Tahun Anggaran

img
Paket

951

img
Pagu

201.477.000.781

img
Silpa

18.248.491.767

img
Penawaran

183.228.509.014

Progress Non Tender
Semua Belum e-Kontrak Belum Penilaian Kinerja Selesai
Jenis Jumlah Paket Total Pagu Jumlah Paket Total Pagu Jumlah Paket Total Pagu Jumlah Paket Total Pagu
Pengadaan Langsung 893 96.991.766.419 203 23.991.670.179 893 96.991.766.419 0 0
Penunjukan Langsung 58 104.485.234.362 38 102.221.046.862 58 104.485.234.362 0 0
Total 951 201.477.000.781 241 126.212.717.041 951 201.477.000.781 0 0
Persentase 25.34 % 100 % 0 %
Metode Pemilihan
Pengadan Langsung
Penunjukkan Langsung
93.9%6.1%
Non Tender Perbulan
2002001801801601601401401201201001008080606040402020002637581011141296410619712413January 2019January 2019February 2019February 2019March 2019March 2019April 2019April 2019May 2019May 2019June 2019June 2019July 2019July 2019August 2019August 2019September 2019September 2019October 2019October 2019November 2019November 2019December 2019December 2019
Download SVG
Download PNG
Download CSV
NoTahun AnggaranNama SatkerNama PaketMetode PemilihanJenis PengadaanKode Non TenderKode RUPSumber DanaPaguHPSNilai PenawaranNilai TerkoreksiNilai NegosiasiNilai KontrakNilai PDN KontrakNilai UMK KontrakTanggal Pengumuman Non TenderTanggal Selesai Non TenderNPWP Penyedia Pemenang Non TenderNama Penyedia Pemenang Non TenderSisa Selisih Pagu (silpa)Persentase SilpaNilai Kinerja Penyedia
1 2019 TAMAN HUTAN RAYA SULTAN ADAM Pengawas Jalan Desa Wisata Belangian Pengadaan Langsung Jasa Konsultansi Badan Usaha Non Konstruksi 4307181 19754822 APBD 87,500,000 86,625,000 85,569,000 85,569,000 85,569,000 85,569,000 85,569,000 85,569,000 2019-02-20 2019-03-09 cv.airlangga konsultan 03.122.016.3-732.000 1,931,000 2.21 % 2.8
2 2019 TAMAN HUTAN RAYA SULTAN ADAM Pengawas Jalan Desa Wisata Belangian Pengadaan Langsung Jasa Konsultansi Badan Usaha Non Konstruksi 4307181 19754822 APBD 87,500,000 86,625,000 85,569,000 85,569,000 85,569,000 85,569,000 0 0 2019-02-20 2019-03-09 cv.airlangga konsultan 03.122.016.3-732.000 1,931,000 2.21 % 2.8
3 2019 TAMAN HUTAN RAYA SULTAN ADAM Konsultan Pengawas Pembuatan Tracking (Lanjutan) Pengadaan Langsung Jasa Konsultansi Badan Usaha Non Konstruksi 4140181 19753772 APBD 92,000,000 91,999,875 91,850,000 91,850,000 91,850,000 91,850,000 0 0 2019-01-28 2019-03-05 CV. DIGDAYA MAHARDIKA 03.242.995.3-731.000 150,000 0.16 %
4 2019 TAMAN HUTAN RAYA SULTAN ADAM Konsultan Pengawas Pembuatan Tracking (Lanjutan) Pengadaan Langsung Jasa Konsultansi Badan Usaha Non Konstruksi 4140181 19753772 APBD 92,000,000 91,999,875 91,850,000 91,850,000 91,850,000 91,850,000 0 0 2019-01-28 2019-03-05 CV. DIGDAYA MAHARDIKA 03.242.995.3-731.000 150,000 0.16 %
5 2019 TAMAN HUTAN RAYA SULTAN ADAM Konsultan Pengawas Restorasi Pesanggrahan/ Situs Pengadaan Langsung Jasa Konsultansi Badan Usaha Non Konstruksi 4164181 19755400 APBD 90,000,000 89,925,000 80,850,000 80,850,000 80,850,000 0 0 0 2019-03-04 2019-04-04 SADWA RAMA CONSULTANT 03.025.627.5-731.000 9,150,000 10.17 %
6 2019 PANTI REHABILITASI SOSIAL PENYANDANG DISABILITAS ISKAYA BANARAN KONSULTAN PERENCANA REHAB BANGUNAN KANTOR Pengadaan Langsung Jasa Konsultansi Badan Usaha Non Konstruksi 4184181 19820116 APBD 20,698,300 20,680,000 20,415,450 20,415,450 20,415,450 20,415,450 0 0 2019-03-22 2019-04-15 CV. WINAKO GRAHA 01.907.825.2-732.000 282,850 1.37 %
7 2019 PANTI REHABILITASI SOSIAL PENYANDANG DISABILITAS ISKAYA BANARAN KONSULTAN PERENCANA REHAB BANGUNAN KANTOR Pengadaan Langsung Jasa Konsultansi Badan Usaha Non Konstruksi 4184181 19820116 APBD 20,698,300 20,680,000 20,415,450 20,415,450 20,415,450 20,415,450 0 0 2019-03-22 2019-04-15 CV. WINAKO GRAHA 01.907.825.2-732.000 282,850 1.37 %
8 2019 DINAS KEHUTANAN Perencanaan Pembangunan Jaringan Penyiraman Tanaman Pengadaan Langsung Jasa Konsultansi Badan Usaha Non Konstruksi 4302181 19948703 APBD 15,000,000 14,999,875 14,934,700 14,934,700 14,934,700 14,934,700 0 0 2019-03-06 2019-03-26 CV. EMPAT BELAS 72.116.516.5-731.000 65,300 0.44 %
9 2019 DINAS KEHUTANAN Perencanaan Pembangunan Jaringan Penyiraman Tanaman Pengadaan Langsung Jasa Konsultansi Badan Usaha Non Konstruksi 4302181 19948703 APBD 15,000,000 14,999,875 14,934,700 14,934,700 14,934,700 14,934,700 0 0 2019-03-06 2019-03-26 CV. EMPAT BELAS 72.116.516.5-731.000 65,300 0.44 %
10 2019 PANTI PERLINDUNGAN DAN REHABILITASI SOSIAL LANJUT USIA BUDI SEJAHTERA Belanja Modal Pengadaan Komputer Note Book Pengadaan Langsung Pengadaan Barang 4303181 19976096 APBD 40,000,000 39,820,000 39,917,007 39,815,600 39,815,600 39,815,600 0 0 2019-02-27 2019-03-06 CV ARRASY 03.094.013.4-732.000 82,993 0.21 %
Showing 1 to 10 of 951 entries
NoTahun AnggaranNama SatkerNama PaketMetode PemilihanJenis PengadaanKode Non TenderKode RUPPaguHPSNilai PenawaranNilai TerkoreksiNilai NegosiasiNilai KontrakNilai PDN KontrakNilai UMK KontrakTanggal Pengumuman Non TenderNPWP Penyedia Pemenang Non TenderNama Penyedia Pemenang Non TenderSisa Selisih Pagu (silpa)Persentase SilpaNilai Kinerja Penyedia
1 2019 TAMAN HUTAN RAYA SULTAN ADAM Pengawas Jalan Desa Wisata Belangian Pengadaan Langsung Jasa Konsultansi Badan Usaha Non Konstruksi 4307181 19754822 87,500,000 86,625,000 85,569,000 85,569,000 85,569,000 85,569,000 85,569,000 85,569,000 2019-02-20 cv.airlangga konsultan 03.122.016.3-732.000 1,931,000 2.21 % 2.8
2 2019 TAMAN HUTAN RAYA SULTAN ADAM Pengawas Jalan Desa Wisata Belangian Pengadaan Langsung Jasa Konsultansi Badan Usaha Non Konstruksi 4307181 19754822 87,500,000 86,625,000 85,569,000 85,569,000 85,569,000 85,569,000 0 0 2019-02-20 cv.airlangga konsultan 03.122.016.3-732.000 1,931,000 2.21 % 2.8
3 2019 TAMAN HUTAN RAYA SULTAN ADAM Konsultan Pengawas Pembuatan Tracking (Lanjutan) Pengadaan Langsung Jasa Konsultansi Badan Usaha Non Konstruksi 4140181 19753772 92,000,000 91,999,875 91,850,000 91,850,000 91,850,000 91,850,000 0 0 2019-01-28 CV. DIGDAYA MAHARDIKA 03.242.995.3-731.000 150,000 0.16 %
4 2019 TAMAN HUTAN RAYA SULTAN ADAM Konsultan Pengawas Pembuatan Tracking (Lanjutan) Pengadaan Langsung Jasa Konsultansi Badan Usaha Non Konstruksi 4140181 19753772 92,000,000 91,999,875 91,850,000 91,850,000 91,850,000 91,850,000 0 0 2019-01-28 CV. DIGDAYA MAHARDIKA 03.242.995.3-731.000 150,000 0.16 %
5 2019 TAMAN HUTAN RAYA SULTAN ADAM Konsultan Pengawas Restorasi Pesanggrahan/ Situs Pengadaan Langsung Jasa Konsultansi Badan Usaha Non Konstruksi 4164181 19755400 90,000,000 89,925,000 80,850,000 80,850,000 80,850,000 0 0 0 2019-03-04 SADWA RAMA CONSULTANT 03.025.627.5-731.000 9,150,000 10.17 %
6 2019 PANTI REHABILITASI SOSIAL PENYANDANG DISABILITAS ISKAYA BANARAN KONSULTAN PERENCANA REHAB BANGUNAN KANTOR Pengadaan Langsung Jasa Konsultansi Badan Usaha Non Konstruksi 4184181 19820116 20,698,300 20,680,000 20,415,450 20,415,450 20,415,450 20,415,450 0 0 2019-03-22 CV. WINAKO GRAHA 01.907.825.2-732.000 282,850 1.37 %
7 2019 PANTI REHABILITASI SOSIAL PENYANDANG DISABILITAS ISKAYA BANARAN KONSULTAN PERENCANA REHAB BANGUNAN KANTOR Pengadaan Langsung Jasa Konsultansi Badan Usaha Non Konstruksi 4184181 19820116 20,698,300 20,680,000 20,415,450 20,415,450 20,415,450 20,415,450 0 0 2019-03-22 CV. WINAKO GRAHA 01.907.825.2-732.000 282,850 1.37 %
8 2019 DINAS KEHUTANAN Perencanaan Pembangunan Jaringan Penyiraman Tanaman Pengadaan Langsung Jasa Konsultansi Badan Usaha Non Konstruksi 4302181 19948703 15,000,000 14,999,875 14,934,700 14,934,700 14,934,700 14,934,700 0 0 2019-03-06 CV. EMPAT BELAS 72.116.516.5-731.000 65,300 0.44 %
9 2019 DINAS KEHUTANAN Perencanaan Pembangunan Jaringan Penyiraman Tanaman Pengadaan Langsung Jasa Konsultansi Badan Usaha Non Konstruksi 4302181 19948703 15,000,000 14,999,875 14,934,700 14,934,700 14,934,700 14,934,700 0 0 2019-03-06 CV. EMPAT BELAS 72.116.516.5-731.000 65,300 0.44 %
10 2019 PANTI PERLINDUNGAN DAN REHABILITASI SOSIAL LANJUT USIA BUDI SEJAHTERA Belanja Modal Pengadaan Komputer Note Book Pengadaan Langsung Pengadaan Barang 4303181 19976096 40,000,000 39,820,000 39,917,007 39,815,600 39,815,600 39,815,600 0 0 2019-02-27 CV ARRASY 03.094.013.4-732.000 82,993 0.21 %
Showing 1 to 10 of 893 entries
NoTahun AnggaranNama SatkerNama PaketMetode PemilihanJenis PengadaanKode Non TenderKode RUPPaguHPSNilai PenawaranNilai TerkoreksiNilai NegosiasiNilai KontrakNilai PDN KontrakNilai UMK KontrakTanggal Pengumuman Non TenderNPWP Penyedia Pemenang Non TenderNama Penyedia Pemenang Non TenderSisa Selisih Pagu (silpa)Persentase SilpaNilai Kinerja Penyedia
1 2019 DINAS PERTANIAN DAN KETAHANAN PANGAN Pengadaan Penangkaran Bawang Merah ( Kab.Tapin ) Penunjukan Langsung Pengadaan Barang 4498181 21040212 104,300,000 103,916,040 103,803,000 103,803,000 103,803,000 0 0 0 2019-04-08 CV. LULA KARYA 02.237.071.2-732.000 497,000 0.48 %
2 2019 DINAS PERTANIAN DAN KETAHANAN PANGAN Pengadaan Penangkaran Bawang Merah ( Kab.Tanah Laut ) Penunjukan Langsung Pengadaan Barang 4514181 21040137 104,300,000 103,916,040 103,518,100 103,518,100 103,518,100 0 0 0 2019-04-08 CV.RESAGRI JAYA 02.753.642.4-732.000 781,900 0.75 %
3 2019 DINAS PERTANIAN DAN KETAHANAN PANGAN Pengadaan Penangkaran Bawang Merah ( Kab.Tabalong ) Penunjukan Langsung Pengadaan Barang 4515181 21039932 104,300,000 103,916,040 103,648,000 103,648,000 103,648,000 0 0 0 2019-04-08 CV. Rizki Banua Borneo 70.057.665.5-732.000 652,000 0.63 %
4 2019 DINAS PERTANIAN DAN KETAHANAN PANGAN Pengadaan Penangkaran Bawang Merah ( Kab.Batola ) Penunjukan Langsung Pengadaan Barang 4516181 21039688 104,300,000 103,916,040 103,544,600 103,544,600 103,544,600 0 0 0 2019-04-08 cv. agri resta jaya 03.094.032.4-732.000 755,400 0.72 %
5 2019 BADAN PENGELOLAAN KEUANGAN DAN ASET DAERAH Rehabilitasi Ruang Samsat Corner UPPD Banjarmasin I Penunjukan Langsung Pekerjaan Konstruksi 4878181 19436318 200,000,000 167,940,891 167,900,490 167,900,490 167,900,490 167,900,000 0 0 2019-05-07 CV. ADHI KARYA MANDIRI 31.725.819.2-731.000 32,099,510 16.05 %
6 2019 BADAN PENGELOLAAN KEUANGAN DAN ASET DAERAH Rehabilitasi Ruang Samsat Corner UPPD Banjarmasin I Penunjukan Langsung Pekerjaan Konstruksi 4878181 19436318 200,000,000 167,940,891 167,900,490 167,900,490 167,900,490 167,900,000 0 0 2019-05-07 CV. ADHI KARYA MANDIRI 31.725.819.2-731.000 32,099,510 16.05 %
7 2019 BALAI BENIH TANAMAN PANGAN DAN HORTIKULTURA Perencanaan Pembuatan Pagar Pembatas,Perencanaan Pembuatan Pagar Pembatas UPB Batu Tungku,Perencanaan Pembuatan Pagar Batas di UPB Padi Binuang Penunjukan Langsung Jasa Konsultansi Badan Usaha Non Konstruksi 5168181 19968662;19968766;21641737 15,000,000 14,950,100 14,850,275 14,850,275 14,850,275 14,850,275 0 0 2019-06-13 CV. RISCON SULTARINDO 02.361.853.1-731.000 149,725 1 %
8 2019 BALAI BENIH TANAMAN PANGAN DAN HORTIKULTURA Perencanaan Pembuatan Pagar Pembatas,Perencanaan Pembuatan Pagar Pembatas UPB Batu Tungku,Perencanaan Pembuatan Pagar Batas di UPB Padi Binuang Penunjukan Langsung Jasa Konsultansi Badan Usaha Non Konstruksi 5168181 19968662;19968766;21641737 15,000,000 14,950,100 14,850,275 14,850,275 14,850,275 14,850,275 0 0 2019-06-13 CV. RISCON SULTARINDO 02.361.853.1-731.000 149,725 1 %
9 2019 BADAN PENGELOLAAN KEUANGAN DAN ASET DAERAH Penataan Halaman Kantor UPPD Samsat Tanjung Penunjukan Langsung Pekerjaan Konstruksi 5241181 21694132 172,000,000 169,000,882 168,441,519 168,441,519 168,441,519 0 0 0 2019-06-18 cv. afmi bersaudara 03.266.032.6-731.000 3,558,481 2.07 %
10 2019 BADAN PENGELOLAAN KEUANGAN DAN ASET DAERAH Pengerasan Jalan Masuk dan Keluar Kantor UPPD Samsat Tanjung Penunjukan Langsung Pekerjaan Konstruksi 5244181 21694182 180,600,000 177,450,244 176,811,593 176,811,593 176,811,593 0 0 0 2019-06-18 CV. CHAI CHEL 03.063.051.1-731.000 3,788,407 2.1 %
Showing 1 to 10 of 58 entries
Sumber data isb.lkpp.go.id penarikan tanggal 2024-11-08 07:34:36
Settings
  • Theme Mode

    Choose light or dark mode or Auto

  • Sidebar Theme

    Choose Sidebar Theme

  • Accent color

    Choose your primary theme color

  • Sidebar Caption

    Sidebar Caption Hide/Show

  • Theme Layout

    LTR/RTL

  • Layout Width

    Choose Full or Container Layout