-732.000 | CV. 313 | 782,046,560 | 42.29 % | |
78 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Lanjutan Pembangunan Toilet Pria Mesjid Raya Sabilal Muhtadin di Banjarmasin | Tender | Pekerjaan Konstruksi | 5918181 | 22058481 | APBDP | 810,250,000 | 809,062,812 | 703,312,291 | 703,312,291 | 645,620,000 | 645,620,000 | 0 | 0 | 2019-09-30 08:00:00 | 2019-10-16 | 2019-11-01 | 02.708.648.7-731.000 | CV. SUBUR MAKMUR KARYA BERSAMA | 02.708.648.7-731.000 | CV. SUBUR MAKMUR KARYA BERSAMA | 106,937,709 | 13.2 % | |
79 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Mako Brimob | Tender | Pekerjaan Konstruksi | 6003181 | 19368884 | APBD | 844,000,000 | 691,742,017 | 682,867,804 | 682,867,804 | 682,204,000 | 682,204,000 | 0 | 0 | 2019-10-09 10:00:00 | 2019-10-23 | 2019-11-01 | 71.378.880.0-733.000 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | CV. GLOBAL MITRA KARYA | 161,132,196 | 19.09 % | |
80 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jembatan Banjarmasin - Martapura (Lanjutan) | Tender | Pekerjaan Konstruksi | 6054181 | 21947818 | APBDP | 2,883,250,000 | 2,883,234,784 | 2,824,583,471 | 2,824,583,471 | 2,824,583,471 | 0 | 0 | 0 | 2019-10-08 21:00:00 | 2019-10-22 | 80.777.350.2-731.000 | CV. TRI HIDAYAH | 58,666,529 | 2.03 % | ||||
81 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan KM 45 - KM 52 (Ruas Lumpangi - Batulicin) | Tender | Pekerjaan Konstruksi | 6062181 | 21950173 | APBDP | 40,945,400,000 | 40,945,395,325 | 38,651,265,596 | 38,651,265,596 | 38,594,329,684 | 0 | 0 | 0 | 2019-10-11 11:00:00 | 2019-10-25 | 03.169.298.1-734.000 | PT.BATULICIN BETON ASPHALT | 2,294,134,404 | 5.6 % | ||||
82 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Jalan Batulicin - Mentawakan (KM 4 - KM 10) (Lanjutan) | Tender | Pekerjaan Konstruksi | 6075181 | 22065358 | APBDP | 9,852,925,000 | 9,852,911,071 | 9,194,701,010 | 9,194,701,010 | 9,161,792,638 | 0 | 0 | 0 | 2019-10-11 11:00:00 | 2019-10-28 | 01.222.215.4-734.000 | CV. Dewi Indah | 658,223,990 | 6.68 % | ||||
83 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Paramasan dan Angkipih Atas - Paramasan Bawah | Tender | Pekerjaan Konstruksi | 6126181 | 21947979 | APBDP | 4,855,150,000 | 4,852,970,830 | 4,682,129,348 | 4,682,129,348 | 4,682,129,348 | 0 | 0 | 0 | 2019-10-18 12:00:00 | 2019-11-04 | 02.489.989.0-731.000 | CV. SETIAWAN NOOR | 173,020,652 | 3.56 % | ||||
84 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Wisata Goa Liang Bangkai | Tender | Pekerjaan Konstruksi | 6179181 | 22318024 | APBDP | 4,855,150,000 | 4,855,146,372 | 4,622,472,457 | 4,622,472,457 | 4,586,985,000 | 0 | 0 | 0 | 2019-10-24 15:00:00 | 2019-11-05 | 01.222.215.4-734.000 | CV. Dewi Indah | 232,677,543 | 4.79 % | ||||
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Sarana dan Prasarana Pendukung Tugu Pal Nol (Konsultan Pengawas) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3960181 | 19023901 | APBD | 400,000,000 | 399,877,500 | 324,274,000 | 324,274,000 | 324,874,000 | 324,274,000 | 0 | 0 | 2019-01-10 11:00:00 | 2019-02-12 | 2019-03-18 | 95.412.417.8-731.000 | PT. Prisma Jasa Konsulindo | 95.412.417.8-731.000 | PT. Prisma Jasa Konsulindo | 75,726,000 | 18.93 % | |
2 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Negara-Muara Tapus | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3962181 | 18972013 | APBD | 250,000,000 | 248,050,000 | 242,880,000 | 242,880,000 | 242,880,000 | 0 | 0 | 0 | 2019-01-24 09:00:00 | 2019-04-02 | 02.089.773.2-733.000 | PT. TECHNIKATAMA JASA KONSULTAN | 7,120,000 | 2.85 % | ||||
3 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Gunung Kupang-Kiram-Tambang Ulang (DAK) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3963181 | 18829733 | APBD | 450,000,000 | 449,350,000 | 399,168,000 | 399,168,000 | 399,168,000 | 0 | 0 | 0 | 2019-01-23 15:30:00 | 2019-03-06 | 03.025.828.9-731.000 | CV. GRIYASHANTA | 50,832,000 | 11.3 % | ||||
4 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Kandangan-Negara (DAK) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3964181 | 18829731 | APBD | 225,000,000 | 224,235,000 | 189,007,500 | 189,007,500 | 189,007,500 | 0 | 0 | 0 | 2019-01-23 13:00:00 | 2019-03-05 | 02.089.773.2-733.000 | PT. TECHNIKATAMA JASA KONSULTAN | 35,992,500 | 16 % | ||||
5 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Amuntai-Lampihong-Paringin-Halong (DAK) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3966181 | 18829725 | APBD | 225,000,000 | 224,235,000 | 212,272,500 | 212,272,500 | 212,272,500 | 0 | 0 | 0 | 2019-01-23 16:00:00 | 2019-03-05 | 03.025.627.5-731.000 | SADWA RAMA CONSULTANT | 12,727,500 | 5.66 % | ||||
6 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Lontar-Tanjung Seloka-Berangas | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3967181 | 18829710 | APBD | 350,000,000 | 348,315,000 | 331,760,000 | 331,760,000 | 331,760,000 | 0 | 0 | 0 | 2019-01-24 09:00:00 | 2019-03-08 | 95.412.417.8-731.000 | PT. Prisma Jasa Konsulindo | 18,240,000 | 5.21 % | ||||
7 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Tanjung Serdang-Lontar | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3968181 | 18829708 | APBD | 350,000,000 | 348,315,000 | 293,387,600 | 293,387,600 | 293,387,600 | 0 | 0 | 0 | 2019-01-24 09:00:00 | 2019-03-13 | 02.778.681.3-423.000 | PT. Gumilang Sajati | 56,612,400 | 16.17 % | ||||
8 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jembatan Sungai Temunih dan Sungai Kusan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3969181 | 18829705 | APBD | 400,000,000 | 398,530,000 | 318,780,000 | 318,780,000 | 318,780,000 | 0 | 0 | 0 | 2019-01-23 15:00:00 | 2019-03-11 | 01.124.509.9-731.000 | PT. SEKTA GUBAH SARANA | 81,220,000 | 20.31 % | ||||
9 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jembatan Desa Sungai Apuy 1 dan Apuy II | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3970181 | 18829700 | APBD | 400,000,000 | 398,530,000 | 370,530,875 | 370,530,875 | 370,530,875 | 0 | 0 | 0 | 2019-01-23 13:00:00 | 2019-03-06 | 01.489.654.2-711.000 | PT.TEMA KARYA MANDIRI | 29,469,125 | 7.37 % | ||||
10 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Suka Damai-Mentewe | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3971181 | 18829698 | APBD | 350,000,000 | 345,840,000 | 331,265,000 | 331,265,000 | 331,265,000 | 0 | 0 | 0 | 2019-01-23 16:00:00 | 2019-03-06 | 95.412.417.8-731.000 | PT. Prisma Jasa Konsulindo | 18,735,000 | 5.35 % | ||||
11 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Mentawakan-Mentewe | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3972181 | 18829696 | APBD | 350,000,000 | 345,840,000 | 318,175,000 | 318,175,000 | 318,175,000 | 0 | 0 | 0 | 2019-01-23 16:00:00 | 2019-03-11 | 80.562.640.5-731.000 | CV. RAMIER JAYA ARKANANTA | 31,825,000 | 9.09 % | ||||
12 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Batulicin-Mentawakan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3973181 | 18829694 | APBD | 400,000,000 | 389,620,000 | 364,952,500 | 364,952,500 | 364,952,500 | 0 | 0 | 0 | 2019-01-23 15:30:00 | 2019-03-04 | 02.090.318.3-731.000 | CV. Inditec Consultant | 35,047,500 | 8.76 % | ||||
13 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Kiram-Gunung Mawar Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3974181 | 18829691 | APBD | 450,000,000 | 441,540,000 | 432,872,000 | 432,872,000 | 432,872,000 | 0 | 0 | 0 | 2019-01-23 16:00:00 | 2019-03-05 | 02.050.569.9-731.000 | CV. Dharma Cipta Pratama | 17,128,000 | 3.81 % | ||||
14 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan dan Jembatan Lumpangi-Loksado | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3976181 | 18829680 | APBD | 350,000,000 | 346,720,000 | 325,875,000 | 325,875,000 | 325,875,000 | 0 | 0 | 0 | 2019-01-24 09:00:00 | 2019-04-05 | 02.531.704.1-731.000 | CV. FIAZTA MATRIX CONSULTANT | 24,125,000 | 6.89 % | ||||
15 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Dahai-Tanjung Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3977181 | 18829677 | APBD | 450,000,000 | 449,570,000 | 425,810,000 | 425,810,000 | 425,810,000 | 0 | 0 | 0 | 2019-01-23 16:00:00 | 2019-03-04 | 02.090.318.3-731.000 | CV. Inditec Consultant | 24,190,000 | 5.38 % | ||||
16 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Lampihong-Mantimin Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3978181 | 18829672 | APBD | 550,000,000 | 549,230,000 | 499,136,000 | 499,136,000 | 499,136,000 | 0 | 0 | 0 | 2019-01-23 16:00:00 | 2019-03-06 | 03.025.828.9-731.000 | CV. GRIYASHANTA | 50,864,000 | 9.25 % | ||||
17 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Birayang-Tariwin-Lok Batu-Batu Mandi Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3979181 | 18827742 | APBD | 450,000,000 | 446,710,000 | 424,330,500 | 424,330,500 | 424,330,500 | 0 | 0 | 0 | 2019-01-18 00:00:00 | 2019-02-15 | 02.050.569.9-731.000 | CV. Dharma Cipta Pratama | 25,669,500 | 5.7 % | ||||
18 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Rantau-Muara Muning Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3980181 | 18827691 | APBD | 550,000,000 | 544,170,000 | 500,665,000 | 500,665,000 | 500,307,500 | 0 | 0 | 0 | 2019-01-24 09:00:00 | 2019-03-06 | 80.562.640.5-731.000 | CV. RAMIER JAYA ARKANANTA | 49,335,000 | 8.97 % | ||||
19 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jembatan Jalan Pendidkan Sekumpul Martapura (Pelebaran) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3981181 | 18827526 | APBD | 350,000,000 | 347,160,000 | 347,050,000 | 347,050,000 | 347,050,000 | 0 | 0 | 0 | 2019-01-11 10:45:00 | 2019-02-15 | 01.517.846.0-731.000 | PT. WINAYA KONTEKS KHARISMA | 2,950,000 | 0.84 % | ||||
20 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Paramasan-Bawah dan Paramasan Atas | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3982181 | 18827436 | APBD | 350,000,000 | 345,675,000 | 319,962,500 | 319,962,500 | 314,187,500 | 0 | 0 | 0 | 2019-01-23 16:00:00 | 2019-03-08 | 03.025.627.5-731.000 | SADWA RAMA CONSULTANT | 30,037,500 | 8.58 % | ||||
21 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Alternatif Makam Syeh Arsyad Al Banjari | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3983181 | 18826684 | APBD | 350,000,000 | 347,160,000 | 238,106,000 | 238,106,000 | 232,276,000 | 0 | 0 | 0 | 2019-01-23 15:30:00 | 2019-04-01 | 02.778.681.3-423.000 | PT. Gumilang Sajati | 111,894,000 | 31.97 % | ||||
22 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Banjarbaru-Bati bati Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3984181 | 18826604 | APBD | 550,000,000 | 510,510,000 | 504,640,070 | 504,640,070 | 504,640,070 | 0 | 0 | 0 | 2019-01-23 15:00:00 | 2019-03-05 | 01.879.315.8-731.000 | CV. ADIHANMAN TATA RANCANG | 45,359,930 | 8.25 % | ||||
23 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Golf Banjarbaru Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3985181 | 18825315 | APBD | 450,000,000 | 441,540,000 | 412,830,000 | 412,830,000 | 412,830,000 | 0 | 0 | 0 | 2019-01-23 15:00:00 | 2019-03-08 | 02.090.318.3-731.000 | CV. Inditec Consultant | 37,170,000 | 8.26 % | ||||
24 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Simpang 3 Golf-Jalan Kasturi (Paket I) Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3986181 | 18824971 | APBD | 550,000,000 | 538,010,000 | 502,755,000 | 502,755,000 | 502,755,000 | 0 | 0 | 0 | 2019-01-23 13:00:00 | 2019-03-06 | 80.562.640.5-731.000 | CV. RAMIER JAYA ARKANANTA | 47,245,000 | 8.59 % | ||||
25 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Simpang 4 Gatot Subroto-Lingkar Dalam Selatan Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3987181 | 18816166 | APBD | 450,000,000 | 443,080,000 | 398,161,500 | 398,161,500 | 388,734,500 | 0 | 0 | 0 | 2019-01-25 12:00:00 | 2019-04-18 | 03.025.809.9-731.000 | CV. SETIA JASA UTAMA | 51,838,500 | 11.52 % | ||||
26 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jembatan Banjarmasin-Martapura | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3988181 | 18816141 | APBD | 350,000,000 | 345,840,000 | 321,227,500 | 321,227,500 | 321,227,500 | 0 | 0 | 0 | 2019-01-23 16:00:00 | 2019-03-04 | 95.412.417.8-731.000 | PT. Prisma Jasa Konsulindo | 28,772,500 | 8.22 % | ||||
27 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Anjir Pasar-Marabahan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3989181 | 18816133 | APBD | 350,000,000 | 348,040,000 | 326,095,000 | 326,095,000 | 326,095,000 | 0 | 0 | 0 | 2019-01-23 12:00:00 | 2019-03-11 | 02.303.631.2-731.000 | CV. AFAPASTA CONSULTANT | 23,905,000 | 6.83 % | ||||
28 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Desa Bahandang-Desa Keliling Benteng Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3990181 | 18816105 | APBD | 550,000,000 | 544,720,000 | 499,180,000 | 499,180,000 | 499,180,000 | 0 | 0 | 0 | 2019-01-23 10:00:00 | 2019-03-08 | 03.025.809.9-731.000 | CV. SETIA JASA UTAMA | 50,820,000 | 9.24 % | ||||
29 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Rehab/Renovasi Gor Hasanuddin di Banjarmasin | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3991181 | 19038407 | APBD | 231,650,000 | 230,906,500 | 204,451,500 | 204,451,500 | 204,451,500 | 204,451,500 | 0 | 0 | 2019-01-10 14:00:00 | 2019-02-22 | 2019-03-18 | 02.050.569.9-731.000 | CV. Dharma Cipta Pratama | 02.050.569.9-731.000 | CV. Dharma Cipta Pratama | 27,198,500 | 11.74 % | |
30 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Rehab/Renovasi Stadion 17 Mei di Banjarmasin | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3994181 | 19039178 | APBD | 481,650,000 | 481,536,000 | 411,831,200 | 411,831,200 | 411,831,200 | 411,831,200 | 0 | 0 | 2019-01-11 10:00:00 | 2019-02-27 | 2019-03-18 | 01.860.230.0-731.000 | CV PRAKTIRA KONSULTAN | 01.860.230.0-731.000 | CV PRAKTIRA KONSULTAN | 69,818,800 | 14.5 % | |
31 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Lanjutan Pembangunan Gedung Bakeuda (Konsultan Pengawas) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3998181 | 19039452 | APBD | 350,000,000 | 349,189,500 | 280,115,000 | 280,115,000 | 263,230,000 | 263,230,000 | 0 | 0 | 2019-01-23 16:10:00 | 2019-03-12 | 2019-04-15 | 71.883.318.9-609.000 | PT. DIRA BINA NUSA | 71.883.318.9-609.000 | PT. DIRA BINA NUSA | 69,885,000 | 19.97 % | |
32 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Embung Jaro Kabupaten Tabalong | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4081181 | 19014512 | APBD | 1,000,000,000 | 999,999,000 | 955,460,000 | 955,460,000 | 955,460,000 | 955,460,000 | 0 | 0 | 2019-02-11 14:00:00 | 2019-04-08 | 2019-05-10 | 01.426.908.8-441.000 | PT. SARANA BHUANA JAYA | 01.426.908.8-441.000 | PT. SARANA BHUANA JAYA | 44,540,000 | 4.45 % | |
33 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Supervisi Rehabillitas DIR. Polder Tambak Hanyar Kab. Banjar | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4086181 | 19014590 | APBD | 250,000,000 | 249,975,000 | 237,380,000 | 237,380,000 | 230,505,000 | 230,505,000 | 0 | 0 | 2019-02-11 14:00:00 | 2019-03-27 | 2019-04-22 | 02.531.704.1-731.000 | CV. FIAZTA MATRIX CONSULTANT | 02.531.704.1-731.000 | CV. FIAZTA MATRIX CONSULTANT | 12,620,000 | 5.05 % | |
34 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Supervisi Peningkatan Polder Mini Daerah Irigasi Rawa Polder Bakar Kabupaten Hulu Sungai Utara | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4093181 | 19014442 | APBD | 650,000,000 | 649,715,000 | 630,465,000 | 630,465,000 | 615,725,000 | 615,725,000 | 0 | 0 | 2019-02-14 11:00:00 | 2019-04-18 | 2019-05-10 | 01.534.559.8-731.000 | PT TECTAMA KARYA | 01.534.559.8-731.000 | PT TECTAMA KARYA | 19,535,000 | 3.01 % | |
35 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Galeri di Mess Billiton dan di Anjungan Kalsel TMII Jakarta (Konsultan Perencana) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4118181 | 19364045 | APBD | 250,000,000 | 247,214,000 | 222,035,000 | 222,035,000 | 215,490,000 | 215,490,000 | 0 | 0 | 2019-02-06 14:00:00 | 2019-03-22 | 2019-04-22 | 71.883.318.9-609.000 | PT. DIRA BINA NUSA | 71.883.318.9-609.000 | PT. DIRA BINA NUSA | 27,965,000 | 11.19 % | |
36 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Gedung Pramuka (Konsultan Pengawas) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4119181 | 19363964 | APBD | 140,000,000 | 139,942,000 | 135,000,800 | 135,000,800 | 135,000,800 | 123,459,600 | 0 | 0 | 2019-02-06 14:00:00 | 2019-04-10 | 2019-05-03 | 02.531.483.2-731.000 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | MANDIRI cipta PRATAMA | 4,999,200 | 3.57 % | |
37 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Gedung Samsat Amuntai (Konsultan Pengawas) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4120181 | 19364012 | APBD | 325,000,000 | 324,698,000 | 316,243,400 | 316,243,400 | 316,243,400 | 283,690,000 | 0 | 0 | 2019-02-06 14:00:00 | 2019-04-10 | 2019-06-19 | 02.531.483.2-731.000 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | MANDIRI cipta PRATAMA | 8,756,600 | 2.69 % | |
38 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Taman Budaya di Kawasan Perkantoran Prov. Kalsel di Banjarbaru (Konsultan Pengawas) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4121181 | 19364039 | APBD | 440,000,000 | 422,928,000 | 393,308,080 | 393,308,080 | 390,660,000 | 0 | 0 | 0 | 2019-02-06 14:00:00 | 2019-03-22 | 01.860.230.0-731.000 | CV PRAKTIRA KONSULTAN | 46,691,920 | 10.61 % | ||||
39 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Banjang-Pulau Nyiur-Batumandi Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4122181 | 18829690 | APBD | 400,000,000 | 399,520,000 | 373,230,000 | 373,230,000 | 373,230,000 | 0 | 0 | 0 | 2019-01-23 16:00:00 | 2019-03-05 | 80.562.640.5-731.000 | CV. RAMIER JAYA ARKANANTA | 26,770,000 | 6.69 % | ||||
40 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Kiram-Simpang 3 Tahura-Mandiangin | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4123181 | 18972161 | APBD | 250,000,000 | 248,820,000 | 242,990,000 | 242,990,000 | 242,990,000 | 0 | 0 | 0 | 2019-01-23 16:20:00 | 2019-03-08 | 01.517.846.0-731.000 | PT. WINAYA KONTEKS KHARISMA | 7,010,000 | 2.8 % | ||||
41 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengadaan dan Pemasangan Assesoris serta Mekanikal Elektrikal Jalur Distribusi Utama Banjarbakula lokasi Banjarbaru dan Kab. Tanah Laut (Konsultan Pengawas) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4128181 | 19038528 | APBD | 182,700,000 | 182,699,000 | 0 | 0 | 0 | 0 | 0 | 0 | 2019-01-30 16:00:00 | 2019-03-01 | 182,700,000 | 100 % | ||||||
42 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultansi Perencanaan Survey IRMS dan BMS Database Web GIS | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4227181 | 18829712 | APBD | 1,946,250,000 | 1,945,350,000 | 1,750,870,000 | 1,750,870,000 | 1,729,035,000 | 0 | 0 | 0 | 2019-03-04 16:00:00 | 2019-05-10 | 01.124.766.5-731.000 | PT.WIRA WIDYATAMA | 195,380,000 | 10.04 % | ||||
43 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Jalan Simpang 3 Lingkar Utara-Lingkar Utara Banjarbaru | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4249181 | 18829713 | APBD | 500,000,000 | 498,663,000 | 484,804,100 | 484,804,100 | 483,016,600 | 0 | 0 | 0 | 2019-03-04 12:00:00 | 2019-04-18 | 02.089.773.2-733.000 | PT. TECHNIKATAMA JASA KONSULTAN | 15,195,900 | 3.04 % | ||||
44 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Kajian Pengembangan Jalan Provinsi | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4255181 | 20235939 | APBD | 969,810,000 | 963,105,000 | 865,977,200 | 865,977,200 | 744,779,200 | 0 | 0 | 0 | 2019-03-06 16:00:00 | 2019-05-06 | 01.489.654.2-711.000 | PT.TEMA KARYA MANDIRI | 103,832,800 | 10.71 % | ||||
45 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Jembatan Penyeberangan Orang Tugu Nol | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4268181 | 18829719 | APBD | 350,000,000 | 349,899,000 | 325,809,000 | 325,809,000 | 302,929,000 | 0 | 0 | 0 | 2019-02-28 16:00:00 | 2019-05-08 | 01.249.265.8-731.000 | PT.KALSECO GRAHA | 24,191,000 | 6.91 % | ||||
46 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Sungai Jati-Sungai Ulin-Matraman | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4269181 | 18829717 | APBD | 500,000,000 | 499,015,000 | 467,060,000 | 467,060,000 | 466,565,000 | 0 | 0 | 0 | 2019-03-04 16:00:00 | 2019-05-09 | 72.116.516.5-731.000 | CV. EMPAT BELAS | 32,940,000 | 6.59 % | ||||
47 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Jalan Gunung Kupang-Kiram-Tambang Ulang dan Jalan Kiram-Gunung Mawar | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4270181 | 18829715 | APBD | 500,000,000 | 495,055,000 | 446,941,000 | 446,941,000 | 446,941,000 | 0 | 0 | 0 | 2019-02-27 16:00:00 | 2019-04-22 | 03.268.848.3-444.000 | PT. Arenco Binatama | 53,059,000 | 10.61 % | ||||
48 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Penyusunan DED SPALD Kawasan Perkantoran Prov Kalsel | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4410181 | 19368229 | APBD | 350,000,000 | 349,627,300 | 341,990,000 | 341,990,000 | 336,870,000 | 336,870,000 | 0 | 0 | 2019-03-27 22:00:00 | 2019-06-17 | 2019-07-03 | 02.173.702.8-652.001 | PT. WAHANA PRAKARSA UTAMA CABANG JATIM | 02.173.702.8-652.001 | PT. WAHANA PRAKARSA UTAMA CABANG JATIM | 8,010,000 | 2.29 % | |
49 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Kajian Lingkungan Pembangunan Tugu Pal Nol | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4413181 | 20519974 | APBD | 482,450,000 | 479,138,000 | 433,950,000 | 433,950,000 | 426,800,000 | 0 | 0 | 0 | 2019-03-27 22:00:00 | 2019-06-17 | 02.108.378.7-429.000 | PT. Munasa Kreasi Nusantara | 48,500,000 | 10.05 % | ||||
50 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Awang Bangkal-Temunih | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4417181 | 19800433 | APBD | 400,000,000 | 398,860,000 | 386,815,000 | 386,815,000 | 386,375,000 | 0 | 0 | 0 | 2019-03-27 07:00:00 | 2019-05-31 | 01.517.846.0-731.000 | PT. WINAYA KONTEKS KHARISMA | 13,185,000 | 3.3 % | ||||
51 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Temunih-Kodeco 58 | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4420181 | 19800926 | APBD | 400,000,000 | 398,860,000 | 391,132,500 | 391,132,500 | 391,132,500 | 0 | 0 | 0 | 2019-03-21 12:00:00 | 2019-05-17 | 02.531.483.2-731.000 | MANDIRI cipta PRATAMA | 8,867,500 | 2.22 % | ||||
52 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Penyusunan Dokumen Outline Business Case Jalan Bebas Hambatan Banjarbaru-Batulicin | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4433181 | 19801311 | APBD | 2,496,250,000 | 2,489,025,000 | 2,238,500,000 | 2,238,500,000 | 2,238,500,000 | 0 | 0 | 0 | 2019-04-04 16:00:00 | 2019-05-09 | 01.124.766.5-731.000 | PT.WIRA WIDYATAMA | 257,750,000 | 10.33 % | ||||
53 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Review Desain Jalan Bebas Hambatan dan Akses Penunjang | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4447181 | 19801136 | APBD | 1,496,250,000 | 1,489,268,000 | 1,340,273,000 | 1,340,273,000 | 1,340,273,000 | 0 | 0 | 0 | 2019-04-08 20:00:00 | 2019-05-11 | 01.534.629.9-731.000 | WIDYADAYA BANDARAN | 155,977,000 | 10.42 % | ||||
54 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Penyusunan Rencana Tata Ruang Kawasan Strategis Provinsi (RTR KSP) Kawasan Pegunungan Meratus | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4499181 | 21079890 | APBD | 851,830,000 | 851,675,000 | 764,830,000 | 764,830,000 | 764,830,000 | 764,775,000 | 0 | 0 | 2019-04-18 08:00:00 | 2019-06-03 | 2019-06-24 | 02.108.378.7-429.000 | PT. Munasa Kreasi Nusantara | 02.108.378.7-429.000 | PT. Munasa Kreasi Nusantara | 87,000,000 | 10.21 % | |
55 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Manual OP Daerah Irigasi Haruyan Dayak, Daerah Irigasi Kahakan, Daerah Irigasi Mangunang Kab. HST dan Daerah Irigasi Kinarum Kab. Tabalong | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4589181 | 19014532 | APBD | 200,000,000 | 199,991,000 | 191,840,000 | 191,840,000 | 189,420,000 | 189,420,000 | 0 | 0 | 2019-04-02 15:00:00 | 2019-05-20 | 2019-07-10 | 02.090.318.3-731.000 | CV. Inditec Consultant | 02.090.318.3-731.000 | CV. Inditec Consultant | 8,160,000 | 4.08 % | |
56 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Mesjid di Kawasan Perkantoran Pemprov. Kalsel (Konsultan Perencana) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4620181 | 19367793 | APBD | 727,250,000 | 721,314,000 | 577,857,500 | 577,857,500 | 511,440,000 | 511,440,000 | 0 | 0 | 2019-04-05 15:59:00 | 2019-07-02 | 2019-07-11 | 02.050.569.9-731.000 | CV. Dharma Cipta Pratama | 02.050.569.9-731.000 | CV. Dharma Cipta Pratama | 149,392,500 | 20.54 % | |
57 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengadaan dan Pemasangan Assesoris serta Mekanikal Elektrikal Jalur Distribusi Utama Banjarbakula lokasi Banjarbaru dan Kab. Tanah Laut (Konsultan Pengawas) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4641181 | 19038528 | APBD | 182,700,000 | 182,700,000 | 178,112,000 | 178,112,000 | 166,832,499 | 166,832,499 | 0 | 0 | 2019-04-10 09:00:00 | 2019-05-20 | 2019-06-12 | 02.172.574.2-731.000 | CV. ANDALUSIA | 02.172.574.2-731.000 | CV. ANDALUSIA | 4,588,000 | 2.51 % | |
58 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Supervisi Pembangunan Prasarana Air Baku Sengayam Kabupaten Kotabaru | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4660181 | 19014543 | APBD | 300,000,000 | 299,970,000 | 261,778,000 | 261,778,000 | 256,140,500 | 256,140,500 | 0 | 0 | 2019-05-22 16:00:00 | 2019-07-16 | 2019-08-20 | 95.412.417.8-731.000 | PT. Prisma Jasa Konsulindo | 95.412.417.8-731.000 | PT. Prisma Jasa Konsulindo | 38,222,000 | 12.74 % | |
59 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Penyusunan RTBL Tugu Pal Nol | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4746181 | 20505540 | APBD | 258,000,000 | 257,658,500 | 227,810,000 | 227,810,000 | 212,520,000 | 212,520,000 | 0 | 0 | 2019-04-22 16:00:00 | 2019-06-12 | 2019-06-21 | 01.548.564.2-424.000 | PT. Belaputera Interplan | 01.548.564.2-424.000 | PT. Belaputera Interplan | 30,190,000 | 11.7 % | |
60 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Mesjid Bambu (DED) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4851181 | 19364052 | APBD | 900,650,000 | 900,504,000 | 868,066,100 | 868,066,100 | 863,110,000 | 863,110,000 | 0 | 0 | 2019-05-03 12:00:00 | 2019-06-24 | 2019-07-04 | 70.095.576.8-643.000 | PT. SIGMA REKATAMA CONSULINDO | 70.095.576.8-643.000 | PT. SIGMA REKATAMA CONSULINDO | 32,583,900 | 3.62 % | |
61 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Supervisi Pembangunan Jaringan Daerah Irigasi Kinarum 1.004 Ha Kabupaten Tabalong | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4856181 | 19014454 | APBD | 1,000,000,000 | 782,485,000 | 900,021,100 | 900,021,100 | 747,740,000 | 747,740,000 | 0 | 0 | 2019-05-04 00:00:00 | 2019-07-08 | 2019-07-19 | 02.172.574.2-731.000 | CV. ANDALUSIA | 02.172.574.2-731.000 | CV. ANDALUSIA | 99,978,900 | 10 % | |
62 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Galeri di Mess Billiton dan di Anjungan Kalsel TMII Jakarta (Konsultan Pengawas) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 5251181 | 19364050 | APBD | 137,000,000 | 136,917,000 | 116,710,000 | 116,710,000 | 116,710,000 | 113,850,000 | 0 | 0 | 2019-06-27 15:00:00 | 2019-08-06 | 2019-08-19 | 01.860.230.0-731.000 | CV PRAKTIRA KONSULTAN | 01.860.230.0-731.000 | CV PRAKTIRA KONSULTAN | 20,290,000 | 14.81 % | |
63 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Perencanaan Pembentukan BLUD SPAM Regional Banjarbakula | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 5360181 | 21701572 | APBD | 910,000,000 | 368,850,900 | 334,675,000 | 334,675,000 | 324,500,000 | 324,500,000 | 0 | 0 | 2019-06-28 16:00:00 | 2019-08-15 | 2019-08-29 | 02.108.378.7-429.000 | PT. Munasa Kreasi Nusantara | 02.108.378.7-429.000 | PT. Munasa Kreasi Nusantara | 575,325,000 | 63.22 % | |
64 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Review FS dan DED SPAM Regional Kalsel Banjarbakula | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 5361181 | 21701571 | APBD | 400,000,000 | 399,943,500 | 398,684,000 | 398,684,000 | 376,400,000 | 376,400,000 | 0 | 0 | 2019-06-28 18:00:00 | 2019-08-15 | 2019-08-29 | 02.185.071.4-061.000 | PT. PRAKARINDO BUANA | 02.185.071.4-061.000 | PT. PRAKARINDO BUANA | 1,316,000 | 0.33 % | |
65 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Penyusunan DED Rehab Kantor Gubernur di Banjarmasin dan Penyelesaian Sarana penunjangnya | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 5687181 | 21914666 | APBDP | 180,625,000 | 180,092,000 | 151,800,000 | 151,800,000 | 151,800,000 | 0 | 0 | 0 | 2019-08-29 15:00:00 | 2019-10-11 | 01.860.272.2-731.000 | CV. DAYAKARSA MADYA Consultant | 28,825,000 | 15.96 % | ||||
66 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Survei Investigasi Pondok Pasantren Darussalam Kabupaten Banjar | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 5969181 | 22136969 | APBDP | 350,000,000 | 349,999,980 | 323,660,700 | 323,660,700 | 323,660,700 | 323,660,700 | 0 | 0 | 2019-10-09 09:00:00 | 2019-11-11 | 2019-11-25 | 02.809.318.5-711.000 | CV. TIKA KREATIF DESAIN KONSULTAN | 02.809.318.5-711.000 | CV. TIKA KREATIF DESAIN KONSULTAN | 26,339,300 | 7.53 % | |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Pagu | HPS | Nilai Penawaran | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Negara-Muara Tapus | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3962181 | 18972013 | 250,000,000 | 248,050,000 | 242,880,000 | 0 | 0 | 0 | 2019-01-24 09:00:00 | 02.089.773.2-733.000 | PT. TECHNIKATAMA JASA KONSULTAN | 7,120,000 | 2.85 % | |||
2 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Gunung Kupang-Kiram-Tambang Ulang (DAK) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3963181 | 18829733 | 450,000,000 | 449,350,000 | 399,168,000 | 0 | 0 | 0 | 2019-01-23 15:30:00 | 03.025.828.9-731.000 | CV. GRIYASHANTA | 50,832,000 | 11.3 % | |||
3 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Kandangan-Negara (DAK) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3964181 | 18829731 | 225,000,000 | 224,235,000 | 189,007,500 | 0 | 0 | 0 | 2019-01-23 13:00:00 | 02.089.773.2-733.000 | PT. TECHNIKATAMA JASA KONSULTAN | 35,992,500 | 16 % | |||
4 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Amuntai-Lampihong-Paringin-Halong (DAK) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3966181 | 18829725 | 225,000,000 | 224,235,000 | 212,272,500 | 0 | 0 | 0 | 2019-01-23 16:00:00 | 03.025.627.5-731.000 | SADWA RAMA CONSULTANT | 12,727,500 | 5.66 % | |||
5 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Lontar-Tanjung Seloka-Berangas | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3967181 | 18829710 | 350,000,000 | 348,315,000 | 331,760,000 | 0 | 0 | 0 | 2019-01-24 09:00:00 | 95.412.417.8-731.000 | PT. Prisma Jasa Konsulindo | 18,240,000 | 5.21 % | |||
6 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Tanjung Serdang-Lontar | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3968181 | 18829708 | 350,000,000 | 348,315,000 | 293,387,600 | 0 | 0 | 0 | 2019-01-24 09:00:00 | 02.778.681.3-423.000 | PT. Gumilang Sajati | 56,612,400 | 16.17 % | |||
7 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jembatan Sungai Temunih dan Sungai Kusan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3969181 | 18829705 | 400,000,000 | 398,530,000 | 318,780,000 | 0 | 0 | 0 | 2019-01-23 15:00:00 | 01.124.509.9-731.000 | PT. SEKTA GUBAH SARANA | 81,220,000 | 20.31 % | |||
8 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jembatan Desa Sungai Apuy 1 dan Apuy II | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3970181 | 18829700 | 400,000,000 | 398,530,000 | 370,530,875 | 0 | 0 | 0 | 2019-01-23 13:00:00 | 01.489.654.2-711.000 | PT.TEMA KARYA MANDIRI | 29,469,125 | 7.37 % | |||
9 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Suka Damai-Mentewe | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3971181 | 18829698 | 350,000,000 | 345,840,000 | 331,265,000 | 0 | 0 | 0 | 2019-01-23 16:00:00 | 95.412.417.8-731.000 | PT. Prisma Jasa Konsulindo | 18,735,000 | 5.35 % | |||
10 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Mentawakan-Mentewe | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3972181 | 18829696 | 350,000,000 | 345,840,000 | 318,175,000 | 0 | 0 | 0 | 2019-01-23 16:00:00 | 80.562.640.5-731.000 | CV. RAMIER JAYA ARKANANTA | 31,825,000 | 9.09 % | |||
11 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Batulicin-Mentawakan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3973181 | 18829694 | 400,000,000 | 389,620,000 | 364,952,500 | 0 | 0 | 0 | 2019-01-23 15:30:00 | 02.090.318.3-731.000 | CV. Inditec Consultant | 35,047,500 | 8.76 % | |||
12 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Kiram-Gunung Mawar Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3974181 | 18829691 | 450,000,000 | 441,540,000 | 432,872,000 | 0 | 0 | 0 | 2019-01-23 16:00:00 | 02.050.569.9-731.000 | CV. Dharma Cipta Pratama | 17,128,000 | 3.81 % | |||
13 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan dan Jembatan Lumpangi-Loksado | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3976181 | 18829680 | 350,000,000 | 346,720,000 | 325,875,000 | 0 | 0 | 0 | 2019-01-24 09:00:00 | 02.531.704.1-731.000 | CV. FIAZTA MATRIX CONSULTANT | 24,125,000 | 6.89 % | |||
14 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Dahai-Tanjung Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3977181 | 18829677 | 450,000,000 | 449,570,000 | 425,810,000 | 0 | 0 | 0 | 2019-01-23 16:00:00 | 02.090.318.3-731.000 | CV. Inditec Consultant | 24,190,000 | 5.38 % | |||
15 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Lampihong-Mantimin Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3978181 | 18829672 | 550,000,000 | 549,230,000 | 499,136,000 | 0 | 0 | 0 | 2019-01-23 16:00:00 | 03.025.828.9-731.000 | CV. GRIYASHANTA | 50,864,000 | 9.25 % | |||
16 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Birayang-Tariwin-Lok Batu-Batu Mandi Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3979181 | 18827742 | 450,000,000 | 446,710,000 | 424,330,500 | 0 | 0 | 0 | 2019-01-18 00:00:00 | 02.050.569.9-731.000 | CV. Dharma Cipta Pratama | 25,669,500 | 5.7 % | |||
17 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Rantau-Muara Muning Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3980181 | 18827691 | 550,000,000 | 544,170,000 | 500,665,000 | 0 | 0 | 0 | 2019-01-24 09:00:00 | 80.562.640.5-731.000 | CV. RAMIER JAYA ARKANANTA | 49,335,000 | 8.97 % | |||
18 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jembatan Jalan Pendidkan Sekumpul Martapura (Pelebaran) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3981181 | 18827526 | 350,000,000 | 347,160,000 | 347,050,000 | 0 | 0 | 0 | 2019-01-11 10:45:00 | 01.517.846.0-731.000 | PT. WINAYA KONTEKS KHARISMA | 2,950,000 | 0.84 % | |||
19 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Paramasan-Bawah dan Paramasan Atas | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3982181 | 18827436 | 350,000,000 | 345,675,000 | 319,962,500 | 0 | 0 | 0 | 2019-01-23 16:00:00 | 03.025.627.5-731.000 | SADWA RAMA CONSULTANT | 30,037,500 | 8.58 % | |||
20 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Alternatif Makam Syeh Arsyad Al Banjari | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3983181 | 18826684 | 350,000,000 | 347,160,000 | 238,106,000 | 0 | 0 | 0 | 2019-01-23 15:30:00 | 02.778.681.3-423.000 | PT. Gumilang Sajati | 111,894,000 | 31.97 % | |||
21 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Banjarbaru-Bati bati Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3984181 | 18826604 | 550,000,000 | 510,510,000 | 504,640,070 | 0 | 0 | 0 | 2019-01-23 15:00:00 | 01.879.315.8-731.000 | CV. ADIHANMAN TATA RANCANG | 45,359,930 | 8.25 % | |||
22 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Golf Banjarbaru Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3985181 | 18825315 | 450,000,000 | 441,540,000 | 412,830,000 | 0 | 0 | 0 | 2019-01-23 15:00:00 | 02.090.318.3-731.000 | CV. Inditec Consultant | 37,170,000 | 8.26 % | |||
23 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Simpang 3 Golf-Jalan Kasturi (Paket I) Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3986181 | 18824971 | 550,000,000 | 538,010,000 | 502,755,000 | 0 | 0 | 0 | 2019-01-23 13:00:00 | 80.562.640.5-731.000 | CV. RAMIER JAYA ARKANANTA | 47,245,000 | 8.59 % | |||
24 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Simpang 4 Gatot Subroto-Lingkar Dalam Selatan Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3987181 | 18816166 | 450,000,000 | 443,080,000 | 398,161,500 | 0 | 0 | 0 | 2019-01-25 12:00:00 | 03.025.809.9-731.000 | CV. SETIA JASA UTAMA | 51,838,500 | 11.52 % | |||
25 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jembatan Banjarmasin-Martapura | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3988181 | 18816141 | 350,000,000 | 345,840,000 | 321,227,500 | 0 | 0 | 0 | 2019-01-23 16:00:00 | 95.412.417.8-731.000 | PT. Prisma Jasa Konsulindo | 28,772,500 | 8.22 % | |||
26 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Anjir Pasar-Marabahan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3989181 | 18816133 | 350,000,000 | 348,040,000 | 326,095,000 | 0 | 0 | 0 | 2019-01-23 12:00:00 | 02.303.631.2-731.000 | CV. AFAPASTA CONSULTANT | 23,905,000 | 6.83 % | |||
27 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Desa Bahandang-Desa Keliling Benteng Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3990181 | 18816105 | 550,000,000 | 544,720,000 | 499,180,000 | 0 | 0 | 0 | 2019-01-23 10:00:00 | 03.025.809.9-731.000 | CV. SETIA JASA UTAMA | 50,820,000 | 9.24 % | |||
28 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Gunung Kupang-Kiram-Tambang Ulang (DAK) | Tender | Pekerjaan Konstruksi | 4051181 | 18829732 | 24,050,517,000 | 24,050,517,000 | 23,209,700,904 | 0 | 0 | 0 | 2019-02-19 14:35:00 | 70.694.710.8-732.000 | PT.TANJUNG RAYA BERSAMA | 840,816,096 | 3.5 % | |||
29 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Batulicin-Mentawakan | Tender | Pekerjaan Konstruksi | 4067181 | 18829693 | 39,505,080,000 | 39,505,080,000 | 38,398,917,978 | 0 | 0 | 0 | 2019-01-30 14:00:00 | 03.169.298.1-734.000 | PT.BATULICIN BETON ASPHALT | 1,106,162,022 | 2.8 % | |||
30 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Taman Budaya di Kawasan Perkantoran Prov. Kalsel di Banjarbaru (Konsultan Pengawas) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4121181 | 19364039 | 440,000,000 | 422,928,000 | 393,308,080 | 0 | 0 | 0 | 2019-02-06 14:00:00 | 01.860.230.0-731.000 | CV PRAKTIRA KONSULTAN | 46,691,920 | 10.61 % | |||
31 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Banjang-Pulau Nyiur-Batumandi Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4122181 | 18829690 | 400,000,000 | 399,520,000 | 373,230,000 | 0 | 0 | 0 | 2019-01-23 16:00:00 | 80.562.640.5-731.000 | CV. RAMIER JAYA ARKANANTA | 26,770,000 | 6.69 % | |||
32 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Kiram-Simpang 3 Tahura-Mandiangin | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4123181 | 18972161 | 250,000,000 | 248,820,000 | 242,990,000 | 0 | 0 | 0 | 2019-01-23 16:20:00 | 01.517.846.0-731.000 | PT. WINAYA KONTEKS KHARISMA | 7,010,000 | 2.8 % | |||
33 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengadaan dan Pemasangan Assesoris serta Mekanikal Elektrikal Jalur Distribusi Utama Banjarbakula lokasi Banjarbaru dan Kab. Tanah Laut (Konsultan Pengawas) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4128181 | 19038528 | 182,700,000 | 182,699,000 | 0 | 0 | 0 | 0 | 2019-01-30 16:00:00 | 182,700,000 | 100 % | |||||
34 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultansi Perencanaan Survey IRMS dan BMS Database Web GIS | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4227181 | 18829712 | 1,946,250,000 | 1,945,350,000 | 1,750,870,000 | 0 | 0 | 0 | 2019-03-04 16:00:00 | 01.124.766.5-731.000 | PT.WIRA WIDYATAMA | 195,380,000 | 10.04 % | |||
35 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Jalan Simpang 3 Lingkar Utara-Lingkar Utara Banjarbaru | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4249181 | 18829713 | 500,000,000 | 498,663,000 | 484,804,100 | 0 | 0 | 0 | 2019-03-04 12:00:00 | 02.089.773.2-733.000 | PT. TECHNIKATAMA JASA KONSULTAN | 15,195,900 | 3.04 % | |||
36 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Kajian Pengembangan Jalan Provinsi | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4255181 | 20235939 | 969,810,000 | 963,105,000 | 865,977,200 | 0 | 0 | 0 | 2019-03-06 16:00:00 | 01.489.654.2-711.000 | PT.TEMA KARYA MANDIRI | 103,832,800 | 10.71 % | |||
37 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Jembatan Penyeberangan Orang Tugu Nol | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4268181 | 18829719 | 350,000,000 | 349,899,000 | 325,809,000 | 0 | 0 | 0 | 2019-02-28 16:00:00 | 01.249.265.8-731.000 | PT.KALSECO GRAHA | 24,191,000 | 6.91 % | |||
38 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Sungai Jati-Sungai Ulin-Matraman | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4269181 | 18829717 | 500,000,000 | 499,015,000 | 467,060,000 | 0 | 0 | 0 | 2019-03-04 16:00:00 | 72.116.516.5-731.000 | CV. EMPAT BELAS | 32,940,000 | 6.59 % | |||
39 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Jalan Gunung Kupang-Kiram-Tambang Ulang dan Jalan Kiram-Gunung Mawar | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4270181 | 18829715 | 500,000,000 | 495,055,000 | 446,941,000 | 0 | 0 | 0 | 2019-02-27 16:00:00 | 03.268.848.3-444.000 | PT. Arenco Binatama | 53,059,000 | 10.61 % | |||
40 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Simpang 4 Gatot Subroto-Lingkar Dalam Selatan | Tender | Pekerjaan Konstruksi | 4368181 | 19045763 | 14,008,000,000 | 14,008,000,000 | 13,283,834,732 | 0 | 0 | 0 | 2019-03-04 10:00:00 | 72.196.664.6-731.000 | BIMO LAKSANA GROUP | 724,165,268 | 5.17 % | |||
41 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Kajian Lingkungan Pembangunan Tugu Pal Nol | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4413181 | 20519974 | 482,450,000 | 479,138,000 | 433,950,000 | 0 | 0 | 0 | 2019-03-27 22:00:00 | 02.108.378.7-429.000 | PT. Munasa Kreasi Nusantara | 48,500,000 | 10.05 % | |||
42 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Awang Bangkal-Temunih | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4417181 | 19800433 | 400,000,000 | 398,860,000 | 386,815,000 | 0 | 0 | 0 | 2019-03-27 07:00:00 | 01.517.846.0-731.000 | PT. WINAYA KONTEKS KHARISMA | 13,185,000 | 3.3 % | |||
43 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Temunih-Kodeco 58 | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4420181 | 19800926 | 400,000,000 | 398,860,000 | 391,132,500 | 0 | 0 | 0 | 2019-03-21 12:00:00 | 02.531.483.2-731.000 | MANDIRI cipta PRATAMA | 8,867,500 | 2.22 % | |||
44 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Penyusunan Dokumen Outline Business Case Jalan Bebas Hambatan Banjarbaru-Batulicin | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4433181 | 19801311 | 2,496,250,000 | 2,489,025,000 | 2,238,500,000 | 0 | 0 | 0 | 2019-04-04 16:00:00 | 01.124.766.5-731.000 | PT.WIRA WIDYATAMA | 257,750,000 | 10.33 % | |||
45 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Review Desain Jalan Bebas Hambatan dan Akses Penunjang | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4447181 | 19801136 | 1,496,250,000 | 1,489,268,000 | 1,340,273,000 | 0 | 0 | 0 | 2019-04-08 20:00:00 | 01.534.629.9-731.000 | WIDYADAYA BANDARAN | 155,977,000 | 10.42 % | |||
46 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Awang Bangkal-Temunih | Tender | Pekerjaan Konstruksi | 4625181 | 19800324 | 33,502,000,000 | 33,502,000,000 | 31,376,125,000 | 0 | 0 | 0 | 2019-04-23 08:00:00 | 03.018.059.0-732.000 | PTADHIEWANGOEN SEDAYA | 2,125,875,000 | 6.35 % | |||
47 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Mako Brimob | Tender | Pekerjaan Konstruksi | 5469181 | 19368884 | 844,000,000 | 841,066,941 | 814,713,839 | 0 | 0 | 0 | 2019-08-19 12:00:00 | 72.694.383.0-731.000 | CV. SAID KARYA KONSTRUKSI | 29,286,161 | 3.47 % | |||
48 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Penyusunan DED Rehab Kantor Gubernur di Banjarmasin dan Penyelesaian Sarana penunjangnya | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 5687181 | 21914666 | 180,625,000 | 180,092,000 | 151,800,000 | 0 | 0 | 0 | 2019-08-29 15:00:00 | 01.860.272.2-731.000 | CV. DAYAKARSA MADYA Consultant | 28,825,000 | 15.96 % | |||
49 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Angsana | Tender | Pekerjaan Konstruksi | 5855181 | 21950421 | 1,857,650,000 | 1,857,649,992 | 1,783,132,596 | 0 | 0 | 0 | 2019-09-27 13:00:00 | 91.744.784.9-734.000 | Indo Tama Jaya | 74,517,404 | 4.01 % | |||
50 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Tanjung Serdang - Lontar | Tender | Pekerjaan Konstruksi | 5858181 | 21950232 | 4,855,150,000 | 4,854,385,302 | 4,709,822,955 | 0 | 0 | 0 | 2019-10-01 15:00:00 | 91.744.784.9-734.000 | Indo Tama Jaya | 145,327,045 | 2.99 % | |||
51 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Pelaihari - Takisung & Peningkatan Jalan Pelaihari - Batakan | Tender | Pekerjaan Konstruksi | 5860181 | 21950037 | 4,855,150,000 | 4,855,149,990 | 4,756,029,557 | 0 | 0 | 0 | 2019-09-26 14:00:00 | 02.521.809.0-732.000 | cv. andhika karya | 99,120,443 | 2.04 % | |||
52 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Galam Rabah | Tender | Pekerjaan Konstruksi | 5866181 | 22066804 | 2,857,650,000 | 2,856,992,588 | 2,657,731,729 | 0 | 0 | 0 | 2019-09-27 17:00:00 | 84.697.060.6-731.000 | PT. Wassenar Karya Marga | 199,918,271 | 7 % | |||
53 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Kasturi - Jalan Akses Bandara - Jalan Lingkar Utara Banjarbaru (Paket II) Lanjutan | Tender | Pekerjaan Konstruksi | 5901181 | 21947701 | 19,871,000,000 | 19,871,000,000 | 18,762,730,524 | 0 | 0 | 0 | 2019-09-27 15:30:00 | 01.124.946.3-731.000 | PT. ADIMANUNGGAL CIPTA PADUNUSA | 1,108,269,476 | 5.58 % | |||
54 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jembatan Banjarmasin - Martapura (Lanjutan) | Tender | Pekerjaan Konstruksi | 6054181 | 21947818 | 2,883,250,000 | 2,883,234,784 | 2,824,583,471 | 0 | 0 | 0 | 2019-10-08 21:00:00 | 80.777.350.2-731.000 | CV. TRI HIDAYAH | 58,666,529 | 2.03 % | |||
55 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan KM 45 - KM 52 (Ruas Lumpangi - Batulicin) | Tender | Pekerjaan Konstruksi | 6062181 | 21950173 | 40,945,400,000 | 40,945,395,325 | 38,651,265,596 | 0 | 0 | 0 | 2019-10-11 11:00:00 | 03.169.298.1-734.000 | PT.BATULICIN BETON ASPHALT | 2,294,134,404 | 5.6 % | |||
56 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Jalan Batulicin - Mentawakan (KM 4 - KM 10) (Lanjutan) | Tender | Pekerjaan Konstruksi | 6075181 | 22065358 | 9,852,925,000 | 9,852,911,071 | 9,194,701,010 | 0 | 0 | 0 | 2019-10-11 11:00:00 | 01.222.215.4-734.000 | CV. Dewi Indah | 658,223,990 | 6.68 % | |||
57 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Paramasan dan Angkipih Atas - Paramasan Bawah | Tender | Pekerjaan Konstruksi | 6126181 | 21947979 | 4,855,150,000 | 4,852,970,830 | 4,682,129,348 | 0 | 0 | 0 | 2019-10-18 12:00:00 | 02.489.989.0-731.000 | CV. SETIAWAN NOOR | 173,020,652 | 3.56 % | |||
58 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Wisata Goa Liang Bangkai | Tender | Pekerjaan Konstruksi | 6179181 | 22318024 | 4,855,150,000 | 4,855,146,372 | 4,622,472,457 | 0 | 0 | 0 | 2019-10-24 15:00:00 | 01.222.215.4-734.000 | CV. Dewi Indah | 232,677,543 | 4.79 % | |||
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Pagu | HPS | Nilai Penawaran | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Pagu | HPS | Nilai Penawaran | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Sarana dan Prasarana Pendukung Tugu Pal Nol (Konsultan Pengawas) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3960181 | 19023901 | 400,000,000 | 399,877,500 | 324,274,000 | 324,274,000 | 0 | 0 | 2019-01-10 11:00:00 | 95.412.417.8-731.000 | PT. Prisma Jasa Konsulindo | 95.412.417.8-731.000 | PT. Prisma Jasa Konsulindo | 75,726,000 | 18.93 % | |
2 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Negara-Muara Tapus | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3962181 | 18972013 | 250,000,000 | 248,050,000 | 242,880,000 | 0 | 0 | 0 | 2019-01-24 09:00:00 | 02.089.773.2-733.000 | PT. TECHNIKATAMA JASA KONSULTAN | 7,120,000 | 2.85 % | |||
3 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Gunung Kupang-Kiram-Tambang Ulang (DAK) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3963181 | 18829733 | 450,000,000 | 449,350,000 | 399,168,000 | 0 | 0 | 0 | 2019-01-23 15:30:00 | 03.025.828.9-731.000 | CV. GRIYASHANTA | 50,832,000 | 11.3 % | |||
4 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Kandangan-Negara (DAK) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3964181 | 18829731 | 225,000,000 | 224,235,000 | 189,007,500 | 0 | 0 | 0 | 2019-01-23 13:00:00 | 02.089.773.2-733.000 | PT. TECHNIKATAMA JASA KONSULTAN | 35,992,500 | 16 % | |||
5 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Amuntai-Lampihong-Paringin-Halong (DAK) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3966181 | 18829725 | 225,000,000 | 224,235,000 | 212,272,500 | 0 | 0 | 0 | 2019-01-23 16:00:00 | 03.025.627.5-731.000 | SADWA RAMA CONSULTANT | 12,727,500 | 5.66 % | |||
6 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Lontar-Tanjung Seloka-Berangas | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3967181 | 18829710 | 350,000,000 | 348,315,000 | 331,760,000 | 0 | 0 | 0 | 2019-01-24 09:00:00 | 95.412.417.8-731.000 | PT. Prisma Jasa Konsulindo | 18,240,000 | 5.21 % | |||
7 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Tanjung Serdang-Lontar | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3968181 | 18829708 | 350,000,000 | 348,315,000 | 293,387,600 | 0 | 0 | 0 | 2019-01-24 09:00:00 | 02.778.681.3-423.000 | PT. Gumilang Sajati | 56,612,400 | 16.17 % | |||
8 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jembatan Sungai Temunih dan Sungai Kusan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3969181 | 18829705 | 400,000,000 | 398,530,000 | 318,780,000 | 0 | 0 | 0 | 2019-01-23 15:00:00 | 01.124.509.9-731.000 | PT. SEKTA GUBAH SARANA | 81,220,000 | 20.31 % | |||
9 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jembatan Desa Sungai Apuy 1 dan Apuy II | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3970181 | 18829700 | 400,000,000 | 398,530,000 | 370,530,875 | 0 | 0 | 0 | 2019-01-23 13:00:00 | 01.489.654.2-711.000 | PT.TEMA KARYA MANDIRI | 29,469,125 | 7.37 % | |||
10 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Suka Damai-Mentewe | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3971181 | 18829698 | 350,000,000 | 345,840,000 | 331,265,000 | 0 | 0 | 0 | 2019-01-23 16:00:00 | 95.412.417.8-731.000 | PT. Prisma Jasa Konsulindo | 18,735,000 | 5.35 % | |||
11 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Mentawakan-Mentewe | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3972181 | 18829696 | 350,000,000 | 345,840,000 | 318,175,000 | 0 | 0 | 0 | 2019-01-23 16:00:00 | 80.562.640.5-731.000 | CV. RAMIER JAYA ARKANANTA | 31,825,000 | 9.09 % | |||
12 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Batulicin-Mentawakan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3973181 | 18829694 | 400,000,000 | 389,620,000 | 364,952,500 | 0 | 0 | 0 | 2019-01-23 15:30:00 | 02.090.318.3-731.000 | CV. Inditec Consultant | 35,047,500 | 8.76 % | |||
13 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Kiram-Gunung Mawar Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3974181 | 18829691 | 450,000,000 | 441,540,000 | 432,872,000 | 0 | 0 | 0 | 2019-01-23 16:00:00 | 02.050.569.9-731.000 | CV. Dharma Cipta Pratama | 17,128,000 | 3.81 % | |||
14 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan dan Jembatan Lumpangi-Loksado | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3976181 | 18829680 | 350,000,000 | 346,720,000 | 325,875,000 | 0 | 0 | 0 | 2019-01-24 09:00:00 | 02.531.704.1-731.000 | CV. FIAZTA MATRIX CONSULTANT | 24,125,000 | 6.89 % | |||
15 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Dahai-Tanjung Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3977181 | 18829677 | 450,000,000 | 449,570,000 | 425,810,000 | 0 | 0 | 0 | 2019-01-23 16:00:00 | 02.090.318.3-731.000 | CV. Inditec Consultant | 24,190,000 | 5.38 % | |||
16 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Lampihong-Mantimin Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3978181 | 18829672 | 550,000,000 | 549,230,000 | 499,136,000 | 0 | 0 | 0 | 2019-01-23 16:00:00 | 03.025.828.9-731.000 | CV. GRIYASHANTA | 50,864,000 | 9.25 % | |||
17 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Birayang-Tariwin-Lok Batu-Batu Mandi Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3979181 | 18827742 | 450,000,000 | 446,710,000 | 424,330,500 | 0 | 0 | 0 | 2019-01-18 00:00:00 | 02.050.569.9-731.000 | CV. Dharma Cipta Pratama | 25,669,500 | 5.7 % | |||
18 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Rantau-Muara Muning Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3980181 | 18827691 | 550,000,000 | 544,170,000 | 500,665,000 | 0 | 0 | 0 | 2019-01-24 09:00:00 | 80.562.640.5-731.000 | CV. RAMIER JAYA ARKANANTA | 49,335,000 | 8.97 % | |||
19 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jembatan Jalan Pendidkan Sekumpul Martapura (Pelebaran) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3981181 | 18827526 | 350,000,000 | 347,160,000 | 347,050,000 | 0 | 0 | 0 | 2019-01-11 10:45:00 | 01.517.846.0-731.000 | PT. WINAYA KONTEKS KHARISMA | 2,950,000 | 0.84 % | |||
20 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Paramasan-Bawah dan Paramasan Atas | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3982181 | 18827436 | 350,000,000 | 345,675,000 | 319,962,500 | 0 | 0 | 0 | 2019-01-23 16:00:00 | 03.025.627.5-731.000 | SADWA RAMA CONSULTANT | 30,037,500 | 8.58 % | |||
21 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Alternatif Makam Syeh Arsyad Al Banjari | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3983181 | 18826684 | 350,000,000 | 347,160,000 | 238,106,000 | 0 | 0 | 0 | 2019-01-23 15:30:00 | 02.778.681.3-423.000 | PT. Gumilang Sajati | 111,894,000 | 31.97 % | |||
22 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Banjarbaru-Bati bati Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3984181 | 18826604 | 550,000,000 | 510,510,000 | 504,640,070 | 0 | 0 | 0 | 2019-01-23 15:00:00 | 01.879.315.8-731.000 | CV. ADIHANMAN TATA RANCANG | 45,359,930 | 8.25 % | |||
23 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Golf Banjarbaru Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3985181 | 18825315 | 450,000,000 | 441,540,000 | 412,830,000 | 0 | 0 | 0 | 2019-01-23 15:00:00 | 02.090.318.3-731.000 | CV. Inditec Consultant | 37,170,000 | 8.26 % | |||
24 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Simpang 3 Golf-Jalan Kasturi (Paket I) Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3986181 | 18824971 | 550,000,000 | 538,010,000 | 502,755,000 | 0 | 0 | 0 | 2019-01-23 13:00:00 | 80.562.640.5-731.000 | CV. RAMIER JAYA ARKANANTA | 47,245,000 | 8.59 % | |||
25 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Simpang 4 Gatot Subroto-Lingkar Dalam Selatan Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3987181 | 18816166 | 450,000,000 | 443,080,000 | 398,161,500 | 0 | 0 | 0 | 2019-01-25 12:00:00 | 03.025.809.9-731.000 | CV. SETIA JASA UTAMA | 51,838,500 | 11.52 % | |||
26 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jembatan Banjarmasin-Martapura | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3988181 | 18816141 | 350,000,000 | 345,840,000 | 321,227,500 | 0 | 0 | 0 | 2019-01-23 16:00:00 | 95.412.417.8-731.000 | PT. Prisma Jasa Konsulindo | 28,772,500 | 8.22 % | |||
27 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Anjir Pasar-Marabahan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3989181 | 18816133 | 350,000,000 | 348,040,000 | 326,095,000 | 0 | 0 | 0 | 2019-01-23 12:00:00 | 02.303.631.2-731.000 | CV. AFAPASTA CONSULTANT | 23,905,000 | 6.83 % | |||
28 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Desa Bahandang-Desa Keliling Benteng Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3990181 | 18816105 | 550,000,000 | 544,720,000 | 499,180,000 | 0 | 0 | 0 | 2019-01-23 10:00:00 | 03.025.809.9-731.000 | CV. SETIA JASA UTAMA | 50,820,000 | 9.24 % | |||
29 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Rehab/Renovasi Gor Hasanuddin di Banjarmasin | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3991181 | 19038407 | 231,650,000 | 230,906,500 | 204,451,500 | 204,451,500 | 0 | 0 | 2019-01-10 14:00:00 | 02.050.569.9-731.000 | CV. Dharma Cipta Pratama | 02.050.569.9-731.000 | CV. Dharma Cipta Pratama | 27,198,500 | 11.74 % | |
30 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Rehab/Renovasi Stadion 17 Mei di Banjarmasin | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3994181 | 19039178 | 481,650,000 | 481,536,000 | 411,831,200 | 411,831,200 | 0 | 0 | 2019-01-11 10:00:00 | 01.860.230.0-731.000 | CV PRAKTIRA KONSULTAN | 01.860.230.0-731.000 | CV PRAKTIRA KONSULTAN | 69,818,800 | 14.5 % | |
31 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Sarana dan Prasarana Pendukung Tugu Pal Nol | Tender | Pekerjaan Konstruksi | 3995181 | 19038515 | 12,531,000,000 | 12,459,462,021 | 11,367,410,174 | 11,367,410,174 | 0 | 0 | 2019-01-29 15:00:00 | 74.895.338.7-609.000 | PT. DEFANI ENERGI INDONESIA | 74.895.338.7-609.000 | PT. DEFANI ENERGI INDONESIA | 1,163,589,826 | 9.29 % | |
32 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Lanjutan Pembangunan Gedung Bakeuda (Konsultan Pengawas) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3998181 | 19039452 | 350,000,000 | 349,189,500 | 280,115,000 | 263,230,000 | 0 | 0 | 2019-01-23 16:10:00 | 71.883.318.9-609.000 | PT. DIRA BINA NUSA | 71.883.318.9-609.000 | PT. DIRA BINA NUSA | 69,885,000 | 19.97 % | |
33 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan dan Jembatan Lumpangi-Loksado | Tender | Pekerjaan Konstruksi | 4000181 | 18829679 | 4,564,830,000 | 4,564,828,828 | 4,327,546,227 | 4,299,724,985 | 0 | 0 | 2019-01-30 14:00:00 | 02.224.175.6-733.000 | PT.MITRA REZKI UTAMA | 02.224.175.6-733.000 | PT.MITRA REZKI UTAMA | 237,283,773 | 5.2 % | |
34 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jembatan Jalan Pendidkan Sekumpul Martapura (Pelebaran) | Tender | Pekerjaan Konstruksi | 4001181 | 18972548 | 10,615,525,000 | 10,615,525,000 | 9,925,000,165 | 9,925,000,165 | 0 | 0 | 2019-01-17 15:00:00 | 01.424.331.5-732.000 | PT. JATI BARU | 01.424.331.5-732.000 | PT. JATI BARU | 690,524,835 | 6.5 % | |
35 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan By Pass-Binderang | Tender | Pekerjaan Konstruksi | 4002181 | 18827707 | 2,921,550,000 | 2,921,550,000 | 2,829,236,298 | 2,829,236,298 | 0 | 0 | 2019-01-30 14:00:00 | 80.203.029.6-731.000 | PT. WAJI PUTERA KARYA MANDIRI | 80.203.029.6-731.000 | PT. WAJI PUTERA KARYA MANDIRI | 92,313,702 | 3.16 % | |
36 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jembatan Desa Sungai Apuy 1 dan Apuy II | Tender | Pekerjaan Konstruksi | 4004181 | 19043697 | 34,505,080,000 | 34,505,080,000 | 33,666,666,736 | 33,666,666,000 | 0 | 0 | 2019-04-22 14:00:00 | 03.265.981.5-731.000 | PT. Pandji Pratama Indonesia | 03.265.981.5-731.000 | PT. Pandji Pratama Indonesia | 838,413,264 | 2.43 % | |
37 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Desa Bahandang-Desa Keliling Benteng | Tender | Pekerjaan Konstruksi | 4005181 | 18816083 | 6,862,605,000 | 6,862,605,000 | 6,693,446,006 | 6,681,890,000 | 0 | 0 | 2019-01-30 14:00:00 | 70.694.710.8-732.000 | PT.TANJUNG RAYA BERSAMA | 70.694.710.8-732.000 | PT.TANJUNG RAYA BERSAMA | 169,158,994 | 2.46 % | |
38 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Gambut-Pulau Sari | Tender | Pekerjaan Konstruksi | 4007181 | 18827641 | 4,967,750,000 | 4,967,750,000 | 4,682,064,365 | 4,682,064,365 | 0 | 0 | 2019-01-30 14:00:00 | 01.137.533.4-731.000 | PT. PUTRA KANCA | 01.137.533.4-731.000 | PT. PUTRA KANCA | 285,685,635 | 5.75 % | |
39 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Ray 7-Desa Bahandang | Tender | Pekerjaan Konstruksi | 4009181 | 18816098 | 4,914,830,000 | 4,914,830,000 | 4,714,741,067 | 4,685,220,000 | 0 | 0 | 2019-01-30 14:00:00 | 03.265.981.5-731.000 | PT. Pandji Pratama Indonesia | 03.265.981.5-731.000 | PT. Pandji Pratama Indonesia | 200,088,933 | 4.07 % | |
40 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Simpang 3 Lingkar Utara-Simpang 3 Jalan Golf | Tender | Pekerjaan Konstruksi | 4014181 | 18824895 | 9,965,525,000 | 9,965,525,000 | 9,428,570,170 | 9,428,570,170 | 0 | 0 | 2019-01-30 14:00:00 | 02.614.233.1-731.000 | PT. MENARA PILAR UTAMA | 02.614.233.1-731.000 | PT. MENARA PILAR UTAMA | 536,954,830 | 5.39 % | |
41 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Kasturi-Jalan Akses Bandara-Jalan Lingkar Utara (Paket II) | Tender | Pekerjaan Konstruksi | 4017181 | 18825091 | 4,967,750,000 | 4,967,750,000 | 4,764,686,310 | 4,764,686,310 | 0 | 0 | 2019-01-30 14:00:00 | 70.733.060.1-731.000 | PT. AQILA AGUNG MULTI PERSADA | 70.733.060.1-731.000 | PT. AQILA AGUNG MULTI PERSADA | 203,063,690 | 4.09 % | |
42 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Suka Damai-Mentewe | Tender | Pekerjaan Konstruksi | 4018181 | 18829697 | 37,555,080,000 | 37,551,417,484 | 36,038,126,423 | 35,928,984,159 | 0 | 0 | 2019-01-30 14:00:00 | 03.169.298.1-734.000 | PT.BATULICIN BETON ASPHALT | 03.169.298.1-734.000 | PT.BATULICIN BETON ASPHALT | 1,516,953,577 | 4.04 % | |
43 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Rantau-Muara Muning | Tender | Pekerjaan Konstruksi | 4037181 | 18827676 | 4,371,550,000 | 4,371,550,000 | 4,215,791,273 | 4,215,791,273 | 0 | 0 | 2019-01-30 14:00:00 | 02.237.343.5-733.000 | PT.Bina Bangun Banua Bersama | 02.237.343.5-733.000 | PT.Bina Bangun Banua Bersama | 155,758,727 | 3.56 % | |
44 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Kiram-Gunung Mawar | Tender | Pekerjaan Konstruksi | 4046181 | 19045657 | 4,517,750,000 | 4,517,750,000 | 4,402,026,033 | 4,384,824,982 | 0 | 0 | 2019-01-30 14:00:00 | 03.018.148.1-732.000 | PT. ADJI PERKASA | 03.018.148.1-732.000 | PT. ADJI PERKASA | 115,723,967 | 2.56 % | |
45 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Kiram-Gunung Coklat | Tender | Pekerjaan Konstruksi | 4049181 | 18827388 | 5,965,525,000 | 5,965,525,000 | 5,804,918,768 | 5,783,630,000 | 0 | 0 | 2019-01-30 17:00:00 | 70.694.710.8-732.000 | PT.TANJUNG RAYA BERSAMA | 70.694.710.8-732.000 | PT.TANJUNG RAYA BERSAMA | 160,606,232 | 2.69 % | |
46 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Kiram-Simpang 3 Tahura-Mandiangin | Tender | Pekerjaan Konstruksi | 4050181 | 18985916 | 4,717,750,000 | 4,717,750,000 | 4,591,715,628 | 4,573,435,000 | 0 | 0 | 2019-01-30 14:00:00 | 76.210.704.3-731.000 | PT.SATRIA BAGUS PERKASA | 76.210.704.3-731.000 | PT.SATRIA BAGUS PERKASA | 126,034,372 | 2.67 % | |
47 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Gunung Kupang-Kiram-Tambang Ulang (DAK) | Tender | Pekerjaan Konstruksi | 4051181 | 18829732 | 24,050,517,000 | 24,050,517,000 | 23,209,700,904 | 0 | 0 | 0 | 2019-02-19 14:35:00 | 70.694.710.8-732.000 | PT.TANJUNG RAYA BERSAMA | 840,816,096 | 3.5 % | |||
48 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Anjir Pasar-Marabahan | Tender | Pekerjaan Konstruksi | 4053181 | 19045907 | 13,555,080,000 | 13,555,080,000 | 13,011,226,245 | 12,701,661,000 | 0 | 0 | 2019-01-30 14:00:00 | 03.265.981.5-731.000 | PT. Pandji Pratama Indonesia | 03.265.981.5-731.000 | PT. Pandji Pratama Indonesia | 543,853,755 | 4.01 % | |
49 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Jejangkit Muara-Ray 7 | Tender | Pekerjaan Konstruksi | 4054181 | 18816118 | 6,912,605,000 | 6,912,605,000 | 6,481,878,475 | 6,481,878,475 | 0 | 0 | 2019-01-30 14:00:00 | 01.124.946.3-731.000 | PT. ADIMANUNGGAL CIPTA PADUNUSA | 01.124.946.3-731.000 | PT. ADIMANUNGGAL CIPTA PADUNUSA | 430,726,525 | 6.23 % | |
50 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Golf Banjarbaru | Tender | Pekerjaan Konstruksi | 4057181 | 18825221 | 4,517,750,000 | 4,517,750,000 | 4,313,770,255 | 4,313,770,255 | 0 | 0 | 2019-01-30 14:00:00 | 01.133.868.8-731.000 | PT. HM Taher | 01.133.868.8-731.000 | PT. HM Taher | 203,979,745 | 4.52 % | |
51 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Banjarbaru-Simpang 3 Tahura-Aranio | Tender | Pekerjaan Konstruksi | 4058181 | 18825474 | 4,967,750,000 | 4,967,750,000 | 4,761,972,915 | 4,761,972,915 | 0 | 0 | 2019-01-30 14:00:00 | 01.124.866.3-732.000 | PT. VANAGA UTAMA | 01.124.866.3-732.000 | PT. VANAGA UTAMA | 205,777,085 | 4.14 % | |
52 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Kapar Kias-Birayang | Tender | Pekerjaan Konstruksi | 4061181 | 18829686 | 4,914,830,000 | 4,914,830,000 | 4,563,641,426 | 4,563,641,426 | 0 | 0 | 2019-01-30 14:00:00 | 01.124.058.7-733.000 | AIRA DUTA MURAKATA. PT | 01.124.058.7-733.000 | AIRA DUTA MURAKATA. PT | 351,188,574 | 7.15 % | |
53 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Banjang-Pulau Nyiur-Batumandi | Tender | Pekerjaan Konstruksi | 4062181 | 18829689 | 2,528,270,000 | 2,528,270,000 | 2,387,938,450 | 2,368,770,000 | 0 | 0 | 2019-02-15 18:00:00 | 02.896.703.2-733.000 | PT.PUTRA PERDANA PERSADA | 02.896.703.2-733.000 | PT.PUTRA PERDANA PERSADA | 140,331,550 | 5.55 % | |
54 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Lingkar Binuang | Tender | Pekerjaan Konstruksi | 4064181 | 18827664 | 4,914,830,000 | 4,914,830,000 | 4,710,480,823 | 4,710,480,823 | 0 | 0 | 2019-01-30 14:00:00 | 75.222.098.8-331.000 | PT. TOSAMA ADHI JAYA | 75.222.098.8-331.000 | PT. TOSAMA ADHI JAYA | 204,349,177 | 4.16 % | |
55 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Tanjung Serdang-Lontar | Tender | Pekerjaan Konstruksi | 4065181 | 18829706 | 9,561,525,000 | 9,061,250,286 | 8,770,942,955 | 8,770,942,955 | 0 | 0 | 2019-01-30 14:00:00 | 31.807.270.9-731.000 | nawa cipta waradana pt | 31.807.270.9-731.000 | nawa cipta waradana pt | 790,582,045 | 8.27 % | |
56 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Lontar-Tanjung Seloka-Berangas | Tender | Pekerjaan Konstruksi | 4066181 | 18829709 | 9,561,525,000 | 9,061,525,000 | 8,777,851,045 | 8,777,851,000,000 | 0 | 0 | 2019-01-30 14:00:00 | 31.807.270.9-731.000 | nawa cipta waradana pt | 31.807.270.9-731.000 | nawa cipta waradana pt | 783,673,955 | 8.2 % | |
57 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Batulicin-Mentawakan | Tender | Pekerjaan Konstruksi | 4067181 | 18829693 | 39,505,080,000 | 39,505,080,000 | 38,398,917,978 | 0 | 0 | 0 | 2019-01-30 14:00:00 | 03.169.298.1-734.000 | PT.BATULICIN BETON ASPHALT | 1,106,162,022 | 2.8 % | |||
58 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Birayang-Tariwin-Lok Batu-Batu Mandi | Tender | Pekerjaan Konstruksi | 4070181 | 18827723 | 4,464,830,000 | 4,464,830,000 | 4,149,170,525 | 4,089,565,000 | 0 | 0 | 2019-01-30 14:00:00 | 02.942.104.7-731.000 | SAPTA JASA KONSTRUKSI | 02.942.104.7-731.000 | SAPTA JASA KONSTRUKSI | 315,659,475 | 7.07 % | |
59 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Guntung Panaitan-Lampihong | Tender | Pekerjaan Konstruksi | 4074181 | 18829692 | 2,928,270,000 | 2,928,270,000 | 2,810,126,129 | 2,810,126,129 | 0 | 0 | 2019-01-30 14:00:00 | 01.124.098.3-735.000 | PT. CAHAYA MENTARI | 01.124.098.3-735.000 | PT. CAHAYA MENTARI | 118,143,871 | 4.03 % | |
60 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Dahai-Tanjung | Tender | Pekerjaan Konstruksi | 4076181 | 18829676 | 4,464,830,000 | 4,464,830,000 | 4,247,124,269 | 4,247,124,269 | 0 | 0 | 2019-02-15 14:00:00 | 02.746.857.8-735.000 | PT. Sinar Mahaputera Mandaga Bakti | 02.746.857.8-735.000 | PT. Sinar Mahaputera Mandaga Bakti | 217,705,731 | 4.88 % | |
61 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Amuntai-Lampihong-Paringin-Halong (DAK) | Tender | Pekerjaan Konstruksi | 4077181 | 18829724 | 4,775,000,000 | 4,775,000,000 | 4,579,721,456 | 4,579,721,456 | 0 | 0 | 2019-01-30 14:00:00 | 01.124.098.3-735.000 | PT. CAHAYA MENTARI | 01.124.098.3-735.000 | PT. CAHAYA MENTARI | 195,278,544 | 4.09 % | |
62 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Embung Jaro Kabupaten Tabalong | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4081181 | 19014512 | 1,000,000,000 | 999,999,000 | 955,460,000 | 955,460,000 | 0 | 0 | 2019-02-11 14:00:00 | 01.426.908.8-441.000 | PT. SARANA BHUANA JAYA | 01.426.908.8-441.000 | PT. SARANA BHUANA JAYA | 44,540,000 | 4.45 % | |
63 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Simpang 3 Golf-Jalan Kasturi (Paket I) | Tender | Pekerjaan Konstruksi | 4082181 | 19046006 | 18,908,000,000 | 18,908,000,000 | 17,706,696,487 | 17,706,696,487 | 0 | 0 | 2019-01-30 14:00:00 | 01.124.946.3-731.000 | PT. ADIMANUNGGAL CIPTA PADUNUSA | 01.124.946.3-731.000 | PT. ADIMANUNGGAL CIPTA PADUNUSA | 1,201,303,513 | 6.35 % | |
64 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Supervisi Rehabillitas DIR. Polder Tambak Hanyar Kab. Banjar | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4086181 | 19014590 | 250,000,000 | 249,975,000 | 237,380,000 | 230,505,000 | 0 | 0 | 2019-02-11 14:00:00 | 02.531.704.1-731.000 | CV. FIAZTA MATRIX CONSULTANT | 02.531.704.1-731.000 | CV. FIAZTA MATRIX CONSULTANT | 12,620,000 | 5.05 % | |
65 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Supervisi Peningkatan Polder Mini Daerah Irigasi Rawa Polder Bakar Kabupaten Hulu Sungai Utara | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4093181 | 19014442 | 650,000,000 | 649,715,000 | 630,465,000 | 615,725,000 | 0 | 0 | 2019-02-14 11:00:00 | 01.534.559.8-731.000 | PT TECTAMA KARYA | 01.534.559.8-731.000 | PT TECTAMA KARYA | 19,535,000 | 3.01 % | |
66 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Tanjung-Muara Uya | Tender | Pekerjaan Konstruksi | 4094181 | 18829688 | 4,914,830,000 | 4,914,829,343 | 4,533,040,887 | 4,533,040,887 | 0 | 0 | 2019-02-15 14:00:00 | 02.421.761.4-735.000 | PT. PILAR JAYA KONSTRUKSI | 02.421.761.4-735.000 | PT. PILAR JAYA KONSTRUKSI | 381,789,113 | 7.77 % | |
67 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Normalisasi Sungai Saluran Pembuang Embung Landasan Ulin | Tender | Pekerjaan Konstruksi | 4096181 | 19014585 | 2,000,000,000 | 1,999,997,281 | 1,337,479,716 | 1,337,479,716 | 0 | 0 | 2019-02-12 10:00:00 | 02.050.836.2-735.000 | CV.SEPAKAT | 02.050.836.2-735.000 | CV.SEPAKAT | 662,520,284 | 33.13 % | |
68 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jaringan Daerah Irigasi Kinarum 1.004 Ha Kabupaten Tabalong | Tender | Pekerjaan Konstruksi | 4098181 | 19014478 | 25,472,087,000 | 25,472,055,252 | 22,262,797,099 | 22,166,354,000 | 0 | 0 | 2019-02-11 10:00:00 | 01.407.735.8-711.000 | PT.ARGO SANJOYO ADHITAMA | 01.407.735.8-711.000 | PT.ARGO SANJOYO ADHITAMA | 3,209,289,901 | 12.6 % | |
69 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Polder Mini Daerah Irigasi Rawa Polder Bakar Kabupaten Hulu Sungai Utara | Tender | Pekerjaan Konstruksi | 4100181 | 19014465 | 9,640,000,000 | 9,639,997,036 | 9,152,211,000 | 9,147,380,000 | 0 | 0 | 2019-02-11 08:00:00 | 01.424.627.6-733.000 | PT. DIANG PUTRA ANDHIKATAMA | 01.424.627.6-733.000 | PT. DIANG PUTRA ANDHIKATAMA | 487,789,000 | 5.06 % | |
70 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Kandangan-Negara (DAK) | Tender | Pekerjaan Konstruksi | 4104181 | 18829730 | 4,775,000,000 | 4,774,984,854 | 4,723,219,871 | 4,572,000,000 | 0 | 0 | 2019-02-15 18:00:00 | 01.860.696.2-731.000 | PT. SALSABILA ONIRESH NUSANTARA | 01.860.696.2-731.000 | PT. SALSABILA ONIRESH NUSANTARA | 51,780,129 | 1.08 % | |
71 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Jaringan DIR. Alalak Padang Kab. Banjar | Tender | Pekerjaan Konstruksi | 4106181 | 19014610 | 5,000,000,000 | 4,999,999,639 | 3,740,158,613 | 3,740,158,613 | 0 | 0 | 2019-02-11 15:30:00 | 75.733.281.2-731.000 | PT. CIPTA RAYA NUSANTARA | 75.733.281.2-731.000 | PT. CIPTA RAYA NUSANTARA | 1,259,841,387 | 25.2 % | |
72 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Jaringan DIR. Polder Tambak Hanyar Kab. Banjar | Tender | Pekerjaan Konstruksi | 4114181 | 19014597 | 3,000,000,000 | 2,999,972,842 | 2,732,834,000 | 2,584,420,677 | 0 | 0 | 2019-02-12 15:30:00 | 71.698.315.0-733.000 | PT. ARYA JAYA KARYA | 71.698.315.0-733.000 | PT. ARYA JAYA KARYA | 267,166,000 | 8.91 % | |
73 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Paramasan-Bawah dan Paramasan Atas-Angkipih | Tender | Pekerjaan Konstruksi | 4115181 | 18985859 | 4,464,830,000 | 4,464,829,871 | 4,241,046,538 | 4,241,046,538 | 0 | 0 | 2019-02-15 17:00:00 | 02.014.742.7-714.000 | PT. RAHMAT AGUNG UTAMA | 02.014.742.7-714.000 | PT. RAHMAT AGUNG UTAMA | 223,783,462 | 5.01 % | |
74 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Galeri di Mess Billiton dan di Anjungan Kalsel TMII Jakarta (Konsultan Perencana) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4118181 | 19364045 | 250,000,000 | 247,214,000 | 222,035,000 | 215,490,000 | 0 | 0 | 2019-02-06 14:00:00 | 71.883.318.9-609.000 | PT. DIRA BINA NUSA | 71.883.318.9-609.000 | PT. DIRA BINA NUSA | 27,965,000 | 11.19 % | |
75 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Gedung Pramuka (Konsultan Pengawas) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4119181 | 19363964 | 140,000,000 | 139,942,000 | 135,000,800 | 123,459,600 | 0 | 0 | 2019-02-06 14:00:00 | 02.531.483.2-731.000 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | MANDIRI cipta PRATAMA | 4,999,200 | 3.57 % | |
76 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Gedung Samsat Amuntai (Konsultan Pengawas) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4120181 | 19364012 | 325,000,000 | 324,698,000 | 316,243,400 | 283,690,000 | 0 | 0 | 2019-02-06 14:00:00 | 02.531.483.2-731.000 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | MANDIRI cipta PRATAMA | 8,756,600 | 2.69 % | |
77 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Taman Budaya di Kawasan Perkantoran Prov. Kalsel di Banjarbaru (Konsultan Pengawas) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4121181 | 19364039 | 440,000,000 | 422,928,000 | 393,308,080 | 0 | 0 | 0 | 2019-02-06 14:00:00 | 01.860.230.0-731.000 | CV PRAKTIRA KONSULTAN | 46,691,920 | 10.61 % | |||
78 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Banjang-Pulau Nyiur-Batumandi Cs | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4122181 | 18829690 | 400,000,000 | 399,520,000 | 373,230,000 | 0 | 0 | 0 | 2019-01-23 16:00:00 | 80.562.640.5-731.000 | CV. RAMIER JAYA ARKANANTA | 26,770,000 | 6.69 % | |||
79 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Peningkatan Jalan Kiram-Simpang 3 Tahura-Mandiangin | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4123181 | 18972161 | 250,000,000 | 248,820,000 | 242,990,000 | 0 | 0 | 0 | 2019-01-23 16:20:00 | 01.517.846.0-731.000 | PT. WINAYA KONTEKS KHARISMA | 7,010,000 | 2.8 % | |||
80 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Lanjutan Pembangunan Gedung Bakeuda | Tender | Pekerjaan Konstruksi | 4124181 | 19039430 | 8,628,425,000 | 8,623,335,560 | 7,326,620,308 | 7,326,620,307 | 0 | 0 | 2019-02-15 16:00:00 | 31.551.576.7-036.000 | PT. ARYSNA MANDIRI | 31.551.576.7-036.000 | PT. ARYSNA MANDIRI | 1,301,804,692 | 15.09 % | |
81 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengadaan dan Pemasangan Assesoris serta Mekanikal Elektrikal Jalur Distribusi Utama Banjarbakula lokasi Banjarbaru dan Kab. Tanah Laut (Konsultan Pengawas) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4128181 | 19038528 | 182,700,000 | 182,699,000 | 0 | 0 | 0 | 0 | 2019-01-30 16:00:00 | 182,700,000 | 100 % | |||||
82 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Negara-Muara Tapus | Tender | Pekerjaan Konstruksi | 4146181 | 18984374 | 4,664,830,000 | 4,664,830,000 | 4,471,158,746 | 4,466,795,000 | 0 | 0 | 2019-02-11 08:00:00 | 02.215.612.9-735.000 | PT. Pusaka Agung Manunggal | 02.215.612.9-735.000 | PT. Pusaka Agung Manunggal | 193,671,255 | 4.15 % | |
83 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehab Halaman dan Pembangunan Toilet Mesjid Raya Sabilal Muhtadin di Banjarmasin (Tahap II) | Tender | Pekerjaan Konstruksi | 4148181 | 19798611 | 1,382,400,000 | 1,380,717,010 | 1,091,048,469 | 1,091,048,469 | 0 | 0 | 2019-02-01 14:25:00 | 02.708.646.1-731.000 | mulia akbar | 02.708.646.1-731.000 | mulia akbar | 291,351,531 | 21.08 % | |
84 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Amuntai-Lampihong-Paringin | Tender | Pekerjaan Konstruksi | 4149181 | 18829204 | 4,814,830,000 | 4,813,177,924 | 4,571,276,600 | 4,571,276,600 | 0 | 0 | 2019-02-11 14:00:00 | 75.885.417.8-735.000 | PT. Cahaya Sambang Sejahtera | 75.885.417.8-735.000 | PT. Cahaya Sambang Sejahtera | 243,553,400 | 5.06 % | |
85 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Lampihong-Mantimin | Tender | Pekerjaan Konstruksi | 4151181 | 18829666 | 4,371,550,000 | 4,371,549,482 | 4,135,890,984 | 4,087,037,000 | 0 | 0 | 2019-02-15 17:00:00 | 02.590.527.4-735.000 | PT. Prima Mitralindo Utama | 02.590.527.4-735.000 | PT. Prima Mitralindo Utama | 235,659,016 | 5.39 % | |
86 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Konsultansi Perencanaan Survey IRMS dan BMS Database Web GIS | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4227181 | 18829712 | 1,946,250,000 | 1,945,350,000 | 1,750,870,000 | 0 | 0 | 0 | 2019-03-04 16:00:00 | 01.124.766.5-731.000 | PT.WIRA WIDYATAMA | 195,380,000 | 10.04 % | |||
87 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Jalan Simpang 3 Lingkar Utara-Lingkar Utara Banjarbaru | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4249181 | 18829713 | 500,000,000 | 498,663,000 | 484,804,100 | 0 | 0 | 0 | 2019-03-04 12:00:00 | 02.089.773.2-733.000 | PT. TECHNIKATAMA JASA KONSULTAN | 15,195,900 | 3.04 % | |||
88 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Kajian Pengembangan Jalan Provinsi | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4255181 | 20235939 | 969,810,000 | 963,105,000 | 865,977,200 | 0 | 0 | 0 | 2019-03-06 16:00:00 | 01.489.654.2-711.000 | PT.TEMA KARYA MANDIRI | 103,832,800 | 10.71 % | |||
89 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Jembatan Penyeberangan Orang Tugu Nol | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4268181 | 18829719 | 350,000,000 | 349,899,000 | 325,809,000 | 0 | 0 | 0 | 2019-02-28 16:00:00 | 01.249.265.8-731.000 | PT.KALSECO GRAHA | 24,191,000 | 6.91 % | |||
90 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Sungai Jati-Sungai Ulin-Matraman | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4269181 | 18829717 | 500,000,000 | 499,015,000 | 467,060,000 | 0 | 0 | 0 | 2019-03-04 16:00:00 | 72.116.516.5-731.000 | CV. EMPAT BELAS | 32,940,000 | 6.59 % | |||
91 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | DED Jalan Gunung Kupang-Kiram-Tambang Ulang dan Jalan Kiram-Gunung Mawar | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4270181 | 18829715 | 500,000,000 | 495,055,000 | 446,941,000 | 0 | 0 | 0 | 2019-02-27 16:00:00 | 03.268.848.3-444.000 | PT. Arenco Binatama | 53,059,000 | 10.61 % | |||
92 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Mentawakan-Mentewe | Tender | Pekerjaan Konstruksi | 4292181 | 18829695 | 31,555,080,000 | 31,555,079,999 | 30,133,983,482 | 30,109,250,000 | 0 | 0 | 2019-02-15 08:00:00 | 02.421.791.1-734.000 | pt hm family | 02.421.791.1-734.000 | pt hm family | 1,421,096,518 | 4.5 % | |
93 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Pile Slab Amuntai-Lampihong-Paringin (Longsoran) | Tender | Pekerjaan Konstruksi | 4305181 | 19906855 | 4,914,830,000 | 4,914,830,000 | 4,668,146,908 | 4,667,480,000 | 0 | 0 | 2019-03-01 15:00:00 | 75.885.417.8-735.000 | PT. Cahaya Sambang Sejahtera | 75.885.417.8-735.000 | PT. Cahaya Sambang Sejahtera | 246,683,092 | 5.02 % | |
94 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Gedung Pramuka | Tender | Pekerjaan Konstruksi | 4326181 | 19363965 | 2,329,700,000 | 2,328,929,003 | 1,791,425,009 | 1,791,425,000 | 0 | 0 | 2019-03-04 11:00:00 | 03.207.898.2-731.000 | CV. DWINA PUTRA MANDIRI | 03.207.898.2-731.000 | CV. DWINA PUTRA MANDIRI | 538,274,991 | 23.1 % | |
95 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengadaan dan Pemasangan Assesoris serta Mekanikal Elektrikal Jalur Distribusi Umum Banjarbakula lokasi Banjarbaru dan Kab. Tanah Laut | Tender | Pekerjaan Konstruksi | 4333181 | 18889480 | 3,242,375,000 | 3,241,375,478 | 3,134,758,380 | 2,963,980,000 | 0 | 0 | 2019-03-04 16:00:00 | 01.879.360.4-731.000 | PT. HIRAVEMINDO KARYA BERSAUDARA | 01.879.360.4-731.000 | PT. HIRAVEMINDO KARYA BERSAUDARA | 107,616,620 | 3.32 % | |
96 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Rumah Dinas dan Dapur Kediaman Gubernur Provinsi Kalimantan Selatan di Banjarmasin | Tender | Pekerjaan Konstruksi | 4334181 | 19363996 | 863,500,000 | 863,488,166 | 796,891,560 | 788,936,813 | 0 | 0 | 2019-03-04 11:00:00 | 02.362.068.5-731.000 | CV. BANGUN SELARAS | 02.362.068.5-731.000 | CV. BANGUN SELARAS | 66,608,440 | 7.71 % | |
97 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Gedung Samsat Amuntai | Tender | Pekerjaan Konstruksi | 4335181 | 19364010 | 7,633,800,000 | 7,622,105,568 | 7,398,214,487 | 7,398,214,000 | 0 | 0 | 2019-04-24 08:00:00 | 01.124.865.5-731.000 | PT. PARTNER KEMENANGAN | 01.124.865.5-731.000 | PT. PARTNER KEMENANGAN | 235,585,513 | 3.09 % | |
98 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Banjarbaru-Bati bati | Tender | Pekerjaan Konstruksi | 4340181 | 20258666 | 8,915,525,000 | 8,915,525,000 | 8,049,833,362 | 8,049,833,361 | 0 | 0 | 2019-03-01 15:00:00 | 31.704.295.0-732.000 | PT. KELANA MULTI KONSTRUKSI | 31.704.295.0-732.000 | PT. KELANA MULTI KONSTRUKSI | 865,691,638 | 9.71 % | |
99 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Normalisasi DAS Martapura | Tender | Pekerjaan Konstruksi | 4357181 | 19014568 | 1,875,500,000 | 1,875,491,948 | 1,329,617,003 | 1,329,617,003 | 0 | 0 | 2019-04-22 10:00:00 | 03.063.004.0-731.000 | CV.TITIAN MAS | 03.063.004.0-731.000 | CV.TITIAN MAS | 545,882,997 | 29.11 % | |
100 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Simpang 4 Gatot Subroto-Lingkar Dalam Selatan | Tender | Pekerjaan Konstruksi | 4368181 | 19045763 | 14,008,000,000 | 14,008,000,000 | 13,283,834,732 | 0 | 0 | 0 | 2019-03-04 10:00:00 | 72.196.664.6-731.000 | BIMO LAKSANA GROUP | 724,165,268 | 5.17 % | |||
101 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Matraman-Sei. Ulin (DAK) | Tender | Pekerjaan Konstruksi | 4392181 | 18829726 | 5,983,407,000 | 5,983,407,000 | 5,661,587,198 | 5,661,587,000 | 0 | 0 | 2019-03-20 08:00:00 | 02.303.665.0-731.000 | PT AGRABUDI JALAN BERDIKARI | 02.303.665.0-731.000 | PT AGRABUDI JALAN BERDIKARI | 321,819,802 | 5.38 % | |
102 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Alternatif Makam Syeh Arsyad Al Banjari | Tender | Pekerjaan Konstruksi | 4395181 | 18986203 | 18,608,000,000 | 18,608,000,000 | 17,551,060,000 | 17,551,060,000 | 0 | 0 | 2019-03-19 16:00:00 | 01.141.499.2-731.000 | PT. SALAMANDRA PETRAMUYA | 01.141.499.2-731.000 | PT. SALAMANDRA PETRAMUYA | 1,056,940,000 | 5.68 % | |
103 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Penyusunan DED SPALD Kawasan Perkantoran Prov Kalsel | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4410181 | 19368229 | 350,000,000 | 349,627,300 | 341,990,000 | 336,870,000 | 0 | 0 | 2019-03-27 22:00:00 | 02.173.702.8-652.001 | PT. WAHANA PRAKARSA UTAMA CABANG JATIM | 02.173.702.8-652.001 | PT. WAHANA PRAKARSA UTAMA CABANG JATIM | 8,010,000 | 2.29 % | |
104 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Kajian Lingkungan Pembangunan Tugu Pal Nol | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4413181 | 20519974 | 482,450,000 | 479,138,000 | 433,950,000 | 0 | 0 | 0 | 2019-03-27 22:00:00 | 02.108.378.7-429.000 | PT. Munasa Kreasi Nusantara | 48,500,000 | 10.05 % | |||
105 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Awang Bangkal-Temunih | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4417181 | 19800433 | 400,000,000 | 398,860,000 | 386,815,000 | 0 | 0 | 0 | 2019-03-27 07:00:00 | 01.517.846.0-731.000 | PT. WINAYA KONTEKS KHARISMA | 13,185,000 | 3.3 % | |||
106 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Pembangunan Jalan Temunih-Kodeco 58 | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4420181 | 19800926 | 400,000,000 | 398,860,000 | 391,132,500 | 0 | 0 | 0 | 2019-03-21 12:00:00 | 02.531.483.2-731.000 | MANDIRI cipta PRATAMA | 8,867,500 | 2.22 % | |||
107 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi / Renovasi Gedung Kantor Ramah Difabel | Tender | Pekerjaan Konstruksi | 4432181 | 19363973 | 444,150,000 | 437,806,160 | 357,484,859 | 357,484,000 | 0 | 0 | 2019-04-18 16:00:00 | 73.857.383.1-735.000 | CV. HARAPAN MASA | 73.857.383.1-735.000 | CV. HARAPAN MASA | 86,665,141 | 19.51 % | |
108 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Penyusunan Dokumen Outline Business Case Jalan Bebas Hambatan Banjarbaru-Batulicin | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4433181 | 19801311 | 2,496,250,000 | 2,489,025,000 | 2,238,500,000 | 0 | 0 | 0 | 2019-04-04 16:00:00 | 01.124.766.5-731.000 | PT.WIRA WIDYATAMA | 257,750,000 | 10.33 % | |||
109 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Review Desain Jalan Bebas Hambatan dan Akses Penunjang | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4447181 | 19801136 | 1,496,250,000 | 1,489,268,000 | 1,340,273,000 | 0 | 0 | 0 | 2019-04-08 20:00:00 | 01.534.629.9-731.000 | WIDYADAYA BANDARAN | 155,977,000 | 10.42 % | |||
110 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Prasarana Air Baku Sengayam Kabupaten Kotabaru | Tender | Pekerjaan Konstruksi | 4453181 | 19014553 | 1,500,000,000 | 1,499,938,498 | 1,363,104,731 | 1,339,557,953 | 0 | 0 | 2019-05-24 15:00:00 | 02.590.596.7-733.000 | CV. Putera Bayu Perdana | 02.590.596.7-733.000 | CV. Putera Bayu Perdana | 136,895,269 | 9.13 % | |
111 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Penyusunan Rencana Tata Ruang Kawasan Strategis Provinsi (RTR KSP) Kawasan Pegunungan Meratus | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4499181 | 21079890 | 851,830,000 | 851,675,000 | 764,830,000 | 764,775,000 | 0 | 0 | 2019-04-18 08:00:00 | 02.108.378.7-429.000 | PT. Munasa Kreasi Nusantara | 02.108.378.7-429.000 | PT. Munasa Kreasi Nusantara | 87,000,000 | 10.21 % | |
112 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Manual OP Daerah Irigasi Haruyan Dayak, Daerah Irigasi Kahakan, Daerah Irigasi Mangunang Kab. HST dan Daerah Irigasi Kinarum Kab. Tabalong | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4589181 | 19014532 | 200,000,000 | 199,991,000 | 191,840,000 | 189,420,000 | 0 | 0 | 2019-04-02 15:00:00 | 02.090.318.3-731.000 | CV. Inditec Consultant | 02.090.318.3-731.000 | CV. Inditec Consultant | 8,160,000 | 4.08 % | |
113 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Mesjid di Kawasan Perkantoran Pemprov. Kalsel (Konsultan Perencana) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4620181 | 19367793 | 727,250,000 | 721,314,000 | 577,857,500 | 511,440,000 | 0 | 0 | 2019-04-05 15:59:00 | 02.050.569.9-731.000 | CV. Dharma Cipta Pratama | 02.050.569.9-731.000 | CV. Dharma Cipta Pratama | 149,392,500 | 20.54 % | |
114 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Awang Bangkal-Temunih | Tender | Pekerjaan Konstruksi | 4625181 | 19800324 | 33,502,000,000 | 33,502,000,000 | 31,376,125,000 | 0 | 0 | 0 | 2019-04-23 08:00:00 | 03.018.059.0-732.000 | PTADHIEWANGOEN SEDAYA | 2,125,875,000 | 6.35 % | |||
115 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Temunih-Kodeco 58 | Tender | Pekerjaan Konstruksi | 4626181 | 19800799 | 33,615,080,000 | 33,502,078,691 | 31,717,571,000 | 31,607,650,000 | 0 | 0 | 2019-04-23 08:00:00 | 01.110.775.2-731.000 | SAHABAT BARU | 01.110.775.2-731.000 | SAHABAT BARU | 1,897,509,000 | 5.64 % | |
116 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengadaan dan Pemasangan Assesoris serta Mekanikal Elektrikal Jalur Distribusi Utama Banjarbakula lokasi Banjarbaru dan Kab. Tanah Laut (Konsultan Pengawas) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4641181 | 19038528 | 182,700,000 | 182,700,000 | 178,112,000 | 166,832,499 | 0 | 0 | 2019-04-10 09:00:00 | 02.172.574.2-731.000 | CV. ANDALUSIA | 02.172.574.2-731.000 | CV. ANDALUSIA | 4,588,000 | 2.51 % | |
117 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jembatan Sungai Temunih dan Sungai Kusan | Tender | Pekerjaan Konstruksi | 4649181 | 18984775 | 38,505,080,000 | 36,504,975,720 | 34,577,517,655 | 34,577,517,000 | 0 | 0 | 2019-04-23 14:00:00 | 01.124.402.7-731.000 | PT. HASRAT JAYA UTAMA | 01.124.402.7-731.000 | PT. HASRAT JAYA UTAMA | 3,927,562,345 | 10.2 % | |
118 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jembatan Banjarmasin-Martapura | Tender | Pekerjaan Konstruksi | 4652181 | 18816138 | 19,508,000,000 | 19,508,000,000 | 18,661,138,000 | 18,661,138,000 | 0 | 0 | 2019-04-23 08:00:00 | 31.635.224.4-731.000 | PT. MULTI USAHA PEMBANGUNAN | 31.635.224.4-731.000 | PT. MULTI USAHA PEMBANGUNAN | 846,862,000 | 4.34 % | |
119 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Supervisi Pembangunan Prasarana Air Baku Sengayam Kabupaten Kotabaru | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4660181 | 19014543 | 300,000,000 | 299,970,000 | 261,778,000 | 256,140,500 | 0 | 0 | 2019-05-22 16:00:00 | 95.412.417.8-731.000 | PT. Prisma Jasa Konsulindo | 95.412.417.8-731.000 | PT. Prisma Jasa Konsulindo | 38,222,000 | 12.74 % | |
120 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Penyusunan RTBL Tugu Pal Nol | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4746181 | 20505540 | 258,000,000 | 257,658,500 | 227,810,000 | 212,520,000 | 0 | 0 | 2019-04-22 16:00:00 | 01.548.564.2-424.000 | PT. Belaputera Interplan | 01.548.564.2-424.000 | PT. Belaputera Interplan | 30,190,000 | 11.7 % | |
121 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Mesjid Bambu (DED) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4851181 | 19364052 | 900,650,000 | 900,504,000 | 868,066,100 | 863,110,000 | 0 | 0 | 2019-05-03 12:00:00 | 70.095.576.8-643.000 | PT. SIGMA REKATAMA CONSULINDO | 70.095.576.8-643.000 | PT. SIGMA REKATAMA CONSULINDO | 32,583,900 | 3.62 % | |
122 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Supervisi Pembangunan Jaringan Daerah Irigasi Kinarum 1.004 Ha Kabupaten Tabalong | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4856181 | 19014454 | 1,000,000,000 | 782,485,000 | 900,021,100 | 747,740,000 | 0 | 0 | 2019-05-04 00:00:00 | 02.172.574.2-731.000 | CV. ANDALUSIA | 02.172.574.2-731.000 | CV. ANDALUSIA | 99,978,900 | 10 % | |
123 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehab Gedung Legiun Veteran RI Kalsel dan Sarana Prasarananya di Banjarmasin | Tender | Pekerjaan Konstruksi | 4868181 | 19364022 | 1,473,250,000 | 1,432,467,335 | 1,094,586,390 | 1,094,586,000 | 0 | 0 | 2019-05-09 09:50:00 | 01.879.339.8-731.000 | CV. HARAPAN BARU | 01.879.339.8-731.000 | CV. HARAPAN BARU | 378,663,610 | 25.7 % | |
124 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pemeliharaan Berkala Saluran Pembuang Daerah Irigasi Haruyan Dayak Kabupaten HST | Tender | Pekerjaan Konstruksi | 5043181 | 19014617 | 1,500,000,000 | 1,499,945,636 | 1,099,949,056 | 1,099,949,056 | 0 | 0 | 2019-05-22 09:00:00 | 02.019.157.3-733.000 | SAHABAT KARYA.CV | 02.019.157.3-733.000 | SAHABAT KARYA.CV | 400,050,944 | 26.67 % | |
125 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Galeri di Mess Billiton dan di Anjungan Kalsel TMII Jakarta | Tender | Pekerjaan Konstruksi | 5250181 | 19364048 | 1,501,850,000 | 1,500,998,844 | 1,454,471,775 | 1,454,471,000 | 0 | 0 | 2019-06-27 18:00:00 | 02.362.068.5-731.000 | CV. BANGUN SELARAS | 02.362.068.5-731.000 | CV. BANGUN SELARAS | 47,378,225 | 3.15 % | |
126 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Galeri di Mess Billiton dan di Anjungan Kalsel TMII Jakarta (Konsultan Pengawas) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 5251181 | 19364050 | 137,000,000 | 136,917,000 | 116,710,000 | 113,850,000 | 0 | 0 | 2019-06-27 15:00:00 | 01.860.230.0-731.000 | CV PRAKTIRA KONSULTAN | 01.860.230.0-731.000 | CV PRAKTIRA KONSULTAN | 20,290,000 | 14.81 % | |
127 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Perencanaan Pembentukan BLUD SPAM Regional Banjarbakula | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 5360181 | 21701572 | 910,000,000 | 368,850,900 | 334,675,000 | 324,500,000 | 0 | 0 | 2019-06-28 16:00:00 | 02.108.378.7-429.000 | PT. Munasa Kreasi Nusantara | 02.108.378.7-429.000 | PT. Munasa Kreasi Nusantara | 575,325,000 | 63.22 % | |
128 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Review FS dan DED SPAM Regional Kalsel Banjarbakula | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 5361181 | 21701571 | 400,000,000 | 399,943,500 | 398,684,000 | 376,400,000 | 0 | 0 | 2019-06-28 18:00:00 | 02.185.071.4-061.000 | PT. PRAKARINDO BUANA | 02.185.071.4-061.000 | PT. PRAKARINDO BUANA | 1,316,000 | 0.33 % | |
129 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Mako Brimob | Tender | Pekerjaan Konstruksi | 5469181 | 19368884 | 844,000,000 | 841,066,941 | 814,713,839 | 0 | 0 | 0 | 2019-08-19 12:00:00 | 72.694.383.0-731.000 | CV. SAID KARYA KONSTRUKSI | 29,286,161 | 3.47 % | |||
130 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Penyusunan DED Rehab Kantor Gubernur di Banjarmasin dan Penyelesaian Sarana penunjangnya | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 5687181 | 21914666 | 180,625,000 | 180,092,000 | 151,800,000 | 0 | 0 | 0 | 2019-08-29 15:00:00 | 01.860.272.2-731.000 | CV. DAYAKARSA MADYA Consultant | 28,825,000 | 15.96 % | |||
131 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Barabai - Pagat | Tender | Pekerjaan Konstruksi | 5816181 | 21949737 | 2,855,150,000 | 2,855,149,279 | 2,681,072,543 | 2,681,072,543 | 0 | 0 | 2019-09-23 12:00:00 | 02.342.802.2-735.000 | CV. SANGGA BANUA | 02.342.802.2-735.000 | CV. SANGGA BANUA | 174,077,457 | 6.1 % | |
132 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Angsana | Tender | Pekerjaan Konstruksi | 5855181 | 21950421 | 1,857,650,000 | 1,857,649,992 | 1,783,132,596 | 0 | 0 | 0 | 2019-09-27 13:00:00 | 91.744.784.9-734.000 | Indo Tama Jaya | 74,517,404 | 4.01 % | |||
133 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Tanjung Serdang - Lontar | Tender | Pekerjaan Konstruksi | 5858181 | 21950232 | 4,855,150,000 | 4,854,385,302 | 4,709,822,955 | 0 | 0 | 0 | 2019-10-01 15:00:00 | 91.744.784.9-734.000 | Indo Tama Jaya | 145,327,045 | 2.99 % | |||
134 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Pelaihari - Takisung & Peningkatan Jalan Pelaihari - Batakan | Tender | Pekerjaan Konstruksi | 5860181 | 21950037 | 4,855,150,000 | 4,855,149,990 | 4,756,029,557 | 0 | 0 | 0 | 2019-09-26 14:00:00 | 02.521.809.0-732.000 | cv. andhika karya | 99,120,443 | 2.04 % | |||
135 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan TPA Regional | Tender | Pekerjaan Konstruksi | 5864181 | 22065235 | 9,378,525,000 | 9,378,524,828 | 8,867,385,300 | 8,508,353,000 | 0 | 0 | 2019-09-26 14:00:00 | 02.431.111.0-731.000 | CV. NAHAP | 02.431.111.0-731.000 | CV. NAHAP | 511,139,700 | 5.45 % | |
136 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Gunung Mawar - Gunung Coklat | Tender | Pekerjaan Konstruksi | 5865181 | 21948067 | 4,880,750,000 | 4,879,813,303 | 4,632,406,588 | 4,579,795,000 | 0 | 0 | 2019-09-27 15:30:00 | 02.243.078.9-732.000 | PT. Indah Perkasa Konstruksi | 02.243.078.9-732.000 | PT. Indah Perkasa Konstruksi | 248,343,413 | 5.09 % | |
137 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Galam Rabah | Tender | Pekerjaan Konstruksi | 5866181 | 22066804 | 2,857,650,000 | 2,856,992,588 | 2,657,731,729 | 0 | 0 | 0 | 2019-09-27 17:00:00 | 84.697.060.6-731.000 | PT. Wassenar Karya Marga | 199,918,271 | 7 % | |||
138 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Mandiangin - Puncak Kolam | Tender | Pekerjaan Konstruksi | 5884181 | 22065121 | 5,878,525,000 | 5,877,900,071 | 5,580,753,600 | 5,566,127,363 | 0 | 0 | 2019-09-26 18:00:00 | 01.124.690.7-732.000 | AMARTA JAYA TEHNIK | 01.124.690.7-732.000 | AMARTA JAYA TEHNIK | 297,771,400 | 5.07 % | |
139 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Kasturi - Jalan Akses Bandara - Jalan Lingkar Utara Banjarbaru (Paket II) Lanjutan | Tender | Pekerjaan Konstruksi | 5901181 | 21947701 | 19,871,000,000 | 19,871,000,000 | 18,762,730,524 | 0 | 0 | 0 | 2019-09-27 15:30:00 | 01.124.946.3-731.000 | PT. ADIMANUNGGAL CIPTA PADUNUSA | 1,108,269,476 | 5.58 % | |||
140 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Lingkungan Kawasan Kebun Raya Banua | Tender | Pekerjaan Konstruksi | 5914181 | 22058489 | 4,658,700,000 | 4,658,668,539 | 4,329,548,144 | 4,306,436,712 | 0 | 0 | 2019-09-26 14:00:00 | 01.203.944.2-732.000 | CV. Sari Alam Utama | 01.203.944.2-732.000 | CV. Sari Alam Utama | 329,151,856 | 7.07 % | |
141 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Paving di Miniatur Hutan Hujan Tropis | Tender | Pekerjaan Konstruksi | 5915181 | 22058492 | 1,857,200,000 | 1,367,125,517 | 1,134,733,725 | 1,134,733,725 | 0 | 0 | 2019-09-25 22:10:00 | 01.907.984.1-735.000 | cv.sinar harapan | 01.907.984.1-735.000 | cv.sinar harapan | 722,466,275 | 38.9 % | |
142 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Penataan Halaman Gedung Sultan Suriansyah di Banjarmasin | Tender | Pekerjaan Konstruksi | 5917181 | 22100428 | 1,849,200,000 | 1,093,071,308 | 1,067,153,440 | 1,028,846,000 | 0 | 0 | 2019-09-26 10:00:00 | 02.242.653.0-732.000 | CV. 313 | 02.242.653.0-732.000 | CV. 313 | 782,046,560 | 42.29 % | |
143 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Lanjutan Pembangunan Toilet Pria Mesjid Raya Sabilal Muhtadin di Banjarmasin | Tender | Pekerjaan Konstruksi | 5918181 | 22058481 | 810,250,000 | 809,062,812 | 703,312,291 | 645,620,000 | 0 | 0 | 2019-09-30 08:00:00 | 02.708.648.7-731.000 | CV. SUBUR MAKMUR KARYA BERSAMA | 02.708.648.7-731.000 | CV. SUBUR MAKMUR KARYA BERSAMA | 106,937,709 | 13.2 % | |
144 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Survei Investigasi Pondok Pasantren Darussalam Kabupaten Banjar | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 5969181 | 22136969 | 350,000,000 | 349,999,980 | 323,660,700 | 323,660,700 | 0 | 0 | 2019-10-09 09:00:00 | 02.809.318.5-711.000 | CV. TIKA KREATIF DESAIN KONSULTAN | 02.809.318.5-711.000 | CV. TIKA KREATIF DESAIN KONSULTAN | 26,339,300 | 7.53 % | |
145 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Mako Brimob | Tender | Pekerjaan Konstruksi | 6003181 | 19368884 | 844,000,000 | 691,742,017 | 682,867,804 | 682,204,000 | 0 | 0 | 2019-10-09 10:00:00 | 71.378.880.0-733.000 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | CV. GLOBAL MITRA KARYA | 161,132,196 | 19.09 % | |
146 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jembatan Banjarmasin - Martapura (Lanjutan) | Tender | Pekerjaan Konstruksi | 6054181 | 21947818 | 2,883,250,000 | 2,883,234,784 | 2,824,583,471 | 0 | 0 | 0 | 2019-10-08 21:00:00 | 80.777.350.2-731.000 | CV. TRI HIDAYAH | 58,666,529 | 2.03 % | |||
147 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan KM 45 - KM 52 (Ruas Lumpangi - Batulicin) | Tender | Pekerjaan Konstruksi | 6062181 | 21950173 | 40,945,400,000 | 40,945,395,325 | 38,651,265,596 | 0 | 0 | 0 | 2019-10-11 11:00:00 | 03.169.298.1-734.000 | PT.BATULICIN BETON ASPHALT | 2,294,134,404 | 5.6 % | |||
148 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Jalan Batulicin - Mentawakan (KM 4 - KM 10) (Lanjutan) | Tender | Pekerjaan Konstruksi | 6075181 | 22065358 | 9,852,925,000 | 9,852,911,071 | 9,194,701,010 | 0 | 0 | 0 | 2019-10-11 11:00:00 | 01.222.215.4-734.000 | CV. Dewi Indah | 658,223,990 | 6.68 % | |||
149 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Paramasan dan Angkipih Atas - Paramasan Bawah | Tender | Pekerjaan Konstruksi | 6126181 | 21947979 | 4,855,150,000 | 4,852,970,830 | 4,682,129,348 | 0 | 0 | 0 | 2019-10-18 12:00:00 | 02.489.989.0-731.000 | CV. SETIAWAN NOOR | 173,020,652 | 3.56 % | |||
150 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Wisata Goa Liang Bangkai | Tender | Pekerjaan Konstruksi | 6179181 | 22318024 | 4,855,150,000 | 4,855,146,372 | 4,622,472,457 | 0 | 0 | 0 | 2019-10-24 15:00:00 | 01.222.215.4-734.000 | CV. Dewi Indah | 232,677,543 | 4.79 % | |||
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Pagu | HPS | Nilai Penawaran | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |